SANITARY SEWER FLOW MONITORING

AND INFLOW / INFILTRATION STUDY

City of Ukiah

June 2010

Page 2: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 2/233

 

FLOW MONITORING AND

INFLOW / INFILTRATION STUDY

Prepared for

Prepared by

June 2010

Page 3: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 3/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 TOC - i

TABLE OF CONTENTS

EXECUTIVE SUMMARY........................................................................................................................ 1 

INTRODUCTION .................................................................................................................................... 5 

METHODS AND PROCEDURES........................................................................................................... 7 

Confined Space Entry ......................................................................................................................... 7 

Flow Meter Installation ........................................................................................................................ 8 

RAINFALL RESULTS............................................................................................................................. 9 

Rain Gauge Triangulation ................................................................................................................. 10 

STORM EVENT CLASSIFICATION ..................................................................................................... 12 

FLOW MONITORING RESULTS SUMMARY...................................................................................... 15 

Average Dry Weather Flows ............................................................................................................. 15 

Inflow / Infiltration: General Methods ................................................................................................ 17 

Graphical Identification of I&I Components................................................................................... 19 

Analysis Techniques ..................................................................................................................... 19 

Inflow Analysis .................................................................................................................................. 22 GWI (Groundwater Infiltration) Analysis ...........................................................................................25 

RDI (Rain Dependent Infiltration) Analysis ....................................................................................... 27 

Combined I&I Analysis...................................................................................................................... 30 

Pipeline Capacity Analysis................................................................................................................ 33 

SYNTHETIC HYDROGRAPHS ............................................................................................................ 35 

Design Storm ....................................................................................................................................36 

RECOMMENDATIONS ........................................................................................................................38 

TABLES

Table 1. Flow Monitoring and I&I Results Summary .............................................................................. 1 

Table 2. List of Flow Monitoring and Rainfall Monitoring Sites .............................................................. 5 

Table 3. IDW Method (Sample) ............................................................................................................ 11 

Table 4. Rain Gauge Distribution by Basin ..........................................................................................11 

Table 5. Peak Measured Rainfall Densities per Hourly Period ............................................................ 13 

Table 6. Rain Event Classification per Rain Gauge ............................................................................. 14 

Table 7. Dry Weather Flow Summary ..................................................................................................16 

Table 8. Inflow Analysis Summary .......................................................................................................22 

Table 9. Excess Groundwater Infiltration Rates above Typical Rate ................................................... 26 

Table 10. Infiltration Analysis Summary ............................................................................................... 27 

Table 11. Combined I&I Analysis Summary......................................................................................... 30 

Table 12. Capacity Analysis Summary................................................................................................. 33 Table 13. 10-Year, 10-Day Design Storm Data Summary ................................................................... 37 

FIGURES

Figure 1. Inflow Rankings Temperature Map ........................................................................................ 2 

Figure 2. RDI Rankings Temperature Map ...........................................................................................3 

Page 4: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 4/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 TOC - ii

Figure 3. City of Ukiah Flow and Rain Monitoring Locations ................................................................6 

Figure 4. Typical Flow Meter Installation ............................................................................................... 8 

Figure 5. Rainfall Activity over Flow Monitoring Period ......................................................................... 9 

Figure 6. Rainfall Accumulation Plots.................................................................................................... 9 

Figure 7. Rainfall Inverse Distance Weighting Method ....................................................................... 10 

Figure 8. NOAA Northern California Rainfall Frequency Map............................................................. 12 Figure 9. Ukiah Rain Event Frequency Map .......................................................................................13 

Figure 10. Ukiah Storm Event Classification: Rain Gauge West ........................................................ 14 

Figure 11. Site 1: Average Dry Weather Flow..................................................................................... 15 

Figure 12. Typical Sources of Infiltration and Inflow............................................................................ 18 

Figure 13. Inflow / Infiltration Graphical Response Patterns ............................................................... 19 

Figure 14. I&I Flow Graph for Basin 4 ................................................................................................. 21 

Figure 15. Inflow Indicator Bar Graphs................................................................................................ 23 

Figure 16. Inflow Rankings Temperature Map .................................................................................... 24 

Figure 17. Groundwater Infiltration Sample Figure ............................................................................. 25 

Figure 18. Peak and Minimum Flow Ratios vs. ADWF ....................................................................... 26 

Figure 19. RDI Indicator Bar Graphs ................................................................................................... 28 Figure 20. RDI Rankings Temperature Map .......................................................................................29 

Figure 21. Combined I&I Indicator Bar Graphs ................................................................................... 31 

Figure 22. Combined I&I Rankings Temperature Map........................................................................ 32 

Figure 23. Capacity Rankings: Peaking Factor and d/D Ratio by Site................................................ 34 

Figure 24. Basin 3: Synthetic Hydrograph........................................................................................... 35 

Figure 25. 10-Year, 10-Day Design Storm .......................................................................................... 36 

Figure 26. Basin 3: 10-Year, 10-Day Design Storm ............................................................................ 37 

Figure 27. Inflow Temperature Map: Peak I&I per IDM..................................................................... A-1 

Figure 28. Inflow Temperature Map: Peak I&I per ACRE ................................................................. A-2 

Figure 29. Inflow Temperature Map: Peak I&I per ADWF................................................................. A-3 

Figure 30. RDI Temperature Map: Feb 2 Infiltration Rate per IDM................................................... A-4 Figure 31. RDI Temperature Map: Feb 2 Infiltration Rate per ACRE................................................ A-5 

Figure 32. RDI Temperature Map: Feb 2 Infiltration Rate per ADWF............................................... A-6 

Figure 33. Combined I&I Temperature Map: Total I&I per IDM ........................................................ A-7 

Figure 34. Combined I&I Temperature Map: Total I&I per ACRE..................................................... A-8 

Figure 35. Combined I&I Temperature Map: Total I&I per ADWF .................................................... A-9 

APPENDICES

Appendix A: Temperature Maps

Appendix B: Flow Monitoring Sites: Data, Graphs, Information

Page 5: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 5/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 1 of 1

EXECUTIVE SUMMARY

Flow Monitoring Results

V&A has completed sanitary sewer flow monitoring, rainfall monitoring and inflow and infiltration (I&I)

analysis within the City of Ukiah, California. Flow, pump station and rainfall monitoring occurred over a

3-month period from January 16, 2010 to April 9, 2010 at 9 open channel flow monitoring sites and 2

pump stations. Table 1 summarizes the flow monitoring and infiltration and inflow results for the flow

monitoring sites. Figure 1 and Figure 2 show temperature maps summarizing the basin rankings for

inflow and rain dependent infiltration, respectively. The following results from this project are noted:

  Inflow: Basin 3A has the highest inflow.

  Groundwater Infiltration (GWI): Basin 2 has the highest groundwater infiltration rates(during dry weather flow).

  Rain Dependent Infiltration (RDI): Basin 3A has the highest rain dependent infiltrationrates.

  Capacity (Peaking Factor): All sites were above the typical design threshold limit forpeaking factor.

  Capacity (d/D Ratio): The monitoring sites for Basins 3 and 8-1 had d/D ratios that exceedthe common threshold value for d/D ratio. None of the flow monitoring sites reached asurcharged condition. 

Table 1.

Flow Monitoring and I&I Results Summary

Site 2009 – 2010 Study ResultsIsolated BasinI&I Rankings

10-Year, 24-HourDesign Storm

ResponseLocation

ADWF(mgd)

PeakI&I

RateA (mgd)

Total

Infiltration(gallons)

A

PeakingFactor

d/DRatio

Overall

InflowRank

Overall

RDIRank

Peak

Flow(mgd)

PeakingFactor

Basin 2 0.25 0.84 6,081,000 4.50 0.51 6 10 1.66 6.74

Basin 3 0.41 2.81 24,322,000 7.97 0.81 2 2 5.01 12.28

Basin 3AB 

0.30 2.12 18,101,000 n/a n/a 1 1 3.68 12.35

Basin 3B  0.11 0.69 6,221,000 7.33 0.56 4 6 1.34 11.89

Basin 4 0.49 3.87 27,826,000 8.99 0.67 3 3 8.15 16.38

Basin 5 0.016 0.096 737,000 11.35 n/a 11 11 0.23 14.20

Basin 6 0.20 0.78 5,000,000 5.07 0.43 10 9 1.86 9.31

Basin 7A 0.11 0.37 1,679,000 4.58 0.70 12 12 1.10 9.82

Basin 7B 0.022 0.062 178,000 4.13 n/a 13 13 0.18 8.36

Basin 8B

0.55 1.56 12,835,000 3.88 n/a 7 6 3.68 6.59

Basin 8-1 0.33 0.85 8,211,000 3.78 0.79 9 4 1.74 5.37

Basin 8-2  0.23 0.80 4,624,000 4.93 0.36 5 8 2.05 8.77

Site 9 2.12 9.88 83,360,000 5.79 0.66 8 5 20.04 9.48A

I&I Analysis data taken from stacked rainfall events occurring from January 16 through 27, 2010.B

Basins 3A and 8 were not directly monitored. A subtraction or addition of flows was required to analyze these basins.

Page 6: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 6/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 2 of 2

Figure 1. Inflow Rankings Temperature Map

Inflow Rank ≤ 1

Inflow Rank 2 - 3

Inflow Rank 4 - 5

Inflow Rank 6 - 7

Inflow Rank 8 - 9

Page 7: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 7/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 3 of 3

Figure 2. RDI Rankings Temperature Map

RDI Rank ≤ 1

RDI Rank 2 - 3

RDI Rank 4 - 5

RDI Rank 6 - 7

RDI Rank 8 - 9

Page 8: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 8/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 4 of 4

Recommendations

V&A advises that future I&I reduction plans consider the following recommendations:

1. Determine I&I Reduction Program: The City should examine its I&I reduction needs todetermine a future I&I reduction program.

a. If peak flows, sanitary sewer overflows, and pipeline capacity issues are of greaterconcern, then priority can be given to investigate and reduce sources of inflow within thebasins with the greatest inflow problems.

b. If total infiltration and general pipeline deterioration are of greater concern, then theprogram can be weighted to investigate and reduce sources of infiltration within thebasins with the greatest infiltration problems.

2. I&I Investigation Methods: Potential I&I investigation methods include the following:

a. smoke testing

b. mini-basin flow monitoring

c. night-time reconnaissance work to (1) investigate and determine direct point sources ofinflow, and (2) determine the areas and/or pipe reaches responsible for high levels ofinfiltration contribution.

d. CCTV inspection

3. I&I Reduction Cost Effective Analysis: The City should conduct a study to determine whichis more cost-effective: (1) locating the sources of infiltration and inflow and systematicallyrehabilitating or replacing the faulty pipelines; or (2) continued treatment of the additionalrainfall dependent I&I flow.

Page 9: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 9/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 5 of 5

INTRODUCTION

V&A has completed sanitary sewer flow monitoring, rainfall monitoring and inflow and infiltration (I&I)

analysis within the City of Ukiah (City), California. Flow monitoring occurred over the 3-month period

from January 16, 2010 to April 9, 2010 at nine open channel flow monitoring sites and three pump

stations. Rainfall data was recorded at three locations within the City. The flow monitoring sites with

associated basin data and information are listed in Table 2 and illustrated in Figure 3. Detailed

descriptions of the individual flow monitoring sites, including photographs, are included in Appendix B .

Table 2.

List of Flow Monitoring and Rainfall Monitoring Sites

LocationPipeSize(in)

AddressBasinSize

 

(acres)

BasinPipe

Length 

(IDM)

Basin 2 10 MH 1043: Norgard Lane at Townsend Lane 387 41.5

Basin 3 18 MH 750: Frontage Road; off of Talmage Road 493 96.1

Basin 3A n/a Subtraction of flows between Basin 3 and Basin 3B 311 63.8

Basin 3B 12MH 959: South State Street between Washington Avenueand Wabash Avenue

182 32.3

Basin 4 21 MH 722: E Gobbi Street; west of Babcock Lane 682 147.5

Basin 5 n/aVichy Springs PS: Vichy Springs Road and RedemeyerRoad

622 21.2

Basin 6 15 MH 667: E Perkins Street; west of Oak Manor Drive 528 84.2

Basin 7A 15MH 120 North: Ford Road; under the US 101 HighwayOverpass

719 72.3

Basin 7B n/a El Dorado PS: West of Redemeyer Road and El DoradoRoad; in wine field near creek 179 17.8

Basin 8A

15, 15

This basin was monitored at two locations:

• Basin 8-1: MH 120 West: Ford Road; under the US101 Highway Overpass (409 acres, 59.7 IDM);

• Basin 8-2: MH 311: Brush Street; east of Orr Street(282 acres, 41.3 IDM)

691 101.0

Site 9 36MH 1035: Airport Road. This location monitoredapproximately 90% of the entire system flow. This sitedid not capture Basins 1B and 2.

5,286 733.2

IDM = total pipe length measured in inch-diameter miles (for example: 1 mile of 6-inch pipe = 1 x 6 = 6 IDM)

Notes:A

For calculations later in this report, the basin size and pipe length for Basins 8-1 and 8-2 were

assumed to have the same distribution as per the ratio of their respective baseline flows.

Page 10: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 10/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 6 of 6

Figure 3. City of Ukiah Flow and Rain Monitoring Locations

Metering Site Location and Label

Rain Gauge Location and Label

Isolated Basin

Page 11: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 11/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 7 of 7

METHODS AND PROCEDURES

Confined Space Entry

A confined space (Photo 1) is defined as any space that is large enough and so configured that a

person can bodily enter and perform assigned work, has limited or restricted means for entry or exit

and is not designed for continuous employee occupancy. Title 8, Section 5158 of the California Code

of Regulations provides the guidelines and rules for working in these environments. In general, the

atmosphere must be constantly monitored for sufficient levels of oxygen (19.5 to 23.0%), and the

absence of Hydrogen Sulfide (H2S) gas, Carbon Monoxide (CO) gas and LEL levels. A typical

confined space entry crew has members with OSHA defined responsibilities of: Entrant, Attendant

and Supervisor. The Entrant is the individual performing the work. He/she is equipped with the

necessary personal protective equipment needed to perform the job safely, including a personal 4-

gas monitor (Photo 2). If it is not possible to maintain line-of-sight with the Entrant, then more

Entrants are required until line-of-sight can be maintained. The Attendant is responsible for

maintaining contact with the entrant(s) to monitor the atmosphere on another 4-gas monitor and

maintaining records of all Entrants, if there is more than one. The Supervisor develops the safe work

plan for the job at hand prior to entering.

Photo 1. Confined Space Entry Photo 2. Typical Personal 4-Gas

Monitor

Page 12: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 12/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 8 of 8

Flow Meter Installation

One Sigma 910 flow meter and eight Isco 2150 flow meters were installed by V&A in the sewer lines

shown in Figure 3. Sigma and Isco meters use a pressure transducer to collect depth readings and

ultrasonic Doppler sensors on the probe to determine the average fluid velocity. Figure 4 shows a

sketch of a typical flow meter installation.

Figure 4. Typical Flow Meter Installation

Continuous depth and velocity readings were recorded by the flow meters in 15-minute increments

and downloaded into a computer spreadsheet program where the data could be analyzed and made

report ready. Manual level and velocity readings were taken in the field during the flow meter

installation and again when the flow meters were removed. These readings were compared to the

readings of the flow meters to ensure proper calibration and accuracy.

Page 13: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 13/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 9 of 9

RAINFALL RESULTS

Three rain gauges were installed within the City of Ukiah (refer to Figure 3). Figure 5 graphically

displays the rainfall events recorded over the flow monitoring period (RG South data illustrated).

Figure 6 shows the rain accumulation plot of the rain gauges, as well as the historical average

rainfalls in the City during this project duration1. For the region, rainfall totals were approximately

between 110% and 137% of normal levels during this time period.

0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

0.40

0.45

0.50

     1     6   -     J    a    n

     1     8   -     J    a    n

     2     0   -     J    a    n

     2     2   -     J    a    n

     2     4   -     J    a    n

     2     6   -     J    a    n

     2     8   -     J    a    n

     3     0   -     J    a    n

     1   -     F    e     b

     3   -     F    e     b

     5   -     F    e     b

     7   -     F    e     b

     9   -     F    e     b

     1     1   -     F    e     b

     1     3   -     F    e     b

     1     5   -     F    e     b

     1     7   -     F    e     b

     1     9   -     F    e     b

     2     1   -     F    e     b

     2     3   -     F    e     b

     2     5   -     F    e     b

     2     7   -     F    e     b

     1   -     M    a    r

     3   -     M    a    r

     5   -     M    a    r

     7   -     M    a    r

     9   -     M    a    r

     1     1   -     M    a    r

     1     3   -     M    a    r

     1     5   -     M    a    r

     1     7   -     M    a    r

     1     9   -     M    a    r

     2     1   -     M    a    r

     2     3   -     M    a    r

     2     5   -     M    a    r

     2     7   -     M    a    r

     2     9   -     M    a    r

     3     1   -     M    a    r

     2   -     A    p    r

     4   -     A    p    r

     6   -     A    p    r

     8   -     A    p    r

   R  a   i  n   (   i  n

  c   h  e  s  p  e  r   h  o  u  r   )

12.54Total Rainfall over Period: 23.26 inches

 

Figure 5. Rainfall Activity over Flow Monitoring Period

0.02.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

20.0

22.0

24.0

26.0

     1     6   -     J    a    n

     1     8   -     J    a    n

     2     0   -     J    a    n

     2     2   -     J    a    n

     2     4   -     J    a    n

     2     6   -     J    a    n

     2     8   -     J    a    n

     3     0   -     J    a    n

     1   -     F    e     b

     3   -     F    e     b

     5   -     F    e     b

     7   -     F    e     b

     9   -     F    e     b

     1     1   -     F    e     b

     1     3   -     F    e     b

     1     5   -     F    e     b

     1     7   -     F    e     b

     1     9   -     F    e     b

     2     1   -     F    e     b

     2     3   -     F    e     b

     2     5   -     F    e     b

     2     7   -     F    e     b

     1   -     M    a    r

     3   -     M    a    r

     5   -     M    a    r

     7   -     M    a    r

     9   -     M    a    r

     1     1   -     M    a    r

     1     3   -     M    a    r

     1     5   -     M    a    r

     1     7   -     M    a    r

     1     9   -     M    a    r

     2     1   -     M    a    r

     2     3   -     M    a    r

     2     5   -     M    a    r

     2     7   -     M    a    r

     2     9   -     M    a    r

     3     1   -     M    a    r

     2   -     A    p    r

     4   -     A    p    r

     6   -     A    p    r

     8   -     A    p    r

   R  a   i  n   (   i  n  c   h  e  s   )

RG South RG East

RG West Historical Average23.26

17.64

24.09

19.41

 

Figure 6. Rainfall Accumulation Plots

1 Historical data was taken from the WRCC at Station 049122 in Ukiah, California and can be found at:

http://www.wrcc.dri.edu/summary/climsmnca.html

Page 14: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 14/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 10 of 10

Rain Gauge Triangulation

The rainfall affecting the sanitary sewer collection system basins must be calculated based on the

proximity to the rain gauge locations. The mean precipitation for the sanitary sewer collection system

was calculated by taking data from seven local rain gauges and using the Inverse Distance Weighting

(IDW) method. The IDW is an interpolation method that assumes the influence of each rain gauge

location diminishes with distance. The center of a sanitary sewer collection system was identified and

a weighted average was taken of the precipitation data from nearby rain gauge locations. The IDW

function is as follows:

∑=

 p

 p

d d weight 1

1

)( , where: d = distance p = power (p > 0)

The value of p is user defined. The most common choice for hydrological studies of watershed areas

is p = 2. Figure 7 and Table 3 illustrate the IDW method (sample data). The rain gauge distribution as

calculated for each flow monitoring site is shown in Table 4.

Figure 7. Rainfall Inverse Distance Weighting Method

2.17 miles

1.75 miles

Basin Boundary

Rain Gauge A

Rain Gauge B

Page 15: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 15/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 11 of 11

Table 3.

IDW Method (Sample)

Rain GaugeDistance(miles) 2

1d 

 Weight

(%)

Rain Gauge A 2.17 0.2124 39.4%

Rain Gauge B 1.75 0.3265 60.6%

Totals 0.5389 100%

Table 4.

Rain Gauge Distribution by Basin

SiteRain

GaugeSouth

RainGaugeWest

RainGaugeEast

Basin 2 98.8% 0.7% 0.5%

Basin 3 51.0% 32.1% 16.9%

Basin 3A 51.0% 32.1% 16.9%

Basin 3B 73.5% 17.2% 9.3%

Basin 4 11.8% 66.9% 21.3%

Basin 5 0.0% 0.0% 100.0%

Basin 6 0.0% 84.9% 15.1%

Basin 7A 0.0% 44.6% 55.4%

Basin 7B 0.0% 0.0% 100.0%

Basin 8 0.0% 70.0% 30.0%

Basin 8-1 0.0% 66.1% 33.9%

Basin 8-2 0.0% 74.7% 25.3%

Site 9 10.2% 55.8% 34.0%

Page 16: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 16/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 12 of 12

STORM EVENT CLASSIFICATION

It is important to classify the relative size of the major storm event that occurs over the course of a

flow monitoring period2. Storm events are classified by intensity and duration. Based on historical

data, frequency contour maps for given intensity and duration storm events have been developed by

the National Oceanic and Atmospheric Administration (NOAA) for all areas within the continental

United States. For example, the NOAA Rainfall Frequency Atlas3

classifies a 10-year, 24-hour storm

event in Ukiah as 5.29 inches (Figure 8). This means that in any given year, there is a 10% chance

that 5.29 inches of rain will fall in any 24-hour period.

Figure 8. NOAA Northern California Rainfall Frequency Map

From the NOAA frequency maps, the rainfall totals for 1-hour, 6-hour and 24-hour, 2-day, 4-day, 7-

day and 10-day period durations, and 2-year, 5-year, 10-year, 25-year, 50-year, and 100-year period

2Sanitary sewers are often designed to withstand I&I contribution to sanitary flows for specific sized “design” storm events.

3NOAA Western U.S. Precipitation Frequency Maps Atlas 2, 1973 <http://www.wrcc.dri.edu/pcpnfreq.html>. 

Rainfall in Tenths of Inch 

Ukiah

Page 17: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 17/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 13 of 13

intensities, were plotted to develop a rain event frequency map specific to the rainfall monitoring site,

shown in Figure 9.

2

5

10

25

50100

1921681441209672 216 2404824181261

0

5

10

15

20

Duration (hours)

   I  n  c   h  e  s  o   f   R  a   i  n

 

Figure 9. Ukiah Rain Event Frequency Map

The highest rainfall in a 1-hour period was 0.32 inches and occurred during Event 2. The highest

rainfall in any 24-hour period was 1.20 inches and occurred during Event 4. Peak measured

densities per hourly periods were calculated for each rainfall event, as summarized in Table 5.

Superimposing the peak measured densities for the storm events on the Rainfall Storm Event

Classification Chart determines the classification of each storm event, shown in Figure 10.

Table 5.

Peak Measured Rainfall Densities per Hourly Period

RainfallDuration

RainGaugeSouth

(inches)

RainGaugeWest

(inches)

RainGaugeEast

(inches)

1 hour 0.41 0.38 0.28

6 hours 1.71 1.59 1.17

24 hours 3.10 2.77 2.22

2 days 5.38 4.71 3.72

4 days 8.64 8.09 6.27

7 days 9.94 9.71 7.51

10 days 12.54 12.38 9.46

Page 18: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 18/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 14 of 14

2

5

10

25

50100

1921681441209672 216 2404824181261

0

5

10

15

20

Duration (hours)

   I  n  c   h  e  s  o   f   R  a   i  n

January 17 - 26, 2010

 

Figure 10. Ukiah Storm Event Classification: Rain Gauge West

At Rain Gauge West, the rainfall events of January 17 to 26, 2010 were less than 2 year events from

the 1-hour to 24-hour durations, but were greater than 2-year events for the 4-day and 10-day

duration. Table 6 summarizes the classifications for each rain gauge at different durations.

Table 6.

Rain Event Classification per Rain Gauge

RainfallDuration

RainGaugeSouth

(inches)

RainGaugeWest

(inches)

RainGaugeEast

(inches)

1 hour < 2 yr < 2 yr < 2 yr

6 hours < 2 yr < 2 yr < 2 yr

24 hours < 2 yr < 2 yr < 2 yr

2 days 2 yr < 2 yr < 2 yr

4 days 3.5 yr 2.5 yr < 2 yr

7 days 2 yr < 2 yr < 2 yr

10 days 4 yr 4 yr < 2 yr

Page 19: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 19/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 15 of 15

FLOW MONITORING RESULTS SUMMARY

Average Dry Weather Flows

Weekday and weekend flow patterns vary and must be separated when determining average dry

weather flows. For this project, the flow meters were installed immediately prior to the largest rainfall

event of the season. After this rainfall event, flows did not return to baseline levels for many of the

flow monitoring sites. The early morning flows on January 17, 2010 (prior to the rainfall event) were

used to establish baseline flows; daily diurnal flow patterns were established during the days least

affected by rainfall later in the flow monitoring period.

Figure 11 shows a sample of the average dry weather flow graph that was generated for Site 1.

Table 7 lists the average dry weather flow (ADWF) and average peak dry weather flows (PDWF)

recorded during this study for the flow monitoring sites. Detailed graphs of the flow monitoring data on

a site-by-site basis are included in Appendix B .

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00

Hour

   F   l  o  w

   (  m  g   d   )

Weekday

Weekend

Weekday: Ave = 0.50 mgd Peak = 0.68 mgd at 10:45 Weekend: Ave = 0.48 mgd Peak = 0.70 mgd at 11:00 

 

Figure 11. Site 1: Average Dry Weather Flow

Page 20: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 20/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 16 of 16

Table 7.

Dry Weather Flow Summary

Average DryWeather Flow

(mgd)

Average Peak DryWeather Flow

(mgd)

PDWF/ADWFRatioLocation

Wkday Wkend

Weekend/Weekday

Ratio Wkday Wkend Wkday Wkend

Basin 2 0.25 0.25 1.00 0.30 0.35 1.21 1.41

Basin 3 0.41 0.42 1.02 0.54 0.65 1.32 1.55

Basin 3A 0.30 0.30 1.00 0.38 0.45 1.26 1.50 

Basin 3B 0.11 0.12 1.03 0.16 0.20 1.38 1.69 

Basin 4 0.50 0.48 0.96 0.68 0.70 1.37 1.47

Basin 5 0.016 0.017 1.06 0.033 0.031 2.07 1.83

Basin 6 0.20 0.20 1.00 0.32 0.35 1.60 1.76

Basin 7A 0.11 0.11 0.94 0.16 0.17 1.40 1.63

Basin 7B 0.021 0.024 1.11 0.041 0.050 1.90 2.10

Basin 8 0.56 0.54 0.98 0.72 0.79 1.29 1.45

Basin 8-1 0.32 0.34 1.03 0.44 0.48 1.35 1.42 

Basin 8-2 0.23 0.21 0.89 0.35 0.35 1.50 1.67 

Site 9(90% of System)

2.11 2.14 1.01 2.72 2.90 1.29 1.36

Page 21: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 21/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 17 of 17

Inflow / Infiltration: General Methods

Inflow / Infiltration (I&I) consists of storm water and groundwater which enters the sewer system

through pipe defects and improper storm drainage connections, defined as follows:

Inflow

  Definition: Storm water inflow is defined as water discharged into the sewer system,including private sewer laterals, from direct connections such as downspouts, yard and areadrains, holes in manhole covers, cross connections from storm drains, or catch basins.

  Impact: This component of I&I creates a peak flow problem in the sewer system and oftendictates the required capacity of downstream pipes and transport facilities to carry these peakinstantaneous flows. Because the response and magnitude of inflow is tied closely to theintensity of the storm event, the short-term peak instantaneous flows may result insurcharging and overflows within a collection system. Severe inflow may result in sewagedilution, resulting in upsetting the biological treatment (secondary treatment) at the treatmentfacility.

  Cost of Source Identification and Removal: Inflow locations are usually less difficult to findand less expensive to correct. These sources include direct and indirect cross connectionswith storm drainage systems, roof downspouts, and various types of surface drains.Generally, the costs to identify and remove sources of inflow are low compared to potentialbenefits to public health and safety, or the costs of building new facilities to convey and treatthe resulting peak flows.

  Graphical Identification: Inflow is usually recognized graphically by large magnitude, shortduration spikes immediately following a rain event.

Infiltration

  Definition: Infiltration is defined as water entering the sanitary sewer system throughdefective pipes, pipe joints, and manhole walls, and may include cracks, offset joints, root

intrusion points, and broken pipes.

  Impact: Infiltration typically creates long-term annual volumetric problems. The major impactis the cost of pumping and treating the additional volume of water, and of paying for treatment(for municipalities that are billed strictly on flow volume).

  Cost of Source Detection and Removal: Infiltration sources are usually harder to find andmore expensive to correct than inflow sources. Infiltration sources include defects indeteriorated sewer pipes and/or manholes, and may include cracks, offset joints, rootintrusion points, and broken pipes. The sources may be wide-spread throughout a sanitarysewer system.

  Graphical Identification: Infiltration is often recognized graphically by a gradual increase inflow after a wet weather event. The increased flow typically sustains for a period after rainfallhas stopped and then gradually drops off as soils become less saturated, and asgroundwater levels recede to normal levels.

Infiltration Components

Infiltration can be further subdivided into components as follows:

  Groundwater Infiltration – Groundwater infiltration depends on the depth of thegroundwater table above the pipelines as well as the percentage of the system submerged.

Page 22: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 22/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 18 of 18

The variation on groundwater levels and subsequent groundwater infiltration rates areseasonal by nature. On a day-to-day basis, groundwater infiltration rates are relativelysteady and will not fluctuate greatly.

  Rainfall Dependent Infiltration – This component occurs as a result of storm water andenters the sewer system through pipe defects similar to groundwater infiltration. The stormwater first percolates directly into the soil and then migrates to an infiltration point. Typically,

the time of concentration for rainfall related infiltration may be 24 hours or longer, butdepends on the soil permeability and saturation levels.

  Rainfall Responsive Infiltration is storm water which enters the collection system indirectlythrough pipe defects, but normally in sewers constructed close to the ground surface such asprivate laterals. Rainfall responsive infiltration is independent of the groundwater table, andreaches defective sewers via the pipe trench in which the sewer is constructed, particularly ifthe pipe is placed in impermeable soil and bedded and backfilled with a granular material. Inthis case, the pipe trench serves as a conduit similar to a French drain, conveying stormdrainage to defective joints and other openings in the system. Note: this type of infiltrationcan have a quick response and graphically can look very similar to inflow.

Figure 12 illustrates the possible locations and components of I&I.

Figure 12. Typical Sources of Infiltration and Inflow

Page 23: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 23/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 19 of 19

Graphical Identification of I&I Components 

Figure 13 shows sample graphs indicating the typical graphical response patterns for Inflow / 

Infiltration.

Figure 13. Inflow / Infiltration Graphical Response Patterns

Analysis Techniques 

After differentiating I&I flows from baseline flows, various calculations can be made to determine

which I&I component is more prevalent at a particular site, and to compare the relative magnitude of

the I&I components between drainage basins and between storm events, summarized as follows:

Inflow Indicators

Peak I&I Flow Rate: It is preferable for I&I analysis to look strictly at I&I flow rates rather than peak

flow rates; peak flow rates can be skewed higher or lower depending on whether the storm event I&I

response occurs during low flow or high flow hours. After determining the peak I&I flow rate for a

given site, and for a given storm event, there are three ways to normalize  the peak I&I rates for an

“apples-to-apples” comparison amongst the different drainage basins:

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

   F   l  o  w    (   M

   G   D   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

   R  a   i  n   (   i  n   /   h  r   )

0.00

0.05

0.10

0.15

0.20

0.25

0.30

0.35

0.40

0.45

0.50

4-Jun 5-Jun

   I   /   I   (   M   G   D   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

   R  a   i  n   (   i  n   /   h  r   )

0

5

10

15

20

25

30

   F   l  o  w

   (  g  p  m   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

   R  a   i  n   (   i  n   /   h  r   )

0

2

4

6

8

10

12

14

16

18

22-Feb 23-Feb

   F   l  o  w

   (  g  p  m   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

   R  a   i  n   (   i  n   /   h  r   )

0.00

0.10

0.20

0.30

0.40

0.50

   F   l  o  w

   (   M   G   D   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

   R  a   i  n   (   i  n   /   h  r   )

0.00

0.05

0.10

0.15

0.20

0.25

17-De c 18-De c 19-De c 20-De c

   F   l  o  w

   (   M   G   D   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

   R  a   i  n   (   i  n   /   h  r   )

Inflow Combination I&IInfiltration

RainfallBaseline FlowRealtime Flow

I&I Flow Rate

Response PatternSharp SpikeShort Duration

Response PatternGradual IncreaseGradual Recession

Response PatternCombination of Inflowand Infiltration

Page 24: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 24/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 20 of 20

  Peak I&I Flow Rate per IDM: Peak measured I&I rate divided by length of pipe within thedrainage basin, expressed in units of inch-diameter-mile (IDM) (miles of pipeline multiplied bythe diameter of the pipeline in inches). Final units are gallons per day (gpd) per IDM.

  Peak I&I Flow Rate per Acre: Peak measured I&I rate divided by the basin size of thedrainage basin. Basin units expressed in acres. Units are gpd per acre.

  Peak I&I Flow Rate to ADWF Ratio: Peak measured I&I rate divided by average dryweather flow (ADWF). This is a ratio and is expressed without units.

All three normalization methods are used in this report. A final ranking of Inflow is based on

averaging the individual rankings for each method. For the purposes of this report, each method is

given equal weighting towards the final ranking.

Infiltration Indicators

Dry Weather Groundwater Infiltration: GWI analysis is conducted by looking at minimum dry

weather flow to average dry weather flow ratios and comparing them to established standards, which

may result in quantifying the rate of excess ground water infiltration. Similar to the discussion on

inflow, GWI infiltration rates can be normalized by means of pipe length (IDM), basin area (acres)

and/or dry weather flow rates (ADWF). These methods are discussed in further detail in the

Groundwater Analysis section later in this report.

Rainfall Dependent Infiltration: Infiltration  occurring 24 hours or more after the conclusion of a

storm event is typically classified as rainfall dependent infiltration. Analysis is conducted by looking at

the infiltration rates at set periods after the conclusion of a storm event. Depending on the system

and the time required for flows to return to ADWF levels, different set periods may be examined to

determine the basins with the greatest or most sustained rainfall dependent infiltration rates.

For this project, there was conclusive infiltration occurring 48 hours after the rainfall events during this

study.

Combined I&I Indicators

Total Infiltration: The total inflow and infiltration is measured in gallons per site and per storm event.

Because it is based on total I&I volume, it is an indicator of combined infiltration and inflow and is

used to identify the overall volumetric influence of I&I within the monitoring basin. Similar to Inflow,

pipe length, basin area and dry weather flow are used to normalize combined I&I for basin

comparison:

  Combined I&I Flow Rate per IDM: Total infiltration (gallons) divided by length of pipe (IDM)and divided by storm event rainfall (inches of rain). Final units are gallons per day (gpd) perIDM per inch-rain.

  R-Value: Total infiltration (gallons) divided by the total rainfall that fell within the acreage ofthat basin (gallons of rainfall). This is expressed as a percentage and is explained as “the

Page 25: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 25/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 21 of 21

percent of rain that falls that enters the sanitary sewer collection system.” Systems with R-Values less than 5%

4are often considered to be performing well.

  Combined I&I Flow Rate per ADWF: Total infiltration (gallons) divided by the ADWF (gpd)and divided by storm event rainfall (inches of rain). Final units are gallons (x 10

6) per MGD of

ADWF per inch-rain.

Figure 14 below shows a sample I&I graph (Basin 4 shown) that illustrates and summarizes the I&I

response and I&I calculations made per site per storm event. Similar graphs for each site are located

in Appendix B .

Figure 14. I&I Flow Graph for Basin 4

4 Keefe, P.N. “Test Basins for I&I Reduction and SSO Elimination”, 1998, WEF Wet Weather Specialty Conference, Cleveland. 

Page 26: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 26/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 22 of 22

Inflow Analysis

Table 8 summarizes the peak I&I flows and inflow analysis results for the flow monitoring sites and

associated basins. I&I analysis data was taken from stacked rainfall events occurring from January

16 through 27, 2010. Numbers in parenthesis indicate the relative ranking of the basin for that sub-

category. Figure 15 shows a bar graph of the inflow indicators. Figure 16 shows a temperature map

of the overall inflow ranking results. Temperature maps for all methods of normalization can be found

in Appendix A.

Table 8.

Inflow Analysis Summary

Site Data(Cumulative)

Isolated Basin Data

Location

ADWF(mgd)

Peak I&IRate

(mgd)

Peak I&I

per PipeLength

(gpd/IDM)

Peak I&Iper Acre

(gpd/acre)

Peak I&Ito ADWF

Ratio

OverallInflow

RankingA

Basin 2 0.25 0.84 20,200 (5)  2,170 (7)  3.40 (9)  6

Basin 3 0.41 2.81 29,200 (2)  5,700 (2)  6.84 (3)  2

Basin 3A 0.30 2.12 33,200 (1)  6,800 (1)  7.11 (2)  1

Basin 3B  0.11 0.69 21,400 (4)  3,800 (4)  6.10 (4)  4

Basin 4 0.49 3.87 26,300 (3)  5,680 (3)  7.87 (1)  3

Basin 5 0.016 0.096 4,600 (12)  1,560 (10)  5.99 (5)  11

Basin 6 0.20 0.78 9,200 (10)  1,470 (11)  3.88 (7)  10

Basin 7A 0.11 0.37 5,100 (11)  520 (12)  3.37 (10)  12

Basin 7B 0.022 0.062 3,500 (13)  350 (13)  2.82 (11)  13

Basin 8 0.55 1.56 15,400 (7)  2,250 (6)  2.81 (12)  7

Basin 8-1 0.33 0.85 14,300 (8)  2,090 (8)  2.60 (13)  9

Basin 8-2  0.23 0.80 19,400 (6)  2,840 (5)  3.55 (8)  5

Site 9 2.12 9.88 13,500 (9)  2,020 (9)  4.66 (6)  8

The overall inflow ranking was determined by a weighted average of the ordinal rankings for each method of

normalization per the following formula: (0.5)(IDM) + (0.25)(ACRE) + (0.25)*(ADWF). The IDM (pipe length) methodwas weighted more strongly because future CIP rehabilitation projects are likely to be based on repair of length ofpipe.

Page 27: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 27/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 23 of 23

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

   3   A    3 4

   3   B 2

   8  -   2 8

   8  -   1 6

   7   A    5

   7   B

   S   i   t  e   9

   P  e  a   k   I   &   I  p  e  r   I   D

   M

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

   3   A    3 4

   3   B

   8  -   2 8 2

   8  -   1 5 6

   7   A

   7   B

   S   i   t  e   9

   P  e  a   k   I   &   I  p  e  r   A  c  r  e

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   4   3   A    3

   3   B 5 6

   8  -   2 2

   7   A    7

   B 8   8  -   1

   S   i   t  e   9

   P  e

  a   k   I   &   I   t  o   A   D   W   F

 

Figure 15. Inflow Indicator Bar Graphs

Page 28: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 28/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 24 of 24

Figure 16. Inflow Rankings Temperature Map

Inflow Rank = 1

Inflow Rank 2 - 3

Inflow Rank 4 - 5

Inflow Rank 6 - 7

Inflow Rank 8 - 9

Page 29: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 29/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 25 of 25

GWI (Groundwater Infiltration) Analysis

Dry weather (baseline) flow can be expected to have a predictable diurnal flow pattern. While each

site is unique, experience has shown that, given a reasonable volume of flow and typical loading

conditions, the daily peaks and lows fall into a predictable range when compared to the daily average

flow. If a site has a large percentage of groundwater infiltration occurring during the periods of dry

weather flow measurement, the amplitudes of the peak and low flows will be dampened5. Figure 17

shows a sample of two flow monitoring sites, both with nearly the same average daily flow, but with

considerably different peak and low flows. In this sample  case, Site B1 may have a considerable

volume of groundwater infiltration.

West County Wastewater District: B1 and A9 Baseline Weekday Flows

0.0

0.1

0.2

0.3

0.4

0.5

0.6

00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 00

Hour

   F   l  o  w

   N   1   (   M   G   D   )

Site A9 Site B1

Site B1 Baseline Weekday Flow: 0.30 MGD 

Site A9 Baseline Weekday Flow: 0.28 MGD 

 

Figure 17. Groundwater Infiltration Sample Figure

It can be useful to compare the peak-to-baseline and low-to-baseline flow ratios for all flow metering

sites. A site with abnormal ratios, and with no other reasons to suspect abnormal flow patterns (such

as proximity to pump station, treatment facilities, etc.), has a distinct possibility of higher levels of

groundwater infiltration in comparison to the rest of the collection system. Figure 18 plots the peak-to-

baseline and min-to-baseline flow ratios against the baseline flows for all sites monitored during this

study. The dotted line shows “typical” min-to-baseline flow ratios per the Water Pollution Control

Federation6. There are no established peak-to-baseline ratios, but a system trendline has been

drawn to better distinguish sites that fall outside the system trends. The min-to-baseline ratio should

be taken with more weight as low flows during early morning hours are generally more predictable

than peak flows.

5 Theoretically imagining an extreme case, if there were 0.2 MGD of baseline flow and 2.0 MGD of groundwater infiltration, the

peaks and lows would be barely recognizable; the baseline flow would be nearly a straight line. 

6 WPCF Manual of Practice No. 9 “Design and Construction of Sanitary and Storm Sewers”. 

Page 30: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 30/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 26 of 26

Figure 18. Peak and Minimum Flow Ratios vs. ADWF7 

Basins 2, 3A, 4 and 8-1 had minimum flow to ADWF ratios that were above the WPCF typical Low-to-

Average Ratio, indicating excessive groundwater infiltration. The rates of groundwater infiltration

above typical groundwater infiltration standards (as set forth by WPCF) for these sites were

calculated and are shown in Table 9. Basin 2 has the highest GWI contribution.

Table 9.

Excess Groundwater Infiltration Rates above Typical Rate

LocationADWF(mgd)

ExcessGWI Rate

(mgd)

GWI Rateper PipeLength

(gpd/IDM)

GWI Rateper Acre

(gpd/acre)

Basin 2 0.25 0.13 3,225 345

Basin 3 0.41 0.08 875 170

Basin 4 0.49 0.11 750 162

Basin 8-1 0.32 0.12 2,050 299

7 Due to attenuation, it should be expected that sites with larger flow volumes should not have quite the peak-to-average and

low-to-average flow ratios as sites with lesser flow volumes, which is why the typical and system trend lines slope closer to 1.0as the ADWF increases, as shown in the figure. 

-

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

- 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.20

 ADWF (MGD)

   P  e  a   k  a  n   d   M   i  n   i  m  u  m   F   l  o  w   R  a   t   i  o  s

Maximum, 24 hr

Minimum, 24 hr

ADWF = 1.0

S stem Peak-to-Avera e Trendline

WPCF Typical Low-to-Average Ratio

Basin 3A

Basin 8-1

Basin 2

Basin 4

Please note: The stated groundwater rates are not total groundwater infiltration rates, butgroundwater rates above typical rates.

Page 31: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 31/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 27 of 27

RDI (Rain Dependent Infiltration) Analysis

Table 10 summarizes the rain dependent infiltration results for the flow monitoring sites and

associated basins. I&I analysis data was taken from stacked rainfall events occurring from January

16 through 27, 2010. Numbers in parenthesis indicate the relative ranking of the basin for that sub-

category. Figure 19 shows a bar graph of the RDI indicators. Figure 20 shows a temperature map of

the overall RDI infiltration rankings. Temperature maps for all methods of normalization can be found

in Appendix A.

Table 10.

Infiltration Analysis Summary

Site Data(Cumulative)

Isolated Basin Data

Location

ADWF(mgd)

RDI Rateon 2/2/2010

(mgd)

RDI Rate

per PipeLength

(gpd/IDM)

RDI Rateper Acre

(gpd/acre)

RDI Rateto ADWF

Ratio

OverallRDI

RankingA

Basin 2 0.25 0.12 2,900 (10)  320 (11)  50% (12)  10

Basin 3 0.41 1.08 11,200 (2)  2,180 (2)  262% (2)  2

Basin 3A 0.30 0.92 14,500 (1)  2,960 (1)  310% (1)  1

Basin 3B  0.11 0.15 4,800 (8)  850 (5)  136% (6)  6

Basin 4 0.49 1.19 8,000 (3)  1,740 (3)  241% (3)  3

Basin 5 0.016 0.014 700 (12)  20 (13)  87% (10)  11

Basin 6 0.20 0.25 2,900 (11)  470 (10)  124% (8)  9

Basin 7A 0.11 0.038 500 (13)  50 (12)  35% (13)  12

Basin 7B 0.022 0.001 100 (14)  10 (14)  4% (14)  13

Basin 8 0.55 0.58 5,800 (5)  840 (6)  105% (9)  6

Basin 8-1 0.33 0.42 7,100 (4)  1,040 (4)  129% (7)  4

Basin 8-2  0.23 0.16 3,900 (9)  570 (9)  71% (11)  8

Site 9 2.12 3.85 5,300 (6)  790 (7)  181% (4)  5

The overall RDI ranking was determined by a weighted average of the ordinal rankings for each method of normalization

per the following formula: (0.5)(IDM) + (0.25)(ACRE) + (0.25)*(ADWF). The IDM (pipe length) method was weightedmore strongly because future CIP rehabilitation projects are likely to be based on repair of length of pipe.

Page 32: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 32/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 28 of 28

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

   3   A    3 4

   8  -   1 8

   3   B

   8  -   2 2 6 5

   7   A

   7   B

   S   i   t  e   9

   I  n   f   i   l   t  r  a   t   i  o  n   R  a   t  e  p  e

  r   I   D   M

0

500

1,000

1,500

2,000

2,500

3,000

3,500

   3   A    3 4

   8  -   1

   3   B 8

   8  -   2 6 2

   7   A    5

   7   B

   S   i   t  e   9

   I  n   f   i   l   t  r  a   t   i  o  n   R  a   t  e  p  e  r   A  c  r  e

0%

50%

100%

150%

200%

250%

300%

350%

   3   A    3 4

   3   B

   8  -   1 6 8 5

   8  -   2 2

   7   A    7

   B

   S   i   t  e   9

   I  n   f   i   l   t  r  a   t

   i  o  n   R  a   t  e   (   %   o

   f   A   D   W   F   )

 

Figure 19. RDI Indicator Bar Graphs

Page 33: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 33/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 29 of 29

Figure 20. RDI Rankings Temperature Map

RDI Rank = 1

RDI Rank 2 - 3

RDI Rank 4 - 5

RDI Rank 6 - 7

RDI Rank 8 - 9

Page 34: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 34/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 30 of 30

Combined I&I Analysis

Table 11 summarizes the combined I&I analysis results for the flow monitoring sites and associated

basins. I&I Analysis data taken from stacked rainfall events occurring from January 16 through 27,

2010; total I&I was calculated through February 4, 2010. Numbers in parenthesis indicate the relative

ranking of the basin for that sub-category. Figure 21 shows a bar graph of the combined I&I

indicators. Figure 22 shows a temperature map of the overall combined I&I rankings. Temperature

maps for all methods of normalization can be found in Appendix A.

Table 11.

Combined I&I Analysis Summary

Site Data(Cumulative)

Isolated Basin Data

LocationADWF(mgd)

Total I&I(gallons)

Total I&Iper PipeLength

(gal/IDM)

Total I&I

per Acre(R-Value)

Total I&I

to ADWFRatio

OverallCombined

I&IRanking

A

Basin 2 0.25 6,081,000 11,300 (6)  4.4% (9)  1.89 (10)  8

Basin 3 0.41 24,322,000 20,500 (2)  14.7% (2)  4.78 (2)  2

Basin 3A 0.30 18,101,000 22,700 (1)  17.1% (1)  4.86 (1)  1

Basin 3B  0.11 6,221,000 15,200 (4)  9.9% (4)  4.34 (5)  4

Basin 4 0.49 27,826,000 15,600 (3)  12.4% (3)  4.68 (3)  3

Basin 5 0.016 737,000 3,500 (11)  0.4% (12)  4.63 (4)  10

Basin 6 0.20 5,000,000 4,900 (10)  2.9% (10)  2.05 (8)  10

Basin 7A 0.11 1,679,000 2,100 (12)  0.8% (11)  1.37 (12)  12

Basin 7B 0.022 178,000 1,000 (13)  0.4% (13)  0.82 (13)  13

Basin 8 0.55 12,835,000 10,800 (7)  5.8% (6)  1.96 (9)  6

Basin 8-1 0.33 8,211,000 11,800 (5)  6.3% (5)  2.14 (7)  5

Basin 8-2  0.23 4,624,000 9,400 (9)  5.1% (8)  1.71 (11)  9

Site 9 2.12 83,360,000 9,700 (8)  5.3% (7)  3.35 (6)  6

The overall combined I&I ranking was determined by a weighted average of the ordinal rankings for each method ofnormalization per the following formula: (0.5)(IDM) + (0.25)(ACRE) + (0.25)*(ADWF). The IDM (pipe length) method wasweighted more strongly because future CIP rehabilitation projects are likely to be based on repair of length of pipe.

Page 35: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 35/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 31 of 31

0

5,000

10,000

15,000

20,000

25,000

   3   A    3 4

   3   B

   8  -   1 2 8

   8  -   2 6 5

   7   A

   7   B

   S   i   t  e   9

   T  o   t  a   l   I   &   I  p  e  r   I   D

   M

0%

2%

4%

6%

8%

10%

12%

14%

16%

18%

   3   A    3 4

   3   B

   8  -   1 8

   8  -   2 2 6

   7   A    5

   7   B

   S   i   t  e   9

   R  -   V  a   l  u  e

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   3   A    3 4 5

   3   B

   8  -   1 6 8 2

   8  -   2    7

   A    7   B

   S   i   t  e   9

   T  o   t  a   l   I   &   I  p  e  r   A   D   W   F

 

Figure 21. Combined I&I Indicator Bar Graphs

Page 36: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 36/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 32 of 32

Figure 22. Combined I&I Rankings Temperature Map

Combined I&I Rank = 1

Combined I&I Rank 2 - 3

Combined I&I Rank 4 - 5

Combined I&I Rank 6 - 7

Combined I&I Rank 8 - 9

Page 37: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 37/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 33 of 33

Pipeline Capacity Analysis

Peaking Factor: Peaking Factor is defined as the Peak Measured Flow divided by the Average Dry

Weather Flow. A peaking factor threshold value of 3.0 is commonly used for sanitary sewer design.

d/D Ratio: The d/D ratio is the peak measured depth of flow divided by the pipe diameter. A d/D ratio

less than 0.75 is a common threshold value used for pipe design. The d/D ratio for each site was

computed based on the maximum depth of flow during the rainfall events.

Table 12 summarizes the peak recorded d/D ratios and Peaking Factors per site during the flow

monitoring period. Figure 23 shows a bar graph of the capacity results.

Table 12.

Capacity Analysis Summary

MonitoringSite

PeakingFactor

d/DRatio

Basin 2 4.50 0.51

Basin 3 7.97 0.81

Basin 3B 7.33 0.56

Basin 4 8.99 0.67

Basin 5 11.35 n/a

Basin 6 5.07 0.43

Basin 7A 4.58 0.70

Basin 7B 4.13 n/a

Basin 8 3.88 n/a

Basin 8-1 3.78 0.79

Basin 8-2  4.93 0.36

Site 9 (Syst) 5.79 0.66

The following capacity analysis results are noted:

  Peaking Factor: All sites were above the typical design threshold limit for peak flow toaverage dry weather flow ratio.

  d/D Ratio: The sites monitoring Basins 3 and 8-1 had d/D ratios that exceed the common

threshold value for d/D ratio. None of the flow monitoring sites reached a surchargedcondition.

Page 38: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 38/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 34 of 34

0.0

2.0

4.0

6.0

8.0

10.0

12.0

   5 4   3   A

   3   B

   S   i   t  e   9 6

   8  -   2

   7   A    2

   7   B 8

   8  -   1

   P  e  a   k   i  n  g   F  a  c   t  o  r

 

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

1.1

   3   A

   8  -   1    7

   A    4

   S   i   t  e   9

   3   B 2 6

   8  -   2

   d   /   D   R  a   t   i  o

 

Figure 23. Capacity Rankings: Peaking Factor and d/D Ratio by Site

Surcharge Threshold

TypicalDesignThreshold

Typical Design Threshold

Page 39: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 39/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 35 of 35

SYNTHETIC HYDROGRAPHS

In order to model design storms, synthetic hydrographs were developed to approximate the actual

RDI/I hydrograph shape in terms of parameters representing time to the peak and the recession

coefficient. The actual RDI/I hydrograph was best matched with a synthetic hydrograph by separating

the synthetic hydrograph into seven volume components (R1, R2, R3, R4, R5, R6, R7). The seven

components represent different response times to the rainfall event and, therefore, different infiltration

or inflow paths into the sewer system. R1 is characterized by a short response time and is assumed

to consist of mainly inflow. R7 represents slower response and longer recession times and consists of

mostly infiltration. Levels of soil saturation are also considered. Using synthetic hydrograph analysis,

appropriate time and recession parameters were estimated by a trial-and-error procedure until a good

match was obtained. A sample synthetic hydrograph and its component hydrographs for the period

of January 17 through February 19, 2010 for Basin 3 is shown in Figure 24.

Figure 24. Basin 3: Synthetic Hydrograph

0.00

0.50

1.00

1.50

2.00

2.50

3.00

17-

Jan

19-

Jan

21-

Jan

23-

Jan

25-

Jan

27-

Jan

29-

Jan

31-

Jan

2-

Feb

4-

Feb

6-

Feb

8-

Feb

10-

Feb

12-

Feb

14-

Feb

16-

Feb

18-

Feb

   I   &   I   F   l  o  w

   (  m  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

   R  a   i  n   (   i  n   /   h  r   )

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

17-

Jan

19-

Jan

21-

Jan

23-

Jan

25-

Jan

27-

Jan

29-

Jan

31-

Jan

2-

Feb

4-

Feb

6-

Feb

8-

Feb

10-

Feb

12-

Feb

14-

Feb

16-

Feb

18-

Feb

   I   &   I   F   l  o  w

   (  m  g   d   )

0.00.10.20.30.40.50.60.7

0.80.91.0

   R  a   i  n   (   i  n   /   h  r   )

  Rain Realtime I/I Hydrograph

Synthetic Hydrograph R1 Component

R2 Component R3 Component

R4 Component R5 Component

R6 Component R7 Component

Page 40: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 40/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 36 of 36

Design Storm

With the I&I components defined, design storms can be applied and the resulting I&I flows can be

predicted. The design storm used for this analysis was a 10-day, 10-year storm event taken from the

NOAA Western U.S. Precipitation Frequency Maps.

Figure 25 summarizes the design storm per hour and shows the storm profile for the 24-hour, 10-year

event. This particular profile distribution also fits the NOAA criterion for a 2-hour, 6-hour, 24-hour, 2-

day, 4-day and 7-day event.

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10

   R  a   i  n   f  a   l   l   (   i  n   /   h  r   )

 

Figure 25. 10-Year, 10-Day Design Storm

Table 13 summarizes the final results for each design storm on a site-by-site basis. The peak I/I

flows from the design storm coincide with peak dry weather flows to get a “worst-case” scenario of

peak wet weather flows. Figure 26 shows the synthetic hydrograph response for the 10-year event forBasin 3.

Total Rainfall: 15.0 inches

Page 41: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 41/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 37 of 37

Table 13.

10-Year, 10-Day Design Storm Data Summary

SitePeak Flow

(mgd)

PeakingFactor

Basin 2 1.66 6.74

Basin 3 5.01 12.28

Basin 3A 3.68 12.35

Basin 3B  1.34 11.89

Basin 4 8.15 16.38

Basin 5 0.23 14.20

Basin 6 1.86 9.31

Basin 7A 1.10 9.82

Basin 7B 0.18 8.36

Basin 8 3.68 6.59Basin 8-1 1.74 5.37

Basin 8-2  2.05 8.77

Site 9 20.04 9.48

Figure 26. Basin 3: 10-Year, 10-Day Design Storm

0.0

0.5

1.0

1.5

2.0

Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11 Day 12 Day 13

   I   /   I   (  m  g   d   )

0.0

0.1

0.2

0.30.4

0.5

0.6

0.7

0.8

0.9

1.0

   R  a   i  n   (   i  n   /   h  r   )

0.0

1.0

2.0

3.0

4.0

5.0

6.0

Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8 Day 9 Day 10 Day 11 Day 12 Day 13

   F   l  o  w

   (  m  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

   R  a   i  n   (   i  n   /   h  r   )

Rain Estimated Total Flow Synthetic I/I Hydrograph

R1 Component R2 Component R3 Component R4 Component

R5 Component R6 Component R7 Component

Page 42: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 42/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page 38 of 38

RECOMMENDATIONS

V&A advises that future I&I reduction plans consider the following recommendations:

1. Determine I&I Reduction Program: The City should examine its I&I reduction needs to

determine a future I&I reduction program.

a. If peak flows, sanitary sewer overflows, and pipeline capacity issues are of greaterconcern, then the program can be prioritized to investigate and reduce sources of inflowwithin the basins with the greatest inflow problems.

b. If total infiltration and general pipeline deterioration are of greater concern, then prioritycan be given to investigate and reduce sources of infiltration within the basins with thegreatest infiltration problems.

2. I&I Investigation Methods: Potential I&I investigation methods include the following:

a. smoke testing

b. mini-basin flow monitoring

c. night-time reconnaissance work to (1) investigate and determine direct point sources ofinflow, and (2) determine the areas and/or pipe reaches responsible for high levels ofinfiltration contribution.

d. CCTV inspection

I&I Reduction Cost Effective Analysis: The City should conduct a study to determine which is more

cost-effective: (1) locating the sources of infiltration and inflow and systematically rehabilitating or

replacing the faulty pipelines; or (2) continued treatment of the additional rainfall dependent I&I flow.

Page 43: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 43/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Appendix A

APPENDIX A

INFLOW / INFILTRATION

TEMPERATURE MAPS

Page 44: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 44/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page A - 1

Figure 27. Inflow Temperature Map: Peak I&I per IDM

I&I:IDM > 30,000

25,000 > I&I:IDM > 30,000

20,000 > I&I:IDM > 25,000

15,000 > I&I:IDM > 20,000

I&I:IDM < 15,000

Page 45: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 45/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page A - 2

Figure 28. Inflow Temperature Map: Peak I&I per ACRE

I&I:ACRE > 6,000

4,500 > I&I:ACRE > 6,000

3,000 > I&I:ACRE > 4,500

1,500 > I&I:ACRE > 3,000

I&I:ACRE < 1,500

Page 46: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 46/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page A - 3

Figure 29. Inflow Temperature Map: Peak I&I per ADWF

I&I:ADWF > 7

7 > I&I:ADWF > 6

6 > I&I:ADWF > 5

5 > I&I:ADWF > 4

I&I:ADWF < 4

Page 47: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 47/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page A - 4

Figure 30. RDI Temperature Map: Feb 2 Infiltration Rate per IDM

I&I:IDM > 10,000

7,500 > I&I:IDM > 10,000

5,000 > I&I:IDM > 7,500

2,500 > I&I:IDM > 5,000

I&I:IDM < 2,500

Page 48: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 48/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page A - 5

Figure 31. RDI Temperature Map: Feb 2 Infiltration Rate per ACRE

I&I:ACRE > 2,400

1,800 > I&I:ACRE > 2,400

1,200 > I&I:ACRE > 1,800

600 > I&I:ACRE > 1,200

I&I:ACRE < 600

Page 49: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 49/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page A - 6

Figure 32. RDI Temperature Map: Feb 2 Infiltration Rate per ADWF

I&I:ADWF > 275%

200% > I&I:ADWF > 275%

125% > I&I:ADWF > 200%

50% > I&I:ADWF > 125%

I&I:ADWF < 50%

Page 50: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 50/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page A - 7

Figure 33. Combined I&I Temperature Map: Total I&I per IDM

I&I:IDM > 20,000

15,000 > I&I:IDM > 20,000

10,000 > I&I:IDM > 15,000

5,000 > I&I:IDM > 10,000

I&I:IDM < 5,000

Page 51: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 51/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page A - 8

Figure 34. Combined I&I Temperature Map: Total I&I per ACRE

I&I:R-Value > 16%

12% > I&I:R-Value > 16%

8% > I&I:R-Value > 12%

4% > I&I:R-Value > 8%

I&I:R-Value < 4%

Page 52: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 52/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Page A - 9

Figure 35. Combined I&I Temperature Map: Total I&I per ADWF

I&I:ADWF > 6.0

4.5 > I&I:ADWF > 6.0

3.0 > I&I:ADWF > 4.5

1.5 > I&I:ADWF > 3.0

I&I:ADWF < 1.5

Page 53: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 53/233

City of UkiahFlow Monitoring and Inflow / Infiltration Study

09-0747 WK Ukiah FM and II Report2 Appendix B

APPENDIX B

FLOW MONITORING SITES: DATA, GRAPHS, INFORMATION

Page 54: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 54/233

Monitoring Site:

Location:

Size/Type Line:

Basin 2

MH 1043: Norgard Lane at Townsend Lane

10-inch Sanitary Sewer Pipe

Temporary Flow Monitoring StudySanitary Sewer Collection System

Data Summary Report

Page 55: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 55/233

Basin 2

Location: MH 1043: Norgard Lane atTownsend Lane

Diameter: 10

Monitoring Site:Site Information

Report

 Average Dry Weather Flow: 0.247

Peak Measured Flow: 1.113

mgd 

mgd 

Flow Sketch

Satellite Map

Latitude: 39.1176°

Longitude: -123.1963°

Rim Elevation: 584 feet above sea level 

inches 

Street View Photo

Sanitary Map

Plan View Photo

Page 56: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 56/233

0.00

0.20

0.40

0.60

0.80

1.00

1.20

16-Jan

Sat

17-Jan

Sun

18-Jan

Mon

19-Jan

Tue

20-Jan

Wed

21-Jan

Thu

22-Jan

Fri

23-Jan

Sat

24-Jan

Sun

25-Jan

Mon

26-Jan

Tue

27-Jan

Wed

28-Jan

Thu

29-Jan

Fri

30-Jan

Sat

31-Jan

Sun

1-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        0 .

        7        4        7

        0 .

        8        5        9

        0 .

        8        4        5

        0 .

        7        0        9

        0 .

        8        2        7

        0 .

        7        4        2

        0 .

        6        0        5

        0 .

        5        3        2

        0 .

        4        9        8

        0 .

        4        0        6

        0 .

        3        6        9

        0 .

        3        8        1

        0 .

        4        1        8

        0 .

        4        9        6

        0 .

        4        5        3

        0 .

        4        2        0

        0 .

        3        7        5

        0 .

        3        5        4

        0 .

        3        3        7

        0 .

        3        0        8

        0 .

        3        0        7

        0 .

        2        9        1

        0 .

        2        7        4

0.00

0.20

0.40

0.60

0.80

1.00

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

   F   l  o  w    (   M

   G  a   l   )

0.00

0.20

0.40

0.60

0.80

1.00

1.20

6-Feb

Sat

7-Feb

Sun

8-Feb

Mon

9-Feb

Tue

10-Feb

Wed

11-Feb

Thu

12-Feb

Fri

13-Feb

Sat

14-Feb

Sun

15-Feb

Mon

16-Feb

Tue

17-Feb

Wed

18-Feb

Thu

19-Feb

Fri

20-Feb

Sat

21-Feb

Sun

22-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

        0 .

        3        0        7

        0 .

        2        9        7

        0 .

        6        2        7

        0 .

        5        9        6

        0 .

        4        8        1

        0 .

        4        4        3

        0 .

        5        2        4

        0 .

        5        1        9

        0 .

        3        3        1

        0 .

        3        1        9

        0 .

        2        8        1

0.00

0.20

0.40

0.60

0.80

1.00

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

        0 .

        5        6        8

        0 .

        3        4        5

0.00

0.20

0.40

0.60

0.80

1.00

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

January 16 to February 27, 2010

Total Monthly Rainfall: 16.72 inches Avg Flow: 0.46 mgd Peak Flow: 1.11 mgd Min Flow: 0.17 mgd

Page 57: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 57/233

0.00

0.20

0.40

0.60

0.80

1.00

1.20

27-Feb

Sat

28-Feb

Sun

1-Mar 

Mon

2-Mar 

Tue

3-Mar 

Wed

4-Mar 

Thu

5-Mar 

Fri

6-Mar 

Sat

7-Mar 

Sun

8-Mar 

Mon

9-Mar 

Tue

10-Mar 

Wed

11-Mar 

Thu

12-Mar 

Fri

13-Mar 

Sat

14-Mar 

Sun

15-Mar 

Mon

1

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        0 .

        3        7        0

        0 .

        4        5        5

        0 .

        5        6        3

        0 .

        5        1        6

        0 .

        4        6        5

        0 .

        3        6        4

        0 .

        3        4        2

        0 .

        3        5        6

        0 .

        3        1        6

        0 .

        4        3        3

        0 .

        3        6        3

        0 .

        3        3        6

        0 .

        3        1        3

        0 .

        2        9        5

        0 .

        2        7        6

        0 .

        2        4        7

        0 .

        2        5        6

        0 .

        2        5        3

        0 .

        2        5        9

        0 .

        2        5        7

        0 .

        2        6        2

        0 .

        3        3        4

        0 .

        3        9        3

        0 .

        3        8        4

        0 .

        4        1        6

0.00

0.20

0.40

0.60

0.80

1.00

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

   F   l  o  w    (   M

   G  a   l   )

0.00

0.20

0.40

0.60

0.80

1.00

1.20

20-Mar 

Sat

21-Mar 

Sun

22-Mar 

Mon

23-Mar 

Tue

24-Mar 

Wed

25-Mar 

Thu

26-Mar 

Fri

27-Mar 

Sat

28-Mar 

Sun

29-Mar 

Mon

30-Mar 

Tue

31-Mar 

Wed

1-Apr 

Thu

2-Apr 

Fri

3-Apr 

Sat

4-Apr 

Sun

5-Apr 

Mon

6

   F   l  o  w

   (  m  g   d   )

        0 .

        4        9        8

        0 .

        4        4        2

        0 .

        4        4        6

        0 .

        4        0        9

        0 .

        4        8        9

        0 .

        4        2        2

        0 .

        2        5        8

        0 .

        2        5        9

        0 .

        2        6        4

        0 .

        2        5        9

        0 .

        4        5        2

0.00

0.20

0.40

0.60

0.80

1.00

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

0.00

0.20

0.40

0.60

0.80

1.00

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

February 27, 2010 to April 9, 2010

Total Monthly Rainfall: 6.53 inches Avg Flow: 0.38 mgd Peak Flow: 0.78 mgd Min Flow: 0.16 mgd

Page 58: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 58/233

M Average Dry Weather Flow

0.000

0.050

0.100

0.150

0.200

0.250

0.300

0.350

0.400

        0      :        0        0

        1      :        0        0

        2      :        0        0

        3      :        0        0

        4      :        0        0

        5      :        0        0

        6      :        0        0

        7      :        0        0

        8      :        0        0

        9      :        0        0

        1        0      :        0        0

        1        1      :        0        0

        1        2      :        0        0

        1        3      :        0        0

        1        4      :        0        0

        1        5      :        0        0

        1        6      :        0        0

        1        7      :        0        0

        1        8      :        0        0

        1        9      :        0        0

        2        0      :        0        0

        2        1      :        0        0

        2        2      :        0        0

        2        3      :        0        0

   F   l  o  w    (  m

  g   d   )

WeekdayWeekend

Page 59: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 59/233

MoI/I Summary

 

0.00

0.20

0.40

0.60

0.80

1.00

1.20

       0       1        /       1       7

       0       1        /       1        8

       0       1        /       1       9

       0       1        /       2       0

       0       1        /       2       1

       0       1        /       2       2

       0       1        /       2       3

       0       1        /       2       4

       0       1        /       2       5

       0       1        /       2       6

       0       1        /       2       7

       0       1        /       2        8

       0       1        /       2       9

       0       1        /       3       0

       0       1        /       3       1

   F   l  o  w    (

  m  g   d   )

Event 1 I&I ANALYSIS (Rainfall = 13 inches)

Inflow Infiltration on 2/2/2010 (post rain event) Total I&I

Total I/I: gallons6,081,000

I/I per ADWF: per in-rain1.89

Peak I/I Rate: mgd 0.84

Pk I/I:ADWF: 3.40

Infiltration Rate: 0.12

4.4%R-Value:

11,300I/I per IDM: gal/IDM/in-rai

Pk I/I:ACRE: 2,170

Pk I/I:IDM: 20,200

mgd 

Infiltration:ADWF: 0.50

Infiltration:ACRE: 320

Infiltration:IDM: 2,900  gpd/IDM

 gpd/acre

 gpd/IDM

 gpd/acre

Page 60: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 60/233

Basin 2

Monitoring Site:Level, Velocity and Flow

From 1/11/2010 to 1/18/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1/11 1/12 1/13 1/14 1/15 1/16 1/17

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.76 inches

Avg Level: 2.4 in. Peak Level: 3.16 in. Min Level: 1.83 in.

Avg Velocity: 4.54 fps Peak Velocity: 5.04 fps Min Velocity: 3.78 fps

Avg Flow: 0.3 mgd Peak Flow: 0.481 mgd Min Flow: 0.172 mgd

Page 61: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 61/233

Basin 2

Monitoring Site:Level, Velocity and Flow

From 1/18/2010 to 1/25/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1/18 1/19 1/20 1/21 1/22 1/23 1/24

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 9.37 inches

Avg Level: 3.85 in. Peak Level: 5.14 in. Min Level: 2.44 in.

Avg Velocity: 5.6 fps Peak Velocity: 6.18 fps Min Velocity: 4.48 fps

Avg Flow: 0.707 mgd Peak Flow: 1.113 mgd Min Flow: 0.303 mgd

Page 62: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 62/233

Basin 2

Monitoring Site:Level, Velocity and Flow

From 1/25/2010 to 2/1/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1/25 1/26 1/27 1/28 1/29 1/30 1/31

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.79 inches

Avg Level: 3.46 in. Peak Level: 4.78 in. Min Level: 2.63 in.

Avg Velocity: 5.4 fps Peak Velocity: 6.04 fps Min Velocity: 4.88 fps

Avg Flow: 0.59 mgd Peak Flow: 1.006 mgd Min Flow: 0.362 mgd

Page 63: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 63/233

Basin 2

Monitoring Site:Level, Velocity and Flow

From 2/1/2010 to 2/8/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

2/1 2/2 2/3 2/4 2/5 2/6 2/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.63 inches

Avg Level: 2.93 in. Peak Level: 3.83 in. Min Level: 2.18 in.

Avg Velocity: 5.11 fps Peak Velocity: 5.6 fps Min Velocity: 4.44 fps

Avg Flow: 0.445 mgd Peak Flow: 0.677 mgd Min Flow: 0.255 mgd

Page 64: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 64/233

Basin 2

Monitoring Site:Level, Velocity and Flow

From 2/8/2010 to 2/15/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

2/8 2/9 2/10 2/11 2/12 2/13 2/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.41 inches

Avg Level: 2.64 in. Peak Level: 3.28 in. Min Level: 2.09 in.

Avg Velocity: 4.93 fps Peak Velocity: 5.4 fps Min Velocity: 4.3 fps

Avg Flow: 0.37 mgd Peak Flow: 0.542 mgd Min Flow: 0.23 mgd

Page 65: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 65/233

Basin 2

Monitoring Site:Level, Velocity and Flow

From 2/15/2010 to 2/22/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

2/15 2/16 2/17 2/18 2/19 2/20 2/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.02 inches

Avg Level: 2.37 in. Peak Level: 3.17 in. Min Level: 1.87 in.

Avg Velocity: 4.62 fps Peak Velocity: 5.1 fps Min Velocity: 4.05 fps

Avg Flow: 0.299 mgd Peak Flow: 0.482 mgd Min Flow: 0.189 mgd

Page 66: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 66/233

Basin 2

Monitoring Site:Level, Velocity and Flow

From 2/22/2010 to 3/1/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

2/22 2/23 2/24 2/25 2/26 2/27 2/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.8 inches

Avg Level: 2.67 in. Peak Level: 3.64 in. Min Level: 1.89 in.

Avg Velocity: 4.81 fps Peak Velocity: 5.5 fps Min Velocity: 4 fps

Avg Flow: 0.372 mgd Peak Flow: 0.637 mgd Min Flow: 0.185 mgd

Page 67: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 67/233

Basin 2

Monitoring Site:Level, Velocity and Flow

From 3/1/2010 to 3/8/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

3/1 3/2 3/3 3/4 3/5 3/6 3/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.56 inches

Avg Level: 3.01 in. Peak Level: 3.8 in. Min Level: 2.18 in.

Avg Velocity: 5.12 fps Peak Velocity: 5.65 fps Min Velocity: 4.42 fps

Avg Flow: 0.461 mgd Peak Flow: 0.695 mgd Min Flow: 0.252 mgd

Page 68: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 68/233

Basin 2

Monitoring Site:Level, Velocity and Flow

From 3/8/2010 to 3/15/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

3/8 3/9 3/10 3/11 3/12 3/13 3/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.53 inches

Avg Level: 2.74 in. Peak Level: 3.6 in. Min Level: 1.99 in.

Avg Velocity: 4.9 fps Peak Velocity: 5.45 fps Min Velocity: 4.18 fps

Avg Flow: 0.389 mgd Peak Flow: 0.62 mgd Min Flow: 0.208 mgd

Page 69: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 69/233

Basin 2

Monitoring Site:Level, Velocity and Flow

From 3/15/2010 to 3/22/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

3/15 3/16 3/17 3/18 3/19 3/20 3/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlow

Avg Level: 2.32 in. Peak Level: 2.89 in. Min Level: 1.79 in.

Avg Velocity: 4.78 fps Peak Velocity: 5.31 fps Min Velocity: 4.09 fps

Avg Flow: 0.3 mgd Peak Flow: 0.447 mgd Min Flow: 0.175 mgd

Page 70: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 70/233

Basin 2

Monitoring Site:Level, Velocity and Flow

From 3/22/2010 to 3/29/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

3/22 3/23 3/24 3/25 3/26 3/27 3/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.37 inches

Avg Level: 2.13 in. Peak Level: 2.71 in. Min Level: 1.72 in.

Avg Velocity: 4.61 fps Peak Velocity: 5.19 fps Min Velocity: 4 fps

Avg Flow: 0.256 mgd Peak Flow: 0.381 mgd Min Flow: 0.165 mgd

Page 71: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 71/233

Basin 2

Monitoring Site:Level, Velocity and Flow

From 3/29/2010 to 4/5/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

3/29 3/30 3/31 4/1 4/2 4/3 4/4

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.89 inches

Avg Level: 2.69 in. Peak Level: 4.12 in. Min Level: 1.74 in.

Avg Velocity: 5.11 fps Peak Velocity: 5.74 fps Min Velocity: 4.03 fps

Avg Flow: 0.398 mgd Peak Flow: 0.784 mgd Min Flow: 0.165 mgd

Page 72: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 72/233

Basin 2

Monitoring Site:Level, Velocity and Flow

From 4/5/2010 to 4/12/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

4/5 4/6 4/7 4/8 4/9 4/10 4/11

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.11 inches

Avg Level: 3.01 in. Peak Level: 3.78 in. Min Level: 2.41 in.

Avg Velocity: 5.22 fps Peak Velocity: 5.69 fps Min Velocity: 4.55 fps

Avg Flow: 0.47 mgd Peak Flow: 0.695 mgd Min Flow: 0.299 mgd

Page 73: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 73/233

Monitoring Site:

Location:

Size/Type Line:

Basin 3A 

MH 750: Frontage Road; off of Talmage Road

18-inch Sanitary Sewer Pipe

Temporary Flow Monitoring StudySanitary Sewer Collection System

Data Summary Report

Page 74: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 74/233

Basin 3A 

Location: MH 750: Frontage Road; off of Talmage Road

Diameter: 18

Monitoring Site:Site Information

Report

 Average Dry Weather Flow: 0.411

Peak Measured Flow: 3.274

mgd 

mgd 

Flow Sketch

Satellite Map

Latitude: 39.1365°

Longitude: -123.1942°

Rim Elevation: 592 feet above sea level 

inches 

Street View Photo

Sanitary Map

Plan View Photo

Page 75: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 75/233

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

16-Jan

Sat

17-Jan

Sun

18-Jan

Mon

19-Jan

Tue

20-Jan

Wed

21-Jan

Thu

22-Jan

Fri

23-Jan

Sat

24-Jan

Sun

25-Jan

Mon

26-Jan

Tue

27-Jan

Wed

28-Jan

Thu

29-Jan

Fri

30-Jan

Sat

31-Jan

Sun

1-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        1 .

        3        8        1

        1 .

        9        4        5

        2 .

        1        5        2

        1 .

        9        9        6

        2 .

        6        1        1

        2 .

        6        0        5

        2 .

        2        2        9

        2 .

        0        1        1

        1 .

        8        5        8

        1 .

        5        3        0

        1 .

        4        7        6

        1 .

        3        8        6

        1 .

        4        4        5

        1 .

        6        1        7

        1 .

        5        0        2

        1 .

        4        5        6

        1 .

        3        8        3

        1 .

        3        1        9

        1 .

        2        8        0

        1 .

        1        3        3

        1 .

        1        2        5

        1 .

        0        9        5

        1 .

        0        6        5

0.00

0.50

1.00

1.50

2.00

2.50

3.00

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

   F   l  o  w    (   M

   G  a   l   )

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

6-Feb

Sat

7-Feb

Sun

8-Feb

Mon

9-Feb

Tue

10-Feb

Wed

11-Feb

Thu

12-Feb

Fri

13-Feb

Sat

14-Feb

Sun

15-Feb

Mon

16-Feb

Tue

17-Feb

Wed

18-Feb

Thu

19-Feb

Fri

20-Feb

Sat

21-Feb

Sun

22-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

        0 .

        5        6        4

        0 .

        4        7        1

        1 .

        8        5        9

        1 .

        8        4        9

        1 .

        7        7        2

        1 .

        6        3        1

        1 .

        6        2        6

        1 .

        5        9        4

        1 .

        2        3        3

        1 .

        1        7        3

        1 .

        0        5        8

0.00

0.50

1.00

1.50

2.00

2.50

3.00

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

        0 .

        9        5        4

        1 .

        1        7        4

0.00

0.50

1.00

1.50

2.00

2.50

3.00

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

January 16 to February 27, 2010

Total Monthly Rainfall: 15.92 inches Avg Flow: 1.46 mgd Peak Flow: 3.27 mgd Min Flow: 0.21 mgd

Page 76: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 76/233

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

27-Feb

Sat

28-Feb

Sun

1-Mar 

Mon

2-Mar 

Tue

3-Mar 

Wed

4-Mar 

Thu

5-Mar 

Fri

6-Mar 

Sat

7-Mar 

Sun

8-Mar 

Mon

9-Mar 

Tue

10-Mar 

Wed

11-Mar 

Thu

12-Mar 

Fri

13-Mar 

Sat

14-Mar 

Sun

15-Mar 

Mon

1

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        1 .

        2        3        0

        1 .

        3        3        3

        1 .

        6        4        8

        1 .

        6        6        4

        1 .

        5        8        4

        1 .

        4        0        7

        1 .

        3        5        6

        1 .

        3        4        0

        1 .

        2        9        0

        1 .

        4        2        2

        1 .

        3        9        0

        1 .

        3        1        7

        1 .

        2        6        7

        1 .

        2        4        5

        1 .

        2        2        7

        1 .

        0        9        6

        1 .

        0        6        7

        1 .

        0        5        9

        1 .

        0        5        8

        1 .

        0        1        8

        1 .

        0        4        7

        1 .

        1        1        4

        1 .

        2        1        4

        1 .

        1        8        4

        1 .

        2        4        9

0.00

0.50

1.00

1.50

2.00

2.50

3.00

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

   F   l  o  w    (   M

   G  a   l   )

0.00

0.50

1.00

1.50

2.00

2.50

3.003.50

4.00

20-Mar 

Sat

21-Mar 

Sun

22-Mar 

Mon

23-Mar 

Tue

24-Mar 

Wed

25-Mar 

Thu

26-Mar 

Fri

27-Mar 

Sat

28-Mar 

Sun

29-Mar 

Mon

30-Mar 

Tue

31-Mar 

Wed

1-Apr 

Thu

2-Apr 

Fri

3-Apr 

Sat

4-Apr 

Sun

5-Apr 

Mon

6

   F   l  o  w

   (  m  g   d   )

        1 .

        4        0        7

        1 .

        2        9        6

        1 .

        5        5        5

        1 .

        4        8        6

        1 .

        5        4        2

        1 .

        4        4        6

        1 .

        1        3        3

        1 .

        1        0        5

        1 .

        0        3        1

        1 .

        0        4        3

        1 .

        2        9        1

0.00

0.50

1.00

1.50

2.00

2.50

3.00

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

0.00

0.50

1.00

1.50

2.00

2.50

3.00

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

February 27, 2010 to April 9, 2010

Total Monthly Rainfall: 6.96 inches Avg Flow: 1.3 mgd Peak Flow: 1.88 mgd Min Flow: 0.76 mgd

Page 77: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 77/233

M Average Dry Weather Flow

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

        0      :        0        0

        1      :        0        0

        2      :        0        0

        3      :        0        0

        4      :        0        0

        5      :        0        0

        6      :        0        0

        7      :        0        0

        8      :        0        0

        9      :        0        0

        1        0      :        0        0

        1        1      :        0        0

        1        2      :        0        0

        1        3      :        0        0

        1        4      :        0        0

        1        5      :        0        0

        1        6      :        0        0

        1        7      :        0        0

        1        8      :        0        0

        1        9      :        0        0

        2        0      :        0        0

        2        1      :        0        0

        2        2      :        0        0

        2        3      :        0        0

   F   l  o  w    (  m

  g   d   )

WeekdayWeekend

Page 78: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 78/233

MoI/I Summary

 

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

       0       1        /       1       7

       0       1        /       1        8

       0       1        /       1       9

       0       1        /       2       0

       0       1        /       2       1

       0       1        /       2       2

       0       1        /       2       3

       0       1        /       2       4

       0       1        /       2       5

       0       1        /       2       6

       0       1        /       2       7

       0       1        /       2        8

       0       1        /       2       9

       0       1        /       3       0

       0       1        /       3       1

   F   l  o  w    (

  m  g   d   )

Event 1 I&I ANALYSIS (Rainfall = 12.37 inches)

Inflow Infiltration on 2/2/2010 (post rain event) Total I&I

Total I/I: gallons24,322,000

I/I per ADWF: per in-rain4.78

Peak I/I Rate: mgd 2.81

Pk I/I:ADWF: 6.84

Infiltration Rate: 1.08

14.7%R-Value:

20,500I/I per IDM: gal/IDM/in-rai

Pk I/I:ACRE: 5,700

Pk I/I:IDM: 29,200

mgd 

Infiltration:ADWF: 2.62

Infiltration:ACRE: 2,180

Infiltration:IDM: 11,200  gpd/IDM

 gpd/acre

 gpd/IDM

 gpd/acre

Page 79: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 79/233

Basin 3A 

Monitoring Site:Level, Velocity and Flow

From 1/11/2010 to 1/18/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

1/11 1/12 1/13 1/14 1/15 1/16 1/17

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.81 inches

Avg Level: 4.8 in. Peak Level: 5.87 in. Min Level: 3.34 in.

Avg Velocity: 1.99 fps Peak Velocity: 2.41 fps Min Velocity: 1.42 fps

Avg Flow: 0.502 mgd Peak Flow: 0.774 mgd Min Flow: 0.207 mgd

Page 80: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 80/233

Basin 3A 

Monitoring Site:Level, Velocity and Flow

From 1/18/2010 to 1/25/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

1/18 1/19 1/20 1/21 1/22 1/23 1/24

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 8.83 inches

Avg Level: 8.9 in. Peak Level: 10.77 in. Min Level: 4.31 in.

Avg Velocity: 3.02 fps Peak Velocity: 3.5 fps Min Velocity: 1.82 fps

Avg Flow: 1.734 mgd Peak Flow: 2.487 mgd Min Flow: 0.388 mgd

Page 81: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 81/233

Basin 3A 

Monitoring Site:Level, Velocity and Flow

From 1/25/2010 to 2/1/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

1/25 1/26 1/27 1/28 1/29 1/30 1/31

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.66 inches

Avg Level: 10.07 in. Peak Level: 14.52 in. Min Level: 8.28 in.

Avg Velocity: 3.19 fps Peak Velocity: 3.62 fps Min Velocity: 2.84 fps

Avg Flow: 2.102 mgd Peak Flow: 3.274 mgd Min Flow: 1.501 mgd

Page 82: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 82/233

Basin 3A 

Monitoring Site:Level, Velocity and Flow

From 2/1/2010 to 2/8/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

2/1 2/2 2/3 2/4 2/5 2/6 2/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.39 inches

Avg Level: 8.44 in. Peak Level: 9.74 in. Min Level: 7.19 in.

Avg Velocity: 2.89 fps Peak Velocity: 3.16 fps Min Velocity: 2.67 fps

Avg Flow: 1.525 mgd Peak Flow: 1.971 mgd Min Flow: 1.181 mgd

Page 83: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 83/233

Basin 3A 

Monitoring Site:Level, Velocity and Flow

From 2/8/2010 to 2/15/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

2/8 2/9 2/10 2/11 2/12 2/13 2/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.37 inches

Avg Level: 7.84 in. Peak Level: 8.75 in. Min Level: 6.7 in.

Avg Velocity: 2.79 fps Peak Velocity: 3.03 fps Min Velocity: 2.56 fps

Avg Flow: 1.335 mgd Peak Flow: 1.627 mgd Min Flow: 0.999 mgd

Page 84: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 84/233

Basin 3A 

Monitoring Site:Level, Velocity and Flow

From 2/15/2010 to 2/22/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

2/15 2/16 2/17 2/18 2/19 2/20 2/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.02 inches

Avg Level: 7.08 in. Peak Level: 8.18 in. Min Level: 6.04 in.

Avg Velocity: 2.62 fps Peak Velocity: 2.99 fps Min Velocity: 2.34 fps

Avg Flow: 1.095 mgd Peak Flow: 1.384 mgd Min Flow: 0.794 mgd

Page 85: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 85/233

Basin 3A 

Monitoring Site:Level, Velocity and Flow

From 2/22/2010 to 3/1/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

2/22 2/23 2/24 2/25 2/26 2/27 2/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.9 inches

Avg Level: 7.26 in. Peak Level: 9.25 in. Min Level: 5.84 in.

Avg Velocity: 2.68 fps Peak Velocity: 3.12 fps Min Velocity: 2.24 fps

Avg Flow: 1.166 mgd Peak Flow: 1.796 mgd Min Flow: 0.727 mgd

Page 86: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 86/233

Basin 3A 

Monitoring Site:Level, Velocity and Flow

From 3/1/2010 to 3/8/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

3/1 3/2 3/3 3/4 3/5 3/6 3/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.66 inches

Avg Level: 8.28 in. Peak Level: 9.41 in. Min Level: 6.59 in.

Avg Velocity: 2.91 fps Peak Velocity: 3.13 fps Min Velocity: 2.58 fps

Avg Flow: 1.5 mgd Peak Flow: 1.876 mgd Min Flow: 0.995 mgd

Page 87: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 87/233

Basin 3A 

Monitoring Site:Level, Velocity and Flow

From 3/8/2010 to 3/15/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

3/8 3/9 3/10 3/11 3/12 3/13 3/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.58 inches

Avg Level: 7.98 in. Peak Level: 9.25 in. Min Level: 6.69 in.

Avg Velocity: 2.86 fps Peak Velocity: 3.07 fps Min Velocity: 2.61 fps

Avg Flow: 1.4 mgd Peak Flow: 1.802 mgd Min Flow: 1.033 mgd

Page 88: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 88/233

Basin 3A 

Monitoring Site:Level, Velocity and Flow

From 3/15/2010 to 3/22/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

3/15 3/16 3/17 3/18 3/19 3/20 3/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches

Avg Level: 7.46 in. Peak Level: 8.6 in. Min Level: 6.28 in.

Avg Velocity: 2.77 fps Peak Velocity: 3 fps Min Velocity: 2.46 fps

Avg Flow: 1.241 mgd Peak Flow: 1.605 mgd Min Flow: 0.899 mgd

Page 89: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 89/233

Basin 3A 

Monitoring Site:Level, Velocity and Flow

From 3/22/2010 to 3/29/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

3/22 3/23 3/24 3/25 3/26 3/27 3/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.46 inches

Avg Level: 6.86 in. Peak Level: 7.81 in. Min Level: 5.84 in.

Avg Velocity: 2.62 fps Peak Velocity: 2.83 fps Min Velocity: 2.24 fps

Avg Flow: 1.053 mgd Peak Flow: 1.313 mgd Min Flow: 0.757 mgd

Page 90: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 90/233

Basin 3A 

Monitoring Site:Level, Velocity and Flow

From 3/29/2010 to 4/5/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

3/29 3/30 3/31 4/1 4/2 4/3 4/4

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 3.08 inches

Avg Level: 7.34 in. Peak Level: 8.97 in. Min Level: 6.05 in.

Avg Velocity: 2.76 fps Peak Velocity: 3.09 fps Min Velocity: 2.38 fps

Avg Flow: 1.215 mgd Peak Flow: 1.755 mgd Min Flow: 0.815 mgd

Page 91: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 91/233

Basin 3A 

Monitoring Site:Level, Velocity and Flow

From 4/5/2010 to 4/12/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4/5 4/6 4/7 4/8 4/9 4/10 4/11

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.12 inches

Avg Level: 7.92 in. Peak Level: 8.85 in. Min Level: 6.89 in.

Avg Velocity: 2.89 fps Peak Velocity: 3.09 fps Min Velocity: 2.62 fps

Avg Flow: 1.402 mgd Peak Flow: 1.7 mgd Min Flow: 1.092 mgd

Page 92: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 92/233

Monitoring Site:

Location:

Size/Type Line:

Basin 3B

MH 959: S State Street between Washington Avenue and Wabash Avenue

12-inch Sanitary Sewer Pipe

Temporary Flow Monitoring StudySanitary Sewer Collection System

Data Summary Report

Page 93: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 93/233

Basin 3B

Location: MH 959: S State Street betweenWashington Avenue and Wabash

Diameter: 12

Monitoring Site:Site Information

Report

 Average Dry Weather Flow: 0.113

Peak Measured Flow: 0.830

mgd 

mgd 

Flow Sketch

Satellite Map

Latitude: 39.1331°

Longitude: -123.2051°

Rim Elevation: 627 feet above sea level 

inches 

Street View Photo

Sanitary Map

Plan View Photo

Page 94: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 94/233

0.00

0.20

0.40

0.60

0.80

1.00

1.20

16-Jan

Sat

17-Jan

Sun

18-Jan

Mon

19-Jan

Tue

20-Jan

Wed

21-Jan

Thu

22-Jan

Fri

23-Jan

Sat

24-Jan

Sun

25-Jan

Mon

26-Jan

Tue

27-Jan

Wed

28-Jan

Thu

29-Jan

Fri

30-Jan

Sat

31-Jan

Sun

1-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        0 .

        3        8        1

        0 .

        5        2        5

        0 .

        5        9        4

        0 .

        5        6        8

        0 .

        6        8        5

        0 .

        6        9        7

        0 .

        6        1        4

        0 .

        5        5        9

        0 .

        5        1        0

        0 .

        2        9        8

        0 .

        2        6        5

        0 .

        2        5        0

        0 .

        2        4        6

        0 .

        2        7        5

        0 .

        2        6        1

        0 .

        2        4        8

        0 .

        2        3        2

        0 .

        2        0        9

        0 .

        1        9        8

        0 .

        1        3        2

        0 .

        1        3        3

        0 .

        1        2        9

        0 .

        1        1        8

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

   F   l  o  w    (   M

   G  a   l   )

0.00

0.20

0.40

0.60

0.80

1.00

1.20

6-Feb

Sat

7-Feb

Sun

8-Feb

Mon

9-Feb

Tue

10-Feb

Wed

11-Feb

Thu

12-Feb

Fri

13-Feb

Sat

14-Feb

Sun

15-Feb

Mon

16-Feb

Tue

17-Feb

Wed

18-Feb

Thu

19-Feb

Fri

20-Feb

Sat

21-Feb

Sun

22-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

        0 .

        1        3        7

        0 .

        1        2        7

        0 .

        5        8        4

        0 .

        5        4        6

        0 .

        4        6        2

        0 .

        3        6        5

        0 .

        2        7        9

        0 .

        2        7        1

        0 .

        1        7        1

        0 .

        1        3        9

        0 .

        1        1        3

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

        0 .

        2        3        2

        0 .

        1        4        0

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

January 16 to February 27, 2010

Total Monthly Rainfall: 16.29 inches Avg Flow: 0.3 mgd Peak Flow: 0.83 mgd Min Flow: 0.03 mgd

Page 95: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 95/233

0.00

0.20

0.40

0.60

0.80

1.00

1.20

27-Feb

Sat

28-Feb

Sun

1-Mar 

Mon

2-Mar 

Tue

3-Mar 

Wed

4-Mar 

Thu

5-Mar 

Fri

6-Mar 

Sat

7-Mar 

Sun

8-Mar 

Mon

9-Mar 

Tue

10-Mar 

Wed

11-Mar 

Thu

12-Mar 

Fri

13-Mar 

Sat

14-Mar 

Sun

15-Mar 

Mon

1

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        0 .

        1        4        6

        0 .

        1        6        8

        0 .

        1        9        9

        0 .

        1        9        4

        0 .

        1        8        9

        0 .

        1        8        0

        0 .

        1        7        6

        0 .

        1        8        9

        0 .

        1        7        1

        0 .

        1        8        1

        0 .

        1        7        6

        0 .

        1        5        9

        0 .

        1        5        4

        0 .

        1        5        3

        0 .

        1        4        1

        0 .

        1        1        6

        0 .

        1        0        8

        0 .

        1        1        3

        0 .

        1        2        9

        0 .

        1        2        2

        0 .

        1        1        6

        0 .

        1        3        8

        0 .

        1        5        9

        0 .

        1        5        3

        0 .

        1        7        8

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

   F   l  o  w    (   M

   G  a   l   )

0.00

0.20

0.40

0.60

0.80

1.00

1.20

20-Mar 

Sat

21-Mar 

Sun

22-Mar 

Mon

23-Mar 

Tue

24-Mar 

Wed

25-Mar 

Thu

26-Mar 

Fri

27-Mar 

Sat

28-Mar 

Sun

29-Mar 

Mon

30-Mar 

Tue

31-Mar 

Wed

1-Apr 

Thu

2-Apr 

Fri

3-Apr 

Sat

4-Apr 

Sun

5-Apr 

Mon

6

   F   l  o  w

   (  m  g   d   )

        0 .

        1        6        8

        0 .

        1        6        1

        0 .

        1        8        7

        0 .

        1        9        5

        0 .

        1        9        2

        0 .

        1        7        6

        0 .

        1        3        0

        0 .

        1        3        4

        0 .

        1        3        4

        0 .

        1        2        9

        0 .

        1        7        7

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

February 27, 2010 to April 9, 2010

Total Monthly Rainfall: 6.76 inches Avg Flow: 0.16 mgd Peak Flow: 0.32 mgd Min Flow: 0.04 mgd

Page 96: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 96/233

M Average Dry Weather Flow

0.000

0.050

0.100

0.150

0.200

0.250

        0      :        0        0

        1      :        0        0

        2      :        0        0

        3      :        0        0

        4      :        0        0

        5      :        0        0

        6      :        0        0

        7      :        0        0

        8      :        0        0

        9      :        0        0

        1        0      :        0        0

        1        1      :        0        0

        1        2      :        0        0

        1        3      :        0        0

        1        4      :        0        0

        1        5      :        0        0

        1        6      :        0        0

        1        7      :        0        0

        1        8      :        0        0

        1        9      :        0        0

        2        0      :        0        0

        2        1      :        0        0

        2        2      :        0        0

        2        3      :        0        0

   F   l  o  w    (  m

  g   d   )

WeekdayWeekend

Page 97: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 97/233

MoI/I Summary

 

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

       0       1        /       1       7

       0       1        /       1        8

       0       1        /       1       9

       0       1        /       2       0

       0       1        /       2       1

       0       1        /       2       2

       0       1        /       2       3

       0       1        /       2       4

       0       1        /       2       5

       0       1        /       2       6

       0       1        /       2       7

       0       1        /       2        8

       0       1        /       2       9

       0       1        /       3       0

       0       1        /       3       1

   F   l  o  w    (

  m  g   d   )

Event 1 I&I ANALYSIS (Rainfall = 12.66 inches)

Inflow Infiltration on 2/2/2010 (post rain event) Total I&I

Total I/I: gallons6,221,000

I/I per ADWF: per in-rain4.34

Peak I/I Rate: mgd 0.69

Pk I/I:ADWF: 6.10

Infiltration Rate: 0.15

9.9%R-Value:

15,200I/I per IDM: gal/IDM/in-rai

Pk I/I:ACRE: 3,800

Pk I/I:IDM: 21,400

mgd 

Infiltration:ADWF: 1.36

Infiltration:ACRE: 850

Infiltration:IDM: 4,800  gpd/IDM

 gpd/acre

 gpd/IDM

 gpd/acre

Page 98: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 98/233

Basin 3B

Monitoring Site:Level, Velocity and Flow

From 1/11/2010 to 1/18/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1/11 1/12 1/13 1/14 1/15 1/16 1/17

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.79 inches

Avg Level: 2.37 in. Peak Level: 3.1 in. Min Level: 1.43 in.

Avg Velocity: 1.76 fps Peak Velocity: 2.12 fps Min Velocity: 1.24 fps

Avg Flow: 0.13 mgd Peak Flow: 0.214 mgd Min Flow: 0.043 mgd

Page 99: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 99/233

Basin 3B

Monitoring Site:Level, Velocity and Flow

From 1/18/2010 to 1/25/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1/18 1/19 1/20 1/21 1/22 1/23 1/24

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 9.08 inches

Avg Level: 4.69 in. Peak Level: 5.87 in. Min Level: 2.09 in.

Avg Velocity: 2.59 fps Peak Velocity: 2.92 fps Min Velocity: 1.56 fps

Avg Flow: 0.49 mgd Peak Flow: 0.698 mgd Min Flow: 0.092 mgd

Page 100: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 100/233

Basin 3B

Monitoring Site:Level, Velocity and Flow

From 1/25/2010 to 2/1/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1/25 1/26 1/27 1/28 1/29 1/30 1/31

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.72 inches

Avg Level: 5.07 in. Peak Level: 6.66 in. Min Level: 3.69 in.

Avg Velocity: 2.69 fps Peak Velocity: 2.99 fps Min Velocity: 2.12 fps

Avg Flow: 0.556 mgd Peak Flow: 0.83 mgd Min Flow: 0.282 mgd

Page 101: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 101/233

Basin 3B

Monitoring Site:Level, Velocity and Flow

From 2/1/2010 to 2/8/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

2/1 2/2 2/3 2/4 2/5 2/6 2/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.5 inches

Avg Level: 3.56 in. Peak Level: 4.29 in. Min Level: 2.74 in.

Avg Velocity: 2.11 fps Peak Velocity: 2.48 fps Min Velocity: 1.72 fps

Avg Flow: 0.269 mgd Peak Flow: 0.392 mgd Min Flow: 0.15 mgd

Page 102: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 102/233

Basin 3B

Monitoring Site:Level, Velocity and Flow

From 2/8/2010 to 2/15/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

2/8 2/9 2/10 2/11 2/12 2/13 2/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.39 inches

Avg Level: 3 in. Peak Level: 3.79 in. Min Level: 2.01 in.

Avg Velocity: 2.06 fps Peak Velocity: 2.52 fps Min Velocity: 1.42 fps

Avg Flow: 0.208 mgd Peak Flow: 0.336 mgd Min Flow: 0.079 mgd

Page 103: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 103/233

Basin 3B

Monitoring Site:Level, Velocity and Flow

From 2/15/2010 to 2/22/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

2/15 2/16 2/17 2/18 2/19 2/20 2/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.02 inches

Avg Level: 2.3 in. Peak Level: 3.2 in. Min Level: 1.36 in.

Avg Velocity: 1.77 fps Peak Velocity: 2.3 fps Min Velocity: 1.18 fps

Avg Flow: 0.126 mgd Peak Flow: 0.226 mgd Min Flow: 0.04 mgd

Page 104: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 104/233

Basin 3B

Monitoring Site:Level, Velocity and Flow

From 2/22/2010 to 3/1/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

2/22 2/23 2/24 2/25 2/26 2/27 2/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.85 inches

Avg Level: 2.39 in. Peak Level: 3.43 in. Min Level: 1.24 in.

Avg Velocity: 1.85 fps Peak Velocity: 2.38 fps Min Velocity: 1.06 fps

Avg Flow: 0.139 mgd Peak Flow: 0.28 mgd Min Flow: 0.031 mgd

Page 105: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 105/233

Basin 3B

Monitoring Site:Level, Velocity and Flow

From 3/1/2010 to 3/8/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

3/1 3/2 3/3 3/4 3/5 3/6 3/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.61 inches

Avg Level: 2.85 in. Peak Level: 3.63 in. Min Level: 1.72 in.

Avg Velocity: 1.94 fps Peak Velocity: 2.47 fps Min Velocity: 1.41 fps

Avg Flow: 0.183 mgd Peak Flow: 0.305 mgd Min Flow: 0.063 mgd

Page 106: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 106/233

Basin 3B

Monitoring Site:Level, Velocity and Flow

From 3/8/2010 to 3/15/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

3/8 3/9 3/10 3/11 3/12 3/13 3/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.56 inches

Avg Level: 2.82 in. Peak Level: 3.57 in. Min Level: 1.9 in.

Avg Velocity: 1.95 fps Peak Velocity: 2.42 fps Min Velocity: 1.42 fps

Avg Flow: 0.181 mgd Peak Flow: 0.288 mgd Min Flow: 0.081 mgd

Page 107: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 107/233

Basin 3B

Monitoring Site:Level, Velocity and Flow

From 3/15/2010 to 3/22/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

3/15 3/16 3/17 3/18 3/19 3/20 3/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches

Avg Level: 2.54 in. Peak Level: 3.3 in. Min Level: 1.64 in.

Avg Velocity: 1.86 fps Peak Velocity: 2.31 fps Min Velocity: 1.26 fps

Avg Flow: 0.149 mgd Peak Flow: 0.252 mgd Min Flow: 0.053 mgd

Page 108: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 108/233

Basin 3B

Monitoring Site:Level, Velocity and Flow

From 3/22/2010 to 3/29/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

3/22 3/23 3/24 3/25 3/26 3/27 3/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.42 inches

Avg Level: 2.28 in. Peak Level: 3.28 in. Min Level: 1.41 in.

Avg Velocity: 1.74 fps Peak Velocity: 2.31 fps Min Velocity: 1.17 fps

Avg Flow: 0.121 mgd Peak Flow: 0.251 mgd Min Flow: 0.042 mgd

Page 109: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 109/233

Basin 3B

Monitoring Site:Level, Velocity and Flow

From 3/29/2010 to 4/5/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

3/29 3/30 3/31 4/1 4/2 4/3 4/4

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.99 inches

Avg Level: 2.63 in. Peak Level: 3.73 in. Min Level: 1.39 in.

Avg Velocity: 1.87 fps Peak Velocity: 2.47 fps Min Velocity: 1.25 fps

Avg Flow: 0.161 mgd Peak Flow: 0.311 mgd Min Flow: 0.042 mgd

Page 110: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 110/233

Basin 3B

Monitoring Site:Level, Velocity and Flow

From 4/5/2010 to 4/12/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

4/5 4/6 4/7 4/8 4/9 4/10 4/11

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.12 inches

Avg Level: 3.21 in. Peak Level: 4.05 in. Min Level: 2.43 in.

Avg Velocity: 1.82 fps Peak Velocity: 2.23 fps Min Velocity: 1.55 fps

Avg Flow: 0.201 mgd Peak Flow: 0.317 mgd Min Flow: 0.119 mgd

Page 111: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 111/233

Monitoring Site:

Location:

Size/Type Line:

Basin 4

MH 722: E Gobbi Street; west of Babcock Lane

21-inch Sanitary Sewer Pipe

Temporary Flow Monitoring StudySanitary Sewer Collection System

Data Summary Report

Page 112: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 112/233

Basin 4

Location: MH 722: E Gobbi Street; west of Babcock Lane

Diameter: 21

Monitoring Site:Site Information

Report

 Average Dry Weather Flow: 0.492

Peak Measured Flow: 4.422

mgd 

mgd 

Flow Sketch

Satellite Map

Latitude: 39.1453°

Longitude: -123.1931°

Rim Elevation: 597 feet above sea level 

inches 

Street View Photo

Sanitary Map

Plan View Photo

Page 113: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 113/233

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

16-Jan

Sat

17-Jan

Sun

18-Jan

Mon

19-Jan

Tue

20-Jan

Wed

21-Jan

Thu

22-Jan

Fri

23-Jan

Sat

24-Jan

Sun

25-Jan

Mon

26-Jan

Tue

27-Jan

Wed

28-Jan

Thu

29-Jan

Fri

30-Jan

Sat

31-Jan

Sun

1-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        1 .

        7        1        2

        2 .

        2        9        9

        2 .

        4        5        1

        1 .

        9        5        5

        3 .

        5        1        9

        3 .

        4        6        2

        2 .

        6        9        2

        2 .

        2        7        2

        2 .

        0        9        3

        1 .

        7        8        4

        1 .

        6        9        5

        1 .

        5        8        5

        1 .

        7        8        9

        2 .

        2        2        9

        1 .

        7        6        3

        1 .

        7        7        5

        1 .

        5        9        9

        1 .

        5        0        4

        1 .

        4        4        1

        1 .

        2        0        0

        1 .

        1        5        3

        1 .

        1        1        6

        1 .

        0        4        7

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

   F   l  o  w    (   M

   G  a   l   )

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

6-Feb

Sat

7-Feb

Sun

8-Feb

Mon

9-Feb

Tue

10-Feb

Wed

11-Feb

Thu

12-Feb

Fri

13-Feb

Sat

14-Feb

Sun

15-Feb

Mon

16-Feb

Tue

17-Feb

Wed

18-Feb

Thu

19-Feb

Fri

20-Feb

Sat

21-Feb

Sun

22-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

        0 .

        5        4        3

        0 .

        5        7        8

        1 .

        7        6        9

        1 .

        8        5        8

        1 .

        9        7        8

        1 .

        8        2        2

        2 .

        1        6        5

        1 .

        9        3        4

        1 .

        3        4        6

        1 .

        2        9        0

        1 .

        0        3        1

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

        1 .

        1        3        4

        1 .

        2        6        3

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

January 16 to February 27, 2010

Total Monthly Rainfall: 15.49 inches Avg Flow: 1.66 mgd Peak Flow: 4.42 mgd Min Flow: 0.28 mgd

Page 114: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 114/233

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

27-Feb

Sat

28-Feb

Sun

1-Mar 

Mon

2-Mar 

Tue

3-Mar 

Wed

4-Mar 

Thu

5-Mar 

Fri

6-Mar 

Sat

7-Mar 

Sun

8-Mar 

Mon

9-Mar 

Tue

10-Mar 

Wed

11-Mar 

Thu

12-Mar 

Fri

13-Mar 

Sat

14-Mar 

Sun

15-Mar 

Mon

1

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        1 .

        1        4        8

        1 .

        4        4        2

        2 .

        0        1        9

        1 .

        8        5        2

        1 .

        5        8        8

        1 .

        2        0        5

        1 .

        2        0        3

        1 .

        2        4        5

        1 .

        1        3        2

        1 .

        6        0        4

        1 .

        3        4        0

        1 .

        2        6        7

        1 .

        1        9        8

        1 .

        1        9        4

        1 .

        1        1        5

        0 .

        9        9        2

        0 .

        9        3        4

        0 .

        9        4        1

        0 .

        9        4        6

        0 .

        9        0        6

        0 .

        9        0        7

        1 .

        0        7        5

        1 .

        4        8        2

        1 .

        4        8        5

        1 .

        6        3        1

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

   F   l  o  w    (   M

   G  a   l   )

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

20-Mar 

Sat

21-Mar 

Sun

22-Mar 

Mon

23-Mar 

Tue

24-Mar 

Wed

25-Mar 

Thu

26-Mar 

Fri

27-Mar 

Sat

28-Mar 

Sun

29-Mar 

Mon

30-Mar 

Tue

31-Mar 

Wed

1-Apr 

Thu

2-Apr 

Fri

3-Apr 

Sat

4-Apr 

Sun

5-Apr 

Mon

6

   F   l  o  w

   (  m  g   d   )

        1 .

        3        6        1

        1 .

        1        8        1

        1 .

        4        5        1

        1 .

        2        7        4

        1 .

        7        0        5

        1 .

        4        1        9

        1 .

        0        1        7

        0 .

        9        8        9

        0 .

        8        6        9

        0 .

        8        3        5

        1 .

        6        4        3

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

February 27, 2010 to April 9, 2010

Total Monthly Rainfall: 7.5 inches Avg Flow: 1.34 mgd Peak Flow: 2.74 mgd Min Flow: 0.63 mgd

Page 115: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 115/233

M Average Dry Weather Flow

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

        0      :        0        0

        1      :        0        0

        2      :        0        0

        3      :        0        0

        4      :        0        0

        5      :        0        0

        6      :        0        0

        7      :        0        0

        8      :        0        0

        9      :        0        0

        1        0      :        0        0

        1        1      :        0        0

        1        2      :        0        0

        1        3      :        0        0

        1        4      :        0        0

        1        5      :        0        0

        1        6      :        0        0

        1        7      :        0        0

        1        8      :        0        0

        1        9      :        0        0

        2        0      :        0        0

        2        1      :        0        0

        2        2      :        0        0

        2        3      :        0        0

   F   l  o  w    (  m

  g   d   )

WeekdayWeekend

Page 116: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 116/233

MoI/I Summary

 

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

       0       1        /       1       7

       0       1        /       1        8

       0       1        /       1       9

       0       1        /       2       0

       0       1        /       2       1

       0       1        /       2       2

       0       1        /       2       3

       0       1        /       2       4

       0       1        /       2       5

       0       1        /       2       6

       0       1        /       2       7

       0       1        /       2        8

       0       1        /       2       9

       0       1        /       3       0

       0       1        /       3       1

   F   l  o  w    (

  m  g   d   )

Event 1 I&I ANALYSIS (Rainfall = 12.09 inches)

Inflow Infiltration on 2/2/2010 (post rain event) Total I&I

Total I/I: gallons27,826,000

I/I per ADWF: per in-rain4.68

Peak I/I Rate: mgd 3.87

Pk I/I:ADWF: 7.87

Infiltration Rate: 1.19

12.4%R-Value:

15,600I/I per IDM: gal/IDM/in-rai

Pk I/I:ACRE: 5,680

Pk I/I:IDM: 26,300

mgd 

Infiltration:ADWF: 2.41

Infiltration:ACRE: 1,740

Infiltration:IDM: 8,000  gpd/IDM

 gpd/acre

 gpd/IDM

 gpd/acre

Page 117: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 117/233

Basin 4

Monitoring Site:Level, Velocity and Flow

From 1/11/2010 to 1/18/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

1/11 1/12 1/13 1/14 1/15 1/16 1/17

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.87 inches

Avg Level: 4.43 in. Peak Level: 6.02 in. Min Level: 3.26 in.

Avg Velocity: 2.3 fps Peak Velocity: 2.87 fps Min Velocity: 1.8 fps

Avg Flow: 0.567 mgd Peak Flow: 1.042 mgd Min Flow: 0.277 mgd

Page 118: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 118/233

Basin 4

Monitoring Site:Level, Velocity and Flow

From 1/18/2010 to 1/25/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

1/18 1/19 1/20 1/21 1/22 1/23 1/24

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 8.55 inches

Avg Level: 7.94 in. Peak Level: 11.31 in. Min Level: 4.26 in.

Avg Velocity: 3.42 fps Peak Velocity: 3.91 fps Min Velocity: 2.14 fps

Avg Flow: 1.882 mgd Peak Flow: 3.236 mgd Min Flow: 0.485 mgd

Page 119: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 119/233

Basin 4

Monitoring Site:Level, Velocity and Flow

From 1/25/2010 to 2/1/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

1/25 1/26 1/27 1/28 1/29 1/30 1/31

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.61 inches

Avg Level: 9.79 in. Peak Level: 14.04 in. Min Level: 7.45 in.

Avg Velocity: 3.54 fps Peak Velocity: 4.06 fps Min Velocity: 3.17 fps

Avg Flow: 2.548 mgd Peak Flow: 4.422 mgd Min Flow: 1.585 mgd

Page 120: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 120/233

Basin 4

Monitoring Site:Level, Velocity and Flow

From 2/1/2010 to 2/8/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

2/1 2/2 2/3 2/4 2/5 2/6 2/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.14 inches

Avg Level: 8.23 in. Peak Level: 10.62 in. Min Level: 6.41 in.

Avg Velocity: 3.32 fps Peak Velocity: 3.65 fps Min Velocity: 2.92 fps

Avg Flow: 1.883 mgd Peak Flow: 2.76 mgd Min Flow: 1.178 mgd

Page 121: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 121/233

Basin 4

Monitoring Site:Level, Velocity and Flow

From 2/8/2010 to 2/15/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

2/8 2/9 2/10 2/11 2/12 2/13 2/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.33 inches

Avg Level: 7.25 in. Peak Level: 8.89 in. Min Level: 6.08 in.

Avg Velocity: 3.2 fps Peak Velocity: 3.5 fps Min Velocity: 2.83 fps

Avg Flow: 1.531 mgd Peak Flow: 2.195 mgd Min Flow: 1.058 mgd

Page 122: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 122/233

Basin 4

Monitoring Site:Level, Velocity and Flow

From 2/15/2010 to 2/22/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

2/15 2/16 2/17 2/18 2/19 2/20 2/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches

Avg Level: 6.17 in. Peak Level: 7.42 in. Min Level: 5.02 in.

Avg Velocity: 2.9 fps Peak Velocity: 3.26 fps Min Velocity: 2.5 fps

Avg Flow: 1.114 mgd Peak Flow: 1.557 mgd Min Flow: 0.716 mgd

Page 123: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 123/233

Basin 4

Monitoring Site:Level, Velocity and Flow

From 2/22/2010 to 3/1/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

2/22 2/23 2/24 2/25 2/26 2/27 2/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.02 inches

Avg Level: 6.13 in. Peak Level: 8.81 in. Min Level: 4.61 in.

Avg Velocity: 2.98 fps Peak Velocity: 3.5 fps Min Velocity: 2.32 fps

Avg Flow: 1.141 mgd Peak Flow: 2.169 mgd Min Flow: 0.603 mgd

Page 124: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 124/233

Basin 4

Monitoring Site:Level, Velocity and Flow

From 3/1/2010 to 3/8/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

3/1 3/2 3/3 3/4 3/5 3/6 3/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.78 inches

Avg Level: 7.2 in. Peak Level: 9.32 in. Min Level: 5.22 in.

Avg Velocity: 3.23 fps Peak Velocity: 3.61 fps Min Velocity: 2.69 fps

Avg Flow: 1.539 mgd Peak Flow: 2.391 mgd Min Flow: 0.829 mgd

Page 125: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 125/233

Basin 4

Monitoring Site:Level, Velocity and Flow

From 3/8/2010 to 3/15/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

3/8 3/9 3/10 3/11 3/12 3/13 3/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.67 inches

Avg Level: 6.83 in. Peak Level: 9.41 in. Min Level: 5.24 in.

Avg Velocity: 3.06 fps Peak Velocity: 3.46 fps Min Velocity: 2.62 fps

Avg Flow: 1.359 mgd Peak Flow: 2.27 mgd Min Flow: 0.802 mgd

Page 126: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 126/233

Basin 4

Monitoring Site:Level, Velocity and Flow

From 3/15/2010 to 3/22/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

3/15 3/16 3/17 3/18 3/19 3/20 3/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.03 inches

Avg Level: 6.32 in. Peak Level: 7.8 in. Min Level: 5.28 in.

Avg Velocity: 2.92 fps Peak Velocity: 3.3 fps Min Velocity: 2.44 fps

Avg Flow: 1.16 mgd Peak Flow: 1.652 mgd Min Flow: 0.758 mgd

Page 127: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 127/233

Basin 4

Monitoring Site:Level, Velocity and Flow

From 3/22/2010 to 3/29/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

3/22 3/23 3/24 3/25 3/26 3/27 3/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.56 inches

Avg Level: 5.59 in. Peak Level: 6.63 in. Min Level: 4.77 in.

Avg Velocity: 2.75 fps Peak Velocity: 3.13 fps Min Velocity: 2.35 fps

Avg Flow: 0.917 mgd Peak Flow: 1.216 mgd Min Flow: 0.63 mgd

Page 128: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 128/233

Basin 4

Monitoring Site:Level, Velocity and Flow

From 3/29/2010 to 4/5/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

3/29 3/30 3/31 4/1 4/2 4/3 4/4

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 3.31 inches

Avg Level: 7.08 in. Peak Level: 10.56 in. Min Level: 4.79 in.

Avg Velocity: 3.09 fps Peak Velocity: 3.57 fps Min Velocity: 2.33 fps

Avg Flow: 1.453 mgd Peak Flow: 2.736 mgd Min Flow: 0.634 mgd

Page 129: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 129/233

Basin 4

Monitoring Site:Level, Velocity and Flow

From 4/5/2010 to 4/12/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.50

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

4/5 4/6 4/7 4/8 4/9 4/10 4/11

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.13 inches

Avg Level: 7.94 in. Peak Level: 9.8 in. Min Level: 6.34 in.

Avg Velocity: 3.27 fps Peak Velocity: 3.55 fps Min Velocity: 2.92 fps

Avg Flow: 1.77 mgd Peak Flow: 2.492 mgd Min Flow: 1.18 mgd

Page 130: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 130/233

Monitoring Site:

Location:

Size/Type Line:

Basin 5

 Vichy Springs PS: Vichy Springs Road andRedemeyer Road

-inch Sanitary Sewer Pipe

Temporary Flow Monitoring StudySanitary Sewer Collection System

Data Summary Report

Page 131: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 131/233

Basin 5

Location:  Vichy Springs PS: Vichy Springs Road and Redemeyer Road

Monitoring Site:Site Information

Report

 Average Dry Weather Flow: 0.016

Peak Measured Flow: 0.183

mgd 

mgd 

Satellite Map

Latitude: 39.1607°

Longitude: -123.1863°

Rim Elevation: 621 feet above sea level 

Street View PhotoSanitary Map

Page 132: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 132/233

M Average Dry Weather Flow

 Average Dry Weather Flow: mgd  0.02

0.000

0.005

0.010

0.015

0.020

0.025

0.030

0.035

        0      :        0        0

        1      :        0        0

        2      :        0        0

        3      :        0        0

        4      :        0        0

        5      :        0        0

        6      :        0        0

        7      :        0        0

        8      :        0        0

        9      :        0        0

        1        0      :        0        0

        1        1      :        0        0

        1        2      :        0        0

        1        3      :        0        0

        1        4      :        0        0

        1        5      :        0        0

        1        6      :        0        0

        1        7      :        0        0

        1        8      :        0        0

   F   l  o  w

   (  m  g   d

   )

Page 133: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 133/233

MoI/I Summary

 

0.00

0.02

0.04

0.06

0.08

0.10

0.12

0.14

0.16

0.18

0.20

       0       1        /       1       7

       0       1        /       1        8

       0       1        /       1       9

       0       1        /       2       0

       0       1        /       2       1

       0       1        /       2       2

       0       1        /       2       3

       0       1        /       2       4

       0       1        /       2       5

       0       1        /       2       6

       0       1        /       2       7

       0       1        /       2        8

       0       1        /       2       9

       0       1        /       3       0

       0       1        /       3       1

   F   l  o  w    (

  m  g   d   )

Event 1 I&I ANALYSIS (Rainfall = 9.87 inches)

Inflow Infiltration on 2/2/2010 (post rain event) Total I&I

Total I/I: gallons737,000

I/I per ADWF: per in-rain4.63

Peak I/I Rate: mgd 0.10

Pk I/I:ADWF: 5.99

Infiltration Rate: 0.01

0.4%R-Value:

3,500I/I per IDM: gal/IDM/in-rai

Pk I/I:ACRE: 160

Pk I/I:IDM: 4,600

mgd 

Infiltration:ADWF: 0.87

Infiltration:ACRE: 20

Infiltration:IDM: 700  gpd/IDM

 gpd/acre

 gpd/IDM

 gpd/acre

Page 134: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 134/233

Monitoring Site:

Location:

Size/Type Line:

Basin 6

MH 667: E Perkins Street; west of Oak ManorDrive

15-inch Sanitary Sewer Pipe

Temporary Flow Monitoring StudySanitary Sewer Collection System

Data Summary Report

Page 135: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 135/233

Basin 6

Location: MH 667: E Perkins Street; west of Oak Manor Drive

Diameter: 15

Monitoring Site:Site Information

Report

 Average Dry Weather Flow: 0.200

Peak Measured Flow: 1.012

mgd 

mgd 

Flow Sketch

Satellite Map

Latitude: 39.1516°

Longitude: -123.1936°

Rim Elevation: 601 feet above sea level 

inches 

Street View Photo

Sanitary Map

Plan View Photo

Page 136: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 136/233

0.00

0.20

0.40

0.60

0.80

1.00

1.20

16-Jan

Sat

17-Jan

Sun

18-Jan

Mon

19-Jan

Tue

20-Jan

Wed

21-Jan

Thu

22-Jan

Fri

23-Jan

Sat

24-Jan

Sun

25-Jan

Mon

26-Jan

Tue

27-Jan

Wed

28-Jan

Thu

29-Jan

Fri

30-Jan

Sat

31-Jan

Sun

1-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        0 .

        3        9        5

        0 .

        4        6        7

        0 .

        4        4        4

        0 .

        3        8        7

        0 .

        7        6        2

        0 .

        7        4        3

        0 .

        6        1        8

        0 .

        5        5        7

        0 .

        5        2        0

        0 .

        4        6        7

        0 .

        4        4        7

        0 .

        4        2        8

        0 .

        4        7        9

        0 .

        4        9        5

        0 .

        4        7        1

        0 .

        4        8        5

        0 .

        4        3        9

        0 .

        4        4        0

        0 .

        4        2        6

        0 .

        3        9        0

        0 .

        3        9        5

        0 .

        3        6        9

        0 .

        3        6        5

0.000.100.200.300.400.500.600.700.80

0.90

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

   F   l  o  w    (   M

   G  a   l   )

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

6-Feb

Sat

7-Feb

Sun

8-Feb

Mon

9-Feb

Tue

10-Feb

Wed

11-Feb

Thu

12-Feb

Fri

13-Feb

Sat

14-Feb

Sun

15-Feb

Mon

16-Feb

Tue

17-Feb

Wed

18-Feb

Thu

19-Feb

Fri

20-Feb

Sat

21-Feb

Sun

22-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

        0 .

        2        4        2

        0 .

        2        4        2

        0 .

        3        6        6

        0 .

        4        2        1

        0 .

        5        0        4

        0 .

        4        8        3

        0 .

        5        2        3

        0 .

        4        9        4

        0 .

        4        1        3

        0 .

        3        8        9

        0 .

        3        5        4

0.000.100.200.300.400.500.600.700.80

0.90

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

        0 .

        3        4        0

        0 .

        4        0        8

0.000.100.200.300.400.500.600.700.80

0.90

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

January 16 to February 27, 2010

Total Monthly Rainfall: 15.56 inches Avg Flow: 0.44 mgd Peak Flow: 1.01 mgd Min Flow: 0.05 mgd

Page 137: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 137/233

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

27-Feb

Sat

28-Feb

Sun

1-Mar 

Mon

2-Mar 

Tue

3-Mar 

Wed

4-Mar 

Thu

5-Mar 

Fri

6-Mar 

Sat

7-Mar 

Sun

8-Mar 

Mon

9-Mar 

Tue

10-Mar 

Wed

11-Mar 

Thu

12-Mar 

Fri

13-Mar 

Sat

14-Mar 

Sun

15-Mar 

Mon

1

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        0 .

        3        4        0

        0 .

        4        2        2

        0 .

        4        8        4

        0 .

        4        5        5

        0 .

        4        8        0

        0 .

        4        1        7

        0 .

        4        1        5

        0 .

        4        0        4

        0 .

        4        0        8

        0 .

        4        8        7

        0 .

        4        3        7

        0 .

        4        2        8

        0 .

        4        2        1

        0 .

        4        1        9

        0 .

        4        1        2

        0 .

        3        9        2

        0 .

        3        7        1

        0 .

        3        6        2

        0 .

        3        6        4

        0 .

        3        5        7

        0 .

        3        6        9

        0 .

        4        1        1

        0 .

        4        3        9

        0 .

        4        0        7

        0 .

        4        6        2

0.000.100.200.300.400.500.600.700.80

0.90

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

   F   l  o  w    (   M

   G  a   l   )

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

20-Mar 

Sat

21-Mar 

Sun

22-Mar 

Mon

23-Mar 

Tue

24-Mar 

Wed

25-Mar 

Thu

26-Mar 

Fri

27-Mar 

Sat

28-Mar 

Sun

29-Mar 

Mon

30-Mar 

Tue

31-Mar 

Wed

1-Apr 

Thu

2-Apr 

Fri

3-Apr 

Sat

4-Apr 

Sun

5-Apr 

Mon

6

   F   l  o  w

   (  m  g   d   )

        0 .

        4        3        7

        0 .

        3        5        5

        0 .

        4        7        4

        0 .

        4        4        9

        0 .

        4        7        0

        0 .

        4        5        0

        0 .

        4        0        5

        0 .

        4        0        9

        0 .

        3        4        3

        0 .

        3        5        4

        0 .

        4        5        2

0.000.100.200.300.400.500.600.700.80

0.90

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

0.000.100.200.300.400.500.600.700.80

0.90

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

February 27, 2010 to April 9, 2010

Total Monthly Rainfall: 7.83 inches Avg Flow: 0.42 mgd Peak Flow: 0.74 mgd Min Flow: 0.16 mgd

Page 138: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 138/233

M Average Dry Weather Flow

0.000

0.050

0.100

0.150

0.200

0.250

0.300

0.350

0.400

        0      :        0        0

        1      :        0        0

        2      :        0        0

        3      :        0        0

        4      :        0        0

        5      :        0        0

        6      :        0        0

        7      :        0        0

        8      :        0        0

        9      :        0        0

        1        0      :        0        0

        1        1      :        0        0

        1        2      :        0        0

        1        3      :        0        0

        1        4      :        0        0

        1        5      :        0        0

        1        6      :        0        0

        1        7      :        0        0

        1        8      :        0        0

        1        9      :        0        0

        2        0      :        0        0

        2        1      :        0        0

        2        2      :        0        0

        2        3      :        0        0

   F   l  o  w    (  m

  g   d   )

WeekdayWeekend

Page 139: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 139/233

MoI/I Summary

 

0.00

0.20

0.40

0.60

0.80

1.00

1.20

       0       1        /       1       7

       0       1        /       1        8

       0       1        /       1       9

       0       1        /       2       0

       0       1        /       2       1

       0       1        /       2       2

       0       1        /       2       3

       0       1        /       2       4

       0       1        /       2       5

       0       1        /       2       6

       0       1        /       2       7

       0       1        /       2        8

       0       1        /       2       9

       0       1        /       3       0

       0       1        /       3       1

   F   l  o  w    (

  m  g   d   )

Event 1 I&I ANALYSIS (Rainfall = 12.21 inches)

Inflow Infiltration on 2/2/2010 (post rain event) Total I&I

Total I/I: gallons5,000,000

I/I per ADWF: per in-rain2.05

Peak I/I Rate: mgd 0.78

Pk I/I:ADWF: 3.88

Infiltration Rate: 0.25

2.9%R-Value:

4,900I/I per IDM: gal/IDM/in-rai

Pk I/I:ACRE: 1,470

Pk I/I:IDM: 9,200

mgd 

Infiltration:ADWF: 1.24

Infiltration:ACRE: 470

Infiltration:IDM: 2,900  gpd/IDM

 gpd/acre

 gpd/IDM

 gpd/acre

Page 140: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 140/233

Basin 6

Monitoring Site:Level, Velocity and Flow

From 1/11/2010 to 1/18/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

1/11 1/12 1/13 1/14 1/15 1/16 1/17

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.91 inches

Avg Level: 2.87 in. Peak Level: 4.78 in. Min Level: 1.46 in.

Avg Velocity: 2.09 fps Peak Velocity: 2.82 fps Min Velocity: 1.29 fps

Avg Flow: 0.242 mgd Peak Flow: 0.612 mgd Min Flow: 0.052 mgd

Page 141: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 141/233

Basin 6

Monitoring Site:Level, Velocity and Flow

From 1/18/2010 to 1/25/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

1/18 1/19 1/20 1/21 1/22 1/23 1/24

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 8.6 inches

Avg Level: 3.78 in. Peak Level: 5.39 in. Min Level: 1.84 in.

Avg Velocity: 2.47 fps Peak Velocity: 3 fps Min Velocity: 1.57 fps

Avg Flow: 0.403 mgd Peak Flow: 0.76 mgd Min Flow: 0.088 mgd

Page 142: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 142/233

Basin 6

Monitoring Site:Level, Velocity and Flow

From 1/25/2010 to 2/1/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1/25 1/26 1/27 1/28 1/29 1/30 1/31

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.65 inches

Avg Level: 4.67 in. Peak Level: 6.38 in. Min Level: 3.08 in.

Avg Velocity: 2.79 fps Peak Velocity: 3.25 fps Min Velocity: 2.18 fps

Avg Flow: 0.598 mgd Peak Flow: 1.012 mgd Min Flow: 0.256 mgd

Page 143: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 143/233

Basin 6

Monitoring Site:Level, Velocity and Flow

From 2/1/2010 to 2/8/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

2/1 2/2 2/3 2/4 2/5 2/6 2/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.04 inches

Avg Level: 4.15 in. Peak Level: 5.56 in. Min Level: 2.8 in.

Avg Velocity: 2.61 fps Peak Velocity: 2.94 fps Min Velocity: 1.99 fps

Avg Flow: 0.476 mgd Peak Flow: 0.766 mgd Min Flow: 0.204 mgd

Page 144: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 144/233

Basin 6

Monitoring Site:Level, Velocity and Flow

From 2/8/2010 to 2/15/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

2/8 2/9 2/10 2/11 2/12 2/13 2/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.3 inches

Avg Level: 3.96 in. Peak Level: 5.24 in. Min Level: 2.84 in.

Avg Velocity: 2.57 fps Peak Velocity: 2.98 fps Min Velocity: 2.02 fps

Avg Flow: 0.438 mgd Peak Flow: 0.735 mgd Min Flow: 0.212 mgd

Page 145: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 145/233

Basin 6

Monitoring Site:Level, Velocity and Flow

From 2/15/2010 to 2/22/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

2/15 2/16 2/17 2/18 2/19 2/20 2/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlow

Avg Level: 3.65 in. Peak Level: 4.75 in. Min Level: 2.59 in.

Avg Velocity: 2.47 fps Peak Velocity: 2.93 fps Min Velocity: 1.94 fps

Avg Flow: 0.376 mgd Peak Flow: 0.602 mgd Min Flow: 0.178 mgd

Page 146: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 146/233

Basin 6

Monitoring Site:Level, Velocity and Flow

From 2/22/2010 to 3/1/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

2/22 2/23 2/24 2/25 2/26 2/27 2/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.09 inches

Avg Level: 3.77 in. Peak Level: 5.68 in. Min Level: 2.49 in.

Avg Velocity: 2.43 fps Peak Velocity: 2.92 fps Min Velocity: 1.86 fps

Avg Flow: 0.389 mgd Peak Flow: 0.804 mgd Min Flow: 0.163 mgd

Page 147: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 147/233

Basin 6

Monitoring Site:Level, Velocity and Flow

From 3/1/2010 to 3/8/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

3/1 3/2 3/3 3/4 3/5 3/6 3/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.85 inches

Avg Level: 4.14 in. Peak Level: 5.19 in. Min Level: 2.74 in.

Avg Velocity: 2.45 fps Peak Velocity: 2.87 fps Min Velocity: 1.73 fps

Avg Flow: 0.443 mgd Peak Flow: 0.662 mgd Min Flow: 0.173 mgd

Page 148: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 148/233

Basin 6

Monitoring Site:Level, Velocity and Flow

From 3/8/2010 to 3/15/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

3/8 3/9 3/10 3/11 3/12 3/13 3/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.73 inches

Avg Level: 4.03 in. Peak Level: 5.44 in. Min Level: 2.79 in.

Avg Velocity: 2.49 fps Peak Velocity: 2.86 fps Min Velocity: 1.96 fps

Avg Flow: 0.436 mgd Peak Flow: 0.733 mgd Min Flow: 0.199 mgd

Page 149: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 149/233

Basin 6

Monitoring Site:Level, Velocity and Flow

From 3/15/2010 to 3/22/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

3/15 3/16 3/17 3/18 3/19 3/20 3/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.03 inches

Avg Level: 3.95 in. Peak Level: 5.11 in. Min Level: 2.71 in.

Avg Velocity: 2.47 fps Peak Velocity: 2.85 fps Min Velocity: 2.02 fps

Avg Flow: 0.419 mgd Peak Flow: 0.619 mgd Min Flow: 0.202 mgd

Page 150: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 150/233

Basin 6

Monitoring Site:Level, Velocity and Flow

From 3/22/2010 to 3/29/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

3/22 3/23 3/24 3/25 3/26 3/27 3/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.61 inches

Avg Level: 3.67 in. Peak Level: 5.13 in. Min Level: 2.5 in.

Avg Velocity: 2.36 fps Peak Velocity: 2.81 fps Min Velocity: 1.83 fps

Avg Flow: 0.363 mgd Peak Flow: 0.618 mgd Min Flow: 0.162 mgd

Page 151: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 151/233

Basin 6

Monitoring Site:Level, Velocity and Flow

From 3/29/2010 to 4/5/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

3/29 3/30 3/31 4/1 4/2 4/3 4/4

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 3.44 inches

Avg Level: 4.04 in. Peak Level: 5.58 in. Min Level: 2.51 in.

Avg Velocity: 2.46 fps Peak Velocity: 2.79 fps Min Velocity: 1.98 fps

Avg Flow: 0.432 mgd Peak Flow: 0.74 mgd Min Flow: 0.175 mgd

Page 152: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 152/233

Basin 6

Monitoring Site:Level, Velocity and Flow

From 4/5/2010 to 4/12/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

4/5 4/6 4/7 4/8 4/9 4/10 4/11

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.12 inches

Avg Level: 4.09 in. Peak Level: 5.21 in. Min Level: 3.01 in.

Avg Velocity: 2.47 fps Peak Velocity: 2.79 fps Min Velocity: 1.99 fps

Avg Flow: 0.44 mgd Peak Flow: 0.679 mgd Min Flow: 0.226 mgd

Page 153: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 153/233

Monitoring Site:

Location:

Size/Type Line:

Basin 7A 

MH 120 North: Ford Road; under the US 101Highway Overpass

15-inch Sanitary Sewer Pipe

Temporary Flow Monitoring StudySanitary Sewer Collection System

Data Summary Report

Page 154: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 154/233

Basin 7A 

Location: MH 120 North: Ford Road; under theUS 101 Highway Overpass

Diameter: 15

Monitoring Site:Site Information

Report

 Average Dry Weather Flow: 0.110

Peak Measured Flow: 0.504

mgd 

mgd 

Flow Sketch

Satellite Map

Latitude: 39.1675°

Longitude: -123.2056°

Rim Elevation: 619 feet above sea level 

inches 

Street View Photo

Sanitary Map

Plan View Photo

Page 155: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 155/233

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

16-Jan

Sat

17-Jan

Sun

18-Jan

Mon

19-Jan

Tue

20-Jan

Wed

21-Jan

Thu

22-Jan

Fri

23-Jan

Sat

24-Jan

Sun

25-Jan

Mon

26-Jan

Tue

27-Jan

Wed

28-Jan

Thu

29-Jan

Fri

30-Jan

Sat

31-Jan

Sun

1-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        0 .

        2        3        8

        0 .

        2        9        4

        0 .

        2        4        4

        0 .

        1        9        7

        0 .

        3        8        2

        0 .

        2        9        1

        0 .

        2        1        7

        0 .

        1        8        7

        0 .

        1        7        5

        0 .

        1        5        9

        0 .

        1        5        1

        0 .

        1        4        5

        0 .

        1        6        4

        0 .

        1        6        5

        0 .

        1        5        3

        0 .

        1        5        3

        0 .

        1        4        8

        0 .

        1        4        0

        0 .

        1        3        6

        0 .

        1        4        5

        0 .

        1        4        6

        0 .

        1        5        0

        0 .

        1        3        9

0.000.050.100.150.200.250.300.350.40

0.45

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

   F   l  o  w    (   M

   G  a   l   )

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

6-Feb

Sat

7-Feb

Sun

8-Feb

Mon

9-Feb

Tue

10-Feb

Wed

11-Feb

Thu

12-Feb

Fri

13-Feb

Sat

14-Feb

Sun

15-Feb

Mon

16-Feb

Tue

17-Feb

Wed

18-Feb

Thu

19-Feb

Fri

20-Feb

Sat

21-Feb

Sun

22-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

        0 .

        1        2        4

        0 .

        1        1        5

        0 .

        1        6        9

        0 .

        1        9        2

        0 .

        1        6        6

        0 .

        1        5        6

        0 .

        1        7        0

        0 .

        1        6        1

        0 .

        1        3        4

        0 .

        1        2        9

        0 .

        1        3        0

0.000.050.100.150.200.250.300.350.40

0.45

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

        0 .

        1        7        9

        0 .

        1        3        7

0.000.050.100.150.200.250.300.350.40

0.45

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

January 16 to February 27, 2010

Total Monthly Rainfall: 14.51 inches Avg Flow: 0.17 mgd Peak Flow: 0.5 mgd Min Flow: 0.05 mgd

Page 156: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 156/233

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

27-Feb

Sat

28-Feb

Sun

1-Mar 

Mon

2-Mar 

Tue

3-Mar 

Wed

4-Mar 

Thu

5-Mar 

Fri

6-Mar 

Sat

7-Mar 

Sun

8-Mar 

Mon

9-Mar 

Tue

10-Mar 

Wed

11-Mar 

Thu

12-Mar 

Fri

13-Mar 

Sat

14-Mar 

Sun

15-Mar 

Mon

1

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        0 .

        1        4        8

        0 .

        1        6        4

        0 .

        1        8        8

        0 .

        1        6        2

        0 .

        1        4        6

        0 .

        1        4        2

        0 .

        1        4        6

        0 .

        1        5        6

        0 .

        1        3        8

        0 .

        1        5        8

        0 .

        1        4        6

        0 .

        1        3        8

        0 .

        1        2        9

        0 .

        1        3        0

        0 .

        1        2        6

        0 .

        1        2        7

        0 .

        1        2        9

        0 .

        1        2        6

        0 .

        1        2        8

        0 .

        1        1        8

        0 .

        1        2        8

        0 .

        1        3        8

        0 .

        1        6        2

        0 .

        1        4        5

        0 .

        1        5        3

0.000.050.100.150.200.250.300.350.40

0.45

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

   F   l  o  w    (   M

   G  a   l   )

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

20-Mar 

Sat

21-Mar 

Sun

22-Mar 

Mon

23-Mar 

Tue

24-Mar 

Wed

25-Mar 

Thu

26-Mar 

Fri

27-Mar 

Sat

28-Mar 

Sun

29-Mar 

Mon

30-Mar 

Tue

31-Mar 

Wed

1-Apr 

Thu

2-Apr 

Fri

3-Apr 

Sat

4-Apr 

Sun

5-Apr 

Mon

6

   F   l  o  w

   (  m  g   d   )

        0 .

        1        5        1

        0 .

        1        4        0

        0 .

        1        3        9

        0 .

        1        3        5

        0 .

        1        5        0

        0 .

        1        3        5

        0 .

        1        1        8

        0 .

        1        1        5

        0 .

        1        1        8

        0 .

        1        2        7

        0 .

        1        4        5

0.000.050.100.150.200.250.300.350.40

0.45

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

0.000.050.100.150.200.250.300.350.40

0.45

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

February 27, 2010 to April 9, 2010

Total Monthly Rainfall: 6.99 inches Avg Flow: 0.14 mgd Peak Flow: 0.3 mgd Min Flow: 0.04 mgd

Page 157: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 157/233

M Average Dry Weather Flow

0.000

0.020

0.040

0.060

0.080

0.100

0.120

0.140

0.160

0.180

        0      :        0        0

        1      :        0        0

        2      :        0        0

        3      :        0        0

        4      :        0        0

        5      :        0        0

        6      :        0        0

        7      :        0        0

        8      :        0        0

        9      :        0        0

        1        0      :        0        0

        1        1      :        0        0

        1        2      :        0        0

        1        3      :        0        0

        1        4      :        0        0

        1        5      :        0        0

        1        6      :        0        0

        1        7      :        0        0

        1        8      :        0        0

        1        9      :        0        0

        2        0      :        0        0

        2        1      :        0        0

        2        2      :        0        0

        2        3      :        0        0

   F   l  o  w    (  m

  g   d   )

WeekdayWeekend

Page 158: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 158/233

MoI/I Summary

 

0.00

0.10

0.20

0.30

0.40

0.50

0.60

       0       1        /       1       7

       0       1        /       1        8

       0       1        /       1       9

       0       1        /       2       0

       0       1        /       2       1

       0       1        /       2       2

       0       1        /       2       3

       0       1        /       2       4

       0       1        /       2       5

       0       1        /       2       6

       0       1        /       2       7

       0       1        /       2        8

       0       1        /       2       9

       0       1        /       3       0

       0       1        /       3       1

   F   l  o  w    (

  m  g   d   )

Event 1 I&I ANALYSIS (Rainfall = 11.1 inches)

Inflow Infiltration on 2/2/2010 (post rain event) Total I&I

Total I/I: gallons1,679,000

I/I per ADWF: per in-rain1.37

Peak I/I Rate: mgd 0.37

Pk I/I:ADWF: 3.37

Infiltration Rate: 0.04

0.8%R-Value:

2,100I/I per IDM: gal/IDM/in-rai

Pk I/I:ACRE: 520

Pk I/I:IDM: 5,100

mgd 

Infiltration:ADWF: 0.35

Infiltration:ACRE: 50

Infiltration:IDM: 500  gpd/IDM

 gpd/acre

 gpd/IDM

 gpd/acre

Page 159: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 159/233

Basin 7A 

Monitoring Site:Level, Velocity and Flow

From 1/11/2010 to 1/18/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

1/11 1/12 1/13 1/14 1/15 1/16 1/17

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.81 inches

Avg Level: 4.68 in. Peak Level: 5.9 in. Min Level: 3.46 in.

Avg Velocity: 0.58 fps Peak Velocity: 0.81 fps Min Velocity: 0.28 fps

Avg Flow: 0.118 mgd Peak Flow: 0.21 mgd Min Flow: 0.045 mgd

Page 160: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 160/233

Basin 7A 

Monitoring Site:Level, Velocity and Flow

From 1/18/2010 to 1/25/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

1/18 1/19 1/20 1/21 1/22 1/23 1/24

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 7.86 inches

Avg Level: 6.88 in. Peak Level: 9.19 in. Min Level: 3.69 in.

Avg Velocity: 0.62 fps Peak Velocity: 1.03 fps Min Velocity: 0.33 fps

Avg Flow: 0.216 mgd Peak Flow: 0.499 mgd Min Flow: 0.064 mgd

Page 161: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 161/233

Basin 7A 

Monitoring Site:Level, Velocity and Flow

From 1/25/2010 to 2/1/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

1/25 1/26 1/27 1/28 1/29 1/30 1/31

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.38 inches

Avg Level: 7.66 in. Peak Level: 10.43 in. Min Level: 5.85 in.

Avg Velocity: 0.55 fps Peak Velocity: 0.92 fps Min Velocity: 0.29 fps

Avg Flow: 0.225 mgd Peak Flow: 0.504 mgd Min Flow: 0.087 mgd

Page 162: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 162/233

Basin 7A 

Monitoring Site:Level, Velocity and Flow

From 2/1/2010 to 2/8/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

2/1 2/2 2/3 2/4 2/5 2/6 2/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.22 inches

Avg Level: 6.75 in. Peak Level: 8.14 in. Min Level: 5.41 in.

Avg Velocity: 0.47 fps Peak Velocity: 0.74 fps Min Velocity: 0.22 fps

Avg Flow: 0.159 mgd Peak Flow: 0.313 mgd Min Flow: 0.067 mgd

Page 163: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 163/233

Basin 7A 

Monitoring Site:Level, Velocity and Flow

From 2/8/2010 to 2/15/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

2/8 2/9 2/10 2/11 2/12 2/13 2/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.36 inches

Avg Level: 6.34 in. Peak Level: 7.42 in. Min Level: 5.07 in.

Avg Velocity: 0.46 fps Peak Velocity: 0.69 fps Min Velocity: 0.22 fps

Avg Flow: 0.142 mgd Peak Flow: 0.237 mgd Min Flow: 0.061 mgd

Page 164: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 164/233

Basin 7A 

Monitoring Site:Level, Velocity and Flow

From 2/15/2010 to 2/22/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

2/15 2/16 2/17 2/18 2/19 2/20 2/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.02 inches

Avg Level: 5.78 in. Peak Level: 7.31 in. Min Level: 4.23 in.

Avg Velocity: 0.51 fps Peak Velocity: 0.76 fps Min Velocity: 0.21 fps

Avg Flow: 0.14 mgd Peak Flow: 0.232 mgd Min Flow: 0.051 mgd

Page 165: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 165/233

Basin 7A 

Monitoring Site:Level, Velocity and Flow

From 2/22/2010 to 3/1/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

2/22 2/23 2/24 2/25 2/26 2/27 2/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.89 inches

Avg Level: 5.85 in. Peak Level: 7.37 in. Min Level: 4.15 in.

Avg Velocity: 0.54 fps Peak Velocity: 0.9 fps Min Velocity: 0.24 fps

Avg Flow: 0.149 mgd Peak Flow: 0.325 mgd Min Flow: 0.052 mgd

Page 166: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 166/233

Basin 7A 

Monitoring Site:Level, Velocity and Flow

From 3/1/2010 to 3/8/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

3/1 3/2 3/3 3/4 3/5 3/6 3/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.66 inches

Avg Level: 6.23 in. Peak Level: 7.63 in. Min Level: 4.77 in.

Avg Velocity: 0.51 fps Peak Velocity: 0.76 fps Min Velocity: 0.23 fps

Avg Flow: 0.155 mgd Peak Flow: 0.248 mgd Min Flow: 0.056 mgd

Page 167: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 167/233

Basin 7A 

Monitoring Site:Level, Velocity and Flow

From 3/8/2010 to 3/15/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

3/8 3/9 3/10 3/11 3/12 3/13 3/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.53 inches

Avg Level: 5.94 in. Peak Level: 7.43 in. Min Level: 4.48 in.

Avg Velocity: 0.52 fps Peak Velocity: 0.83 fps Min Velocity: 0.18 fps

Avg Flow: 0.147 mgd Peak Flow: 0.285 mgd Min Flow: 0.048 mgd

Page 168: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 168/233

Basin 7A 

Monitoring Site:Level, Velocity and Flow

From 3/15/2010 to 3/22/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

3/15 3/16 3/17 3/18 3/19 3/20 3/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.02 inches

Avg Level: 5.45 in. Peak Level: 6.78 in. Min Level: 3.98 in.

Avg Velocity: 0.51 fps Peak Velocity: 0.74 fps Min Velocity: 0.23 fps

Avg Flow: 0.129 mgd Peak Flow: 0.228 mgd Min Flow: 0.042 mgd

Page 169: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 169/233

Basin 7A 

Monitoring Site:Level, Velocity and Flow

From 3/22/2010 to 3/29/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

3/22 3/23 3/24 3/25 3/26 3/27 3/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.51 inches

Avg Level: 5.14 in. Peak Level: 6.42 in. Min Level: 3.86 in.

Avg Velocity: 0.54 fps Peak Velocity: 0.77 fps Min Velocity: 0.18 fps

Avg Flow: 0.125 mgd Peak Flow: 0.209 mgd Min Flow: 0.042 mgd

Page 170: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 170/233

Basin 7A 

Monitoring Site:Level, Velocity and Flow

From 3/29/2010 to 4/5/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

3/29 3/30 3/31 4/1 4/2 4/3 4/4

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 3.11 inches

Avg Level: 5.52 in. Peak Level: 7.25 in. Min Level: 3.98 in.

Avg Velocity: 0.58 fps Peak Velocity: 0.87 fps Min Velocity: 0.25 fps

Avg Flow: 0.149 mgd Peak Flow: 0.296 mgd Min Flow: 0.055 mgd

Page 171: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 171/233

Basin 7A 

Monitoring Site:Level, Velocity and Flow

From 4/5/2010 to 4/12/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

4/5 4/6 4/7 4/8 4/9 4/10 4/11

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.14 inches

Avg Level: 5.78 in. Peak Level: 7.01 in. Min Level: 4.41 in.

Avg Velocity: 0.51 fps Peak Velocity: 0.69 fps Min Velocity: 0.23 fps

Avg Flow: 0.137 mgd Peak Flow: 0.222 mgd Min Flow: 0.06 mgd

Page 172: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 172/233

Monitoring Site:

Location:

Size/Type Line:

Basin 7B

El Dorado PS: West of Redemeyer Road andEl Dorado Road; in wine field near creek 

-inch Sanitary Sewer Pipe

Temporary Flow Monitoring StudySanitary Sewer Collection System

Data Summary Report

Page 173: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 173/233

Basin 7B

Location: El Dorado PS: West of Redemeyer Road and El Dorado Road; in wine field near creek 

Monitoring Site:Site Information

Report

 Average Dry Weather Flow: 0.022

Peak Measured Flow: 0.091

mgd 

mgd 

Satellite Map

Latitude: 39.1723°

Longitude: -123.1925°

Rim Elevation: 605 feet above sea level 

Street View PhotoSanitary Map

Page 174: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 174/233

M Average Dry Weather Flow

 Average Dry Weather Flow: mgd  0.02

0.000

0.010

0.020

0.030

0.040

0.050

0.060

        0      :        0        0

        1      :        0        0

        2      :        0        0

        3      :        0        0

        4      :        0        0

        5      :        0        0

        6      :        0        0

        7      :        0        0

        8      :        0        0

        9      :        0        0

        1        0      :        0        0

        1        1      :        0        0

        1        2      :        0        0

        1        3      :        0        0

        1        4      :        0        0

        1        5      :        0        0

        1        6      :        0        0

        1        7      :        0        0

        1        8      :        0        0

   F   l  o  w

   (  m  g   d

   )

Page 175: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 175/233

MoI/I Summary

 

0.00

0.01

0.02

0.03

0.04

0.05

0.06

0.07

0.08

0.09

0.10

       0       1        /       1       7

       0       1        /       1        8

       0       1        /       1       9

       0       1        /       2       0

       0       1        /       2       1

       0       1        /       2       2

       0       1        /       2       3

       0       1        /       2       4

       0       1        /       2       5

       0       1        /       2       6

       0       1        /       2       7

       0       1        /       2        8

       0       1        /       2       9

       0       1        /       3       0

       0       1        /       3       1

   F   l  o  w    (

  m  g   d   )

Event 1 I&I ANALYSIS (Rainfall = 9.87 inches)

Inflow Infiltration on 2/2/2010 (post rain event) Total I&I

Total I/I: gallons178,000

I/I per ADWF: per in-rain0.82

Peak I/I Rate: mgd 0.06

Pk I/I:ADWF: 2.82

Infiltration Rate: 0.00

0.4%R-Value:

1,000I/I per IDM: gal/IDM/in-rai

Pk I/I:ACRE: 350

Pk I/I:IDM: 3,500

mgd 

Infiltration:ADWF: 0.04

Infiltration:ACRE: 10

Infiltration:IDM: 100  gpd/IDM

 gpd/acre

 gpd/IDM

 gpd/acre

Page 176: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 176/233

Monitoring Site:

Location:

Size/Type Line:

Basin 8-1

MH 120 West: Ford Road; under the US 101Highway Overpass

15-inch Sanitary Sewer Pipe

Temporary Flow Monitoring StudySanitary Sewer Collection System

Data Summary Report

Page 177: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 177/233

Basin 8-1

Location: MH 120 West: Ford Road; under theUS 101 Highway Overpass

Diameter: 15

Monitoring Site:Site Information

Report

 Average Dry Weather Flow: 0.328

Peak Measured Flow: 1.240

mgd 

mgd 

Flow Sketch

Satellite Map

Latitude: 39.1675°

Longitude: -123.2056°

Rim Elevation: 619 feet above sea level 

inches 

Street View Photo

Sanitary Map

Plan View Photo

Page 178: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 178/233

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

16-Jan

Sat

17-Jan

Sun

18-Jan

Mon

19-Jan

Tue

20-Jan

Wed

21-Jan

Thu

22-Jan

Fri

23-Jan

Sat

24-Jan

Sun

25-Jan

Mon

26-Jan

Tue

27-Jan

Wed

28-Jan

Thu

29-Jan

Fri

30-Jan

Sat

31-Jan

Sun

1-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        0 .

        6        0        3

        0 .

        7        5        1

        0 .

        8        1        0

        0 .

        7        7        4

        1 .

        0        5        4

        1 .

        0        5        9

        0 .

        9        7        5

        0 .

        9        0        5

        0 .

        8        5        6

        0 .

        7        8        2

        0 .

        7        4        4

        0 .

        7        1        4

        0 .

        7        0        9

        0 .

        7        6        6

        0 .

        7        6        0

        0 .

        7        5        7

        0 .

        7        3        3

        0 .

        7        1        3

        0 .

        7        1        6

        0 .

        6        5        0

        0 .

        6        4        0

        0 .

        6        2        4

        0 .

        5        9        5

0.00

0.20

0.40

0.60

0.80

1.00

1.20

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

   F   l  o  w    (   M

   G  a   l   )

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

6-Feb

Sat

7-Feb

Sun

8-Feb

Mon

9-Feb

Tue

10-Feb

Wed

11-Feb

Thu

12-Feb

Fri

13-Feb

Sat

14-Feb

Sun

15-Feb

Mon

16-Feb

Tue

17-Feb

Wed

18-Feb

Thu

19-Feb

Fri

20-Feb

Sat

21-Feb

Sun

22-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

        0 .

        3        6        6

        0 .

        3        4        3

        0 .

        7        5        3

        0 .

        8        2        2

        0 .

        8        7        3

        0 .

        8        5        4

        0 .

        8        3        2

        0 .

        8        2        4

        0 .

        7        0        4

        0 .

        6        8        8

        0 .

        5        8        2

0.00

0.20

0.40

0.60

0.80

1.00

1.20

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

        0 .

        4        4        3

        0 .

        6        8        5

0.00

0.20

0.40

0.60

0.80

1.00

1.20

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

January 16 to February 27, 2010

Total Monthly Rainfall: 15.07 inches Avg Flow: 0.72 mgd Peak Flow: 1.24 mgd Min Flow: 0.18 mgd

Page 179: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 179/233

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

27-Feb

Sat

28-Feb

Sun

1-Mar 

Mon

2-Mar 

Tue

3-Mar 

Wed

4-Mar 

Thu

5-Mar 

Fri

6-Mar 

Sat

7-Mar 

Sun

8-Mar 

Mon

9-Mar 

Tue

10-Mar 

Wed

11-Mar 

Thu

12-Mar 

Fri

13-Mar 

Sat

14-Mar 

Sun

15-Mar 

Mon

1

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        0 .

        6        1        2

        0 .

        6        4        7

        0 .

        7        2        5

        0 .

        7        2        4

        0 .

        6        9        0

        0 .

        6        3        2

        0 .

        6        2        6

        0 .

        6        2        5

        0 .

        6        1        3

        0 .

        6        5        0

        0 .

        6        4        2

        0 .

        6        3        4

        0 .

        6        2        7

        0 .

        6        0        4

        0 .

        5        9        2

        0 .

        5        5        3

        0 .

        5        5        4

        0 .

        5        2        4

        0 .

        5        3        3

        0 .

        5        3        0

        0 .

        5        1        5

        0 .

        5        3        1

        0 .

        5        6        9

        0 .

        5        8        4

        0 .

        6        0        5

0.00

0.20

0.40

0.60

0.80

1.00

1.20

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

   F   l  o  w    (   M

   G  a   l   )

0.00

0.20

0.40

0.60

0.80

1.00

1.201.40

1.60

20-Mar 

Sat

21-Mar 

Sun

22-Mar 

Mon

23-Mar 

Tue

24-Mar 

Wed

25-Mar 

Thu

26-Mar 

Fri

27-Mar 

Sat

28-Mar 

Sun

29-Mar 

Mon

30-Mar 

Tue

31-Mar 

Wed

1-Apr 

Thu

2-Apr 

Fri

3-Apr 

Sat

4-Apr 

Sun

5-Apr 

Mon

6

   F   l  o  w

   (  m  g   d   )

        0 .

        6        6        6

        0 .

        6        5        9

        0 .

        6        8        4

        0 .

        6        6        2

        0 .

        6        9        6

        0 .

        6        7        4

        0 .

        5        8        9

        0 .

        5        9        3

        0 .

        5        3        7

        0 .

        5        3        4

        0 .

        6        3        1

0.00

0.20

0.40

0.60

0.80

1.00

1.20

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

0.00

0.20

0.40

0.60

0.80

1.00

1.20

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

February 27, 2010 to April 9, 2010

Total Monthly Rainfall: 7.43 inches Avg Flow: 0.62 mgd Peak Flow: 0.89 mgd Min Flow: 0.34 mgd

Page 180: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 180/233

M Average Dry Weather Flow

0.000

0.100

0.200

0.300

0.400

0.500

0.600

        0      :        0        0

        1      :        0        0

        2      :        0        0

        3      :        0        0

        4      :        0        0

        5      :        0        0

        6      :        0        0

        7      :        0        0

        8      :        0        0

        9      :        0        0

        1        0      :        0        0

        1        1      :        0        0

        1        2      :        0        0

        1        3      :        0        0

        1        4      :        0        0

        1        5      :        0        0

        1        6      :        0        0

        1        7      :        0        0

        1        8      :        0        0

        1        9      :        0        0

        2        0      :        0        0

        2        1      :        0        0

        2        2      :        0        0

        2        3      :        0        0

   F   l  o  w    (  m

  g   d   )

WeekdayWeekend

Page 181: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 181/233

MoI/I Summary

 

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

       0       1        /       1       7

       0       1        /       1        8

       0       1        /       1       9

       0       1        /       2       0

       0       1        /       2       1

       0       1        /       2       2

       0       1        /       2       3

       0       1        /       2       4

       0       1        /       2       5

       0       1        /       2       6

       0       1        /       2       7

       0       1        /       2        8

       0       1        /       2       9

       0       1        /       3       0

       0       1        /       3       1

   F   l  o  w    (

  m  g   d   )

Event 1 I&I ANALYSIS (Rainfall = 11.69 inches)

Inflow Infiltration on 2/2/2010 (post rain event) Total I&I

Total I/I: gallons8,211,000

I/I per ADWF: per in-rain2.14

Peak I/I Rate: mgd 0.85

Pk I/I:ADWF: 2.60

Infiltration Rate: 0.42

6.3%R-Value:

11,800I/I per IDM: gal/IDM/in-rai

Pk I/I:ACRE: 2,090

Pk I/I:IDM: 14,300

mgd 

Infiltration:ADWF: 1.29

Infiltration:ACRE: 1,040

Infiltration:IDM: 7,100  gpd/IDM

 gpd/acre

 gpd/IDM

 gpd/acre

Page 182: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 182/233

Basin 8-1

Monitoring Site:Level, Velocity and Flow

From 1/11/2010 to 1/18/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1/11 1/12 1/13 1/14 1/15 1/16 1/17

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.86 inches

Avg Level: 5.94 in. Peak Level: 7.24 in. Min Level: 4.68 in.

Avg Velocity: 1.21 fps Peak Velocity: 1.55 fps Min Velocity: 0.87 fps

Avg Flow: 0.35 mgd Peak Flow: 0.539 mgd Min Flow: 0.18 mgd

Page 183: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 183/233

Basin 8-1

Monitoring Site:Level, Velocity and Flow

From 1/18/2010 to 1/25/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1/18 1/19 1/20 1/21 1/22 1/23 1/24

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 8.25 inches

Avg Level: 8.2 in. Peak Level: 10.84 in. Min Level: 4.99 in.

Avg Velocity: 1.61 fps Peak Velocity: 2.12 fps Min Velocity: 0.92 fps

Avg Flow: 0.708 mgd Peak Flow: 0.964 mgd Min Flow: 0.217 mgd

Page 184: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 184/233

Basin 8-1

Monitoring Site:Level, Velocity and Flow

From 1/25/2010 to 2/1/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1/25 1/26 1/27 1/28 1/29 1/30 1/31

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.52 inches

Avg Level: 8.93 in. Peak Level: 11.91 in. Min Level: 7.05 in.

Avg Velocity: 1.95 fps Peak Velocity: 2.29 fps Min Velocity: 1.69 fps

Avg Flow: 0.939 mgd Peak Flow: 1.24 mgd Min Flow: 0.712 mgd

Page 185: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 185/233

Basin 8-1

Monitoring Site:Level, Velocity and Flow

From 2/1/2010 to 2/8/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

2/1 2/2 2/3 2/4 2/5 2/6 2/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.12 inches

Avg Level: 8 in. Peak Level: 9.54 in. Min Level: 6.6 in.

Avg Velocity: 1.82 fps Peak Velocity: 2.2 fps Min Velocity: 1.55 fps

Avg Flow: 0.767 mgd Peak Flow: 1.018 mgd Min Flow: 0.557 mgd

Page 186: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 186/233

Basin 8-1

Monitoring Site:Level, Velocity and Flow

From 2/8/2010 to 2/15/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

2/8 2/9 2/10 2/11 2/12 2/13 2/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.33 inches

Avg Level: 7.63 in. Peak Level: 8.71 in. Min Level: 6.36 in.

Avg Velocity: 1.82 fps Peak Velocity: 2.17 fps Min Velocity: 1.62 fps

Avg Flow: 0.724 mgd Peak Flow: 0.913 mgd Min Flow: 0.558 mgd

Page 187: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 187/233

Basin 8-1

Monitoring Site:Level, Velocity and Flow

From 2/15/2010 to 2/22/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

2/15 2/16 2/17 2/18 2/19 2/20 2/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches

Avg Level: 7.12 in. Peak Level: 8.6 in. Min Level: 5.59 in.

Avg Velocity: 1.71 fps Peak Velocity: 2.09 fps Min Velocity: 1.43 fps

Avg Flow: 0.623 mgd Peak Flow: 0.859 mgd Min Flow: 0.417 mgd

Page 188: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 188/233

Basin 8-1

Monitoring Site:Level, Velocity and Flow

From 2/22/2010 to 3/1/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

2/22 2/23 2/24 2/25 2/26 2/27 2/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2 inches

Avg Level: 7.13 in. Peak Level: 8.68 in. Min Level: 5.49 in.

Avg Velocity: 1.69 fps Peak Velocity: 2.06 fps Min Velocity: 1.42 fps

Avg Flow: 0.616 mgd Peak Flow: 0.831 mgd Min Flow: 0.396 mgd

Page 189: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 189/233

Basin 8-1

Monitoring Site:Level, Velocity and Flow

From 3/1/2010 to 3/8/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

3/1 3/2 3/3 3/4 3/5 3/6 3/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.76 inches

Avg Level: 7.43 in. Peak Level: 8.81 in. Min Level: 5.93 in.

Avg Velocity: 1.77 fps Peak Velocity: 2.19 fps Min Velocity: 1.52 fps

Avg Flow: 0.678 mgd Peak Flow: 0.886 mgd Min Flow: 0.474 mgd

Page 190: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 190/233

Basin 8-1

Monitoring Site:Level, Velocity and Flow

From 3/8/2010 to 3/15/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

3/8 3/9 3/10 3/11 3/12 3/13 3/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.64 inches

Avg Level: 7.18 in. Peak Level: 8.78 in. Min Level: 5.76 in.

Avg Velocity: 1.76 fps Peak Velocity: 2.16 fps Min Velocity: 1.52 fps

Avg Flow: 0.645 mgd Peak Flow: 0.871 mgd Min Flow: 0.462 mgd

Page 191: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 191/233

Basin 8-1

Monitoring Site:Level, Velocity and Flow

From 3/15/2010 to 3/22/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

3/15 3/16 3/17 3/18 3/19 3/20 3/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.03 inches

Avg Level: 6.77 in. Peak Level: 8.12 in. Min Level: 5.29 in.

Avg Velocity: 1.81 fps Peak Velocity: 2.23 fps Min Velocity: 1.58 fps

Avg Flow: 0.612 mgd Peak Flow: 0.768 mgd Min Flow: 0.437 mgd

Page 192: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 192/233

Basin 8-1

Monitoring Site:Level, Velocity and Flow

From 3/22/2010 to 3/29/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

3/22 3/23 3/24 3/25 3/26 3/27 3/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.56 inches

Avg Level: 6.36 in. Peak Level: 7.55 in. Min Level: 4.97 in.

Avg Velocity: 1.72 fps Peak Velocity: 2.26 fps Min Velocity: 1.42 fps

Avg Flow: 0.538 mgd Peak Flow: 0.759 mgd Min Flow: 0.365 mgd

Page 193: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 193/233

Basin 8-1

Monitoring Site:Level, Velocity and Flow

From 3/29/2010 to 4/5/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

3/29 3/30 3/31 4/1 4/2 4/3 4/4

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 3.29 inches

Avg Level: 6.72 in. Peak Level: 8.57 in. Min Level: 5.15 in.

Avg Velocity: 1.74 fps Peak Velocity: 2.17 fps Min Velocity: 1.36 fps

Avg Flow: 0.585 mgd Peak Flow: 0.795 mgd Min Flow: 0.339 mgd

Page 194: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 194/233

Basin 8-1

Monitoring Site:Level, Velocity and Flow

From 4/5/2010 to 4/12/2010

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

0.5

1.0

1.5

2.0

2.5

3.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

4/5 4/6 4/7 4/8 4/9 4/10 4/11

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.13 inches

Avg Level: 6.93 in. Peak Level: 8.18 in. Min Level: 5.55 in.

Avg Velocity: 1.94 fps Peak Velocity: 2.33 fps Min Velocity: 1.7 fps

Avg Flow: 0.679 mgd Peak Flow: 0.842 mgd Min Flow: 0.497 mgd

Page 195: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 195/233

Monitoring Site:

Location:

Size/Type Line:

Basin 8-2

MH 311: Brush Street; east of Orr Street

15-inch Sanitary Sewer Pipe

Temporary Flow Monitoring StudySanitary Sewer Collection System

Data Summary Report

Page 196: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 196/233

Basin 8-2

Location: MH 311: Brush Street; east of OrrStreet

Diameter: 15

Monitoring Site:Site Information

Report

 Average Dry Weather Flow: 0.226

Peak Measured Flow: 1.116

mgd 

mgd 

Flow Sketch

Satellite Map

Latitude: 39.1594°

Longitude: -123.2019°

Rim Elevation: 609 feet above sea level 

inches 

Street View Photo

Sanitary Map

Plan View Photo

Page 197: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 197/233

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

16-Jan

Sat

17-Jan

Sun

18-Jan

Mon

19-Jan

Tue

20-Jan

Wed

21-Jan

Thu

22-Jan

Fri

23-Jan

Sat

24-Jan

Sun

25-Jan

Mon

26-Jan

Tue

27-Jan

Wed

28-Jan

Thu

29-Jan

Fri

30-Jan

Sat

31-Jan

Sun

1-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        0 .

        5        8        0

        0 .

        6        6        4

        0 .

        5        5        7

        0 .

        4        2        1

        0 .

        7        6        8

        0 .

        6        3        1

        0 .

        5        4        3

        0 .

        4        7        3

        0 .

        4        6        0

        0 .

        4        1        4

        0 .

        3        9        9

        0 .

        3        8        6

        0 .

        4        7        3

        0 .

        5        1        7

        0 .

        4        5        3

        0 .

        4        5        3

        0 .

        4        1        0

        0 .

        3        8        9

        0 .

        3        5        4

        0 .

        3        3        5

        0 .

        3        0        7

        0 .

        3        0        1

        0 .

        2        9        6

0.000.100.200.300.400.500.600.700.80

0.90

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

   F   l  o  w    (   M

   G  a   l   )

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

6-Feb

Sat

7-Feb

Sun

8-Feb

Mon

9-Feb

Tue

10-Feb

Wed

11-Feb

Thu

12-Feb

Fri

13-Feb

Sat

14-Feb

Sun

15-Feb

Mon

16-Feb

Tue

17-Feb

Wed

18-Feb

Thu

19-Feb

Fri

20-Feb

Sat

21-Feb

Sun

22-Feb

Mon

2

   F   l  o  w

   (  m  g   d   )

        0 .

        2        3        2

        0 .

        2        6        6

        0 .

        3        7        7

        0 .

        4        4        1

        0 .

        4        3        4

        0 .

        3        9        7

        0 .

        5        2        9

        0 .

        4        6        8

        0 .

        3        2        0

        0 .

        2        9        1

        0 .

        2        7        9

0.000.100.200.300.400.500.600.700.80

0.90

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

        0 .

        4        7        3

        0 .

        3        2        3

0.000.100.200.300.400.500.600.700.80

0.90

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

January 16 to February 27, 2010

Total Monthly Rainfall: 15.29 inches Avg Flow: 0.42 mgd Peak Flow: 1.12 mgd Min Flow: 0.07 mgd

Page 198: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 198/233

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

27-Feb

Sat

28-Feb

Sun

1-Mar 

Mon

2-Mar 

Tue

3-Mar 

Wed

4-Mar 

Thu

5-Mar 

Fri

6-Mar 

Sat

7-Mar 

Sun

8-Mar 

Mon

9-Mar 

Tue

10-Mar 

Wed

11-Mar 

Thu

12-Mar 

Fri

13-Mar 

Sat

14-Mar 

Sun

15-Mar 

Mon

1

   F   l  o  w

   (  m  g   d   )

MPeriod Flow Summary

        0 .

        3        1        7

        0 .

        3        9        0

        0 .

        4        9        7

        0 .

        4        0        4

        0 .

        3        7        4

        0 .

        3        1        3

        0 .

        3        0        3

        0 .

        3        0        8

        0 .

        2        9        0

        0 .

        4        0        1

        0 .

        3        0        7

        0 .

        2        7        9

        0 .

        2        7        6

        0 .

        2        7        8

        0 .

        2        6        1

        0 .

        2        6        2

        0 .

        2        6        7

        0 .

        2        8        5

        0 .

        3        0        6

        0 .

        2        8        1

        0 .

        2        7        2

        0 .

        3        3        4

        0 .

        3        5        7

        0 .

        2        8        8

        0 .

        3        3        1

0.000.100.200.300.400.500.600.700.80

0.90

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

   F   l  o  w    (   M

   G  a   l   )

0.00

0.20

0.40

0.60

0.80

1.00

1.201.40

1.60

20-Mar 

Sat

21-Mar 

Sun

22-Mar 

Mon

23-Mar 

Tue

24-Mar 

Wed

25-Mar 

Thu

26-Mar 

Fri

27-Mar 

Sat

28-Mar 

Sun

29-Mar 

Mon

30-Mar 

Tue

31-Mar 

Wed

1-Apr 

Thu

2-Apr 

Fri

3-Apr 

Sat

4-Apr 

Sun

5-Apr 

Mon

6

   F   l  o  w

   (  m  g   d   )

        0 .

        3        2        3

        0 .

        2        9        1

        0 .

        3        2        7

        0 .

        3        0        3

        0 .

        3        5        2

        0 .

        2        9        6

        0 .

        2        5        0

        0 .

        2        3        7

        0 .

        2        3        0

        0 .

        2        2        1

        0 .

        2        7        8

0.000.100.200.300.400.500.600.700.80

0.90

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

0.000.100.200.300.400.500.600.700.80

0.90

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

February 27, 2010 to April 9, 2010

Total Monthly Rainfall: 7.61 inches Avg Flow: 0.31 mgd Peak Flow: 0.76 mgd Min Flow: 0.09 mgd

Page 199: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 199/233

M Average Dry Weather Flow

0.000

0.050

0.100

0.150

0.200

0.250

0.300

0.350

0.400

        0      :        0        0

        1      :        0        0

        2      :        0        0

        3      :        0        0

        4      :        0        0

        5      :        0        0

        6      :        0        0

        7      :        0        0

        8      :        0        0

        9      :        0        0

        1        0      :        0        0

        1        1      :        0        0

        1        2      :        0        0

        1        3      :        0        0

        1        4      :        0        0

        1        5      :        0        0

        1        6      :        0        0

        1        7      :        0        0

        1        8      :        0        0

        1        9      :        0        0

        2        0      :        0        0

        2        1      :        0        0

        2        2      :        0        0

        2        3      :        0        0

   F   l  o  w    (  m

  g   d   )

WeekdayWeekend

Page 200: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 200/233

MoI/I Summary

 

0.00

0.20

0.40

0.60

0.80

1.00

1.20

       0       1        /       1       7

       0       1        /       1        8

       0       1        /       1       9

       0       1        /       2       0

       0       1        /       2       1

       0       1        /       2       2

       0       1        /       2       3

       0       1        /       2       4

       0       1        /       2       5

       0       1        /       2       6

       0       1        /       2       7

       0       1        /       2        8

       0       1        /       2       9

       0       1        /       3       0

       0       1        /       3       1

   F   l  o  w    (

  m  g   d   )

Event 1 I&I ANALYSIS (Rainfall = 11.93 inches)

Inflow Infiltration on 2/2/2010 (post rain event) Total I&I

Total I/I: gallons4,624,000

I/I per ADWF: per in-rain1.71

Peak I/I Rate: mgd 0.80

Pk I/I:ADWF: 3.55

Infiltration Rate: 0.16

5.1%R-Value:

9,400I/I per IDM: gal/IDM/in-rai

Pk I/I:ACRE: 2,840

Pk I/I:IDM: 19,400

mgd 

Infiltration:ADWF: 0.71

Infiltration:ACRE: 570

Infiltration:IDM: 3,900  gpd/IDM

 gpd/acre

 gpd/IDM

 gpd/acre

Page 201: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 201/233

Basin 8-2

Monitoring Site:Level, Velocity and Flow

From 1/11/2010 to 1/18/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1/11 1/12 1/13 1/14 1/15 1/16 1/17

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.88 inches

Avg Level: 2.8 in. Peak Level: 4.34 in. Min Level: 1.76 in.

Avg Velocity: 2.3 fps Peak Velocity: 3.75 fps Min Velocity: 1.38 fps

Avg Flow: 0.255 mgd Peak Flow: 0.714 mgd Min Flow: 0.072 mgd

Page 202: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 202/233

Basin 8-2

Monitoring Site:Level, Velocity and Flow

From 1/18/2010 to 1/25/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1/18 1/19 1/20 1/21 1/22 1/23 1/24

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 8.41 inches

Avg Level: 3.66 in. Peak Level: 5.42 in. Min Level: 2.16 in.

Avg Velocity: 3.2 fps Peak Velocity: 4.37 fps Min Velocity: 1.66 fps

Avg Flow: 0.502 mgd Peak Flow: 1.116 mgd Min Flow: 0.12 mgd

Page 203: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 203/233

Basin 8-2

Monitoring Site:Level, Velocity and Flow

From 1/25/2010 to 2/1/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1/25 1/26 1/27 1/28 1/29 1/30 1/31

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.58 inches

Avg Level: 3.81 in. Peak Level: 5.22 in. Min Level: 2.83 in.

Avg Velocity: 3.24 fps Peak Velocity: 4.22 fps Min Velocity: 1.91 fps

Avg Flow: 0.53 mgd Peak Flow: 1.036 mgd Min Flow: 0.2 mgd

Page 204: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 204/233

Basin 8-2

Monitoring Site:Level, Velocity and Flow

From 2/1/2010 to 2/8/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

2/1 2/2 2/3 2/4 2/5 2/6 2/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.08 inches

Avg Level: 3.63 in. Peak Level: 4.79 in. Min Level: 2.73 in.

Avg Velocity: 2.99 fps Peak Velocity: 3.92 fps Min Velocity: 1.69 fps

Avg Flow: 0.455 mgd Peak Flow: 0.817 mgd Min Flow: 0.173 mgd

Page 205: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 205/233

Basin 8-2

Monitoring Site:Level, Velocity and Flow

From 2/8/2010 to 2/15/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

2/8 2/9 2/10 2/11 2/12 2/13 2/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.32 inches

Avg Level: 3.35 in. Peak Level: 4.29 in. Min Level: 2.4 in.

Avg Velocity: 2.8 fps Peak Velocity: 3.71 fps Min Velocity: 1.68 fps

Avg Flow: 0.382 mgd Peak Flow: 0.68 mgd Min Flow: 0.156 mgd

Page 206: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 206/233

Basin 8-2

Monitoring Site:Level, Velocity and Flow

From 2/15/2010 to 2/22/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

2/15 2/16 2/17 2/18 2/19 2/20 2/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches

Avg Level: 2.98 in. Peak Level: 3.87 in. Min Level: 2.19 in.

Avg Velocity: 2.59 fps Peak Velocity: 3.56 fps Min Velocity: 1.71 fps

Avg Flow: 0.3 mgd Peak Flow: 0.559 mgd Min Flow: 0.123 mgd

Page 207: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 207/233

Basin 8-2

Monitoring Site:Level, Velocity and Flow

From 2/22/2010 to 3/1/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

2/22 2/23 2/24 2/25 2/26 2/27 2/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.04 inches

Avg Level: 2.99 in. Peak Level: 4.55 in. Min Level: 2.02 in.

Avg Velocity: 2.76 fps Peak Velocity: 4.09 fps Min Velocity: 1.51 fps

Avg Flow: 0.326 mgd Peak Flow: 0.799 mgd Min Flow: 0.099 mgd

Page 208: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 208/233

Basin 8-2

Monitoring Site:Level, Velocity and Flow

From 3/1/2010 to 3/8/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

3/1 3/2 3/3 3/4 3/5 3/6 3/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.8 inches

Avg Level: 3.1 in. Peak Level: 4.11 in. Min Level: 2.19 in.

Avg Velocity: 3.04 fps Peak Velocity: 3.97 fps Min Velocity: 1.64 fps

Avg Flow: 0.373 mgd Peak Flow: 0.688 mgd Min Flow: 0.118 mgd

Page 209: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 209/233

Basin 8-2

Monitoring Site:Level, Velocity and Flow

From 3/8/2010 to 3/15/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

3/8 3/9 3/10 3/11 3/12 3/13 3/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.68 inches

Avg Level: 2.93 in. Peak Level: 4.39 in. Min Level: 1.96 in.

Avg Velocity: 2.83 fps Peak Velocity: 4.01 fps Min Velocity: 1.69 fps

Avg Flow: 0.323 mgd Peak Flow: 0.759 mgd Min Flow: 0.107 mgd

Page 210: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 210/233

Basin 8-2

Monitoring Site:Level, Velocity and Flow

From 3/15/2010 to 3/22/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

3/15 3/16 3/17 3/18 3/19 3/20 3/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.03 inches

Avg Level: 2.72 in. Peak Level: 3.7 in. Min Level: 1.89 in.

Avg Velocity: 2.64 fps Peak Velocity: 3.78 fps Min Velocity: 1.61 fps

Avg Flow: 0.27 mgd Peak Flow: 0.532 mgd Min Flow: 0.097 mgd

Page 211: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 211/233

Basin 8-2

Monitoring Site:Level, Velocity and Flow

From 3/22/2010 to 3/29/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

3/22 3/23 3/24 3/25 3/26 3/27 3/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.58 inches

Avg Level: 2.68 in. Peak Level: 3.98 in. Min Level: 1.8 in.

Avg Velocity: 2.62 fps Peak Velocity: 3.8 fps Min Velocity: 1.6 fps

Avg Flow: 0.265 mgd Peak Flow: 0.642 mgd Min Flow: 0.088 mgd

Page 212: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 212/233

Basin 8-2

Monitoring Site:Level, Velocity and Flow

From 3/29/2010 to 4/5/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

3/29 3/30 3/31 4/1 4/2 4/3 4/4

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 3.36 inches

Avg Level: 2.9 in. Peak Level: 4.1 in. Min Level: 1.89 in.

Avg Velocity: 2.81 fps Peak Velocity: 4.09 fps Min Velocity: 1.47 fps

Avg Flow: 0.317 mgd Peak Flow: 0.696 mgd Min Flow: 0.097 mgd

Page 213: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 213/233

Basin 8-2

Monitoring Site:Level, Velocity and Flow

From 4/5/2010 to 4/12/2010

0.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

4/5 4/6 4/7 4/8 4/9 4/10 4/11

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.13 inches

Avg Level: 2.81 in. Peak Level: 3.62 in. Min Level: 1.98 in.

Avg Velocity: 2.83 fps Peak Velocity: 3.75 fps Min Velocity: 1.63 fps

Avg Flow: 0.302 mgd Peak Flow: 0.547 mgd Min Flow: 0.107 mgd

Page 214: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 214/233

Monitoring Site:

Location:

Size/Type Line:

System less Basins 1B, 2

MH 1035: Airport Road

36-inch Sanitary Sewer Pipe

Temporary Flow Monitoring StudySanitary Sewer Collection System

Data Summary Report

Page 215: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 215/233

System less Basins 1B, 2

Location: MH 1035: Airport Road

Diameter: 36

Monitoring Site:Site Information

Report

 Average Dry Weather Flow: 2.122

Peak Measured Flow: 12.287

mgd 

mgd 

Flow Sketch

Satellite Map

Latitude: 39.1254°

Longitude: -123.1973°

Rim Elevation: 581 feet above sea level 

inches 

Street View Photo

Sanitary Map

Plan View Photo

Page 216: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 216/233

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

16-Jan

Sat

17-Jan

Sun

18-Jan

Mon

19-Jan

Tue

20-Jan

Wed

21-Jan

Thu

22-Jan

Fri

23-Jan

Sat

24-Jan

Sun

25-Jan

Mon

26-Jan

Tue

27-Jan

Wed

28-Jan

Thu

29-Jan

Fri

30-Jan

Sat

31-Jan

Sun

1-Feb

Mon

   F   l  o  w

   (  m  g   d   )

Syste

MPeriod Flow Summary

        5 .

        5        3        4

        7 .

        0        4        8

        7 .

        7        0        3

        7 .

        0        3        6

        1        0 .

        0        8        7

        1        0 .

        0        5        2

        8 .

        5        3        3

        7 .

        6        4        5

        7 .

        1        0        1

        6 .

        1        6        4

        5 .

        9        5        0

        5 .

        7        1        8

        6 .

        0        4        5

        6 .

        9        7        8

        6 .

        2        4        2

        6 .

        1        8        8

        5 .

        9        5        0

        5 .

        5        7        6

        5 .

        4        7        8

        4 .

        9        0        1

        4 .

        7        8        1

        4 .

        6        2        8

        4 .

        4        9        7

0.00

2.00

4.00

6.00

8.00

10.00

12.00

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

   F   l  o  w    (   M

   G  a   l   )

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

6-Feb

Sat

7-Feb

Sun

8-Feb

Mon

9-Feb

Tue

10-Feb

Wed

11-Feb

Thu

12-Feb

Fri

13-Feb

Sat

14-Feb

Sun

15-Feb

Mon

16-Feb

Tue

17-Feb

Wed

18-Feb

Thu

19-Feb

Fri

20-Feb

Sat

21-Feb

Sun

22-Feb

Mon

   F   l  o  w

   (  m  g   d   )

        2 .

        7        4        5

        2 .

        4        0        7

        6 .

        6        0        4

        6 .

        7        6        1

        6 .

        8        5        2

        6 .

        4        5        2

        7 .

        0        9        5

        6 .

        8        7        3

        5 .

        2        6        2

        5 .

        1        4        2

        4 .

        4        2        2

0.00

2.00

4.00

6.00

8.00

10.00

12.00

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

        3 .

        8        9        6

        5 .

        0        6        5

0.00

2.00

4.00

6.00

8.00

10.00

12.00

       1       /       1       6

       1       /       1       7

       1       /       1       8

       1       /       1       9

       1       /       2       0

       1       /       2       1

       1       /       2       2

       1       /       2       3

       1       /       2       4

       1       /       2       5

       1       /       2       6

       1       /       2       7

       1       /       2       8

       1       /       2       9

       1       /       3       0

       1       /       3       1

       2       /       1

       2       /       2

       2       /       3

       2       /       4

       2       /       5

       2       /       6

       2       /       7

       2       /       8

       2       /       9

       2       /       1       0

       2       /       1       1

       2       /       1       2

       2       /       1       3

       2       /       1       4

       2       /       1       5

       2       /       1       6

       2       /       1       7

       2       /       1       8

       2       /       1       9

       2       /       2       0

January 16 to February 27, 2010

Total Monthly Rainfall: 15.15 inches Avg Flow: 5.91 mgd Peak Flow: 12.29 mgd Min Flow: 1.14 mgd

Page 217: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 217/233

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

27-Feb

Sat

28-Feb

Sun

1-Mar 

Mon

2-Mar 

Tue

3-Mar 

Wed

4-Mar 

Thu

5-Mar 

Fri

6-Mar 

Sat

7-Mar 

Sun

8-Mar 

Mon

9-Mar 

Tue

10-Mar 

Wed

11-Mar 

Thu

12-Mar 

Fri

13-Mar 

Sat

14-Mar 

Sun

15-Mar 

Mon

   F   l  o  w

   (  m  g   d   )

Syste

MPeriod Flow Summary

        4 .

        9        0        4

        5 .

        4        8        8

        6 .

        7        1        8

        6 .

        5        3        7

        5 .

        9        4        1

        5 .

        2        5        3

        5 .

        0        4        5

        5 .

        1        0        5

        4 .

        8        4        4

        5 .

        6        4        2

        5 .

        3        8        2

        5 .

        0        4        5

        4 .

        8        5        2

        4 .

        7        4        0

        4 .

        5        9        2

        4 .

        2        9        9

        4 .

        1        6        4

        4 .

        0        9        3

        4 .

        1        0        0

        4 .

        0        7        7

        3 .

        9        5        1

        4 .

        5        1        0

        5 .

        2        3        5

        5 .

        1        4        5

        5 .

        3        2        1

0.00

2.00

4.00

6.00

8.00

10.00

12.00

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

   F   l  o  w    (   M

   G  a   l   )

0.00

2.00

4.00

6.00

8.00

10.00

12.0014.00

16.00

20-Mar 

Sat

21-Mar 

Sun

22-Mar 

Mon

23-Mar 

Tue

24-Mar 

Wed

25-Mar 

Thu

26-Mar 

Fri

27-Mar 

Sat

28-Mar 

Sun

29-Mar 

Mon

30-Mar 

Tue

31-Mar 

Wed

1-Apr 

Thu

2-Apr 

Fri

3-Apr 

Sat

4-Apr 

Sun

5-Apr 

Mon

   F   l  o  w

   (  m  g   d   )

        5 .

        5        2        3

        5 .

        1        9        5

        5 .

        7        1        0

        5 .

        4        7        9

        6 .

        0        3        4

        5 .

        5        6        2

        4 .

        3        7        8

        4 .

        3        1        4

        3 .

        9        1        9

        3 .

        9        1        5

        5 .

        4        1        7

0.00

2.00

4.00

6.00

8.00

10.00

12.00

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

0.00

2.00

4.00

6.00

8.00

10.00

12.00

       2       /       2       7

       2       /       2       8

       3       /       1

       3       /       2

       3       /       3

       3       /       4

       3       /       5

       3       /       6

       3       /       7

       3       /       8

       3       /       9

       3       /       1       0

       3       /       1       1

       3       /       1       2

       3       /       1       3

       3       /       1       4

       3       /       1       5

       3       /       1       6

       3       /       1       7

       3       /       1       8

       3       /       1       9

       3       /       2       0

       3       /       2       1

       3       /       2       2

       3       /       2       3

       3       /       2       4

       3       /       2       5

       3       /       2       6

       3       /       2       7

       3       /       2       8

       3       /       2       9

       3       /       3       0

       3       /       3       1

       4       /       1

       4       /       2

       4       /       3

February 27, 2010 to April 9, 2010

Total Monthly Rainfall: 7.27 inches Avg Flow: 5.12 mgd Peak Flow: 7.82 mgd Min Flow: 2.83 mgd

Page 218: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 218/233

Syst

M Average Dry Weather Flow

0.000

0.500

1.000

1.500

2.000

2.500

3.000

3.500

        0      :        0        0

        1      :        0        0

        2      :        0        0

        3      :        0        0

        4      :        0        0

        5      :        0        0

        6      :        0        0

        7      :        0        0

        8      :        0        0

        9      :        0        0

        1        0      :        0        0

        1        1      :        0        0

        1        2      :        0        0

        1        3      :        0        0

        1        4      :        0        0

        1        5      :        0        0

        1        6      :        0        0

        1        7      :        0        0

        1        8      :        0        0

        1        9      :        0        0

        2        0      :        0        0

        2        1      :        0        0

        2        2      :        0        0

        2        3      :        0        0

   F   l  o  w    (  m

  g   d   )

WeekdayWeekend

Page 219: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 219/233

MoI/I Summary

 

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

       0       1        /       1       7

       0       1        /       1        8

       0       1        /       1       9

       0       1        /       2       0

       0       1        /       2       1

       0       1        /       2       2

       0       1        /       2       3

       0       1        /       2       4

       0       1        /       2       5

       0       1        /       2       6

       0       1        /       2       7

       0       1        /       2        8

       0       1        /       2       9

       0       1        /       3       0

       0       1        /       3       1

   F   l  o  w    (

  m  g   d   )

Event 1 I&I ANALYSIS (Rainfall = 11.73 inches)

Inflow Infiltration on 2/2/2010 (post rain event) Total I&I

Total I/I: gallons83,360,000

I/I per ADWF: per in-rain3.35

Peak I/I Rate: mgd 9.88

Pk I/I:ADWF: 4.66

Infiltration Rate: 3.85

5.3%R-Value:

9,700I/I per IDM: gal/IDM/in-rai

Pk I/I:ACRE: 2,020

Pk I/I:IDM: 13,500

mgd 

Infiltration:ADWF: 1.81

Infiltration:ACRE: 790

Infiltration:IDM: 5,300  gpd/IDM

 gpd/acre

 gpd/IDM

 gpd/acre

System

Page 220: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 220/233

System less Basins 1B, 2

Monitoring Site:Level, Velocity and Flow

From 1/11/2010 to 1/18/2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

1/11 1/12 1/13 1/14 1/15 1/16 1/17

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.84 inches

Avg Level: 10.31 in. Peak Level: 12.43 in. Min Level: 7.66 in.

Avg Velocity: 2.28 fps Peak Velocity: 2.78 fps Min Velocity: 1.56 fps

Avg Flow: 2.529 mgd Peak Flow: 3.883 mgd Min Flow: 1.138 mgd

Page 221: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 221/233

System less Basins 1B, 2

Monitoring Site:Level, Velocity and Flow

From 1/18/2010 to 1/25/2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

1/18 1/19 1/20 1/21 1/22 1/23 1/24

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 8.3 inches

Avg Level: 15.5 in. Peak Level: 19.68 in. Min Level: 9.09 in.

Avg Velocity: 3.32 fps Peak Velocity: 3.82 fps Min Velocity: 1.88 fps

Avg Flow: 6.369 mgd Peak Flow: 9.327 mgd Min Flow: 1.701 mgd

Page 222: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 222/233

System less Basins 1B, 2

Monitoring Site:Level, Velocity and Flow

From 1/25/2010 to 2/1/2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

1/25 1/26 1/27 1/28 1/29 1/30 1/31

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 2.53 inches

Avg Level: 18 in. Peak Level: 23.93 in. Min Level: 14.6 in.

Avg Velocity: 3.53 fps Peak Velocity: 3.89 fps Min Velocity: 3.09 fps

Avg Flow: 8.103 mgd Peak Flow: 12.287 mgd Min Flow: 5.411 mgd

Page 223: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 223/233

System less Basins 1B, 2

Monitoring Site:Level, Velocity and Flow

From 2/1/2010 to 2/8/2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

2/1 2/2 2/3 2/4 2/5 2/6 2/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.19 inches

Avg Level: 15.66 in. Peak Level: 18.47 in. Min Level: 13.13 in.

Avg Velocity: 3.34 fps Peak Velocity: 3.71 fps Min Velocity: 2.89 fps

Avg Flow: 6.403 mgd Peak Flow: 8.363 mgd Min Flow: 4.419 mgd

Page 224: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 224/233

System less Basins 1B, 2

Monitoring Site:Level, Velocity and Flow

From 2/8/2010 to 2/15/2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

2/8 2/9 2/10 2/11 2/12 2/13 2/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.34 inches

Avg Level: 14.8 in. Peak Level: 16.35 in. Min Level: 13.06 in.

Avg Velocity: 3.2 fps Peak Velocity: 3.53 fps Min Velocity: 2.71 fps

Avg Flow: 5.691 mgd Peak Flow: 7.011 mgd Min Flow: 4.07 mgd

Page 225: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 225/233

System less Basins 1B, 2

Monitoring Site:Level, Velocity and Flow

From 2/15/2010 to 2/22/2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

2/15 2/16 2/17 2/18 2/19 2/20 2/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.01 inches

Avg Level: 13.44 in. Peak Level: 15.06 in. Min Level: 11.63 in.

Avg Velocity: 2.98 fps Peak Velocity: 3.41 fps Min Velocity: 2.54 fps

Avg Flow: 4.663 mgd Peak Flow: 6.181 mgd Min Flow: 3.289 mgd

Page 226: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 226/233

System less Basins 1B, 2

Monitoring Site:Level, Velocity and Flow

From 2/22/2010 to 3/1/2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

2/22 2/23 2/24 2/25 2/26 2/27 2/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.96 inches

Avg Level: 13.69 in. Peak Level: 16.78 in. Min Level: 11.24 in.

Avg Velocity: 3.01 fps Peak Velocity: 3.56 fps Min Velocity: 2.45 fps

Avg Flow: 4.847 mgd Peak Flow: 7.307 mgd Min Flow: 3.018 mgd

Page 227: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 227/233

System less Basins 1B, 2

Monitoring Site:Level, Velocity and Flow

From 3/1/2010 to 3/8/2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

3/1 3/2 3/3 3/4 3/5 3/6 3/7

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.72 inches

Avg Level: 14.99 in. Peak Level: 17.45 in. Min Level: 12.17 in.

Avg Velocity: 3.22 fps Peak Velocity: 3.63 fps Min Velocity: 2.64 fps

Avg Flow: 5.825 mgd Peak Flow: 7.786 mgd Min Flow: 3.625 mgd

Page 228: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 228/233

System less Basins 1B, 2

Monitoring Site:Level, Velocity and Flow

From 3/8/2010 to 3/15/2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

3/8 3/9 3/10 3/11 3/12 3/13 3/14

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 1.61 inches

Avg Level: 14.44 in. Peak Level: 16.84 in. Min Level: 12.07 in.

Avg Velocity: 3.11 fps Peak Velocity: 3.52 fps Min Velocity: 2.6 fps

Avg Flow: 5.355 mgd Peak Flow: 7.328 mgd Min Flow: 3.582 mgd

Page 229: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 229/233

System less Basins 1B, 2

Monitoring Site:Level, Velocity and Flow

From 3/15/2010 to 3/22/2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

3/15 3/16 3/17 3/18 3/19 3/20 3/21

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.02 inches

Avg Level: 13.6 in. Peak Level: 15.21 in. Min Level: 11.54 in.

Avg Velocity: 3 fps Peak Velocity: 3.5 fps Min Velocity: 2.53 fps

Avg Flow: 4.758 mgd Peak Flow: 6.171 mgd Min Flow: 3.212 mgd

Page 230: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 230/233

System less Basins 1B, 2

Monitoring Site:Level, Velocity and Flow

From 3/22/2010 to 3/29/2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

3/22 3/23 3/24 3/25 3/26 3/27 3/28

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.53 inches

Avg Level: 12.65 in. Peak Level: 13.73 in. Min Level: 10.98 in.

Avg Velocity: 2.83 fps Peak Velocity: 3.19 fps Min Velocity: 2.38 fps

Avg Flow: 4.081 mgd Peak Flow: 5.021 mgd Min Flow: 2.874 mgd

Page 231: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 231/233

System less Basins 1B, 2

Monitoring Site:Level, Velocity and Flow

From 3/29/2010 to 4/5/2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

3/29 3/30 3/31 4/1 4/2 4/3 4/4

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 3.22 inches

Avg Level: 13.99 in. Peak Level: 17.45 in. Min Level: 10.69 in.

Avg Velocity: 3.05 fps Peak Velocity: 3.58 fps Min Velocity: 2.45 fps

Avg Flow: 5.062 mgd Peak Flow: 7.824 mgd Min Flow: 2.826 mgd

Page 232: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 232/233

System less Basins 1B, 2

Monitoring Site:Level, Velocity and Flow

From 4/5/2010 to 4/12/2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

Mon Tue Wed Thu Fri Sat Sun

   L  e  v  e   l   (   i  n   )

Lev

0.0

1.0

2.0

3.0

4.0

5.0

6.0

   V  e   l  o  c   i   t  y   (   f  p  s   )

Vel

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

4/5 4/6 4/7 4/8 4/9 4/10 4/11

   F   l  o  w   (  m

  g   d   )

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

   R  a   i  n   (   i

  n   /   h  r   )

Rain Flow BLFlowTotal Weekly Rainfall: 0.13 inches

Avg Level: 14.99 in. Peak Level: 17.03 in. Min Level: 12.86 in.

Avg Velocity: 3.22 fps Peak Velocity: 3.56 fps Min Velocity: 2.78 fps

Avg Flow: 5.82 mgd Peak Flow: 7.446 mgd Min Flow: 4.095 mgd

Page 233: 09-0747 WK Ukiah Draft FM and II Report

7/27/2019 09-0747 WK Ukiah Draft FM and II Report

http://slidepdf.com/reader/full/09-0747-wk-ukiah-draft-fm-and-ii-report 233/233

Basins 7A, 8-1Basins 7A, 8-1

Basin 7BBasin 7B

RG East

Basin 5Basin 5

Basin 6ABasin 6A

Basin 8-2Basin 8-2

RG West