1 © The Delos Partnership 2005
Application of Lean- IntegrationApplication of Lean- Integration
Related to Factory
2 © The Delos Partnership 2005
Lean is elimination of wasteLean is elimination of waste
RunRun
RunRun Setup
Setup
ReceiveReceiveSuppliersSuppliers InspectInspect StoreStore
PickPickSetup
Setup QueueQueue
InspectInspect
Operation 10
QueueQueue Setup
Setup RunRun
Operation 20
InspectInspect
StoreStoreQueueQueueInspectInspectStoreStore
CustomersCustomers
Operation 30
3 © The Delos Partnership 2005
Acceptable QualityAcceptable Quality
5 % Defect level = 50,000 ppm
2 % Defect Level = 20,000 ppm
0.02 % Defect Level = 200 ppm
3.4 Parts Per Million = 6 sigma
4 © The Delos Partnership 2005
Quality Tools requiredQuality Tools required
• Simpler ideas force higher quality
• Quality is in the process not the product
• Operators need to do root cause analysis to identify process problems– Hence pareto charts– Histograms– Run charts
5 © The Delos Partnership 2005
Quality problems identified from Quality problems identified from the process chartsthe process charts
0
5
10
15
20
25
Mon Tue Wed Thu Fri Mon Tue Wed Thu Fri
0
5
10
15
20
25
UCL
LCL
Result
Problems
6 © The Delos Partnership 2005
Reduce Process VariabilityReduce Process Variability
0
5
10
15
20
25
30
35
40
% of ItemsObserved
EliminateEliminateproblemsproblems
Reduce the variationReduce the variation
7 © The Delos Partnership 2005
Economic Order QuantityEconomic Order Quantity
£0
£1,000
£2,000
£3,000
£4,000
£5,000
£6,000
£7,000
100 200 300 400 500 600
InventorySet up
Minimum Cost
8 © The Delos Partnership 2005
Set up- DefinitionSet up- Definition
• The time taken between the completion of the last good quality piece and the start of production of the next good quality piece
• Time can be categorised into– External set up time– Internal set up time
9 © The Delos Partnership 2005
SMED – how to achieveSMED – how to achieve
• Take a video• Record all activities related to change-over• Record as internal or external• Set up group of operators• Brainstorm ways to reduce internal, or
convert internal to external• Implement• Do it again and again
10 © The Delos Partnership 2005
Set Up ReductionSet Up Reduction
Stage Step Time Changeover Type Improvements
Total Step Internal External Waste
Startup 0’.00”
1 Clean Hopper with air blower
32’00” 32’00” A smaller hooper than 150kg ?
2 Get cleanser to put in hopper
34’00” 2’00” Relocate cleanser
3 Keep cleaning injector
52’00” 18’00” Avoid walking to switch
4 Feed ABS pigment to hopper
60’00” 8’00” Unnecessary?
5 Use air blower to clean hopper
67’00” 7’00” Cassette type min-hoppers ?
6 Do a free shot to inject plastic into mould
96’50” 29’50” Moulds with 25 kg too large. Unnecessary step
Process Colour Change Responsible A Jones Item Housing
Machine Mitsubishi Measured By B Brown Changeover time 96’50”
11 © The Delos Partnership 2005
Set –up Time reductionSet –up Time reduction
• Objective is– Smaller Batch sizes– Quicker Lead Times– More flexibility
• It is not to– Fill up with extra production– Reduce people
12 © The Delos Partnership 2005
Today’s job shop Today’s job shop environmentenvironment
Drilling Department
Turning Department
Sanding Department
Finishing Department
GoodsOut
13 © The Delos Partnership 2005
Tomorrow’s flow Tomorrow’s flow environmentenvironment
Flow Line 1Flow Line 1
Flow Line 2Flow Line 2
14 © The Delos Partnership 2005
Review Material FlowsReview Material Flows
Kitting area
Kitting area
Kittingarea
Kittingarea
ProductionProduction
ProductionProduction
ProductionProduction
StoresStores Stores or Work-in-Process ?Stores or Work-in-Process ?
15 © The Delos Partnership 2005
Define Systems and Define Systems and ProceduresProceduresEvery material movement needs a
transaction
Material movement can be recorded by discrete issue or backflush
In = +
Out = -
In = +
Out = -
16 © The Delos Partnership 2005
Backflush Technique Backflush Technique
• Backflushing is a technique for downdating inventory
• Uses Bill of Material to work out what has been used
• Supports an environment in which works orders are not used
• Allows bulk replenishment• Simplifies material control
17 © The Delos Partnership 2005
Handle Structure with BOM’s Handle Structure with BOM’s at every level ?at every level ?
12345 Case of Paper Clips
12345 Case of Paper Clips
12346 Cardboard Case
12346 Cardboard Case
12347 Box of 100 Clips
12347 Box of 100 Clips
12351 Label Case
12351 Label Case
12352 Sellotape
12352 Sellotape
12350 Label for Carton
12350 Label for Carton
12360 Paint
12360 Paint
12361 Wire
12361 Wire
12370 Painted clip in box
12370 Painted clip in box
12353 Painted Clip
12353 Painted Clip
12349 Box
12349 Box
18 © The Delos Partnership 2005
How to trigger actionHow to trigger action
VARIETY
LOW HIGH
V
O
L
LOW WTL WTL
HIGH KANBAN WTL
/KANBAN
19 © The Delos Partnership 2005
Factory – working the planFactory – working the plan
AND/OR
What do I make next ?
Kanban
WorkTo
Lists
20 © The Delos Partnership 2005
KanbanKanban
Means “visible signal”
Replaces need for Work to List
Replaced by– Card– Empty square– Tennis Ball– Empty package
21 © The Delos Partnership 2005
KanbanKanban
• Visible instruction to make or move• Highlights problems• Requires line balance• Requires Andon – traffic light operation• Operator responsible for own quality• Must not pass on known defects• Small batch quantity required
22 © The Delos Partnership 2005
KanbanKanban
• Works to keep the “Kanban” full
• When full must stop
• Do not build extra
• Result is – less WIP– Improved Quality– Shorter Lead times
23 © The Delos Partnership 2005
Kanban vs WTLKanban vs WTL
• Visible feedback• Signal driven not date driven
– Both require feedback– Good Quality helps both– Problem solving tools should support both– WTL needs MRP and CRP; Kanban needs
SOP and RCCP
24 © The Delos Partnership 2005
Eliminate WasteEliminate Waste
“5 S’s”– Organisation– Orderliness– Cleanliness– Standard Clean up– Discipline
Japanese
Seiri - sorting, i.e., proper arrangement
of all items, storage, equipment, tools, inventoryand traffic
Seiton orderliness Seiso cleanliness Seiketsu standardization Shitsuke self-discipline
25 © The Delos Partnership 2005
HousekeepingHousekeeping
“Pick it up your mother does not work here”
Clean, tidy ordered workplace
Locations for everything– Tools – shadow boards– Supplies – clear locations– Materials– Gloves, Overalls etc - cupboards
26 © The Delos Partnership 2005
MRP “Spreadsheet”MRP “Spreadsheet”
1 2 3 4 5 6 7 8 9Projected
Gross Requirements2020 2020 4040 2020 2020
Scheduled Receipts 3030 3030Projected Available Balance
00
Planned Order Release
Weeks
Part Number Description :
14356 Red Barrel
Lead Time : 3 pds
Order Quantity : 30
Safety Stock : 100
Scrap % = 5
1010 1010 2020 2020 1010 -20-20 1010 -10-10 2020
3232 3232
1010 2020
3232 3232
27 © The Delos Partnership 2005
-20-20-20-20
Lean ERP “Spreadsheet”Lean ERP “Spreadsheet”
1 2 3 4 5 6 7 8 9Projected
Gross Requirements2020 2020 4040 2020 2020
Scheduled Receipts 3030Projected Available Balance
00
Planned Order Release
Weeks
Part Number Description :
14356 Red Barrel
Lead Time : 1 pds
Order Quantity : 1/1
Safety Stock : 0
Scrap % = 0
1010 1010 00 00 00 00 00
1010 4040
00 00
2020 2020
28 © The Delos Partnership 2005
Challenges for Financial Challenges for Financial supportsupport
1. Eliminate transactions2. Eliminate Standard Costing3. Implement Target Costing4. Move from Profit to Cash Flow reporting5. Report by Value Stream6. Implement Monthly Sales and Operations
Planning and eliminate the budget.7. Measure Performance by Performance
Measures and not actual versus budget
29 © The Delos Partnership 2005
Eliminate TransactionsEliminate Transactions
1. Invoicing – is this necessary ?
2. Purchase Orders – eliminate three way matching. Pay suppliers on production
3. Works orders – eliminate
Inspection Prevention
Low Volume
High Volume
30 © The Delos Partnership 2005
Where does Value get added ?Where does Value get added ?
Budget
July August September October November December
MarketingPlan
ManufacturingPlan
FinancialPlan
Corporate“Input”
SuperCorporateInput
31 © The Delos Partnership 2005
Change Minds not just Change Minds not just systemssystems
Successful change
Successful change
CULTURECULTURE
TEAMWORKSHARED VISION
COMMUNICATIONWAYS OF WORKING
ACCURACY AND DISCIPLINEPOLICIES AND PROCEDURE
HARDWAREPLANNING TOOLS
LEAN TOOLSAGILE TOOLSSOFTWARE
ACCURATE DATAVALID SCHEDULES
TOOLSTOOLS
32 © The Delos Partnership 2005
Integration is the keyIntegration is the key
SimplicityQuality