المتحدة ات العربيةمار دولة امسلحةقوات الللعامة لدة القيا ايةالم جهازحما نشـ آتالحيويةـسـواحــل وال ات شعبة تــــطويـــر الــــقـــــــــدرUNITED ARAB EMIRATES G.H.Q ARMED FORCES Critical Infrastructure & Coastal Protection Authority Capability Development Department Request for Proposal (RFP) United Arab Emirates Coastal Surveillance System (UCSS) Prepared by Approved by Capability Development Department <name> Consultant <appointment> <date> <date> Candidates will have received, signed and returned a Non- Disclosure Agreement as a pre-condition of accepting this RFP. Non-compliance with this requirement will automatically disqualify the candidate, in which case this document should be returned immediately to theCritical Infrastructure & Coastal Protection Authority.

Upload: alibelgaizi

Post on 22-Apr-2017

231 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1. Ucss Rfp - Main Doc v1.2

دولة اإلمارات العربية المتحدة

القيادة العامة للقوات المسلحة والـسـواحــلآتالحيويةنشـجهازحمايةالم

شعبة تــــطويـــر الــــقـــــــــدرات

UNITED ARAB EMIRATES

G.H.Q ARMED FORCES

Critical Infrastructure & Coastal

Protection Authority

Capability Development Department

Request for Proposal (RFP)

United Arab Emirates Coastal Surveillance System (UCSS)

Prepared by Approved by

Capability Development Department <name>

Consultant <appointment>

<date> <date>

Candidates will have received, signed and returned a Non- Disclosure Agreement as a pre-condition of accepting this RFP. Non-compliance with

this requirement will automatically disqualify the candidate, in which case this document should be returned immediately to theCritical

Infrastructure & Coastal Protection Authority.

Page 2: 1. Ucss Rfp - Main Doc v1.2

2

Table of Contents

1. Introduction .............................................................................................................................................................................. 5

2. Summary of Requirement ................................................................................................................................................... 6

3. Concept of Operations (CONOPS) .................................................................................................................................... 9

4. Statement of Work .............................................................................................................................................................. 10

5. PROPOSAL SUBMISSION DETAILS ............................................................................................................................... 11

5.1 Requirements of RFP submission ....................................................................................................................... 11

5.2 Proposal Submission ................................................................................................................................................ 11

5.3 Enquiries and Communication ............................................................................................................................. 11

6. GENERAL CONDITIONS OF TENDER ........................................................................................................................... 13

6.1 General Conditions .................................................................................................................................................... 13

6.2 Submission Costs ........................................................................................................................................................ 13

6.3 Conflicts of Interest ................................................................................................................................................... 13

6.4 Corrupt, fraudulent, coercive or collusive practices ................................................................................... 14

6.5 Public Relations .......................................................................................................................................................... 14

6.6 Governing Law ............................................................................................................................................................ 15

6.7 Language for Submission ........................................................................................................................................ 15

6.8 Location of Meetings ................................................................................................................................................. 15

6.9 Security Clearance, Policies and Procedures .................................................................................................. 15

6.10 Resources, Fees and Payment ............................................................................................................................... 15

6.11 Terms and Conditions of Appointment ............................................................................................................. 16

6.12 Selection Criteria ........................................................................................................................................................ 16

Annex A – PRICE SCHEDULE .................................................................................................................................................... 18

Annex B – CONTRACT ADMINISTRATION .......................................................................................................................... 19

Annex C – STATEMENT OF COMPLIANCE .......................................................................................................................... 31

Annex D – INFORMATION TO BE INCLUDED IN PROPOSAL ...................................................................................... 32

Annex E – GENERAL TERMS & CONDITIONS OF CONTRACT ..................................................................................... 34

Annex F – Government Furnished Equipment (GFE) ..................................................................................................... 35

Page 3: 1. Ucss Rfp - Main Doc v1.2

3

GLOSSARY

Term Definition

Business-as-usual Core business processes of the UAE Government

Commercial Off the Shelf (COTS)

Commercially available software, products or solutions that can be purchased and integrated with little or no customization.

Concept of Operations (CONOPS)

A document that provides a conceptual understanding of how the delivered capability will operate to achieve a desired operational effect.

Contract Master Schedule The Contract Master Schedule describes the Contractor’s planned sequence of activities, milestones and decision points.

Contractor The successful tenderer that is contracted by the UAE Government to deliver the UCSS

Customer Value Proposition This is a comprehensive statement of the intended value to the UAE

Design Review A formal, documented, comprehensive and systematic examination of a design to evaluate the design requirements and the capability of the design to meet the requirement for quality, and to identify problems and propose solutions.

End-to-End Including all component and subsystems of the UCSS, all interfaces and all end-points

Function and Performance Specification

The requirements from a functional and performance perspective that must be delivered by the contractor

Government Furnished Equipment/Materials (GFE)

Equipment/Materials required by the Contractor from the UAE Government in order to fulfill contractual requirements

Intellectual Property Register Provided by the Contractor, and forms the baseline for distinguishing ownership of all background, foreground and/or other Intellectual Property

Participating Agencies UAE Government stakeholders that will either contribute or benefit to/from the UCSS Capability.

Performance Measures Either Qualitative or Quantitative measures or indicators of progress toward specified outcomes or benchmarks

Project Management Plan (PMP)

Provides an overview of the different project processes and how they fit together to form an integrated management system for the project

Project Status Report The Contractor’s principal statement and explanation of the status of the project to be provided to the UAE Government at the end of each relevant reporting period

Quality Assurance Plan (QAP) This describes the standards, processes and procedures used by the Contractor and its sub-contracted parties

Respondent Any party that provides a formal response to the UAE Government relating to the provision of the UCSS Capability. The same meaning as ‘Tenderer’.

Service Provider(s) Any individual or organization which is authorized to provide services on

Page 4: 1. Ucss Rfp - Main Doc v1.2

4

Term Definition

behalf of one of the Participating Agencies

Subcontractor Any party that is contracted to the Contractor in a role associated with the UCSS project

Tenderer Any party that provides a formal response to the UAE Government relating to the provision of the UCSS Capability. The same meaning as ‘Respondent’.

Page 5: 1. Ucss Rfp - Main Doc v1.2

5

1. INTRODUCTION

1.1.1 The Critical Infrastructure & Coastal Protection Authority (CICPA) is the government

authority tasked with handling the protection and security of The UAE’s vital assets and

infrastructure. The Authority works to ensure that critical facilities are secure from

potential threats, possible disruption and imminent destruction.

1.1.2 Originally established in May 2007, under the Presidential decree issued by HH Sheikh

Khalifa bin Zayed Al Nahyan, President of the UAE and Ruler of Abu Dhabi, CICPA works to

secure the UAE’s infrastructure and promote economic stability. Working with other

government security forces, CICPA takes all necessary precautions to obstruct and prevent

any destructive actions by hostile forces which may have a damaging effect on the UAE’s

well-being.

1.1.3 The significant nature of CICPA is embodied in every aspect of the organization, including

its motto. As “Guardians of the Nation’s Prosperity,” CICPA is the leading agency

responsible for the protection of the UAE’s critical assets and facilities, including its

economic and social success. The Authority strives to provide maximum security while

ensuring the uninterrupted flow of commerce.

1.1.4 CICPA will follow up, assess and update all procedures related to insuring and protecting

vital infrastructure, such as onshore and offshore petroleum facilities, from acts of

sabotage. CICPA is also responsible for implementing the rules and regulations related to

the security and safety of the UAE’s maritime environment. CICPA will help achieve the

UAE’s economic stability and security in coordination with the armed forces, Federal

government agencies and local communities.

1.1.5 CICPA’s logo represents the vital role the Authority plays in the protection of the UAE’s

resources. The logo includes the dhow, which represents commerce and trade – two of the

most fundamental aspects of the Emirate’s prosperity. The use of the gear in the logo

signifies construction and the growth of infrastructure, the foundations upon which the

prosperity of the UAE continues to grow. The crossed daggers symbolize CICPA’s role as

protector and guardian of the UAE’s prosperity. The design of the CICPA logo demonstrates

the organization’s commitment to protecting the vitality of the Emirate.

1.1.6 In order to meet its mandate, the Critical Infrastructure & Coastal Protection Authority

works with the the UAE Executive Council to develop and implement security and

regulatory policies to ensure the protection of the UAE’s infrastructure. CICPA works with

other government authorities and security forces, such as the UAE Armed Forces, to

establish and implement a unified protection plan for the security of the Emirate’s

resources.

Page 6: 1. Ucss Rfp - Main Doc v1.2

6

2. SUMMARY OFREQUIREMENT

2.1.1 As part of a broad national security programme the UAE Government has a responsibility

to provide Coastal Surveillance and Maritime Domain Awareness (MDA) in support of many

operational requirements.

2.1.2 Key to the performance of the security programme is an understanding of the UAEcoastal

and maritime threat environment, which includes, but is not limited to:

1) Maritime Terrorism

a) Direct attack on critical infrastructure, against commercial interests or against other

vessels

b) Direct environmental/biological attack

2) Unauthorised Maritime Arrivals

a) Unauthorized landings either with or without migration intent

3) Illegal Exploitation of Natural Resources

a) Illegal Foreign or Domestic Fishing

b) Removal or destruction of wildlife

c) Damage to ecosystem

d) Seabed exploitation

e) Transfers of catch at sea

4) Prohibited Imports/Exports

a) Import or export of prohibited and regulated goods

b) Transfers of prohibited items at sea

5) Marine Bio-security and Pollution

a) Introduction of animal & plant pests & diseases

b) Introduction of human diseases

c) Introduction of marine pests & diseases

d) Marine spills and discharges

e) Illegal sea-dumping

f) Marine debris

6) Illegal Activity in a Protected Area

a) Breaches of Protected Areas or Safety Zones around offshore oil and gas installations

or submerged pipelines/cables

Page 7: 1. Ucss Rfp - Main Doc v1.2

7

b) Interference with historic maritime wrecks or sites

c) Loitering in Prohibited Zones or Traffic Separation Zones

7) Piracy

a) Organised activity against vessels or infrastructure

b) Opportunistic Attack

2.1.3 For the past several years the UAE Government has relied heavily on the Vessel

Identification System (VIDS) to provide coastal surveillance, maritime domain

awarenessand monitor its threat environment; however, the VIDS capability in its current

state is not able to meet future operational demands.

2.1.4 Due to the age of the current system and its known deficiencies, the UAE Government has

a requirement to procure a new surveillance capability that is able to meet both current

and future capability demands.

NOTE: It may be possible to reuse some components and/or infrastructure used by the

current system. The tenderer may consider reusing components/infrastructure in their

design solution, where it is appropriate.

NOTE: As part of the tender development process, the tenderer is required to conduct a

survey of the current surveillance capability under the supervision of CICPA staff. The

tenderer is to use the results of this survey to develop their design solution and identify any

parts of the current system that may be reused as part of the new capability design

solution. CICPA will advise tenderers of the timings, dates and locations for these site

surveys. Tenderer personnel will be required to have CICPA security permits for this

activity

NOTE: It is recognised that because of the age and the condition of current system’s

components and supporting infrastructure, the tenderer may decide to use new

components and/or infrastructure as part of the new capability design solution. In this

case, the tender must identify the old components/dedicated infrastructure of the current

system which will not be reused and provide a plan for disposing of theseitems and, where

applicable, restoring the site to its earlier condition. These disposal/restoration activities

are to be identified in the disposal plan which to be provided with the new surveillance

capability solution. The successful tenderer will be responsible for implementing the

disposal plan as part of the scope of work.

2.1.5 The UAE Government is seeking the services of a systems integrator able to deliver the

UCSS capability into operational service.

2.1.6 To meet the challenges of this complex project, the UAE Government is seeking the

services of a systems integrator experienced in the design, development and

Page 8: 1. Ucss Rfp - Main Doc v1.2

8

implementation of similar coastal surveillance and/or maritime domain awareness systems.

The successful respondent will be required to demonstrate specific expertise in:

1) The utilisation of GIS platforms to produce intelligence views in coastal/maritime

domains.

2) Designing and implementing interfaces between central systems and multi-source

external data custodians and providers, including direct interfacing to external

databases, database replication and other data sources as necessary, to meet

operational requirements.

3) The design and application of services-oriented architectures (SOA) and command and

control information systems architecture models.

4) The effective integration of various different sensors, systems and infrastructure

required to producea combined operational maritime awareness picture.

2.1.7 The successful contractor will be required to provide their own methodologies, practices,

and experience to mature the UCSS Concept of Operations (CONOPS), further develop

detailed operational and functional requirements, explore solutions, make design

decisions, develop architectures, create the system specification, and deliver the

operational capability.

2.1.8 Respondents to this RFP must provide a fully considered and complete fixed price proposal

to complete all necessary work to identify and prepare the UCSS site locations anddeliver

the UCSS into operational service.

2.1.9 Respondents are informed that whilst no firm project delivery date has been specified

within this RFP, proposals demonstrating a rapid delivery schedule will be evaluated more

favourably.

2.1.10 Respondents must provide references able to confirm details of experience in the design,

development and delivery of similar coastal surveillance and/or maritime domain

awareness systems.

Page 9: 1. Ucss Rfp - Main Doc v1.2

9

3. CONCEPT OF OPERATIONS (CONOPS)

(Refer to Attachment A – Concept of Operations)

Page 10: 1. Ucss Rfp - Main Doc v1.2

10

4. STATEMENT OF WORK

(Refer Attachment B – Statement of Work)

Page 11: 1. Ucss Rfp - Main Doc v1.2

11

5. PROPOSAL SUBMISSION DETAILS

5.1 REQUIREMENTS OF RFP SUBMISSION

5.1.1 Respondents shall submit their Proposal in two (2) separate sealed envelopes, the 1st

envelope containing the technical un-priced proposal (electronically in both PDF and

Microsoft Word Format on CD along with a hard copy), and the 2nd one containing the

commercial (priced) Proposal(electronically in both Microsoft Word/Excel and PDF format

on CD along with a hard copy). Each envelope must be identified with clear marking of the

contents, whether “TECHNICAL PROPOSAL” or “COMMERCIAL PROPOSAL” on the outer

cover.

5.1.2 The envelopes must not bear any mark indicating the name or identity of the Respondent

but shall be clearly marked on the outside with the Proposal title, the Closing Date and the

content of the envelope, as indicated above.

5.2 PROPOSAL SUBMISSION

5.2.1 Submission must be made by xxx no later than 12:00 p.m. local time.

5.2.2 All submissions shall be deposited in the CICPA tender box. XXX

5.2.3 The location of the tender box, the procedures for accessing the box, and the details of a

contact that can be used on the day in the event of any problems with access, shall be

advised prior to the submission date.

5.2.4 Submission or variants to the standard submission will only be considered if previously

authorised by the CICPA and adherence to the standard requirements are met.

5.2.5 The CICPA intends to proceed with this contract in a timely manner, and will therefore hold

the Tenderer to the timescales and deadlines set out herein.

5.2.6 Requests for extensions will not be considered and late submissions will automatically be

disqualified.

5.2.7 The CICPA expects to select a preferred contractor on the basis of submissions. There will

not be an opportunity to revise submission proposals past the stated deadline unless CICPA

requests a revision. CICPA reserves the right to make this request.

5.3 ENQUIRIES AND COMMUNICATION

5.3.1 All enquiries relating to this RFP must be made by email only.

5.3.2 The email address for any enquiries is: [email protected]

5.3.3 The CICPA will acknowledge, by return email, all enquiries.

Page 12: 1. Ucss Rfp - Main Doc v1.2

12

5.3.4 During the preparation period, Tenderers may submit questions and requests for

clarification or further information.

5.3.5 Respondent’s should note the following procedure for obtaining information or

clarification on matters arising during the preparation period:

1) Enquiries and clarifications relating to the content on the RFP will only be considered if

submitted on or before xxx.

2) Companies should prepare questions and requests for clarification and submit these via

e-mail to CICPA. If the question is considered commercially sensitive (i.e. not relating to

a possible error, omission or clarification of the meaning of a statement) the question

should be preceded with the words “Commercially Sensitive:”.

3) If the CICPA does not agree with the Commercially Sensitive classification we will advise

you and you may choose to withdraw the question or proceed on the understanding

that the response will be sent to all parties.

4) CICPA may, at its own discretion, respond to requests for clarification with any

additional information to which it has access. However, CICPA is not obliged to comply

with any such request and does not accept any liability or responsibility for failure to

provide any such information.

5) All questions raised (and not agreed by CICPA to be Commercially Sensitive) and their

associated answers provided by the CICPA will be sent to all parties who have received

and indicated their intention to respond the RFP. CICPA shall use all reasonable

endeavours so as not to identify the party submitting the question.

6) Where we agree the question is commercially sensitive, we will only send the response

to the party that raised it.

5.3.6 Subject to the above protocol, companies are welcome to contact CICPA by email with

reasonable frequency to discuss any aspect of this RFP.

5.3.7 CICPA will only meet with the Tenderer by appointment and only post submission of RFP

where the CICPA has determined a clarification session is required.

Page 13: 1. Ucss Rfp - Main Doc v1.2

13

6. GENERAL CONDITIONS OF TENDER

6.1 GENERAL CONDITIONS

6.1.1 Issuance of RFP

1) The issuance of this RFP and the submission of a response by any interested respondent

do not obligate the CICPA in any manner to proceed with this Tendering process.

2) Legal obligations are only valid once a formal contract has been established through

signature between the CICPA and the successful respondent.

6.1.2 Reservation of Rights

1) CICPA reserves the right to:

a) Amend, modify, or withdraw the RFP;

b) Revise any requirements of the RFP;

c) Require supplemental statements or information from any Respondent;

d) Accept or reject any or all responses hereto;

e) Alter the timetable;

f) Not award a contract and/or discontinue this tendering process.

6.2 SUBMISSION COSTS

6.2.1 Each party is responsible for its own costs and expenses incurred by them or any third

party acting under instruction from them in connection with its bid and submission. This

responsibility extends to costs incurred by party advisors; regardless of whether these arise

as a consequence (direct or indirect) of any amendments made by the CICPA to this RFP.

6.2.2 CICPA will not reimburse or be liable for any costs incurred by the candidate in connection

with any part of the selection process.

6.3 CONFLICTS OF INTEREST

6.3.1 If any respondent believes there may be a conflict of interest, they should immediately

seek clarification from the CICPA during the selection process.

6.3.2 Failure to declare any conflict of interest may disqualify a respondent from the selection

process.

Page 14: 1. Ucss Rfp - Main Doc v1.2

14

6.4 CORRUPT, FRAUDULENT, COERCIVE OR COLLUSIVE PRACTICES

6.4.1 The CICPA requires that tenderers, suppliers, service providers, contractors,

concessionaires and consultants under CICPA awarded contracts, observe the highest

standard of ethics during the procurement and execution of such contracts. In accordance

with this policy, the CICPA :

1) defines, for the purposes of this provision, the terms set forth below as follows:

a) "corrupt practice" means the offering, giving, receiving, or soliciting, directly or

indirectly, anything of value to influence improperly the actions of another party.

b) "fraudulent practice" means any act or omission, including a misrepresentation, that

knowingly or recklessly misleads, or attempts to mislead, a party to obtain a financial

or other benefit or to avoid an obligation.

c) “coercive practice” means impairing or harming, or threatening to impair or harm,

directly or indirectly, any party or the property of the party to influence improperly

the actions of a party.

d) “collusive practice” means an arrangement between two or more parties designed

to achieve an improper purpose, including influencing improperly the actions of

another party;

2) will reject a Proposal for award if it determines that a Tenderer recommended for award

has engaged in corrupt, fraudulent, coercive or collusive practices in competing for this

contract;

3) will declare a firm ineligible indefinitely or for a stated period of time, to be awarded a

CICPA contract if it at any time determines that:

a) the firm has engaged in corrupt, fraudulent, coercive or collusive practices in

competing for, or in executing, a CICPA contract; or

b) the firm has been found by a judicial process or other official inquiry to have

engaged in corrupt, fraudulent, coercive or collusive practices.

6.5 PUBLIC RELATIONS

6.5.1 The Tenderer shall not make any public announcements in relation to this RFP or any

matters relating thereto without theCICPA’s prior written consent.

6.5.2 The CICPA reserves the right to reject the Proposal at any stage and without notice and to

pursue all remedies available to it under the law, should a Tenderer make any public

announcement or statement in any manner in relation to the RFP or related contract at any

time without the CICPA’s prior written consent.

Page 15: 1. Ucss Rfp - Main Doc v1.2

15

6.6 GOVERNING LAW

6.6.1 The negotiations and all subsequent contracts negotiated will be subject to U.A.E law and

the exclusive jurisdiction of the Emirate of the UAE courts.

6.7 LANGUAGE FOR SUBMISSION

6.7.1 The selection process and associated materials and correspondence will be in English and

Arabic.

6.8 LOCATION OF MEETINGS

6.8.1 All formal meetings regarding the selection process will be held in Abu Dhabi, United Arab

Emirates.

6.9 SECURITY CLEARANCE, POLICIES AND PROCEDURES

6.9.1 All personnel working within CICPA sites may be subjected to background checks and other

security clearance procedures.

6.9.2 In the event that the Contractor’s personnel fail to meet the security clearance

requirements, the Contractor shall replace that person within 7 days.

6.9.3 All Contractor staff working on this project, or in any way involved with this project shall be

required to comply with relevant CICPA security policies and procedures.

6.9.4 Contractor staff may be subject to search on arrival and departure each day.

6.9.5 Contractor staff may not bring into or remove any form of data media without prior written

permission from the CICPA. This includes but is not limited to CD/DVD, USB drive, laptop

computers, and mobile phones with data storage capability.

6.10 RESOURCES, FEES AND PAYMENT

General

6.10.1 The CICPA expects the Respondent to provide a fixed all inclusive price to cover the cost of

the fixed deliverables under the contract and a schedule of rates for the optional and

variable components (if applicable).

6.10.2 The financial proposal shall be valid for at least 90 days from the date of submission.

Changes or amendments to the price and costing after submission may be cause for

dismissal/disqualification.

Page 16: 1. Ucss Rfp - Main Doc v1.2

16

6.11 TERMS AND CONDITIONS OF APPOINTMENT

6.11.1 Appointment shall be subject to the CICPA General Conditions of Contract provided

withinAnnex E.

6.12 SELECTION CRITERIA

6.12.1 The CICPA will evaluate responses according to the following general criteria:

1) Ability to satisfy capability requirements:

a) The Respondent’s solution will be assessed for its overall ability to:

i) deliver a capability as broadly described within the Concept of Operations

(CONOPS), included as Attachment A to this document;

ii) meet theUCSS Operational and Functional requirements as described within the

Statement of Work, included as Attachment B to this document; and

iii) meet the Project Delivery requirements ad described within the Statement of

Work, included as Attachment B to this document.

2) Cost Effectiveness:

a) The ability to deliver a capability that represents the ‘best value for money’;

b) The provision of options that allow the CICPA to understand trade-offs between cost

and capability. For example, options that allow for considerable savings to be made

by excluding a requirment that may not be necessary to meet the overall desired

operational effectiveness. Respondents are reminded to clearly articulate what is

included / excluded under these options, as a compromise to overall operational

effectiveness may result in a lower evaluation score if not clearly explained.

3) Quality:

a) The ability to deliver a capability that represents high standards of quality.

b) The ability to staff the project team with recognized subject matter experts within

relevant fields of expertise.

4) Time:

a) The ability to deliver the project into operational service using an accelerated

delivery schedule that does not compromise cost or quality.

b) No ‘operational’ delivery date has been specified within this RFP; however,

respondents should be aware that the UAE would like the capability to be delivered

ASAP, and responses will be evaluated accordingly.

5) Relevant Experience

Page 17: 1. Ucss Rfp - Main Doc v1.2

17

a) The Respondent will be judged in terms of their relevant experience in providing

low-risk coastal surveillance and/or maritime domain awareness solutions in high

tempo operational environments;

i) The Respondent’s Middle East experience particularly the successful delivery of

technical military solutions to organisations within the U.A.E will be well

regarded;

ii) Availability of the Respondent’s resources and/or establishment within the U.A.E

will be well regarded;

iii) The Respondent’s past performance and achievements in related areas will be

considered;

6) Overall Approach

a) The CICPA will consider the complete submission in response to this RFP, taking into

account:

i) The overall approach of the Respondent to fulfilling the requirements of the RFP;

ii) Comprehensive understanding of the CICPA’s objectives, requirements and

constraints;

iii) The ‘Value Added Elements’ that the Respondent is able to bring to the CICPA;

iv) The overall quality of submissions.

Page 18: 1. Ucss Rfp - Main Doc v1.2

18

ANNEX A – PRICE SCHEDULE

1. Cost Model

a. The Respondent is to provide a cost model that clearly breaks down the overall cost of the

project into a meaningful cost structure.

b. Respondents are required to include a proposed payment schedule that is aligned with

milestone deliverables that can be validated through key performance indicators.

Page 19: 1. Ucss Rfp - Main Doc v1.2

19

ANNEX B – CONTRACT ADMINISTRATION

Index

CLAUSE 1 INTRODUCTION

CLAUSE 2 ORGANISATION

CLAUSE 3 COMMUNICATIONS

CLAUSE 4 VARIATIONS

CLAUSE 5 PLANNING AND SCHEDULING

CLAUSE 6 PROGRESS CONTROL AND REPORTING PROCEDURES

CLAUSE 7 INVOICING

CLAUSE 8 INCOME TAX REGULATION

CLAUSE 9 DOCUMENTATION

CLAUSE 10 CICPA WORKING HOURS

Page 20: 1. Ucss Rfp - Main Doc v1.2

20

CLAUSE 1 - INTRODUCTION

This Annex describes the procedures that shall be used by theCICPA and CONTRACTOR in administering the

CONTRACT. This section is intended to compliment Annex E – General Terms & Conditions of Contract by

providing additional detail relevant to the execution of the UCSS Project. Where this section and Annex E are

in contradiction, Annex E is to be considered the superior contractual document. CONTRACTOR shall ensure

that where detailed procedures are not comprehensively set out in this Annex such procedures shall be

developed by CONTRACTOR for APPROVAL by CICPA in time to carry out the WORK in accordance with the

CONTRACT and in accordance with the requirements set out within the Statement of Work and Technical

Information.

CLAUSE 2 - ORGANISATION

The name and address of CICPA REPRESENTATIVE and nominated deputy (ies) and the responsibilities

delegated to each nominated deputy shall be:

CICPA REPRESENTATIVE shall be:

Name :

Position :

Tel :

Fax :

CICPA REPRESENTATIVE nominated Deputy shall be:

Name :

Position :

Tel :

Fax :

The above-nominated Deputy is authorised to act on behalf of CICPA REPRESENTATIVE on the following

matters under the CONTRACT:

a) All Technical Matters;

b) Certification of Invoices; and

c) Contract Administration.

Page 21: 1. Ucss Rfp - Main Doc v1.2

21

CICPA Organisation Chart specifying the job titles and organisation structure for the purpose of this

CONTRACT is:

Tel. :

Fax :

Tel. :

Fax :

Tel. :

Fax :

The name and address of CONTRACTOR REPRESENTATIVE and of the nominated deputy (ies) and the

responsibilities delegated to each nominated deputy shall be confirmed by CONTRACTOR in Schedule 1.1 of

Annex E.

CONTRACTOR Organisation Chart that states job titles and the organisation structure for the CONTRACT shall

be set out in Schedule 1.11 of Annex E.

Details of job descriptions for key CONTRACTOR PERSONNEL including job responsibilities and experience of

incumbents shall be included in Schedule 1.12 of Annex E. Such job descriptions shall not be changed

without the APPROVAL of CICPA.

CLAUSE 3 - COMMUNICATIONS

Except where the CONTRACT specifically states to the contrary all correspondence and communications

under the CONTRACT shall be addressed and directed between CONTRACTOR REPRESENTATIVE and CICPA

REPRESENTATIVE.

All reports, drawings, and other documents transmitted between CONTRACTOR and CICPA shall be sent

under cover of a transmittal note.

Page 22: 1. Ucss Rfp - Main Doc v1.2

22

CONTRACTOR may use the following format for communication:

(i) All telex, telefax and written correspondence to CICPA regarding the CONTRACT shall bear the

following headings:

(Serial ref. number (date)

To : Telex No:

(or) To : Fax No. :

(or) To : Critical Infrastructure & Coastal Protection Authority

PO Box 62220

Abu Dhabi

Unite Arab Emirates.

Attn. : --------, Copy to ---------------------

From : (CONTRACTOR’s Name)

Contract No. :

Contract Title : .

Page 23: 1. Ucss Rfp - Main Doc v1.2

23

Subject : (....................................................................)

(TEXT)

Signature (if fax/letter)

(CONTRACTOR REPRESENTATIVE Name and Title)

All correspondence sent to CICPA shall be clearly marked with CICPA Reference Indicators of the addressee

and other recipients.

CLAUSE 4 - VARIATIONS

This Clause gives a brief outline for issuing VARIATIONS in accordance with the General Conditions of

Contract.

VARIATION shall be transmitted by CICPA to CONTRACTOR via a CONTRACT VARIATION FORM.. Any

additional or varied work not authorised by a CONTRACT VARIATION FORM shall not be considered for

payment.

CONTRACTOR shall, within three (3) working days of receiving a request to a change in the WORK, forward to

CICPA REPRESENTATIVE its detailed cost estimate for the change, including the effect such a change may

have on the EXECUTION PROGRAMME and/or on the CONTRACT PRICE. CONTRACTOR estimate shall be

computed in accordance with the provisions of the Schedule of Prices. The estimating effort in itself shall

not constitute a VARIATION.

Subsequent to CICPA appraisal of CONTRACTOR estimate and after any amendments to be made thereto,

CICPA and CONTRACTOR shall signify their agreement to the financial and/or other effects the VARIATION

may have on the CONTRACT. A CONTRACT VARIATION FORM shall then be issued.

In the event that a VARIATION extends or advances the SCHEDULED COMPLETION DATE and/or increases or

decreases the CONTRACT PRICE, CONTRACTOR shall forthwith amend the Performance Bond (Bank

Guarantee) and Insurance policies accordingly and submit to CICPA within fourteen (14) calendar days from

the issuance of the CONTRACT VARIATION FORM.

Page 24: 1. Ucss Rfp - Main Doc v1.2

24

CLAUSE 5 - PLANNING AND SCHEDULING

CONTRACTOR shall develop detailed implementation plans and CONTRACT Control Procedures based upon

the CONTRACT EXECUTION PLAN as provided in Schedule 1.10 of ANNEX E. CONTRACTOR shall clearly

identify all activities pertaining to the WORK, enabling but not limited to the following functions to be

undertaken:

The Analysis and Identification of CONTRACTOR’s, SUBCONTRACTOR’s, Manufacturer’s and Supplier's basic

activities, including significant milestones through an APPROVED Work Breakdown Structure.

The progress monitoring of these activities through the use of critical path networks, bar charts,

progress curves, histograms and follow-up tables.

Continuous comparison of the EXECUTION PROGRAMME, actual achievements and forecasts.

The prompt identification of delay, and where necessary, actions required to implement corrective

measures to recover any slippage.

CONTRACTOR’s planning services for the implementation of planning, monitoring and control system of the

WORK corresponding to the CONTRACT EXECUTION PLAN shall be submitted as follows:

A preliminary submission plan (Schedule, Execution Plan and Progress Control methodology).

CONTRACTOR shall within fourteen (14) calendar days from the EFFECTIVE DATE, prepare and submit for

review and APPROVAL by CICPA a comprehensive planning package, which shall be based on the

CONTRACT EXECUTION PLAN. This package shall include full details of the arrangements and methods,

which CONTRACTOR proposes to adopt for the execution of the WORK including planning, control of

costs, manpower levels and scheduling. This document shall then be the EXECUTION PROGRAMME

where it complies with the requirements of the CONTRACT and when APPROVED by CICPA.

During the entire period of the CONTRACT, the EXECUTION PROGRAMME shall not be revised in any way

without CICPA’s APPROVAL. Any changes requested by CONTRACTOR shall be made formally in writing

with suitable justifications and submitted for CICPA’s APPROVAL. Any changes in the Scope of Services

agreed between CONTRACTOR and CICPA shall be clearly indicated on the bar chart and the overall

program rescheduled to include the change(s).

CONTRACTOR shall grant CICPA REPRESENTATIVE or his nominated deputy access to all relevant

planning and control documents, during both development and implementation periods.

All Progress Curves and Histograms shall include a data table below graphics providing planned, actual

and cumulative data. When necessary CICPA may request that forecast data be included on some or all

of these documents.

The scope of the planning, scheduling, progress control and reporting procedures are described hereunder.

CONTRACTOR shall include all activities, which are relevant to the Scope of Services.

The planning and progress measurement activities of CONTRACTOR shall be performed in such a way that

CICPA can monitor these aspects and integrate them within its own overall Project Control System. This shall

be done through the usage of the computerised planning software (Microsoft Project).

CONTRACTOR shall develop and detail the EXECUTION PROGRAMME in accordance with the following:

The itemisation breakdown of the CONTRACT Scope of Services into basic measurable activities on the

basis of a user-defined Work Breakdown Structure (WBS). CONTRACTOR shall establish the type and

style of the WBS on the basis of the WORK required under the CONTRACT. This system, once APPROVED

by CICPA, will provide a common activity coding structure, which shall be used throughout both the

Planning and Progress Reporting infrastructures.

Page 25: 1. Ucss Rfp - Main Doc v1.2

25

All planning documents shall cover the entire period of the WORK.

All planning documents shall clearly describe the type and category of manpower, man-hours, special

recourses and status used.

A weekly update shall be made on the day before the last day of the week or at another agreed cut-off

day. In principle no more than 3 calendar days should lapse between cut-off and report submission

dates.

A monthly update will be implemented at the monthly cut-off date as decided and agreed by CICPA. The

regular planning update shall be effected on a monthly basis for all planning documents. An interim

update of planning documents shall be operated if deemed necessary at the request of CICPA (i.e.

weekly, fortnightly, etc.).

Planning updates shall determine by calculation, the Planned and Actual Progress values to date, for

each activity (or Work Package) using Weight Factors. It shall also include, when an activity is not 100%

complete, an assessment of the remaining duration value and a revised forecast completion date.

PROGRESS S-CURVES

CONTRACT Progress S-Curve shall indicate both the weekly or monthly cumulative planned percentage

progress spread over the duration of the project and the weekly or monthly actual cumulative percentage

progress. Weekly or monthly cumulative planned progress shall be based upon the resource loading input in

Level 3 detailed project schedule, and the weekly or monthly cumulative actual progress shall be based upon

the achieved percentage weighting system. The cumulative Planned S-Curve, when APPROVED by CICPA,

shall not change throughout the project duration and shall become the baseline from which progress shall

be measured against each update period.

In addition to the Progress S-Curve, S-Curves categorised by major phases of Work or Milestone Stages and

SUB-CONTRACTORS, if appropriate, shall be provided by CONTRACTOR.

MANPOWER HISTOGRAM

The Manpower Histogram shall indicate both the weekly and monthly manning levels CONTRACTOR plans to

deploy over the duration of the contract , including SUB-CONTRACTORS PERSONNEL, if appropriate, and the

weekly/monthly actual deployment as the project progresses into completion. Planned manpower loading

shall be based from the manpower resources/man-hours estimate allocated to each activity in Level 3 bar

chart.

In addition to the Manpower Histogram, Histogram’s categorised by resource trade grouping or phases of

WORK shall be provided by CONTRACTOR.

ONE MONTH LOOK-AHEAD BAR CHART

CONTRACTOR shall extract from his detailed Network a one month look-ahead bar chart covering Phase 1

activities only. This bar chart shall be updated and issued on a monthly basis within the Monthly Report.

CLAUSE 6 - PROGRESS CONTROL AND REPORTING PRECEDURES

REPORTS

CONTRACTOR shall report to CICPA on the Progress of the WORK during the entire duration of the

CONTRACT. Reports shall contain facts only and shall not be construed as agreement.

Page 26: 1. Ucss Rfp - Main Doc v1.2

26

Presentation of the reports shall be of the highest quality. CONTRACTOR within three calendar days of

EFFECTIVE DATE shall submit draft Weekly & Monthly report formats for CICPA APPROVAL. Once APPROVED

by CICPA the format shall not be altered in any way, except in agreement with CICPA.

Reports shall be issued observing the following timing:

Weekly Report

Monthly Report

Special and Exception Reports (as and when required by CICPA)

Close Out Report

WEEKLY REPORTS

CONTRACTOR shall submit during the entire duration of the CONTRACT, two days after weekly cut-off date, a

Weekly Progress Report under cover of a transmittal sheet and/or by facsimile and shall include as a

minimum the following:

Overall Contract Status (Narrative)

Weekly Progress Tables

Overall Progress Curve

Manpower Return

Milestone Status Report

Level 3 Bar Chart

MONTHLY REPORT

CONTRACTOR shall submit during the entire duration of the CONTRACT, within 5 working days from the Cut

Off date, a Monthly Report under a cover of transmittal sheet which shall include (as a minimum) the

following:

Management / Executive Summary

Project Control

Planning and Cost Control

Areas of Concern

Record of Expenditure

Recovery Actions

SPECIAL AND EXCEPTION REPORTS

If deemed necessary by CICPA, reports shall be generated by CONTRACTOR, which cover all aspects of the

clarifications and/or the problems identified during the course of the project execution and duration.

CLOSE OUT REPORT

CONTRACTOR shall produce for CICPA review and APPROVAL a Close Out Report at the end of Phase 2 of the

WORK including a detailed narrative of main Events/Problems and Solutions for Technical aspects, Planning,

Cost, Contracting, Interfaces etc. This shall include all major decisions undertaken during the performance of

the WORK.

This Report shall include a copy of all Schedules, Progress Curves, Histograms, and Status Tables as listed in

this Planning Section.

Page 27: 1. Ucss Rfp - Main Doc v1.2

27

DOCUMENTS STATUS REGISTER

CONTRACTOR shall be required to develop and maintain a computerized Document Status Register, capable

of registering, planning, tracking, monitoring, expediting and reporting on the production of all

DELIVERABLES. Each DELIVERABLE shall be listed. The current status of each DELIVERABLE shall be identified

and a mutually agreed percentage weighting based on man-hour estimates shall be assigned to the status

noted above for the purpose of progress monitoring. The system used by CONTRACTOR shall be Microsoft

Excel, Microsoft Access or other APPROVED equivalent packages, version(s) to be agreed with CICPA to

achieve prompt and accurate reporting. The Document Status Register shall be submitted to CICPA within

seven (7) calendar days from EFFECTIVE DATE

The minimum information required shall be as follows:

Document No.

Corresponding WBS No.

Document Title

Discipline

Type of Document

Planned/Actual/Forecast dates for different stages of COMPLETION.

Planned/Actual/Forecast dates for different stages of COMPLETION.

Weighted value

Percentage complete

Remarks

All planned dates for each document shall be derived from the lowest level Network providing schedule for

DELIVERABLE activities. All documents shall be coded using a Work Breakdown Structure (WBS) system.

This Document Status Register shall become the basis for the WORK Progress Curve(s).

The above is not exhaustive and any other information shall be added at the request of CICPA.

The system shall be capable of providing exception reporting such as documents overdue, documents to be

issued in the next period.

MEETINGS

WEEKLY AND MONTHLY MEETINGS

Weekly and monthly meeting shall be held at CONTRACTOR’S offices unless otherwise determined by CICPA.

CICPA REPRESENTATIVE or his nominated representative shall chair all meetings.

Agenda: -

Complete review of all work units, progress and associated matters

Review of schedules in view of progress

Review of resources

Highlight problem areas and resolutions

Technical queries

Identification of changes

Management level meetings may take place between CICPA Management and CONTRACTOR Management

as agreed between the PARTIES. Other meetings may be held at CONTRACTOR’S or CICPA request on specific

matters.

Page 28: 1. Ucss Rfp - Main Doc v1.2

28

ORGANISATION OF MEETINGS

The time, place and venue of weekly and monthly meetings shall be determined at least seven (7) calendar

days in advance. Agendas may be completed by both PARTIES as necessary.

The Minutes of Meeting shall be written and recorded by CONTRACTOR.

The notes shall indicate date and location of meeting, names of the persons who were present at the

meeting, purpose of the meeting, record of actions agreed and name of person responsible for each action

and anticipated completion, and distribution of the minutes.

Minutes of each meeting shall be prepared by CONTRACTOR within three (3) working days of the meeting

and sent to CICPA for APPROVAL. CICPA REPRESENTATIVE shall sign, acknowledging the minutes as being a

true record of the meeting, and return a copy to the CONTRACTOR for formal issue.

Clear hand written minutes may be acceptable. Two originals shall be signed by both PARTIES at the end of

the meeting.

CLAUSE 7 - INVOICING

CONTRACTOR shall submit invoices in accordance with the General Conditions of Contract, in arrears in a

format acceptable to CICPA, clearly showing the amount due. Full supporting details, as required by CICPA,

including but not limited to authorised day work sheets and manpower timesheets, where applicable, should

be submitted with the invoice in order for CICPA to be satisfied as to CONTRACTOR entitlement under the

CONTRACT. CONTRACTOR will be reimbursed the amount so invoiced, all in accordance with the General

Conditions of Contract. Invoices must be submitted in duplicate.

Invoices must contain the following information duly approved by CICPA REPRESENTATIVE:

CONTRACT Number;

Milestone/Period being invoiced;

Approved CONTRACT PRICE;

Respective invoice value, and amount of retention;

Previous invoiced value;

Total invoiced to date; and

Break down of amount invoiced as per item numbers contained in the Schedules of Prices.

The invoice as well as invoices and payment related matters should be forwarded to:

CICPA,

PO Box 62220

Abu Dhabi

UAE.

Attention: ______________

Contractor performing a CONTRACT for the first time for CICPA, shall submit a letter giving details of their

bank account number with the first invoice, for registering in CICPA system.

Page 29: 1. Ucss Rfp - Main Doc v1.2

29

Invoices shall not be released for payment until the following had been complied with:

A formal CONTRACT has been signed by both PARTIES,

The submission of the bank guarantee as required per the General Conditions of Contract (hereinafter

called Performance Bond) and

Evidence that all the insurance requirements set out in the General Conditions of Contract.

Separate invoices are to be submitted for each release of retention accompanied by the relevant Completion

or Discharge Certificate

Payment for the completed WORK, withholding and release of retention money shall be made in accordance

with the General Conditions of Contract. Bank Guarantee(s) in lieu of retention money shall not be

accepted.

Whenever a VARIATION necessitates revision to the Performance Bond and/or insurance policies, then such

an amended Performance Bond and/or evidence that insurance policies have been amended shall

accompany the subsequent invoice.

All charges for using CICPA services and facilities will be deducted as and when the charges are incurred,

unless the CONTRACT specifically provides otherwise.

For the release of final payment, in addition to the requirements herein above and the requirements of

Clause 8 herein below, the invoice shall also be accompanied by a Statement of Final CONTRACT PRICE of the

whole CONTRACT and a copy of the Discharge Certificate. Providing VARIATIONS have been issued, then

copies of all CONTRACT VARIATION FORMS issued to CONTRACTOR shall also be attached to the invoice.

CLAUSE 8 - TAX REGULATIONS

CONTRACTOR shall familiarise itself with the latest Tax regulations in force in the UAE and comply with these

regulations.

CLAUSE 9 - DOCUMENTATION

Documents and drawings shall be prepared in compliance with the Approved Configuration Management

Plan. Drawings submitted to CICPA shall indicate the current status. CONTRACTOR shall keep records of all

document/drawings sent to CICPA. Document/drawings submitted to CICPA "for comments" "approval" will

be returned within two (2) weeks. In addition to the requirements contained in the following further

requirements are identified:

Document Index

Within seven (7) days from the EFFECTIVE DATE of the CONTRACT, CONTRACTOR shall issue to CICPA a draft

index identifying, by unique number, every individual document that CONTRACTOR intends developing.

The index format shall be subject to CICPA acceptance

Each document shall be given a specific CONTRACT number, prefix number and a unique number.

Documents Required by CICPA.

Electronic/CD ROM

All Planning related documents submitted as part of the WORK should be prepared in Microsoft Project

software. All submissions shall be accompanied by Electronic copies

Page 30: 1. Ucss Rfp - Main Doc v1.2

30

CLAUSE 10 - CICPA WORKING HOURS

CICPA’s current working hours are between 08:00 hours and 16:00 hours, Sunday to Thursday. CICPA

reserves the right to amend its working hours and working days at its sole discretion. CONTRACTOR shall

comply with any changes in CICPA’s working hours as may be advised by CICPA. Any work requiring the

participation of CICPA outside of normal working hours during the WORK shall be executed only after prior

arrangement and APPROVAL in writing by CICPA REPRESENTATIVE.

Page 31: 1. Ucss Rfp - Main Doc v1.2

31

ANNEX C – STATEMENT OF COMPLIANCE

Respondents are to include a ‘Statement of Compliance’ that identifies where a respondent does not, or are

not, able to comply with any part(s) of this RFP or the ‘General Terms & Conditions of Contract’ at Annex E.

TABLE 1 - STATEMENT OF COMPLIANCE

Provision (eg

clause,paragra

ph…)

Partially

agrees/does not

agree/not

applicable

Reasons/

qualification

Proposed alternative

wording

Differences in

costs or pricing

Page 32: 1. Ucss Rfp - Main Doc v1.2

32

ANNEX D– INFORMATION TO BE INCLUDED IN PROPOSAL

The following checklist is provided to assist in preparing and submitting a response to the RFP. The checklist

is a guide only. Respondents should satisfy themselves that they have met all conditions in this RFP, and

should not rely on the checklist for this purpose. The Respondent should complete and submit this checklist

with its proposal.

TABLE 2– RESPONDENTS CHECKLIST

Schedules for the UAE – Coastal Surveillance System (UCSS) Proposal

CHECKLIST FOR TENDERER

Tick for Appended Items

Schedule 1.1 - Contractor Representative

Schedule 1.2 - Corporate Information

Schedule 1.3 - Executive Summary

Schedule 1.4 - Overall Proposal Description & Design

Schedule 1.5 – Project Delivery

Schedule 1.6 - Tenderer’s Organisation Chart

Schedule 1.7 - Risk Management

Schedule 1.8 - Budget and Cost Control

Schedule 1.9 - Execution Programme

Schedule 1.10 - Project Organisation

Schedule 1.11 - Contractor (Project) Personnel

(Not used)

Schedule 1.13 - Subcontractors And Suppliers

Schedule 1.14 - Related Experience

Schedule 1.15 - Financial Information

Schedule 1.16 - QA/QC Plan

Schedule 1.17 – Health, Safety & Environment Policy

Schedule 1.18 – Assumptions

Schedule 1.19 - CICPA Furnished Equipment / Services /

Information

Schedule 1.20 - Additional (Other) Information

Schedule 2 - Compliance Response

Schedule 3 - Outline Project Management Plans:

Schedule 3.1 - Project Plan

Schedule 3.2 - Logistics Support Plan

Schedule 3.3 - Quality Assurance Plan

Page 33: 1. Ucss Rfp - Main Doc v1.2

33

Schedule 3.4 - Training Plan

Schedule 3.5 - Test & Evaluation Plan

Schedule 3.5 - Configuration Management Plan

Schedule 3.6 - Other Project Management Plans

Page 34: 1. Ucss Rfp - Main Doc v1.2

34

ANNEX E – GENERAL TERMS & CONDITIONS OF CONTRACT

The ‘General Terms & Conditions of Contract’ set out the legal framework that will be used to establish a

contract with the preferred respondent.

Page 35: 1. Ucss Rfp - Main Doc v1.2

35

ANNEX F – GOVERNMENT FURNISHED EQUIPMENT (GFE)

The following list covers the GFE to be provided to the Contractor by the UAE Government for use in

satisfying the SOW requirements of the Contract:

Quantity twenty-three (23) “CassidianOptronics GmbH” brand “Z:NightOwl M” electro-optic sensors