1 WATERPOWER LABORATORY

Upload: phoebe-clark

Post on 21-Jan-2016

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

1

WATERPOWER LABORATORY

Page 2: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

2

WATERPOWER LABORATORY

• Built in 1916• Main areas of research and development:

– Hydro Turbines• Francis

• Pelton

• Pump-Turbines

– Centrifugal Pumps– Pump and turbine control systems

• New areas of research and development:– Tidal energy– Wind energy– Wave energy

Page 3: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

3

Page 4: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

4

Page 5: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

5

Page 6: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

6

Page 7: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

7

Page 8: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

8

Page 9: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

9

• Maximum head: 100 meter

• Open system head: 1,6 meter

• Maximum flow: 1,0 m3/s

• Maximum power: 700 kW

• The system is designed to operate in both open and closed loop.

Page 10: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

10

976 power plants Installed capacity: 28.365 MW Production: 120 TWh

Norwegian Hydropower Status per 1st January 2006

Size Number Total Power

Annual

production

[MW] [ - ] [MW] [GWh/år]

Micro hydro 0 – 0,1 164 6 29

Mini hydro 0,1 - 1 192 91 375

Small hydro 1 - 10 293 1.035 4.850

Large hydro 10 -100 250 9.256 41.419

Large hydro > 100 77 17.977 73.455Source: Fakta 2006, Energi og vannressurser i Norge, OED

Page 11: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

11

Installation of a Francis model turbine in the Waterpower Lab.

Page 12: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

12

Installation of a Francis model turbine in the Waterpower Lab.

Page 13: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

13

Efficiency of the model turbine

Q'p

Th

Where:h = Hydraulic efficiency [ - ] = Angular velocity [rad/s]T = Torque [Nm]p’= Differential pressure [Pa]Q = Flow rate [m3/s]

Page 14: 1 WATERPOWER LABORATORY. 2 Built in 1916 Main areas of research and development: –Hydro Turbines Francis Pelton Pump-Turbines –Centrifugal Pumps –Pump

14

Power output 0,3 W