1102 powerful track and trace delivered by sap transportation management and event management...
DESCRIPTION
tm with emTRANSCRIPT
Powerful Track and TraceDelivered by SAP Transportation Managementand Event Management Integration
Kevin M. SchafferSaika B. Shaikh
@ Hitachi Consulting
allenges
What’s Inside: Introduction Scenario Common Track and Trace Ch Solution Overview Case Study Takeaways
The Scenario
@Hitachi ~ Follow @ASUG365 and #ASUG2013 on
,rt rm'-''-'
r
, o.or»I l_I • 1_11_1
, .rmI• 1_11_1
SHIPPER DESTINATION DESTINATIONLOCATION LOCATION A LOCATION B
Planned ArrivalLoading Begin
Loading CompletePlanned Departure
Planned ArrivalUnloading Begin
Unloading CompletePlanned Departure
Planned ArrivalUnloading Begin
Unloading CompleteShipment Completion
The Scenario: A Shipment with 1 Pickup, and 2 Deliveries.SAP TM has planned an optimal route.
, ,_, ,_,
I
@Hitachi ~ Follow @ASUG365 and #ASUG2013 on
rt rm'-''-' o r»'-''-' n.or»'-''-'
',;, I I I I . ~.!'fl . j I /I '/ ' I'I/ f /J I /. I
'). l~ .... ~I1
I, /'I,/ /,j, f
SHIPPER LOCATION
DESTINATION LOCATION A
DESTINATION LOCATION B
What happens when an unplanned event occurs not according to plan?
Do decision makers have the necessary information to make changes quickly? Can Customer Service Representatives provide customers with real-time shipment
status? Can new ETA’s be calculated based off of updated information? Is historical event data logged for future analysis?
Insert Presentation SubjectInsert Speaker Names
Common Track & TraceChallenges
Lack of V Events in
Common Challenges
isibility to Transportationa Single View
Common Challenges
Integrating Numerous TransportationData Sources
Common Challenges
Access to Real-Time Data Needed to QuicklyReact to Events and Change Plans
Common Challenges
Ability to Log Historic Shipment Eventsfor Trend Analysis
Communication of PlannedActivities Across the Entire
Supply Chain
~ Foll
Solution Overview
Solution Overview
Transportation ManagementSAP Transportation Management (TM) Supports the physical transportation of goods from one location to another. The Transportation Process is broken down into 4 categories:
Order management- The initial event trigger in TM. Involves receipt of orders that require product movement from one location to another
Transportation Planning- Plan the movement or transport of the products required
Transportation Execution- Includes the selection of carriers, initiation of goods issue, creation of a transport order, and trigger the decrement of inventory.
Financial Settlement- Freight contracts are reviewed to determine the correct pricing, Invoices are generated, and accounting processes are performed
SAP Event Management (SAP EM) allows for the monitoring of end-to-end business processes by matching planned events and measurements with the actual events and measurements to uncover exceptions.
Monitoring & Visibility to key Business Processes EM Provides monitoring capabilities to any business process.
Matches Planned to Actual Data - Allowing organizations to identify exceptions.
Real Time Notification of Events - Provides timely data to organizations to react quickly.
Integration with other systems - Easily integrates with SAP and legacy solutions
Event Management
@Hitachi ~ Follow @ASUG365 and #ASUG2013 on
ECC Transportation Management EMsaes.ereer
envery rreanon
Scheduled
LoadBegin
Load End
Departure
Arrival
UnloadBegin
TransportationE:xe011Uon
UnloadEnd
0312B/2013 OB:OO:OO C . 00:00:00 CST SP2000 ROGERS TYSON DISTRIBUTIONTDC
031281201316:00:00 c _ 00:00:00 CST CP6002 RUSSELVILLE VALLEY DC
00:00:00
@Hitachi ~ Follow @ASUG365 and #ASUG2013 on
.S..J Save I X
Cancel
Ed~ I i:, I ~ I Follow Up,. I Check a Calculate Charges Scheduling Subcontractinq a I Fixing,. Set Status a I Cancel Document I Print,. I Custorns ;
' General Data V Business Partner V Stages ~ Charges l ' Overview I Document Flow Execution Information Subcontracting ' House Bill of Lading I ' Output Management ~
I Planned Date I Actual Event Date I Actual Event Ti. .. I Time ... I Location I Description I Estimated Event Date I Referenced Even 191
0312812013 OB:OO:OO C .
0312812013 11 :23:oo c _00:00:00 CST SP2000
00:00:00 CST CP6002
ROGERSTYSON DISTRIBUTIONTDC
RUSSELVILLE VALLEY DC~
Event: Arrive at Origin
Event Reason:
Planned Date:
Actual Event Date:
0312812013OB:OO:OO CST
~----~~~7110000:00 [csrLocation: SP2000 "'=:] ROGERSTYSON DISTRIBUTIONTDC
Item:
Source of Exec. Information:
Estimated Event Date:
Referenced Event:
Date of Reporting:
[ 1
~---~loo:oo:oo I csr
0 Arrive at Origin 031281201308:00:00 C... 0312812013 08:10:00 CST SP2000 ROGERS TYSON DISTRIBU
0 Check Call 00:00:00
@Hitachi ~ Follow @ASUG365 and #ASUG2013 on
g) Save I X CancelL Edit I .:, I ~ I Follow Up~ I Check~ Calculate Charges Scheduling Subcontracting~ I FIXing~ Set stetus , I Cancel Document I Print~ I customs a
/ General Data I ' Business Partner ~' Stages V Charges I/ Overview I Document Flow Execution Information Subcontracting House Bill of Lading l ' Output Management 111
Report Event Insert Event
Statu .. I Event J Planned Date J Actual Event Date I Actual Event TL.. J Time .. I Location
6 Departure 0312812013 08:00:00 c., 00:00:00 CST SP2000J Description I Estimated Event Date
ROGERS TYSON DISTRIBUTION meTIONme
I Referenced '"'" ~
6 ArrivaI at Destination 0312812013 11 :23:00 C... 00:00:00 CST CP6002
8 Unloading End 031281201316:00:00 C... 00:00:00 CST CP6002RUSSELVILLE VALLEY DC
RUSSELVILLE VALLEY DC
Event: [AmV'e at Origin ~
Event Reason:
Planned Date:
Actual Event Date:
Location:
0312812013 08:00:00 CST
10312812013 ~1108:1000 I CST
Item:
Source of Exec. Information:
EstimatedEvent Date:
Referenced Event:
Date of Reporting: 0510112013 17:51 :46 CST
@Hitachi ~ Follow @ASUG365 and #ASUG2013 on
An integrated EM – TM solution provides the following functionality:
VISIBILITY AND MONITORING
Ability to raise exceptions in certain scenarios: Location Deviations - Plan calls for arriving at location A, but arrived at location B Measurements – If container temperature rises above required temperature Partner Performance – If 3rd party partner performance is deviating from plan
COMMUNICATION ACROSS THE SUPPLY CHAIN
Events posted in the Event Management solution are available to other systems for complete communication across the supply chain
REAL-TIME NOTIFICATON OF EVENTS
Ability to receive Planned and Actual events: Regular events - Occurs within the planned period (Ex: Arrived at location) Early / Late events - Occurs outside the planned period (Ex: Late departure) Unexpected events - Events that were never planned for (Ex: Delay Event) Unreported events - Event that was expected but did not receive (Arrival event
not reported)
Real-Time notification allows operations personnel to react quickly, and allow representatives to keep customers informed with up-to-date information
W' Follow @ASUG365 and #ASUG2013 on Twitter @Hitachi Consulting
@Hitachi ~ Follow @ASUG365 and #ASUG2013 on
REPORTING
Ability to retain data in an easy-to-view format: Operational Reporting- View where issues are currently Analytical Reporting – Determine trends over time BI Integration – Ability to integrate EM with the BI Solution
INTEGRATION OF NUMEROUS DATA SOURCES
Numerous Transportation Data Sources can be integrated for full visibility Easy Visibility to transportation events via the TM NWBC or EM Web Interface
CustomerService
Transportation
PlannerT
ransportationO
OperationsM
anagementExecutive
Leadership
@Hitachi ~ Follow @ASUG365 and #ASUG2013 on
Status Checking Operational Reporting
Notifications BAPI IDOC
XI
ECC ApplicationInterface
TM
EM
BAPI
BAPI IDOC
XI
Analytical BWReporting
EventCapture
Case Study
Case Study:“Helping the Chicken Cross the Road”
@Hitachi ~ Follow @ASUG365 and #ASUG2013 on
CC
ENV
$33 Billion manufacturer of fresh, frozen and refrigerated food products. 115,000 Employees globally, Over 400 facilities and offices Exports products to more than 100 countries globally 15,000 shipments planned and executed weekly
SAP Transportation Management 8.1 for Transportation Planning Activities PeopleNet on-board GPS, MileMaker, Rand McNally Legacy Transportation Execution, Order Management and Inventory Solutions Future integration to SAP ECC Manual, paper-based transportation planning processes
Incorporate existing shipment events into a single source for real-timevisibility of planned and unplanned events from a variety of data sources.
Arrive at Origin Unload EndDeparture Shipment CompleteCheck Call Service Failure
Case Study
The Solution:Leverage TM and EM Integration
BS
WarehousingActivities
On-BoardCommunication
Manual EventUpdates
Legacy ExecutionSystem
TransportationManagement
EventManagement
Reporting of expected and unexpected shipment events. Integration with legacy transportation execution and order-entry systems. Historical logging of transportation events to be used for business analysis.
Quickly and Easily integrate legacy data sources Real-Time Shipment Visibility allowing managers to react quickly View shipment event information in a single view Platform Allows for future growth and integration
T
~apag ·Lloyd
30 480 kg67 200 lbs3 800 kg8 380 lbs
Takeaways
kg lb$ mJ cull
The Integration of Event Management with TransportationManagement Allows for Powerful Track and Trace by providingorganizations with the following functionality:
Visibility and Monitoring Communication across the Supply Chain Real-Time Notification of Events Reporting Capabilities Integration to Transportation Data and Systems
~ Follow @ASUG365 and #ASUG2013 on Twitter @Hitachi Consulting
THANK YOU FOR PARTICIPATING
Please provide feedback on this session by completing ashort survey via the event mobile application.
SESSION CODE: 1102
For ongoing education on this area of focus, visit www.ASUG.com