Project : ER 296 Sentosa Gateway (Remaining Progress Plan)
SECTOR 6
(A,B)
Construction D-Wall 84 nos
12 panel
Utlity & Road Diversion
Utlity & Road Diversion 20.6 panels/ month
Utlity & Road Diversion 13 panels/ month
Construction D-Wall 26 nos
BC 40
Utlity & Road Diversion 14.3 panels/ monthConstruction D-Wall 43 nos Low head
SECTOR 1
Bored Pile Work 12 Nos
Construction D-Wall 42 nos
13 panel
Utlity & Road Diversion
30 30
D - Wall
Rebar D-Wall cage Fabrication
SECCTOR
3
Utlity & Road Diversion
30 30 30 30 30 3030 30 30 30 30 3030 30 30 30 30 3030 30 30 30 30 30
June July August September October
30 30 30
December January February March April MayJune July August September Oct ober NovemberDecember January February March April MayJ une J ul y Augus t S epte mber October Novembe r
21th 06, 2013
Description Panel No.
2013 2014 2015
RemarkPrevious
Driving the horizontal
Driving pipe
(Vertical & Bottom)6 Nos
Driving the horizontal
pipe
(Bottom)
6 Nos
Driving the vertical pipe 4 Nos
Driving the vertical pipe 2 Nos
2 Nos
Driving the vertical pipe 4 Nos
Driving the vertical pipe 4 Nos
1 Lane
Driving the horizontal
pipe
(Top)
6 Nos
Driving the horizontal
pipe
(Top) 2 Nos
Driving the vertical pipe
Construction D-Wall 68 nos
SECTOR 6
(C)
Mob. Plants & Set up
Machine
14 panels/ month
Construction D-Wall 42 nos
Driving the horizontal
pipe
(Bottom)
6 Nos
Driving the horizontal
pipe 6 Nos
Driving the vertical pipe 4 Nos
Driving pipe
(Vertical & Bottom)2 Nos
Driving the vertical pipe 4 Nos
Driving the vertical pipe 4 Nos
Driving the vertical pipe 6 Nos
Driving the vertical pipe 2 Nos
2 lane
Driving the horizontalpipe
(Top)
1 Nos
Driving the pipe 4 Nos
Driving the pipe 6 Nos
ppe
(Bottom)
s
Steel support fram &
Excavtion1 L/S
Demolish
working platform
Shield TBM
Lane
2 Lane
*Excavation Ability : Lowhead BC cutter( Sector 5: 0.45m/hour) / BC cutter(Sector 3: 1.0m/hour)
*D-Wall construction unit price : ###
*Schedule is changeable depend on site condition & Main con.
*Operation 2shift(Worrking hour : 20 hour)
*Every 2 weeks 1 day off day : No standby finished Excavation pannel - operation casting team.
REV.00
Remark
BC2+Grab1 BC2+Grab1 BC2+Grab1 BC1+Grab1 BC1+Grab1 BC1+Grab1Machinery BC2+Grab1 BC2+Grab1 BC1+Grab1 BC1+Grab1
6/51 1/524/23 4/27 4/31 2/33 6/39 6/451/1 4/5 6/11 6/17 2/19
4/27 2/29 6/35 6/41 3/44
Nos PIPE BOX11/11 2/13 2/15 4/19 4/23
3 35/4 51 3 63/ 451 3 95/ 451 415/ 451 435 /45 1 451 /45 123 5/4 51 26 9/4 51 2 89/4 51 3 03/ 451 3 17/ 451
28 32 20 20 16
Panels235 34 18 14 14 18
Steel support fram &
Excavtion1 L/S
D-Wall
Driving the horizontal
pipe
(Bottom)
6 Nos
Driving the horizontal
pipe
(Bottom)
1 Nos
( ottom)