(1) Whether, with reference to her reply to question 1208 on 24 June 2013, any performance bonuses were paid to any other staff in her department in the 2012-13 financial year; if so, what is the total (a) number of staff that received bonuses and (b) amount paid out by her department for these bonuses;
(2) what percentage of outputs were achieved by her department as measured against each target set in its Annual Performance Plan in the 2012-13 financial year? NW3133E
The Department of Labour Annual Report
(Performance Information)for the Financial Year 2012/13
2013.10.17
TABLE OF CONTENTS
3
1. INTRODUCTION
2. PERFOMANCE EVALUATION AGAINST THE 2012/13 ANNUAL PERFORMANCE PLAN AND PERFORMANCE AGAINST THE MINISTER’S 2012 BUDGET VOTE
3.CHALLENGES CONTRIBUTING TO NON ACHIEVEMENTS DURING 2012/13
4. COMPARATIVE ANALYSIS OF THE DOL PERFORMANCE OVER A PERIOD OF 4 YEARS (2009/10 – 2012/13)
INTRODUCTION :
THE DOL STRATEGIC OBJECTIVES
4
1. Contribute to employment creation
2. Promote equity in the labour market
3. Protecting vulnerable workers
4. Strengthening multilateral and bilateral relations
5. Strengthening social protection
6. Promoting sound labour relations
7. Monitoring the impact of legislation
8. Strengthening the institutional capacity of the Department
Performance Indicator on track but experiencing delays
40 – 74% Complete
Performance Indicator reflects complete implementation
75 - 100% Complete
Performance Indicator behind schedule
0 – 39% Complete
LEGEND
6
BRANCH CONTRIBUTION TOTHE ANNUAL PERFORMANCE PLAN (APP) 2012/13
BRANCHPlanned
Indicators AchievedPartially Achieved
Not Achieved
Not Reported
Overall Achievement
Administration 33 21 8 4 0 64%Inspections and Enforcement Services 12 5 5 2 0 42%Public Employment Services 15 7 4 4 0 47%Labour Policy and Industrial Relations 23 19 2 2 0 83%
OVERALL PERFORMANCE 83 52 19 12 0
63%PERFORMANCE % 63% 23% 14% 0%
7
ACHIEVEMENTS ON STRATEGIC OBJECTIVES DURING THE FINANCIAL YEAR 2012/13
STRATEGIC OBJECTIVES
ANNUAL ACTUAL OUTPUT - VALIDATEDOverall
AchievementPlanned Indictors Achieved
Partially Achieved
Not Achieved Not Reported
Contribute to employment creation 15 7 4 4 0 47%Promote equity in the labour market 4 3 1 0 0 75%
Protecting vulnerable workers 12 7 3 2 0 58%Strengthening multilateral and bilateral relations 5 4 1 0 0 80%
Strengthening social protection 6 2 2 2 0 33%Promoting sound labour relations 5 5 0 0 0 100%Monitoring the impact of legislation 3 3 0 0 0 100%Strengthening the institutional capacity of the Department 33 21 8 4 0 64%
OVERALL PERFORMANCE 83 52 19 12 0
63%63% 23% 14% 0%
OVERVIEW OF THE DOL’S STRATEGIC PLAN AND ESTIMATES FOR NATIONAL EXPENDITURE (ENE) KEY PEFORMANCE INDICATORS FOR
2012/2013
8
ENE KEY PERFORMANCE ENE KEY PERFORMANCE INDICATORSINDICATORS
PLANNEDPLANNED ACTUAL ACTUAL ACHIEVEMENTACHIEVEMENT
% ACHIEVED% ACHIEVED
1. Number of workplaces inspected 87 795 101 792 116% (Page 37 of the Annual Report)
2.Percentage of labour complaintsresolved within specified number of days of receipt at Registration Services
70% resolved within 14 days
67% 67% (73 786 of 110 252) resolved. 67% is 96% of 70%P 39
3.Number of work seekers registered on the employment services system for South Africa
450 000 600 259 133% work seekers registeredP 45
4.Number of work seekers placed in job opportunities and/or referred to other Services
90 000 (18 000 placed and 72 000 referred)
412 343 (16 171 placed and 396 172 referred)
90% of the target placed550% of the target referred. P 46
5. Number of employers registering vacancies on the Employment Services System for South Africa
3 000 (From 2000 to 3000). 1000 planned target per annum
2 620 262%
P 47
6. Number of sectoral determinations reviewed and published
5 6 120%
P 53
PERFORMANCE EVALUATION AGAINST THEANNUAL PERFORMANCE PLAN (APP) 2012/13
9
10
Program 1: Administration
OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIPStrategic Objective 8: Strengthening the institutional capacity of the Department
KEY PERFORMANCE INDICATORSKEY PERFORMANCE INDICATORS ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
1. Percentage of final reports issued as per timeframes indicated in the approved annual audit plan
85% final reports issued as per timeframes indicated in the approved annual audit plan
89.6% (29 planned and 26 finalised/issued) was achieved
2. Percentage of finalisation of the fraud cases received and detected
87% of cases received or detected finalised by the year end
57% (47 cases received and 27 finalised)
3. Percentage of pre-employment screening applications processed to State Security Agency (SSA) within a specified timeframe
70% pre-employment screening applications processed to State Security Agency (SSA) within two weeks
355 requests for Public Service Commission were received and 226 (63.6%) finalised and 129 (36.3%) outstanding
11
Administration - continues
OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIPStrategic Objective 8: Strengthening the institutional capacity of the Department
KEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
4. Percentage increase of security vetting of staff in the department
8% of staff in the Department vetted
A total of 513 (6.8%) of the 1 374 requests from the staff complement of 7495 was vetted by end of March 2013.
5. Percentage of women, youth and people with disability (PwD) employed in line with the EE Plan
40% women employed in Senior Management Service (SMS),
43% youth and
3% people with disability employed in DoL by 31 March 2013
As at the 31 March 2013, Women are 39%, Youth are 35.3% and PwDs are 2.5%.
a.Total number of women at SMS level (33) / by total number of filled at SMS (85) x 100 = 38.8 % (39 %)b.Total number of youth in DoL (2648) / by total number of filled posts in DoL (7495) x 100 = 35.3 %c.Total number of PwDs (189) / by total number of filled posts in DoL (7495) x 100 = 2.5 %
12
Administration - continues
OUTCOME 12: AN EFFICIENT, EFFECTIVE, AND DEVELOPMENT ORIENTED PUBLIC SERVICE AND AN EMPOWERED AND INCLUSIVE CITIZENSHIP
Strategic Objective 8: Strengthening the institutional capacity of the Department
KEY PERFORMANCE INDICATORSKEY PERFORMANCE INDICATORS ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
6. Percentage reduction of vacancies by financial year end
Vacancy rate reduced to below 7% by 31 March 2013
As the 31 March 2013, the vacancy rate was 7%.
7. Percentage of staff trained in line with Workplace Skills Plan (WSP)
82% of Department’s staff trained in accordance with approved WSP by 31 March 2013
82.47% (5402 of the 6550) staff was trained
8. Percentage of misconduct cases finalised within a prescribed period of time
75% of misconduct cases finalised in line with applicable prescripts by 31 March 2013
78% (234 of 300) cases were finalised in line with applicable prescripts by end March.
9. Percentage of Court Papers to resolve Litigation filed with the Court within specified period
80% of Court Papers to resolve Litigation filed within 10 days of receipt
77% (51 of 66) court papers to resolve Litigation were filed within 10 days of receipt
10. Percentage of elements of the ICT strategy implemented
50% of the ICT strategic plan components implemented
50% of ICT strategic elements completed
13
Program 2: Inspection and Enforcement Services (IES)
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 2: Promote Equity in the Labour Market
KEY PERFORMANCE INDICATORS
ANNUAL TARGETS PROGRESS
1. Number of workplacesreviewed for compliance with employment equity (EE)Legislation
240 employers reviewed comply Public Companies (116)
Private Companies (124)
269
Public companies (87)
Private companies (182) (Page 36 of the Annual Report)
Table 1: Employers inspected
Prov.Annual Target
(Public companies)Actual reviewed
(Public companies)Annual Target
(Private companies )Actual reviewed
(Private companies)EC 16 2 (13%) 9 12 (133%)FS 17 17 (100%) 0 0 GP 25 29 (116%) 30 45 (150%)
KZN 17 2 (12%) 35 34 (97%)LP 16 14 (88%) 6 16 (266%)MP 6 6 (100%) 11 21 (190%)NC 3 2 (67%) 7 13 (186%)NW 10 9 (90%) 6 11 (183%)WC 6 6 (100%) 20 20 (100%)
NATIONAL 116 87 (75%) 124 182 (147%)
14
IES - continues
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 3: Protecting Vulnerable Workers
KEY PERFORMANCE INDICATORS ANNUAL TARGETS PROGRESS
1. Number of workplacesinspected to determine their compliance levels in terms of the relevant labour legislation
87 795 workplaces inspected 101 792 (116%) against a target of 87 795 workplaces were inspected and 55 438 (55%) complied, and 46 354 (45%) did not comply
(P 37)
Table 2: Number of workplaces inspected
Prov. Target Actual inspected No. complied No. not complyingEC 11112 12843 6820 (53%) 6023
FS 8287 8550 6446 (75%) 2104
GP 17027 18108 11026 (60%) 7082
KZN 16092 17992 9498 (53%) 8494
LP 10627 10730 5171 (48%) 5559
MP 7519 7418 3260 (44%) 4158
NC 3844 4408 3069 (70%) 1339
NW 5226 10197 6886 (66%) 3311
WC 8061 11546 3262 (29%) 8284
NATIONAL 87795 101792 55438 (55%) 46354
15
IES - continues
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 3: Protecting Vulnerable Workers
KEY PERFORMANCE INDICATORS ANNUAL TARGETS PROGRESS
2. Number of non-complyingworkplaces of those inspected dealt with in terms of the relevant enforcement regime (relevant labour legislation)
Follow up all non-complying‐workplaces of those inspected
10 880 (23%) follow-up inspections against a target of 46 354 workplaces were inspected; and 10 588 (97%) complied.
(P 38)
Table 3: Number of workplaces inspected-follow-upProv. Follow-up inspections Actual inspected Actual complied
EC 6023 2984 3975 (133%)
FS 2104 516 478 (93%)
GP 7082 1674 1122 (67%)
KZN 8494 1044 824 (79%)
LP 5559 1475 765 (52%)
MP 4158 421 391 (93%)
NC 1339 188 167 (89%)
NW 3311 422 329 (78%)
WC 8284 2156 2537 (118%)
NATIONAL46354 10880 10588 (97%)
16
IES - continues
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 3: Protecting Vulnerable WorkersKEY PERFORMANCE INDICATORSKEY PERFORMANCE INDICATORS ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
3. Percentage of labour complaints resolved within a specified number of days of receipt at Registration Services
Settle 70% of received complaints within14 days
67% (73 786 of 110 252) complaints were resolved within 14 days
(P 39)
Table 4: Complaints management
Prov. Target Number received Number resolved % Resolved
EC 70% 6862 3843 56
FS 70% 6299 4957 79
GP 70% 44073 30037 68
KZN 70% 12671 9885 78
LP 70% 9154 5187 57
MP 70% 13909 10891 78
NC 70% 3226 1932 60
NW 70% 8413 5497 65
WC 70% 5645 1757 31
NATIONAL 70% 110252 73786 67%
17
IES - continues
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 5: Strengthening Social Protection
KEY PERFORMANCE INDICATORSKEY PERFORMANCE INDICATORS ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
1. Number of workplaces audited todetermine their compliance levels in terms of Occupational Health andSafety Legislation
41 965 workplaces audited
26 333 (63%) against a target of 41 965 workplaces were audited , and 13 640 (52%) complied, and 12 593 (48%) did not comply (p 40)
Table 5: Workplaces auditedProv. Target Number audited Number complying No. not complying
EC 2339 1826 1167 (64%) 659FS 1234 1117 821 (74%) 296
GP 12783 6647 3194 (48%) 3453
KZN 12080 8666 4308 (50%) 4358
LP 644 1002 420 (42%) 482
MP 1721 2175 986 (45%) 1189
NC 1655 845 497 (59%) 348
NW 3457 2420 1710 (71%) 710WC 6052 1635 537 (33%) 1098
NATIONAL 41965 26333 13640 (52%) 12593
18
IES - continues
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH Strategic Objective 5: Strengthening Social Protection
KEY PERFORMANCE INDICATORSKEY PERFORMANCE INDICATORS ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS2. Number of non-complying workplaces of those audited are dealt with in terms of the relevant enforcement regime (OHS legislation)
Follow up all non-‐complying workplaces of those audited
* 12 593 – refer to slide 18
2 270 (18%) follow-up inspections audited against a target of 12 593 workplaces were audited; and 1 807 (80%) complied. (p 41)
Table 6: Workplaces audited – follow-upProv. Follow-up audits Actual audited Actual complied
EC 65 419 748 (178%)
FS 296 149 134 (90%)
GP 3453 126 109 (87%)
KZN 4358 660 444 (67%)
LP 482 206 106 (52%)
MP 1189 105 89 (85%)
NC 348 109 75 (69%)
NW 710 96 76 (79%)
WC 1098 400 26 (7%)
NATIONAL 12593 2270 1807 (80%)
19
IES - continues
PERFORMANCE AGAINST ISSUES RAISED IN THE MINISTER’S BUDGET VOTE
ISSUES FLAGGEDISSUES FLAGGED INTERVENTIONSINTERVENTIONS ACTIVITIESACTIVITIES
Level of compliance in the Problematic Sectors
More strategic utilisation of Blitz Programme
New staff in Statutory and Advocacy section employed to assist with training and standardization.
Blitz Program developed and aligned with the APP
Standardisation of the enforcement approach across provinces
Engaging with organised business and labour in Provinces
Providing training both to internal and external stakeholders
Declining compliance level in the high risk sectors at 54%
Recruit and appoint the necessary OHS skills at provincial levels
Build capacity OHS inspectors to build monitor and enforce OHSA.
Specialisation approved, new staff structure developed
Learnership and other training programmes being sourced
20
IES - continues
PERFORMANCE AGAINST ISSUES RAISED IN THE MINISTER’S BUDGET VOTE
ISSUES FLAGGEDISSUES FLAGGED INTERVENTIONSINTERVENTIONS ACTIVITIESACTIVITIES
Roving Team strengthened
Increase the capacity of the Roving Team by strategically deploying the team in the area of need and ensure that their operations are structurally managed.
Roving Team programme aligned with the APP
Team to be provided with the necessary tools
Specialist Training to be identified
Employment Equity Team to follow up non -compliant Employers.
Provinces to ensure that all non-compliant employers are followed-up and EEA Enforced.
EE Team assisted and monitored at National Level
Program reprioritized to focus on follow ups
21
IES - continues
PERFORMANCE AGAINST ISSUES RAISED IN THE MINISTER’S BUDGET VOTE
ISSUES FLAGGEDISSUES FLAGGED INTERVENTIONSINTERVENTIONS ACTIVITIESACTIVITIES
Ratification of ILO Convention No 81
Established partnership with ILO to speed-up the process of the ratification. Establish a task team to ensure that this ratification is processed.
Convention ratified Need to address the
shortcomings as identified by the ILO
OHSA amended to strengthen the Powers of Inspectors
Speed up the process of amending the OHSA
Ongoing
22
Program 3: Public Employment ServicesOUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growthDoL Strategic Objective 1: Contribution to decent employment creation
KEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
1. Employment Services Legislation, regulations and guidelines in place
Employment Services Act, regulations and guidelines in place (Private Employment Agencies and Career Guidance)
PES Branch tabled the Bill to the Portfolio Committee on Labour in March 2013. Private Employment Agencies (PEA) and Career Guidance Regulations and guidelines in place.
2. Increase Number of work seeker registered in different categories
450 000 reporting work-seekers registered on the system
A total of 600 259 work-seekers against a target of 450 000 was registered on the system. (P 45 of the Annual Report)
Table 7: Job-seekers Registered on the system
Prov. Target Actual Number Registered Variance
EC 59000 68380 (115%) 9380FS 36500 43586 (119%) 7086GP 81500 152065 (187%) 70565
KZN 95000 116560 (122%) 21560LP 32000 60791 (190%) 28791MP 36500 50524 (138%) 14024NC 18500 17992 (97%) -508NW 32000 20514 (64%) -11486WC 59000 69847 (118%) 10847
NATIONAL 450000 600259 (133%) 150259
23
PES - continues
OUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growth
DoL Strategic Objective 1: Contribution to decent employment creation
KEY PERFORMANCE INDICATORS ANNUAL TARGETS PROGRESS
3. Percentage of work-seekers registered on the system provided with career counselling and employability enhancement
60% of work-seekers registering on the system are profiled within 60 days of registration
59% of work seekers were profiled against a 60% target.
That is, with a target of 450 000, 600 259 work-seekers were registered on the system,
264 068 were provided with career counselling and employability enhancement against a 60% (270 000) target.
Calculating the 264 068 of 270 000 at 60% gives 59%.
24
PES - continues
OUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growthDoL Strategic Objective 1: Contribution to decent employment creation
KEY PERFORMANCE INDICATORSKEY PERFORMANCE INDICATORS ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS4. Increase number of work-seekers placed/referred to opportunities and other services
18 000 work-seekers placed;
72 000 work-seekers referred
A total of 16 171 (90% of the target) work-seekers was placed;
and a total of 396 172 (550% of the target) was referred. (p 47)
Table 8: Job-seekers placed/referred to opportunities
Prov. Target for placement Actual placed Target for referral Actual referredEC 2860 1865 (65%) 11440 29387 (256%)FS 1420 1445 (102%) 5680 30731 (541%)GP 3400 5050 (149%) 13600 125987 (926%)
KZN 2680 1158 (43%) 10720 112968 (1053%)LP 1960 893 (45%) 7840 59981 (765%)MP 1780 2603 (146%) 7120 10425 (146%)NC 880 1093 (124%) 4960 4128 (83%)
NW 1240 1103 (89%) 3520 7218 (205%)WC 1780 961 (53%) 7120 15347 (215%)
NATIONAL 18000 16171 (90%) 72000 396172 (550%)
25
PES - continues
OUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growth
DoL Strategic Objective 1: Contribution to decent employment creationKEY PERFORMANCE INDICATORSKEY PERFORMANCE INDICATORS ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
5. Increase number of employers registering vacancies on ESSA per annum
Increase from 2000 to 3000 companies register vacancies on ESSA by end of March 2013
2 620 companies registered vacancies on ESSA(P 47)
Table 9: Employers registering vacancies on ESSA
Prov. Expected target to register Actual Registered VarianceEC 90 162 (180%) 72FS 80 193 (241%) 113GP 190 769 (404%) 579
KZN 160 224 (140%) 64LP 110 310 (282%) 200MP 100 277 (277%) 177
NC 50 162 (324%) 112
NW 70 182 (260%) 112
WC 150 341 (227%) 191
NATIONAL 1000 2620 (262%) 1620
26
PES - continues
OUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growth
DoL Strategic Objective 1: Contribution to decent employment creation
KEY PERFORMANCE INDICATORSKEY PERFORMANCE INDICATORS ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS6. Number of requests for recommendation of migrant work permits responded to
All compliant applicationsreceived processed within 30 working days
A total of 153 corporate work permit applications received processed within 30 days, 108 corporate permits covering 12 631 employment opportunities.
8 320 (individuals) were positively recommended. Out of 45 applications for individual work permit 32 were negatively recommended (p48)
Table 10: Request for migrant work permitsProv. Number received Actual Processed
EC 1 1FS 9 9GP 29 29
KZN 6 6LP 41 41MP 29 29NC 2 2NW 1 1
WC 35 35NATIONAL 153 153
27
PES - continues
OUTCOME 4: Improve the quality and accessibility of labour market services to contribute to decent employment through inclusive economic growth
DoL Strategic Objective 1: Contribution to decent employment creation
KEY PERFORMANCE INDICATORSKEY PERFORMANCE INDICATORS ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
7. Number of Private EmploymentAgencies registered increased
Increase from 1500 to 2000 existing private employment agencies registered
A total of 350 existing PEAs were registered
(p 48)
Table 11: Registration of Private Employment Agencies
Prov. Target Actual registered DifferenceEC 60 5 -55FS 40 3 -37GP 95 148 53
KZN 75 36 -39LP 55 3 -52MP 50 57 7NC 25 2 -23NW 30 19 -11
WC70
77 7
NATIONAL 500 350 -150
28
Program 4: Labour Policy and Industrial Relations (LP&IR)OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 2: Promote Equity in the Labour Market
KEY PERFORMANCE KEY PERFORMANCE INDICATORSINDICATORS
ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
1. Employment Equity Act (EEA) and its regulations
NEDLAC engagement finalized on the EEA Amendments by November 2012
Presented the rationale for amendments of the EE Bill to the Portfolio Committee of Labour in February 2013 and public hearings by parliament on Amendment Bill started in February 2013
2. Code of Good Practice and Technical Assistanceguidelines on HIV and AIDS reviewed and Amended andamended
HIV and AIDS Code and technical assistance guidelines amended by June 2012
Amendment to HIV and AIDS Code was gazetted on 15 June 2012 and the amendment to HIV and AIDS Technical Assistance Guidelines (TAG) was finalised on 27 June 2012.
3. Income Differentials assessed to determine race and gender disparities in Salaries
30 Income Differentials assessed to determine race and gender disparities in salaries by March 2013
31 Income differentials assessed to determine race and gender disparities in salaries.
29
LP & IR - continues
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 3: Protecting Vulnerable Workers
KEY PERFORMANCE INDICATORSKEY PERFORMANCE INDICATORS ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
1. BCEA amended Bill submitted to Cabinet by March 2013
Bill approved by Cabinet and currently in Parliament
2. Wage differentials investigated Develop norms and benchmarks for proportionate income differentials by March 2013
Investigation on wage differentials not conducted due to the inability of the IT system to analyse information as reported through the EE report
3. Number of child labour programme of Action
1 Child Labour Programme of Action for 5 year period (2012 2016) ‐reviewed and submitted to Cabinet by March 2013
Child Labour Programme of Action submitted to the Minister for approval
4. Review existing sectoral determinations
Publish an amended SD with minimum wages for one sector by June 2012.
Amendment to the Hospitality sectoral published on 22/06/12 in GG: 35460
30
LP&IR - continues
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 3: Protecting Vulnerable Workers
KEY PERFORMANCE INDICATORSKEY PERFORMANCE INDICATORS ANNUAL TARGETSANNUAL TARGETS PROGRESSPROGRESS
5. Investigate new areas for setting sectoral determinations
Investigate possibility of sectoral determinations for 2 new sectors
Investigation to establish provident funds for domestic and farm workers sector delayed due to the possibility of the introduction of National Social Security Fund by the National Treasury
6. Civil society strengthened 10 civil society organisations involved in the world of work funded
1. DITSELA 2. Workers College 3. COSATU 4. NACTU 5. FEDUSA6. South African Labour Bulletin7. Bloodriver Advice Office8. Relemogile Advice Office9. Funda Development Centre10. Mothutlong Network Advisory
Development Centre
31
LP&IR - continues
STRATEGIC OUTCOME ORIENTED GOALS: 2 (OUTCOME 11): CREATING A BETTER SOUTH AFRICA AND CONTRIBUTING TO A BETTER AND SAFER AFRICA IN A BETTER WORLDStrategic Objective 4: Strengthening multilateral and bilateral relations
KEY PERFORMANCE INDICATORS
ANNUAL TARGETS PROGRESS
Number of reports compiled in terms of Article 19 and 22 of the Constitution of the ILO by specified time-frame
7 reports compiled andsubmitted in terms of Article 19 and 22 of the Constitution of the ILO by September 2012
4 Reports compiled and submitted to the ILO in terms of Article 19 (unratified) and Article 22 (ratified) Conventions.
The reporting cycle for the 8 ILO Core Conventions and the 4 Governance Conventions has now been delayed to 3 years and is no longer of 2 years. Accordingly, there are no reports due for Conventions Nos. 100, 111 and 144 for 2012, which were originally requested by the ILO.
South Africa’s position documents on agenda items for AULSAC, ARLAC and SADC ELS developed and approved
Briefing documents andSouth Africa’s positiondocuments on the agenda items for AULSAC compiled by April 2012
A country report on the Ouagadougou Declaration and Plan was developed and submitted to the AU.
32
LP&IR - continues
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 7: Monitoring the impact of legislation
KEY PERFORMANCE INDICATORS
ANNUAL TARGETS PROGRESS
1. Research reports produced and disseminated
Dissemination of the RME agenda 2 research resultsDevelopment of the agenda 3
Dissemination of completed research reports:
(i) Noise Induced Hearing Loss;
(ii) Impact of the Taxi Sectoral Determination on working conditions in the Taxi Sector.
(iii)Occupational Health and Safety in high risk sectors.
RME agenda 3 was developed and approved by the Minister for further processing and by DBAC for procurement.
33
LP&IR - continues
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 6: Promoting Sound Labour Relations
KEY PERFORMANCE INDICATORS
ANNUAL TARGETS PROGRESS
1. Number of Collective agreements extended within a specified number of days
18 collective agreements published within 60 days of receipt
25 Collective Agreement Approved. Average turnaround time was 52 days
2. Decision to register new labour Organizations taken within a specified period
Decision to register new labour organizations taken within 90 days of receipt of competent applications
130 New applications received 16 approved114 refused Average turnaround time: 86 days
34
LP&IR - continues
OUTCOME 4: DECENT EMPLOYMENT THROUGH INCLUSIVE ECONOMIC GROWTH
Strategic Objective 7: Monitoring the impact of legislation
KEY PERFORMANCE INDICATORS
ANNUAL TARGETS PROGRESS
1. Number of Ministerial briefing reports produced on labour market issues within a specified period
4 Labour market trends reports completed andpublished by September 2012:
• Industrial Action• Annual Labour Market Bulletin,• Job Opportunity and Unemployment in the South African labour market and Annual Administrative Statistics Report
Four Annual labour market trends produced and published by September 2012. These include: • Annual Industrial Action report 2011,• Annual Labour Market Bulletin 2011/12, • Annual Job Opportunity and Unemployment in the SA labour market 2011/12 and • Annual Administrative Statistics report 2011
35
LP & IR - continues
PERFORMANCE AGAINST ISSUES RAISED IN THE MINISTER’S BUDGET VOTE
PLANNED ACTIVITYPLANNED ACTIVITY PROGRESSPROGRESS
Hosting the Labour Relations Indaba
jointly with NEDLAC
NEDLAC is still engaging with the Social
Partners on a possible date.
Engage social partners on adversarial
industrial Relations in the Labour
Market
The Deputy President jointly with the
Department of Labour are engaging with the
Social Partners on this matter
Hosting of Child Labour Day in
Mpumalanga
It will take place in August 2013
Request more money for Strengthen
Civil Society to replicate the model of
Workers College Natal
Engage National Treasury when bids for the
mid-term are considered.
36
LP & IR - continues
PERFORMANCE AGAINST ISSUES RAISED IN THE MINISTER’S BUDGET VOTE
PLANNED ACTIVITYPLANNED ACTIVITY PROGRESSPROGRESS
Pursue compliance around
Employment Equity
Waiting for the promulgations of Employment
Equity Amendments to fast track enforcement
Training and Up-skilling 1000 domestic
workers on BCEA, LRA and Sectoral
Determinations
Plans to start training and up-skill 1000 domestic
workers are under way.
CHALLENGES CONTRIBUTING TO NONE ACHIEVEMENT OF SOME INDICATORS AND CORRECTIVE ACTION
37
KEY STRATEGIC OBJECTIVE
AREA OF CONCERN REASON FOR MAJOR VARIANCE
CORRECTIVE ACTION
PES
Contribute to employment creation
Number of people with disabilities/ ex-combatants and Compensation Fund beneficiaries assisted with skills for employment in the SEF
No beneficiary assisted due to Insufficient funding
Marketing SEF factories, conclusion of sales agreements with Departments tightened
Number of people in SEF trained and placed in mainstream economy
None trained and placed into mainstream economy due to insufficient funding
Arrangements to be made with relevant SETA
Number of jobs saved through social plan intervention
Delays in funding approval from UIF to implement the service and that resulted in limited time for implementation hence the budget was reduced and the target reviewed
Targets changed as per 3 year agreement signed for 2012/13 to 2014/15
CHALLENGES CONTRIBUTING TO NONE ACHIEVEMENT OF SOME INDICATORS AND CORRECTIVE ACTION
38
KEY STRATEGIC OBJECTIVE
AREA OF CONCERN REASON FOR MAJOR VARIANCE
CORRECTIVE ACTION
IES
Strengthening Social Protection
Number of workplaces audited todetermine their compliance levels in terms of Occupational Health andSafety Legislation
Given the increase in number of inspections done (15.9%) it was impossible for inspectors to audit the places as planned as more resources had to be utilised to meet the extra demand else where
Increase advocacy sessions with employers to ensure compliance
Number of noncomplying workplaces to of those audited dealt with in terms of the relevant enforcementregime (OHS legislation)
The target could not be reached due:
•Some of the notices issued were still within the period•The increase in demand made it impossible to go back and do more follow-up inspections
Increase advocacy sessions with employers to minimise non-compliance
CHALLENGES FOR NONE ACHIEVEMENT OF SOME INDICATORS DURING 2012/13
39
KEY STRATEGIC OBJECTIVE
AREA OF CONCERN REASON FOR MAJOR VARIANCE CORRECTIVE ACTION
LP & IR
Promote equity in the labour market
Employment Equity Act (EEA) and its regulationsamended
Amendment to EE not finalised due to delays in Parliamentary processes
Parliament to fast track its processes including public hearings
LP & IR
Protecting vulnerable workers
Wage differentials investigated
Investigation on wage differentials not conducted, due to the inability of the IT system to analyse information as reported through the EE report
Improved IT systems
Number of new areas for setting sectoral determinations investigated
Investigation to establish provident funds for domestic and farm workers sector delayed due to the possibility of introducing the National Social Security Fund by the National Treasury
Establish progress by the National Treasury and how DoL should play part
CS
Strengthening the institutional capacity of the Department
Percentage increase of security vetting of staff in the department
A total of 513 (6.8%) of the 1 374 requests from the staff complement of 7 490 was vetted by end of March 2013. This is due to delays at the State Security Agent as the results of capacity.
Establishment of the internal vetting unit
2009/10 – 2012/13 PERFORMANCE
40
4. COMPARATIVE ANALYSIS THE DOL PERFORMANCE OVER A PERIOD OF FOUR (4) YEARS
41
THE DOL PERFORMANCE OVER A PERIOD OF FOUR (4) YEARS: 2009/10 – 2012/13
BRANCHPlanned
Indicators AchievedPartially Achieved Not Achieved Not Reported
Overall Achievement
Administration 162 101 38 21 2 62%
Inspections and Enforcement Services 49 26 13 10 0 53%
Public Employment Services 153 74 26 36 17 48%
Labour Policy and Industrial Relations 103 76 14 9 4 74%
OVERALL PERFORMANCE 467 277 91 76 23
59%PERFORMANCE % 59% 20% 16% 5%
42
THE DOL YEAR-IN-YEAR PERFORMANCE: 2009/10 – 2012/13
Financial Year Planned Achieved
Partially Achieved
Not Achieved
Not Reported % ACHIEVED
2009/10 139 91 24 22 2 66%
2010/11 116 64 22 26 4 55%
2011/12 129 70 26 16 17 54%
2012/13 83 52 19 12 0 63%
Total 467 277 91 76 23
59%OVERALL PERFORMANCE 59% 20% 16% 5%
43
THE DOL YEAR-IN-YEAR PERFORMANCE: 2009/10 – 2012/13
Between 2009/10 and 2012/13 financial years, there has been a decrease in number of planned performance indicators. The decrease, however, is not positively linked to actual performance i.r.o the actual achievement of indicators.
Conclusion
• We have in the Financial Year 2012/13 tried to improve our strategic plan and Annual Performance Plan with a View to Ensure that they are aligned to the SMART Principle.
• We have done this with the Assistance of the National Treasury Technical Advisory Unit.
• We are still of the view that there is still more work to be done around this area that should assist in ensuring that our work is measurable.
44
Conclusion Cont..• We have further engaged in a number of Change
Management Programmes with a View to Improve our Service Delivery Environment.
• The Change Management Programmes are managed under the Shanduka Project Umbrella and will assist in ensuring that we change for the best.
• The Department has again received another Award from SAIGA, which is the second Award in a space of Three Years.
• The Awards from SAIGA are part of the outcomes and fruits of some of these change initiatives.
45
Conclusion Cont..
• We will keep on striving to improve our level of performance against predetermined objectives, targets as well as Service Delivery.
46
Thank You…