2q 2015 4q 2016 - chicago · 2q 2015 – 4q 2016. government procurement compliance (gpc) forum ......

86
This document will be updated periodically and is subject to change without notice. Contents Contracting Opportunities Highlights City of Chicago 5 Chicago Board of Elections 33 City Colleges 34 Chicago Housing Authority 35 Chicago Park District 39 Chicago Public Schools 40 Chicago Transit Authority 43 Public Building Commission 47 Cook County 48 State of Illinois 62 Assist Agencies 84 2Q 2015 – 4Q 2016

Upload: others

Post on 27-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

This document will be updated periodically and is subject to change without notice.

Contents Contracting Opportunities Highlights

City of Chicago 5

Chicago Board of Elections 33

City Colleges 34

Chicago Housing Authority 35

Chicago Park District 39

Chicago Public Schools 40

Chicago Transit Authority 43

Public Building Commission 47

Cook County 48

State of Illinois 62

Assist Agencies 84

2Q 2015 – 4Q 2016

Page 2: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM

Collectively, our regional governments procure a wealth of goods and services annually. By making our processes more streamlined, standardized, equitable, and transparent, we are not only creating an environment in which businesses of all sizes can flourish, but will be better stewards of taxpayer dollars. In January 2014, under the leadership of Mayor Rahm Emanuel, the City of Chicago Department of Procurement Services (DPS) initiated a series of meetings with the City’s sister agencies and invited County, State and Federal government as well as the Affirmative Action Advisory Board and non-profit assist agencies representing the vendor community.

These meetings have grown into the Government Procurement Compliance (GPC) Forum, a strategic planning effort, which entails the formation a number of working subcommittees tasked with researching and reviewing best practices and recommending solutions to shared challenges.

One of the objectives of the GPC for its participating agencies was to rollout this unified quarterly buying plan across the City, its sister agencies, as well as the County and State, so that vendors can better plan for bidding on government business. The GPC Forum includes:

Over 60 participants

30 government entities and non-profit assist agencies representing local small minority and women-owned businesses

Members of the Affirmative Action Advisory Board

Members from the Office of the Inspector General

4 working subcommittees: Legal Issues/Contract Standardization; Transparency, Outreach & Capacity Building for Vendors; Payments to Contractors and Subcontractors; Certification, Compliance & Good Faith Efforts

Subcommittees are made up of a mix of government institutions and assist agencies to foster an environment of collaboration and inclusion.

GPC Forum MISSION

Drive bold, cross-agency improvements to make our region the benchmark for procurement, certification, and compliance processes that are

streamlined, standardized, equitable and transparent.

Page 3: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Participating Government and Procurement Institutions

Chicago Housing Authority

Chicago Park District

Chicago Transportation Administration

City Colleges of Chicago

Chicago Public Schools

Public Building Commission

Chicago Board of Elections

Cook County Forest Preserve

Cook County Procurement & Compliance

Illinois Tollway

Metra

Metropolitan Pier & Exposition Authority

Metropolitan Water Reclamation District

State of Illinois

University of Chicago

U.S. General Services Administration

Participating Assist Agencies

Black Contractors United

Chatham Business Association

Chicago Minority Supplier Development Council

Chicago Urban League

Cosmopolitan Chamber of Commerce

Eighteenth Street Development Corporation

Far South Community Development Corporation

Federation of Women Contractors

HACIA

Illinois Hispanic Chamber of Commerce

Rainbow PUSH

Save Our Community Taskforce

South Shore Chamber, Inc.

U.S. Minority Contractors Association

Women’s Business Development Center

Women Construction Owners and Executives

Page 4: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

How to Use this Buying Plan - Potential contracting opportunities, to be advertised between 2Q2015 and 4Q2016, are listed in this Buying Plan. The opportunities are listed alphabetically by agency, department and contract type, then chronologically by advertising date. For the most up to date information about procurement processes and upcoming solicitations, visit agency websites, listed below.

City of Chicago Department of Procurement Services (DPS)

DPS is committed to providing information, resources and tools to assist you in your efforts to compete for City of Chicago contracting opportunities. We pledge to work together as a team and with our customers to guarantee an open, fair and timely process by establishing, communicating and enforcing superior business practices. Integrity, public trust and the law are our guiding principles. www.cityofchicago.org/dps and www.cityofchicago.org/bids Cook County of Illinois – Office of the Chief Procurement Officer

Our mission is to procure quality goods and services for Cook County agencies at the best price by promoting competition and implementing best practices. To achieve this goal, the Office of the Chief Procurement Officer is committed to implementing open and transparent procurement methods to promote maximum vendor participation while leveraging overall County volume to achieve lower costs. www.cookcountyil.gov/Purchasing Chicago Board of Elections www.chicagoelections.com/en/job-and-contractor-opportunities.html Chicago Housing Authority (CHA) An overview of the CHA's Department of Procurement and Contracts and its role and responsibility as it relates to purchasing goods and services for all CHA Departments. www.thecha.org/doing-business Chicago Park District (CPD) Learn more about doing business with the Chicago Park District. Download bids; see list of firms that have downloaded bids; track progress on projects being developed for advertisement; see bid tabulations; view and download contracts; track what happens after bids and proposals are received; and more. http://www.chicagoparkdistrict.com/doing-business Chicago Public Schools (CPS) Learn how to become a vendor and be eligible to do business with the Chicago Public Schools (CPS). www.csc.cps.k12.il.us/purchasing

Chicago Transit Authority (CTA) Learn how to become a vendor and be eligible to do business with the Chicago Transit Authority (CTA). www.transitchicago.com/procurement City Colleges of Chicago (CCC) CCC, its trustee, administrator, and staff welcome all companies-both large and small-to do business with CCC, which operates 7 colleges, 5 vocational/technical centers, 3 community learning centers, and a district office. www.ccc.edu/Procurement Public Building Commission (PBC) The PBC serves as a developer of new and renovated public projects that impact our surrounding areas and facilitate community revitalization. www.pbcchicago.com/content/working/ State of Illinois Chief Procurement Office www.purchase.state.il.us/ State of Illinois Department of Central Management Services www.illinois.gov/cms/business/procurement

Page 5: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

5

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Animal Care & Control

Commodities Veterinary Supplies Vaccines & Laboratories

$250,001 to $500,000

36 3Q 2015 Delivery, Supplies Non-Federal

Animal Care & Control

Commodities Animal Disinfectant Cleaner

$100,001 to $250,000

36 3Q 2015 Delivery, Supplies Non-Federal

Animal Care & Control

Small Orders Injectable Identification Microchips

$10,001 to $50,000

36 3Q 2015 Delivery, Supplies Non-Federal

Animal Care & Control

Work Services

Maintenance & Repair of Anesthesia machines

$50,001 to $100,000

36 3Q 2015 Delivery, Supplies Non-Federal

Animal Care & Control

Work Services

Maintenance & Repair of X-Ray

$50,001 to $100,000

36 4Q 2015 Delivery, Supplies Non-Federal

Animal Care & Control

Work Services

Maintenance & Repair of Autoclave

$50,001 to $100,000

36 4Q 2015 Delivery, Supplies Non-Federal

Aviation Commodities Aviation Runway and Taxiway Fixtures and Directional Signage

$10,000,001 to $20,000,000

60 3Q 2015 TBD Non-Federal

Aviation Commodities Surveillance Cameras and Accessories

$10,001 to $2,000,000

60 3Q 2015 TBD Non-Federal

Aviation Construction Baggage Service Alley Retaining Wall Repair -Construction

$3,000,001 to $5,000,000

12 2Q 2015 Laborers, Cement Mason, Concrete Layer/Finisher, Equipment Operator

Non-Federal

Aviation Construction Replacement of Air Handling Units in H&R Plant

$1,000,001 to $5,000,000

12 2Q 2015 Iron Workers, Laborers, Electricians, Insulators, Control Technicians, Sheet Metal Workers, Cement Finishers, Pipe Fitters, Painters, Water Proofers, Mechanics

Non-Federal

Aviation Construction Terminal 5 PCC Reconstruction

$2,000,001 to $3,000,000

12 2Q 2015 Cement Masons, Carpenters, Laborers

Non-Federal

Aviation Construction Large Frame Aircraft Training Mock-Up - Design & Construction

$3,000,001 to $5,000,000

60 2Q 2015 Laborers, Equipment Operator, Sheet Metal Workers

Non-Federal

Page 6: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

6

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Aviation Construction Runway 10R - 28L Safety and Security Additions - Package 2

$1,000,001 to $5,000,000

24 3Q 2015 Construction Laborers, Electricians, Equipment Operator Engineers

Federal

Aviation Construction Restroom Modernization Phase 4 - Construction

$3,000,001 to $5,000,000

12 3Q 2015 Carpenters, Painters, Laborers, Electricians

Non-Federal

Aviation Construction TSA Advanced Surveillance Program CCTV Project - Design & Construction

$5,000,001 to $10,000,000

12 3Q 2015 Electricians, Laborers

Non-Federal

Aviation Construction Runway Status Lights and SAF Facility Improvements

$2,000,001 to $3,000,000

12 3Q 2015 Construction Laborers, Equipment Operators, Carpenters, Electricians

Federal

Aviation Construction Drainage Improvements and Wetlands Removal - Bensenville Ditch East

$10,000,001 to $20,000,000

12 3Q 2015 Laborers, Operators Federal

Aviation Construction Miami Beach Lift Station Improvements - Design

$500,001 to $1,000,000

12 3Q 2015 Laborers, Electricians, Piper Fitters, Mechanics

Non-Federal

Aviation Construction Fire Protection System for the H&R Plant

$2,000,001 to $3,000,000

12 3Q 2015 Laborers, Electricians, Insulators, Control Technicians

Non-Federal

Aviation Construction O'Hare Residential Sound Insulation Program Phase 17A (340 Homes over 1 Bid Package)

$5,000,001 to $10,000,000

24 4Q 2015 Carpenters, Laborers, Sheet Metal Workers, Electricians

Federal

Aviation Construction O'Hare Residential Sound Insulation Program Phase 17B (340 Homes over 1 Bid Package)

$5,000,001 to $10,000,000

24 4Q 2015 Carpenters, Laborers, Sheet Metal Workers, Electricians

Federal

Aviation Construction O'Hare Residential Sound Insulation Program Phase 17C (161 Homes in 1 Bid Package)

$5,000,001 to $10,000,000

24 4Q 2015 Carpenters, Laborers, Sheet Metal Workers, Electricians

Federal

Aviation Construction O'Hare Residential Sound Insulation Program Phase 17C (159 Historical Homes over 1 Bid Package)

$5,000,001 to $10,000,000

24 4Q 2015 Carpenters, Laborers, Sheet Metal Workers, Electricians

Federal

Aviation Professional Services

Residential Sound Insulation Program (RSIP) Program Management

TBD 60 3Q 2015 Carpenters, Laborers Federal

Aviation Professional Services

Program Finance TBD 60 3Q 2015 TBD Non-Federal

Page 7: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

7

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract

Type Project Description Estimated

Value Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Aviation Work Services

Blanket Laundering and Purchase of Blankets, Pillows and Pillow Cases

$500,001 to $1,000,000

60 2Q 2015 TBD Non-Federal

Aviation Work Services

Interior Landscaping Services for Chicago O'Hare International Airport

$1,000,001 to $5,000,000

60 2Q 2015 Plant Material, Site Furnishings

Non-Federal

Aviation Work Services

Snow Removal Services for Midway International Airport

$5,000,001 to $10,000,000

60 2Q 2015 Truck Drivers, Operating Engineers, Laborers

Non-Federal

Aviation Work Services

Airside Ramp Replacement

Over $20,000,001

60 3Q 2015 Truck Drivers, Cement Masons, Laborers

Non-Federal

Aviation Work Services

Airside Concrete Repair and Replacement

$5,000,001 to $10,000,000

60 3Q 2015 Truck Drivers, Cement Masons, Laborers

Non-Federal

Aviation Work Services

Landside Concrete Repair and Replacement

$2,000,001 to $3,000,000

60 3Q 2015 Truck Drivers, Cement Masons, Laborers

Non-Federal

Aviation Work Services

Waste Management Services for Chicago O'Hare and Midway International Airports

$1,000,001 to $5,000,000

60 3Q 2015 Trucking, Fuel Non-Federal

Aviation Work Services

Warranty Repairs of Residential Sound Insulation Program (RSIP) Windows

TBD 84 3Q 2015 Carpenters, Laborers Non-Federal

Aviation Work Services

Asphalt Overlay, Asphalt Patching, Pavement Grooving and Grinding and Joint Sealing

Over $20,000,001

60 3Q 2015 Truck Drivers, Operating Engineers, Laborers

Non-Federal

Aviation Work Services

Inspection, Maintenance, Repair and Replacement of Various Combustion Control Systems for HTW Generation Systems

$2,000,001 to $3,000,000

60 3Q 2015 Technicians, Control Fitters

Non-Federal

Aviation Work Services

Concrete Crushing TBD 60 3Q 2015 Truck Drivers, Equipment Operators, Laborers

Non-Federal

Aviation Work Services

Inspection, Maintenance, Repair and Replacement of Various Control Systems for Variable Frequency Drive Pumps and Fans

$10,001 to $2,000,000

60 3Q 2015 Technicians, Control Fitters

Non-Federal

Aviation Work Services

Pavement Joint Sealing TBD 60 3Q 2015 Laborers Non-Federal

Aviation Work Services

Snow Melting Services for Chicago O'Hare International Airport

Over $20,000,001

84 3Q 2015 Truck Drivers, Equipment Operators, Laborers

Non-Federal

Page 8: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

8

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Aviation Work Services

Inspection, Maintenance, Repair and Replacement of Direct Expansion Air Conditioning (DXAC) for Chicago O'Hare and Midway International Airports

$10,001 to $2,000,000

60 3Q 2015 Service Technicians, Pipefitters, Service Fitters

Non-Federal

Aviation Work Services

Maintenance, Inspection and Repair of High Temperature Water Generators, Hot Water Boilers and Heat Exchangers at Chicago O'Hare International Airport

$3,000,001 to $5,000,000

60 3Q 2015 Boilermakers, Ironworkers, Sheet Metal Workers, Bricklayers, Machinists, Laborers, Pipefitters/Steamfitters

Non-Federal

Aviation Work Services

Decorating Services for Seasonal Display and Special Events

$2,000,001 to $3,000,000

60 4Q 2015 Installers Non-Federal

Aviation Work Services

Repair, Replacement and Fabrication of Signage Systems

TBD 60 4Q 2015 Sign Painters, Electricians, Carpenters, Ironworkers, Laborers

Non-Federal

Aviation Work Services

Servicing and Supplying of Activated Charcoal Filter Cells for Air Handling Units for Chicago O'Hare International Airport

$2,000,001 to $3,000,000

60 4Q 2015 Service Technicians, Pipefitters, Service Fitters

Non-Federal

Aviation Work Services

Maintenance, Repair and Installation of Various Fencing, Guardrail and Related Equipment

$5,000,001 to $10,000,000

60 1Q 2016 Ironworkers Non-Federal

Aviation Work Services

Preventive Maintenance, Repairs and Installation of Automatic Doors at Chicago O'Hare and Midway International Airports

Over $20,000,001

60 2Q 2016 Ironworkers, Electricians, Laborers

Non-Federal

Aviation Work Services

Rental and Maintenance of Portable Chemical Toilets, Sinks, Waste Water Barrels, Waterless Hand Sanitizer Dispensers and Fresh Water Trailers

$2,000,001 to $3,000,000

60 2Q 2016 Truck Drivers Non-Federal

Aviation Work Services

Rental of School Type Motor Coach Buses w/Drivers

$10,001 to $50,000

60 2Q 2016 Bus Drivers Non-Federal

Buildings Work Services

Demolition Services (MTA)

$5,000,001 to $10,000,000

36 3Q 2015 TBD Federal

Page 9: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

9

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract

Type Project Description Estimated

Value Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Business Affairs & Consumer Protection

Commodities Motor Vehicle Tax License Plates (Medallions)

$250,001 to $500,000

60 3Q 2015 TBD

Business Affairs & Consumer Protection

Small Orders Business Compliance Enforcement Label Decals

$10,001 to $50,000

36 2Q 2015 TBD Non-Federal

Business Affairs & Consumer Protection

Small Orders Public Vehicle License Label Decals

Under $10,000

36 3Q 2015 TBD Non-Federal

Cultural Affairs and Special Events

Small Orders Grease Removal Services

Under $10,000

24 2Q 2015 TBD Non-Federal

Cultural Affairs and Special Events

Work Services

Event Support for City Festivals

$10,001 to $2,000,000

60 2Q 2015 Employment Agencies

Non-Federal

Cultural Affairs and Special Events

Work Services

Printing of Brochures $250,001 to $500,000

60 2Q 2015 Paper and Ink Suppliers

Non-Federal

Cultural Affairs and Special Events

Work Services

Rental of Stage Lighting Equipment for City Festivals

$100,001 to $250,000

60 3Q 2015 Insurance Provider, Financial Services, Employee Benefits Program

Non-Federal

Family Support Services

Commodities Home Starter Kits (i.e., Home Kitchen Accessories, Pots, Pans, and Bathroom Accessories)

$100,001 to $250,000

24 3Q 2015 TBD Federal

Family Support Services

Professional Services

Marketing and Program Evaluation for Connect 4 Tots

$100,001 to $250,000

24 3Q 2015 TBD Mixed

Family Support Services

Professional Services

RFP for Domestic Violence and Homelessness Hotline

$100,001 to $250,000

60 4Q 2015 TBD Mixed

Family Support Services

Small Orders Maintenance and Repair of Senior Fitness Equipment

$50,001 to $100,000

24 3Q 2015 TBD Mixed

Family Support Services

Small Orders Repair and Maintenance of Pool Tables

$50,001 to $100,000

24 3Q 2015 TBD Mixed

Family Support Services

Small Orders Hearing and Vision Screening Equipment

$50,001 to $100,000

24 3Q 2015 TBD Federal

Family Support Services

Small Orders Hygiene Supplies (i.e., Soap, Toothpaste, Toothbrushes, Deodorant, Diapers, Baby Supplies, etc.).

$50,001 to $100,000

24 3Q 2015 TBD Federal

Family Support Services

Small Orders Pack and Play Kits Under $10,000

24 3Q 2015 TBD Federal

Page 10: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

10

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Family Support Services

Small Orders Blankets $100,001 to $250,000

24 3Q 2015 TBD Federal

Family Support Services

Small Orders Sleeping Cots $100,001 to $250,000

24 3Q 2015 TBD Federal

Family Support Services

Small Orders Tables and Chairs for Senior Centers

Under $10,000

12 3Q 2016 Delivery, Supplies Mixed

Family Support Services

Small Orders Printing of Life Enrichment Program Book

$10,001 to $50,000

48 3Q 2016 Delivery, Supplies Mixed

Family Support Services

Small Orders Maintenance and/or Repair Service for Ice Machines, Dishwashers, Refrigerators/Freezers, Washing Machine/Dryers, and Cooking Stoves, Walk-In Coolers and Clinical Services Refrigerators Various Other Household Appliances

$50,001 to $100,000

24 TBD Electricians, Laborers

Mixed

Family Support Services

Work Services

Safe Environment Inspection Repairs for Head Start Facilities

$100,001 to $250,000

24 3Q 2015 Carpenters, Painters, Plumbers, Laborers, Electricians

Federal

Family Support Services

Work Services

Major Repair and Remodeling for Homeless Shelters

$100,001 to $250,000

24 3Q 2015 Carpenters, Painters, Plumbers, Laborers, Electricians

Federal

Finance Commodities Target Market Individually Numbered Metal Cable-Tie Locks and Plastic Tag Seal

Under $10,000

60 3Q 2015 Target Market Non-Federal

Finance Professional Services

Workers Comp Claims Processing Services

$100,001 to $250,000

60 2Q 2015 Risk Management; Safety Consulting

Non-Federal

Finance Professional Services

Mobile Device Software Solution for Parking Violation Citation Issuance and Other Violation Ticketing - Including Mobile Devices and Related Consumable Purchase Options

$1,000,001 to $5,000,000

48 3Q 2015 TBD Non-Federal

Finance Professional Services

Financial Services - Master Consulting Agreements (MCAs)

$1,000,001 to $5,000,000

60 3Q 2015 Accountants; Financial Auditors

Non-Federal

Finance Professional Services

Customer-Flow Management System

TBD 60 3Q 2015 IT Services Non-Federal

Page 11: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

11

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract

Type Project Description Estimated

Value Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Finance Professional Services

MPEA Airport Departure Tax Issuance Solution

TBD 60 3Q 2015 IT Services Non-Federal

Finance Professional Services

Printing of Cigarette Tax Stamps and MPEA Airport Departure Tax Stamps

TBD 60 3Q 2015 TBD Non-Federal

Finance Professional Services

Cost Allocation and Indirect Cost Plans

$1,000,001 to $5,000,000

60 3Q 2015 Accountants; Financial Auditors

Non-Federal

Finance Professional Services

Check Processing (Checking Account Validation) Services

$500,001 to $1,000,000

60 3Q 2015 TBD Non-Federal

Finance Professional Services

Parking Enforcement Services

$5,000,001 to $10,000,000

60 4Q 2015 Uniforms Vehicles

Non-Federal

Finance Revenue Generating

Claims Mgmnt, Collections, Cost Recovery Services

$1,000,001 to $5,000,000

60 3Q 2015 Risk Management Non-Federal

Finance Small Orders Target Market - Printing Soldier Field Residential Parking Decals

Under $10,000

24 4Q 2015 Target Market Non-Federal

Finance Small Order Target Market Printing Soldier Field Residential Parking Decals

Under $10,000

60 1Q 2016 Target Market Non-Federal

Finance Work Services

Armored Car Services $1,000,001 to $5,000,000

60 2Q 2015 No Stated Goals Non-Federal

Finance Work Services

Boot Repair Service Provider

TBD 60 3Q 2015 Repair Services; Currier Services

Non-Federal

Finance Work Services

Bicycle Repair Services TBD 60 3Q 2015 Transportation/Currier Services

Non-Federal

Fire Commodities Various Types of Fire Hose and Fire Hose Fittings

$250,001 to $500,000

60 4Q 2015 Delivery, Supplies Non-Federal

Fire Work Services

Lease of Digital Press $100,001 to $250,000

60 3Q 2015 No Stated Goals Non-Federal

Fire Work Services

MSA SCBA and Related Equipment - New Equipment and Maintenance

$250,001 to $500,000

60 3Q 2015 Repair Services Non-Federal

Fire Work Services

Parts, Accessories and Repair Service for Flotec Oxygen Regulators

$100,001 to $250,000

60 4Q 2015 Repair Services Non-Federal

Fleet & Facility Management

Commodities Water Treatment Chemicals

$1,000,001 to $5,000,000

60 2Q 2015 Office Supplies, Supplies

Non-Federal

Page 12: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

12

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Fleet & Facility Management

Commodities Target Market-Janitorial Supplies

$1,000,001 to $5,000,000

60 2Q 2015 Target Market Non-Federal

Fleet & Facility Management

Commodities Target Market-Plumbing Supplies

$3,000,001 to $5,000,000

60 2Q 2015 Target Market Non-Federal

Fleet & Facility Management

Commodities Air Filters $1,000,001 to $5,000,000

60 3Q 2015 Delivery and Parts Non-Federal

Fleet & Facility Management

Commodities HVAC Parts $5,000,001 to $10,000,000

60 4Q 2015 Delivery and Parts Non-Federal

Fleet & Facility Management

Construction Masonry, Windows, Roof, Woodson Regional Library

$5,000,001 to $10,000,000

12 2Q 2015 Masonry, windows, roofing, painting, terrazzo flooring, MEP, carpentry

Non-Federal

Fleet & Facility Management

Professional Services

Target Market - Professional Consulting Services Roof Inspection and Roof Construction Supervision

$500,001 to $1,000,000

60 3Q 2015 Inspection Services Non-Federal

Fleet & Facility Management

Professional Services

Delivery and Installation of Various Furniture and Accessories

$10,000,001 to $20,000,000

60 4Q 2015 Delivery, Parts and Labor

Non-Federal

Fleet & Facility Management

Small Orders Ink and Supplies for the Riso RZ 990 Duplicator

Under $10,000

24 3Q 2015 TBD Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Heavy Duty Tow Trucks $1,000,001 to $5,000,000

60 2Q 2015 Parts, Repair, Transportation, Fuel

Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

4000 Gallon Capacity Fuel Tanker Trucks

$2,000,001 to $3,000,000

36 2Q 2015 Parts, Repair Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Diesel Powered, Rubber Tired, Articulated Front End Loaders

$10,000,001 to $20,000,000

60 2Q 2015 Parts, Repair Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Heavy Duty Trucks Tractor Trailers: Platform, Lowboy and Dump Trailers

$500,001 to $1,000,000

60 2Q 2015 TBD Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Horizontal Feed Log Grinders

$2,000,001 to $3,000,000

36 2Q 2015 Parts, Labor and Transportation

Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Utility and Aerial Trucks Over $20,000,001

60 2Q 2015 Delivery, Parts, Labor and Painting

Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Passenger Vehicles $5,000,001 to $10,000,000

60 3Q 2015 No Stated Goals Non-Federal

Page 13: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

13

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract

Type Project Description Estimated

Value Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Fleet & Facility Management

Vehicles & Heavy Equipment

4WD Hybrid SUVS $1,000,001 to $5,000,000

60 3Q 2015 Insurance, Delivery, Parts, Service, Transportation

Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Utility Trailers (Cargo Landscape and Deckover)

$500,001 to $1,000,000

60 3Q 2015 Insurance, Delivery, Trailer Parts

Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

3 Wheel Self Balancing Personal Mobility Devices, Group B

$500,001 to $1,000,000

60 3Q 2015 Parts, Repair Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Truck Mounted Attenuator

$1,000,001 to $5,000,000

36 4Q 2015 TBD Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Crew Cab/Chassis With 100' Aerial Ladder, Crew Cab/Chassis With Aerial Tower Ladder, Crew Cab/Chassis With Triple Combination Pumper

$10,000,001 to $20,000,000

60 2Q 2016 Labor, Parts Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Aluminum Horse Trailers

$500,001 to $1,000,000

60 4Q 2016 TBD Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Dry Van Trailers $10,001 to $2,000,000

60 4Q 2016 TBD

Fleet & Facility Management

Vehicles & Heavy Equipment

Truck Mounted Catch Basin Cleaners

$5,000,001 to $10,000,000

60 4Q 2016 Labor, Parts Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Airport Rescue and Fire Fighting Vehicle

$5,000,001 to $10,000,000

60 4Q 2016 Labor, Parts Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Police Vehicles - Marked & Unmarked Pursuit Sedans & Mid-Size Hybrid Electric Sedans

$10,000,001 to $20,000,000

60 4Q 2016 Labor, Parts Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

Police Vehicles - Prisoner Transport Vans & Mid-Size SUVs

$3,000,001 to $5,000,000

60 4Q 2016 Labor, Parts Non-Federal

Fleet & Facility Management

Vehicles & Heavy Equipment

4x2 Diesel Powered Cab/Chassis w/Platform Bodies and Log Grapples

$3,000,001 to $5,000,000

60 4Q2016 Labor, Parts Non-Federal

Fleet & Facility Management

Work Services

Rental of Heavy Equipment With and Without Operators

$250,001 to $500,000

60 2Q 2015 Transportation Non-Federal

Fleet & Facility Management

Work Services

Maintenance Parts and Service for Compressed Natural Gas (CNG) Fueling Stations

$10,000,001 to $20,000,000

60 2Q 2015 No Stated Goals Non-Federal

Fleet & Facility Management

Work Services

Parts and Service Caterpillar Engines

$500,001 to $1,000,000

60 2Q 2015 Fuel, Parts and Labor

Non-Federal

Page 14: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

14

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Fleet & Facility Management

Work Services

Window Washing Services

$250,001 to $500,000

60 3Q 2015 Office Supplies, Supplies

Non-Federal

Fleet & Facility Management

Work Services

Auto Glass Replacement Services

$250,001 to $500,000

60 3Q 2015 Glass, Glass Repair Non-Federal

Fleet & Facility Management

Work Services

Pressure Washing Services - Vehicles

$1,000,001 to $5,000,000

60 3Q 2015 Janitorial Supplies, Fuel

Non-Federal

Fleet & Facility Management

Work Services

Parts and Service Rebuild Remanufacture Transmissions and Driveline Components

$500,001 to $1,000,000

60 3Q 2015 Parts, Service, Transportation

Non-Federal

Fleet & Facility Management

Work Services

Storage, Parts and Services for City of Chicago Owned Vessels

$1,000,001 to $5,000,000

60 3Q 2015 Parts Non-Federal

Fleet & Facility Management

Work Services

High Volume B & W Production Printers

$500,001 to $1,000,000

60 3Q 2015 Delivery Service Non-Federal

Fleet & Facility Management

Work Services

Towing Services for City Owned Vehicles and Equipment

$10,001 to $2,000,000

36 3Q 2015 Tire Repair, Towing Services, Fuel

Non-Federal

Fleet & Facility Management

Work Services

Maintenance and Repair of Chillers

$5,000,001 to $10,000,000

60 3Q 2015 Parts, Service Non-Federal

Fleet & Facility Management

Work Services

Parts and Service Liquid Fuel Pumps

$250,001 to $500,000

60 3Q 2015 TBD Non-Federal

Fleet & Facility Management

Work Services

Parts and Service Karcher Pressure Washer and Landa Steam Cleaner

$250,001 to $500,000

60 3Q 2015 TBD Non-Federal

Fleet & Facility Management

Work Services

Rental Parts Washing Cleaners

$250,001 to $500,000

60 3Q 2015 Janitorial Supplies Non-Federal

Fleet & Facility Management

Work Services

Maintenance, Parts and Repair Service for A/C Equipment, Chillers, Pneumatic and Direct Digital Controls

$10,000,001 to $20,000,000

60 3Q 2015 Labor, Parts Non-Federal

Fleet & Facility Management

Work Services

Mailing Equipment and Services

$10,001 to $2,000,000

60 4Q 2015 Delivery, Parts and Labor

Non-Federal

Fleet & Facility Management

Work Services

Repair of Springs and Suspension Components for City Owned Vehicles and Equipment

$5,000,001 to $10,000,000

60 4Q 2015 Labor, Parts Non-Federal

Fleet & Facility Management

Work Services

Tire Repair Services $250,001 to $500,000

60 4Q 2015 Labor Non-Federal

Page 15: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

15

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract

Type Project Description Estimated

Value Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Fleet & Facility Management

Work Services

Safety Lane Inspection Testing Services

$10,001 to $50,000

36 1Q 2016 No Stated Goals Non-Federal

Innovation & Technology

Information Technology

End User Device Services

TBD 60 2Q 2015 IT Professional Services

Non-Federal

Innovation & Technology

Information Technology

Data Center Support Services

TBD 60 2Q 2015 IT Professional Services

Non-Federal

Innovation & Technology

Information Technology

Help Desk Services TBD 60 3Q 2015 IT Professional Services

Non-Federal

Innovation & Technology

Information Technology

Wide Area Network Services

TBD 60 3Q 2015 IT Professional Services

Non-Federal

Innovation & Technology

Information Technology

MCA Non-Target Market

TBD 60 3Q 2015 IT Professional Services

Non-Federal

OEMC Commodities Various Work and Business Uniforms

$2,000,001 to $3,000,000

60 3Q 2015 Delivery, Financials, Screen Printing, Embroidery

TBD

OEMC Professional Services

Master Consulting Agreement: Emergency Operations Planning and Training

$500,001 to $1,000,000

84 3Q 2015 Project Management, Training, Logistics, Marketing, Community Outreach

TBD

OEMC Information Technology

Hardware/Software Maintenance for CAD System

Over $20,000,001

84 2Q 2016 TBD TBD

OEMC Work Services

Gamewell Fire Control Instruments Master Box and Accessories for Fire Alarms and Related Equipment

$500,001 to $1,000,000

60 2Q 2015 No Stated Goals TBD

OEMC Work Services

Pole Marking/Location Identifier

$10,001 to $2,000,000

60 3Q 2015 Signs, installation TBD

OEMC Work Services

Repair of Existing Eaton/Wright Line Consoles & Replacement Parts

$100,001 to $250,000

60 3Q 2015 Parts inventory, delivery, project management

TBD

OEMC Work Services

Preventative Maintenance, Parts, & Repair Services for Outdoor Warning Siren System

$500,001 to $1,000,000

60 1Q 2016 IT programming/integration, IT support, repair, maintenance

TBD

OEMC Work Services

Antenna Replace and Repair

TBD 60 3Q 2016 TBD TBD

OEMC Commodities Wireless Communications Equipment, Component Parts, and Fiber Optic Equipment.

$500,001 to $1,000,000

60 4Q 2015 Wireless Comm Equipment, Component Parts, and Fiber Optic Equipment

TBD

Page 16: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

16

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Office of the City Clerk

Small Orders Aluminum Licensing tags for motorcycles, neighborhood electric vehicles (N.E.V.), dealer demonstration vehicles, and antique vehicles.

Under $10,000

12 3Q 2015 TBD Non-Federal

Planning & Development

Construction JOC (Job Order Construction) EHAP Program

$5,000,001 to $10,000,000

36 2Q 2015 Small Repair (Construction)

Federal

Planning & Development

Professional Services

Target Market - Planning Now / TIF Analysis and Designation Consulting Services

$10,000,001 to $20,000,000

60 3Q 2015 Professional Consulting Services

Non-Federal

Planning & Development

Professional Services

Planning Now / TIF Analysis and Designation Consulting Services (Non-Target Market)

$10,000,001 to $20,000,000

60 3Q 2015 Professional Consulting Services

Non-Federal

Planning & Development

Professional Services

Real Estate Analysis and Brokerage

$2,000,001 to $3,000,000

60 3Q 2015 Professional Consulting Services

Non-Federal

Planning & Development

Professional Services

Small Business Improvement Fund Program Implementation

$5,000,001 to $10,000,000

60 TBD Professional Consulting Services

TBD

Planning & Development

Small Orders Property Survey Consulting Services

$10,001 to $2,000,000

60 3Q 2015 Professional Consulting Services

Non-Federal

Police Commodities Taser $500,001 to $1,000,000

60 3Q 2015 TBD Mixed

Police Work Services

Bus Services $100,001 to $250,000

60 2Q 2015 Delivery, Supplies Mixed

Police Work Services

Veterinarian Services $2,000,001 to $3,000,000

60 3Q 2015 Delivery, Supplies Mixed

Police Work Services

Hazardous /Non Hazardous Waste Disposal

$250,001 to $500,000

60 3Q 2015 Delivery, Supplies Mixed

Police Work Services

Wheel Chair Bound Arrested

$100,001 to $250,000

60 3Q 2015 Delivery, Supplies

Police Work Services

Helicopter Repair & Maintenance

$500,001 to $1,000,000

60 4Q 2015 Delivery, Supplies Federal

Public Health Commodities HIV/STD Testing Kits and Hepatitis C Testing Kits

$1,000,001 to $5,000,000

36 2Q 2015 Product Delivery, Boxes, Labels

Federal

Page 17: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

17

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract

Type Project Description Estimated

Value Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Public Health Commodities Various Printed Forms $100,001 to $250,000

36 3Q 2015 Product Delivery, Boxes, Labels

Federal

Public Health Commodities Family Planning $250,001 to $500,000

60 3Q 2015 Packaging and Delivery

Federal

Public Health Commodities Emergency Medical Supplies and Pallets

$5,000,001 to $10,000,000

60 3Q 2015 Product Delivery, Boxes, Labels

Federal

Public Health Professional Services

Pharmacy Services $5,000,001 to $10,000,000

36 3Q 2015 Product Delivery, Boxes, Labels

TBD

Public Health Professional Services

MCA for Evaluation and Planning Services

$10,000,001 to $20,000,000

60 3Q 2015 Evaluation, research, QA/QC, healthcare consulting services, reporting, information and technology.

TBD

Public Health Small Orders Radon Testing Services Under $10,000

24 2Q 2015 TBD TBD

Public Health Small Orders Infectious Diseases Electronic Reporting

$50,001 to $100,000

12 3Q 2015 Copying, working on reports, mailings

TBD

Public Health Small Orders Specimen Collection and Shipping for HIV and Hepatitis Testing

Under $10,000

24 3Q 2015 Product Delivery services, boxes labels

Federal

Public Health Work Services

Digital X-Ray Equipment, Maintenance and Repair of X-Rays Machines

$1,000,001 to $5,000,000

60 3Q 2015 Equipment, Maintenance and Repair of X-Ray Machines, Delivery Services

TBD

Public Health Work Services

Electronic Waste Disposal

$50,001 to $100,000

24 3Q 2015 Transportation, Packaging, and Reporting

TBD

Public Library Commodities Library Furniture TBD 60 3Q 2015 Freight/Transportation, Office Supplies, Insurance

TBD

Public Library Commodities System Shelving $100,001 to $250,000

60 4Q 2016 No Stated Goals Non-Federal

Public Library Professional Services

Various Training Programs

TBD 36 3Q 2015 Professional Services

Non-Federal

Public Library Professional Services

Integrated Website, CMS and Discovery Platform

$500,001 to $1,000,000

60 3Q 2015 Professional Services

TBD

Public Library Professional Services

Armored Car Serviced $100,001 to $250,000

60 3Q 2016 NA Non-Federal

Public Library Small Orders Rental of School Bus Under $10,000

48 2Q 2016 No Stated Goals Non-Federal

Page 18: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

18

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Public Library Small Orders Appraisal Services Under $10,000

48 2Q 2016 No Stated Goals Non-Federal

Public Library Work Services

Preservation of Rare Books and Other Items

$100,001 to $250,000

60 2Q 2015 Freight/Transportation, Office Supplies

Non-Federal

Streets and Sanitation

Commodities No Parking Signs $250,001 to $500,000

36 2Q 2015 No Stated Goals Non-Federal

Streets and Sanitation

Commodities Target Market - Herbicide

$500,001 to $1,000,000

36 2Q 2015 Target Market Non-Federal

Streets and Sanitation

Commodities Target Market - Decorative Steel Receptacles & Liners

$250,001 to $500,000

36 2Q 2015 Target Market Non-Federal

Streets and Sanitation

Commodities Interior and Exterior Paint and Supplies

$5,000,001 to $10,000,000

36 2Q 2015 No Stated Goals Non-Federal

Streets and Sanitation

Commodities Decorative Steel Trash Receptacles

$100,001 to $250,000

36 3Q 2015 No Stated Goals Non-Federal

Streets and Sanitation

Commodities Purchase and Installation of Heavy Duty Platform Truck Scales

$100,001 to $250,000

36 TBD TBD Non-Federal

Streets and Sanitation

Small Orders Ice and Traction Cleats $50,001 to $100,000

36 3Q 2015 No Stated Goals Non-Federal

Streets and Sanitation

Work Services

Impound Facility Management and Towing Services

TBD 60 3Q 2015 TBD Mixed

Transportation Architecture & Engineering

Construction Engineering for Community Infrastructure Contracts and In-House Construction Support

$10,000,001 to $20,000,000

60 2Q 2015 Construction Engineering, Project Programming (Survey, estimates), IT and GIS

Non-Federal

Transportation Architecture & Engineering

Professional Quality Control/Quality Assurance Construction Engineering Services

$10,000,001 to $20,000,000

60 2Q 2015 Construction Engineering, Quality Assurance/Quality Control

Federal

Transportation Architecture & Engineering

Surface Transportation Studies Groups 1-5, Master Task Order Agreements

$2,000,001 to $3,000,000

60 3Q 2015 Planning, Traffic Studies

Mixed

Transportation Architecture & Engineering

Pre-Qualification for Transit Design, and Transit Construction Engineering

TBD TBD Open Solicitation

Transit Design, Transit Construction Engineering

Mixed

Transportation Commodities Precast Concrete Street Light Pole Foundations, Manholes, Handholes and Polymer Frames and Covers

$2,000,001 to $3,000,000

60 2Q 2015 Material Supplies, Trucking

Non-Federal

Page 19: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

19

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract

Type Project Description Estimated

Value Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Transportation Commodities Bridge Structural Grating

$5,000,001 to $10,000,000

60 3Q 2015 Steel Supply; Delivery Services

Non-Federal

Transportation Construction Root Street Relocation $1,000,001 to $5,000,000

TBD 2Q 2015 Concrete, Sewer, Water, Pavement Marking, Signs, Electricians

Non-Federal

Transportation Construction Halsted Street Improvements 65th Street to 67th Street

$1,000,001 to $5,000,000

TBD 2Q 2015 Carpenters, Cement Finishers, Masons, Operators, Truck Drivers, Laborers

Federal

Transportation Construction Near West Interconnect $1,000,001 to $5,000,000

TBD 2Q 2015 Electricians, Laborers

Federal

Transportation Construction Kinzie Street Improvements II

$5,000,001 to $10,000,000

TBD 2Q 2015 Construction Engineering, Cement Finishers, Operators, Truck Drivers, Iron Workers, Plumbers, Asphalt Paving, Landscaping

Non-Federal

Transportation Construction Western Avenue/Viaduct over Belmont Avenue Viaduct Demolition and Corridor Improvements

Over $20,000,001

24 2Q 2015 Bridge Construction Federal

Transportation Construction Cottage Grove, 77th Street to 87th Street Phase 1 Streetscape Improvements

$3,000,001 to $5,000,000

TBD 2Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Non-Federal

Transportation Construction Morgan Street, 31st Street to 35th Street Streetscape Improvements

$3,000,001 to $5,000,000

TBD 2Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Non-Federal

Transportation Construction Broadway, Wilson to Lawrence Streetscape Improvements

$3,000,001 to $5,000,000

TBD 2Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Non-Federal

Transportation Construction Fulton Market, Halsted to Carpenter, Section 1 Streetscape Improvements

$5,000,001 to $10,000,000

TBD 2Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Non-Federal

Page 20: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

20

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Transportation Construction Fullerton Avenue Streetscape, Ashland Avenue to Racine Avenue

$3,000,001 to $5,000,000

TBD 2Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Federal

Transportation Construction Pilsen Sustainable Streetscape Phase II- Blue Island Avenue from Wolcott Avenue to Western Avenue

$3,000,001 to $5,000,000

TBD 2Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Non-Federal

Transportation Construction Devon Avenue California Avenue to Rockwell St

$3,000,001 to $5,000,000

TBD 2Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Federal

Transportation Construction Safe Routes to School $1,000,001 to $5,000,000

TBD 2Q 2015 Concrete, Pavement Marking, Landscape

Federal

Transportation Construction Damen, Van Buren to Monroe Streetscape (SBI - I)

$2,000,001 to $3,000,000

TBD 2Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Non-Federal

Transportation Construction Streets for Cycling #1 - Protected Bike Lanes

$3,000,001 to $5,000,000

TBD 3Q 2015 Signage/Pavement Markings/Concrete/Landscaping

Federal

Transportation Construction Structure Painting and Power Washing

$1,000,001 to $5,000,000

60 3Q 2015 Painting, Power Washing, Janitorial Supplies

Non-Federal

Transportation Construction 23rd Street, Indiana to State Streetscape Improvements (SBI - II)

$500,001 to $1,000,000

TBD 3Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Non-Federal

Transportation Construction Cicero Avenue - Peterson Avenue to Lexington Avenue (Eisenhower Expwy) - Traffic Signal Interconnect

TBD TBD 3Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Plumbers, Electricians, Landscapers

Federal

Page 21: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

21

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract

Type Project Description Estimated

Value Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Transportation Construction South Water Street Viaduct from Beaubien Ct. to North Stetson Avenue

$500,001 to $1,000,000

TBD 3Q 2015 Engineering and Testing, Electrical Contracting

Federal

Transportation Construction Navy Pier Flyover, Section 2 Disable/Ogden

$10,000,001 to $20,000,000

TBD 3Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Federal

Transportation Construction Arterial Resurfacing - North, Central, South, Far South

$5,000,001 to $10,000,000

12 3Q 2015 Cement Finishers, Operators, Truck Drivers, Laborers, Landscapers

Federal

Transportation Construction New Street Construction- North, Central, South Area

$2,000,001 to $3,000,000

72 3Q 2015 Cement Finishers, Operators, Truck Drivers, Laborers, Landscapers

Non-Federal

Transportation Construction Pin and Link Expansion Retrofits II - Bridges Citywide

$10,000,001 to $20,000,000

TBD 4Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Bridge Construction

Federal

Transportation Construction Devon Avenue, Western to Leavitt and Kedzie to Sacramento Streetscape Improvements

$3,000,001 to $5,000,000

TBD 4Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Non-Federal

Transportation Construction Stony Island Cycle Track

$1,000,001 to $5,000,000

TBD 4Q 2015 Pavement Markings, Signage, Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Federal

Transportation Construction Chicago West Side Safe Routes to School Enhancements

$500,001 to $1,000,000

TBD 4Q 2015 Concrete, Pavement Marking, Landscape

Federal

Transportation Construction Cottage Grove, 77th Street to 87th Street Phase 2 Streetscape Improvements

$3,000,001 to $5,000,000

TBD 1Q 2016 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Non-Federal

Page 22: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

22

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Transportation Construction Fulton Market, Carpenter to Ogden, Section 2 Streetscape Improvements

$5,000,001 to $10,000,000

TBD 1Q 2016 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Non-Federal

Transportation Construction Chicago Neighborhood Greenways#1

$3,000,001 to $5,000,000

TBD 1Q 2016 Pavement Markings, Signage, Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Electricians, Landscapers

Federal

Transportation Construction Streets for Cycling #4 - Protected Bike Lanes

$5,000,001 to $10,000,000

TBD 1Q 2016 Pavement Markings, Signage, Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Electricians, Landscapers

Federal

Transportation Construction Addison Underbridge Connector at Chicago River

$5,000,001 to $10,000,000

TBD 2Q 2016 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Federal

Transportation Construction Walk to Transit / Walk to Transit Series II

$1,000,001 to $5,000,000

TBD TBD Concrete, Pavement Marking, Landscape

Federal

Transportation Construction Cicero/Midway Smart Corridor - Phase III Implementation

$1,000,001 to $5,000,000

TBD TBD Construction Engineering, Electrical Contracting

Federal

Transportation Construction Ashland Interconnect, Lake to Clybourn

$1,000,001 to $5,000,000

TBD TBD Concrete, Landscape, Hauling

Federal

Transportation Construction 79th Street Signal Interconnect

$1,000,001 to $5,000,000

TBD TBD Electricians, Laborers

Federal

Transportation Construction Stony Island Signal Interconnect

$1,000,001 to $5,000,000

TBD TBD Electricians, Laborers

Federal

Transportation Construction 95th Street Signal Interconnect

$1,000,001 to $5,000,000

TBD TBD Electricians, Laborers

Federal

Transportation Construction 87th Street Signal Interconnect

$1,000,001 to $5,000,000

TBD TBD Electricians, Laborers

Federal

Page 23: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

23

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract

Type Project Description Estimated

Value Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Transportation Construction Peterson Avenue Signal Interconnect

$1,000,001 to $5,000,000

TBD TBD Electricians, Laborers

Federal

Transportation Professional Services

Construction Engineering for Addison Underbridge Connector at Chicago River

$500,001 to $1,000,000

TBD 3Q 2015 Cement Finishers, Masons, Operators, Truck Drivers, Laborers, Ironworkers, Plumbers, Electricians, Landscapers

Federal

Transportation Work Services

Barge and Tug Services $1,000,001 to $5,000,000

60 2Q 2015 Delivery, Barge and Tug Services

Non-Federal

Transportation Work Services

Maintenance and Repair Service for Decorative Fountains

$1,000,001 to $5,000,000

60 3Q 2015 Laborers, Plumbers, Material Supplies

Non-Federal

Transportation Work Services

Traffic Controller Parts and Repair

$3,000,001 to $5,000,000

60 3Q 2015 Electricians, Laborers, Material Supply

Non-Federal

Water Management

Commodities Trenching and Shoring Equipment

TBD 60 2Q 2015 Delivery, Supplies Non-Federal

Water Management

Commodities Parts And Services for Large Electric Motors

TBD 60 3Q 2015 Delivery, Supplies Non-Federal

Water Management

Commodities Parts and Services for Large Water Pumps and Steam Turbines

TBD 60 3Q 2015 Delivery, Supplies Non-Federal

Water Management

Commodities Masonry, Cement Portland, Cement High-Alumina and Pre-Mix Masonry Cement

$2,000,001 to $3,000,000

60 3Q 2015 Delivery, Supplies Non-Federal

Water Management

Commodities Mueller Tapping Machine Parts

TBD 60 3Q 2015 Delivery, Supplies Non-Federal

Water Management

Commodities Liquid Caustic Soda TBD 60 3Q 2015 Delivery

Water Management

Commodities General Chemical & Lab Supplies

TBD 60 3Q 2015 Delivery, Supplies Non-Federal

Water Management

Commodities Electrical Supplies-Allen Bradley

$10,001 to $2,000,000

60 3Q 2015 Delivery Supplies Non-Federal

Water Management

Commodities Liquid Aluminum Sulfate

Over $20,000,001

60 3Q 2015 Delivery Non-Federal

Water Management

Construction Street & Parkway Restoration - North Region

Over $20,000,001

60 2Q 2015 Concrete, Asphalt Placement, Trucking, Landscaping

Non-Federal

Page 24: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

24

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Water Management

Construction Street & Parkway Restoration - Central North Region

Over $20,000,001

60 2Q 2015 Concrete, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Street & Parkway Restoration - Central South Region

Over $20,000,001

60 2Q 2015 Concrete, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Street & Parkway Restoration - South Region

Over $20,000,001

60 2Q 2015 Concrete, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Street & Parkway Repairs - North Region

$10,000,001 to $20,000,000

60 2Q 2015 Concrete, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Street & Parkway Repairs - South Region

$10,000,001 to $20,000,000

60 2Q 2015 Concrete, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 56th/57th/Natome/Nottingham Street Sewer Improvement Project (IEPA State Funds)

$5,000,001 to $10,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Federal

Water Management

Construction 62nd Street Sewer Improvement Project

$1,000,001 to $5,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 105th Street Sewer Improvement Project (CDBG DR Funds-Federal)

$2,000,001 to $3,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 116th Street & Bishop Street Sewer Improvement Project

$5,000,001 to $10,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Narragansett Sewer Improvement Project

$1,000,001 to $5,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Page 25: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

25

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract

Type Project Description Estimated

Value Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Water Management

Construction Wolcott Ave Sewer Improvement Project

$3,000,001 to $5,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Jarvis/Overhill/Ottawa/Oriole Sewer Improvement Project

$2,000,001 to $3,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Kenmore/Diversey/Seminary Sewer Improvement Project

$10,001 to $2,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Montrose Avenue Sewer Improvement Project

$10,000,001 to $20,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 60th Street Sewer Improvement Project (SBI - I)

$2,000,001 to $3,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 76th St, Yale & Wentworth Sewer Improve Project (SBI - I)

$2,000,001 to $3,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 118th & 116th St Sewer Improvement Project (SBI - I)

$2,000,001 to $3,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Page 26: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

26

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Water Management

Construction 69th & Langley Sewer Improvement (SBI - I)

$2,000,001 to $3,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 100th/101st Sewer Improvement Project (SBI - I)

$2,000,001 to $3,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 53rd Street Sewer Improvement Project 4

$3,000,001 to $5,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 75th & Evans Sewer Improvement Project

$2,000,001 to $3,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 92nd Street: Anthony to Essex Sewer Improvement Project (CDBG DR Funds)

$3,000,001 to $5,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 99th, Perry, & 102nd Street Sewer Improvement Project (CDBG DR Funds)

$3,000,001 to $5,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 101st Street Sewer Improvement Project

$3,000,001 to $5,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Page 27: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

27

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract

Type Project Description Estimated

Value Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Water Management

Construction 128th Street Sewer Improvement Project (CDBG DR Funds)

$10,001 to $2,000,000

12 2Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Sewer Outfall Pipes/MS4 Rehabilitation Project Design/Build

$10,001 to $2,000,000

TBD 2Q 2015 Field Investigation Services, Inspection Services

Non-Federal

Water Management

Construction District One Water Main Construction

Over $20,000,001

36 3Q 2015 Water Main Installation, Site Excavation, Concrete, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction District Two Water Main Construction

Over $20,000,001

36 3Q 2015 Water Main Installation, Site Excavation, Concrete, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction District Three Water Main Construction

Over $20,000,001

36 3Q 2015 Water Main Installation, Site Excavation, Concrete, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction District Four Water Main Construction

Over $20,000,001

36 3Q 2015 Water Main Installation, Site Excavation, Concrete, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction District Five Water Main Construction

Over $20,000,001

36 3Q 2015 Water Main Installation, Site Excavation, Concrete, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction District Six Water Main Construction

Over $20,000,001

36 3Q 2015 Water Main Installation, Site Excavation, Concrete, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction CBD WATER/CITY WIDE SPECIALTY CONTRACT

Over $20,000,001

36 3Q 2015 Water Main Installation, Site Excavation, Concrete, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction SWPP Filter Controls $10,000,001 to $20,000,000

24 3Q 2015 Electrical, concrete Non-Federal

Page 28: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

28

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Water Management

Construction 95th Street & Cottage Grove Storage Project (CDBG DR Funds)

$10,001 to $2,000,000

12 3Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 97th Street Storage Project

TBD 12 3Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Augusta Boulevard Sewer Improvement Project (CDBG DR Funds)

$2,000,001 to $3,000,000

12 3Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Eberhart Avenue and Calumet Avenue Sewer Improvement Project (CDBG DR Funds)

$3,000,001 to $5,000,000

12 3Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Kingston Avenue and 75th Street Sewer Improvement Project

$10,001 to $2,000,000

12 3Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Mobile/Bloomingdale/Cortland/Wabansia Sewer Improvement Project

$3,000,001 to $5,000,000

12 3Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Merionette/Oglesby Ave Manor Sewer Improvement Project (CDBG DR Funds)

$5,000,001 to $10,000,000

12 3Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Page 29: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

29

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract

Type Project Description Estimated

Value Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Water Management

Construction State/Perry/112th/113th Sewer Improvement PN 6834

$3,000,001 to $5,000,000

TBD 3Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction DWM Mechanical and Electrical JOC

$3,000,001 to $5,000,000

36 4Q 2015 Demolition, Electrical, Plumbing, HVAC, Painting, Plumbing, Flooring, Carpentry, Tile, Glazing, Carpets, Cabinetry, Asbestos Remediation, Debris Disposal

Non-Federal

Water Management

Construction Brook's Park Sewer Improvement and Storage Project

TBD 12 4Q 2015 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Sewer Main Lining Term Agreement - Far North Area

Over $20,000,001

36 4Q 2015 Sewer cleaning, sewer lining, sewer structure cleaning and lining.

Federal

Water Management

Construction Sewer Main Lining Term Agreement - North Area

Over $20,000,001

36 4Q 2015 Sewer cleaning, sewer lining, sewer structure cleaning and lining.

Federal

Water Management

Construction Sewer Main Lining Term Agreement -Central Area

Over $20,000,001

36 4Q 2015 Sewer cleaning, sewer lining, sewer structure cleaning and lining.

Federal

Water Management

Construction Sewer Main Lining Term Agreement - South Area

Over $20,000,001

36 4Q 2015 Sewer cleaning, sewer lining, sewer structure cleaning and lining.

Federal

Water Management

Construction Sewer Main Lining Term Agreement - Far South Area

Over $20,000,001

36 4Q 2015 Sewer cleaning, sewer lining, sewer structure cleaning and lining.

Federal

Water Management

Construction Ancillary Sewer Construction Term Agreement - North Area

$10,000,001 to $20,000,000

36 4Q 2015 Sewer installation, drain connections, excavation, trucking, materials, traffic control

Non-Federal

Water Management

Construction Ancillary Sewer Construction Term Agreement - Central Area

$10,000,001 to $20,000,000

36 4Q 2015 Sewer installation, drain connections, excavation, trucking, materials, traffic control

Non-Federal

Water Management

Construction Ancillary Sewer Construction Term Agreement - South Area

$10,000,001 to $20,000,000

36 4Q 2015 Sewer installation, drain connections, excavation, trucking, materials, traffic control

Non-Federal

Page 30: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

30

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Water Management

Construction Central Park Pumping Station Conversion

Over $20,000,001

48 1Q 2016 Electrical, mechanical, asbestos remediation, painting, landscaping, asphalt placement, plumbing, interior construction, demolition

Non-Federal

Water Management

Construction 86th St/Bishop/Racine Sewer Improvement Project PN7030

$3,000,001 to $5,000,000

TBD 1Q 2016 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction 95th St & Oglesby Ave Sewer Improvement Project PN6397

$3,000,001 to $5,000,000

TBD 1Q 2016 Sewer Construction/Tunneling, Cleaning, Televising, Concrete, Materials Testing, Asphalt Placement, Trucking, Landscaping

Non-Federal

Water Management

Construction Thomas Jefferson Pumping Station Improvement

$2,000,001 to $3,000,000

12 2Q 2016 Electrical, mechanical, asbestos remediation, painting, landscaping, asphalt placement

Non-Federal

Water Management

Construction Demolition of Wilson Ave/Four Mile Crib

$10,000,001 to $20,000,000

24 2Q 2016 Demolition, marine services

Non-Federal

Water Management

Construction JWPP - Medium Voltage Power Distribution Improvements

Over $20,000,001

36 2Q 2016 Electrical, mechanical, asbestos remediation, painting, landscaping, asphalt placement, plumbing, interior construction, demolition

Non-Federal

Water Management

Construction JWPP - Chlorine System Improvements

$3,000,001 to $5,000,000

24 2Q 2016 Electrical, mechanical, asbestos remediation, painting, interior construction, demolition

Non-Federal

Water Management

Construction Sewer Structure Rehabilitation Term Agreement - North Area

$10,000,001 to $20,000,000

36 2Q 2016 Sewer structure cleaning, sewer structure lining, catch basin repair, catch basin replacement, trucking, minor restoration work

Non-Federal

Page 31: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

31

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract

Type Project Description Estimated

Value Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Water Management

Construction Sewer Structure Rehabilitation Term Agreement - Central Area

$10,000,001 to $20,000,000

36 2Q 2016 Sewer structure cleaning, sewer structure lining, catch basin repair, catch basin replacement, trucking, minor restoration work

Non-Federal

Water Management

Construction Sewer Structure Rehabilitation Term Agreement - South Area

$10,000,001 to $20,000,000

36 2Q 2016 Sewer structure cleaning, sewer structure lining, catch basin repair, catch basin replacement, trucking, minor restoration work

Non-Federal

Water Management

Professional Services

Professional Design Services for Sewer Mains

$3,000,001 to $5,000,000

60 3Q 2015 Surveying, Soil Borings/Geotechnical evaluations, CADD work, Printing.

Non-Federal

Water Management

Professional Services

Professional Design Services

$3,000,001 to $5,000,000

60 3Q 2015 Non-Federal

Water Management

Professional Services

Construction Management Services

$3,000,001 to $5,000,000

60 3Q 2015 Non-Federal

Water Management

Professional Services

SWPP - JWPP Filter Under Drain Improvement Design

$5,000,001 to $10,000,000

84 3Q 2015 TBD Non-Federal

Water Management

Professional Services

Western Ave Pump Station Conversion Design

$3,000,001 to $5,000,000

24 2Q 2016 TBD Non-Federal

Water Management

Professional Services

Professional Construction Management Services for Sewer Mains

$5,000,001 to $10,000,000

60 3Q 2016 Structural Engineering reviews, material inspection, resident engineer and inspector services.

Non-Federal

Water Management

Work Services

Sewer Cleaning and Televising Term Agreement - North Area

$5,000,001 to $10,000,000

36 2Q 2015 Sewer cleaning, sewer televising.

Non-Federal

Water Management

Work Services

Sewer Cleaning and Televising Term Agreement - Central Area

$5,000,001 to $10,000,000

36 2Q 2015 Sewer cleaning, sewer televising.

Non-Federal

Water Management

Work Services

Sewer Cleaning and Televising Term Agreement - South Area

$5,000,001 to $10,000,000

36 2Q 2015 Sewer cleaning, sewer televising.

Non-Federal

Water Management

Work Services

Parts and Repair Service for Limitorque Manual and Electric Valve Operators

TBD 60 2Q 2015 TBD Non-Federal

Water Management

Work Services

Security Camera Maintenance

$500,001 to $1,000,000

TBD 3Q 2015 TBD Non-Federal

Page 32: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

City of Chicago Contracting Opportunities

32

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

City o

f Ch

icago

Department Contract Type

Project Description Estimated Value

Estimated Term (Months)

Anticipated Ad Date

Subcontractor Opportunities

Funding Source

Water Management

Work Services

Repair and Maintenance of Water Softeners

TBD TBD 3Q 2015 Delivery, Supplies TBD

Water Management

Work Services

Disposal and Reprocessable Material Sites For Construction And Demolition Debris And Purchase Aggregate

TBD 60 3Q 2015 Delivery, Supplies Non-Federal

Page 33: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Board of Election Contracting Opportunities

33

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

Bo

ard o

f Electio

ns

Contract Type

Project Description Estimated Value

Estimated Term (months)

Anticipated Ad Date

M/WBE Subcontractor Opportunities

Funding Source

Work Services

Cartage of Election Equipment $500,001 to $1,000,000

24 3Q 2015 Staffing, Delivery Non-Federal

Work Services

Printing: Ballots and Delivery $250,001 to $500,000

24 3Q 2015 Delivery, Supplies Non-Federal

Work Services

Printing of Various Forms, Envelopes, Stickers

$250,001 to $500,000

24 3Q 2015 Delivery, Supplies Non-Federal

Work Services

Printing of Various Signs, Banners $250,001 to $500,000

24 3Q 2015 Delivery, Supplies Non-Federal

Professional Services

Microfilm Conversion $250,001 to $500,000

24 3Q 2015 Delivery, Supplies Non-Federal

Work Services

Furniture Rental: Tables, Chairs, Etc.

$50,001 to $100,000

24 3Q 2015 Delivery, Supplies Non-Federal

Small Orders

Lithium Batteries Under $10,000 24 4Q 2015 Delivery, Supplies Non-Federal

Small Orders

Report & Presentation Folders Under $10,000 24 4Q 2015 Delivery, Supplies Non-Federal

Work Services

Printing and Mailing Canvas Services

$10,001 to $50,000

24 3Q 2015 Delivery Non-Federal

Small Orders

Flags Under $10,000 24 3Q 2015 Delivery, Supplies Non-Federal

Work Services

Court Reporters $10,001 to $50,000

24 3Q 2015 Staffing Non-Federal

Page 34: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Chicago City Colleges Contracting Opportunities

34

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

City C

olleg

es

Project Description Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcontracting Opportunities

Fire Extinguisher Maintenance $100,001 to $250,000

36 4Q 2015 Testing, Installation

Disposal of Hazardous Chemicals $250,001 to $500,000

36 3Q 2015 TBD

Elevator and Escalator Maintenance $10,001 to $2,000,000

36 3Q 2015 Electrical, Mechanical

Glass Replacement, Window Glazing and Glass Repair Services

$3,000,001 to $5,000,000

36 4Q 2015 TBD

Life Safety Repair and Maintenance Systems

$500,001 to $1,000,000

36 1Q 2016 TBD

Cosmetology Supplies $10,001 to $2,000,000

36 3Q 2015 TBD

Window Shades and Rollers for the New Malcolm X College

$500,001 to $1,000,000

24 3Q 2015 TBD

Integrated Pest Management Services $500,001 to $1,000,000

36 3Q 2015 TBD

Landscaping Services for the New Malcolm X College

$100,001 to $250,000

24 3Q 2015 TBD

Computer Equipment and Related Services

$10,000,001 to $20,000,000

36 4Q 2015 TBD

Mass Communication Systems $600,000 - $800,00

36 1Q 2016 TBD

Safe Keeping and Custodial Services $10,001 to $50,000 36 1Q 2016 TBD

Page 35: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Chicago Housing Authority Contracting Opportunities

35

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

Ho

usin

g A

uth

ority

Department Contract Type Project Description Estimated Value

Estimated Term

Anticipated Ad Date

Funding Source

Asset Management Professional Services

Electricity Supply and Related

$5,000,001 to $10,000,000

48 4Q 2015

Asset Management Professional Services

Temporary Staffing Services $50,001 to $100,000

12 2Q 2015 Federal

Capital Construction Construction Altgeld Gardens– Library /Family Resource Center

$5,000,001 to $10,000,000

Lump Sum Base Bid

3Q 2015

Capital Construction Construction Common Entrance Program– Judge Slater

$5,000,000 to $10,000,000

Lump Sum Base Bid

3Q 2015

Capital Construction Construction Common Entrance Program– Wicker Park

$5,000,000 to $10,000,000

Lump Sum Base Bid

3Q 2015

Capital Construction Construction Common Entrance Program– Flannery

$5,000,000 to $10,000,000

Lump Sum Base Bid

3Q 2015

Capital Construction Construction Common Entrance Program– Spurlock Sampson

$5,000,000 to $10,000,000

Lump Sum Base Bid

3Q 2015

Capital Construction Construction Lowden Homes Admin. Bldg. Renovation

$1,000,000-$5,000,000

Lump Sum Base Bid

3Q 2015

Capital Construction Construction Trumbull Park Community Center

$3,000,001 to $5,000,000

Lump Sum Base Bid

4Q 2015

Capital Construction Construction Horner Homes Townhomes– Renovation and Mold

$3,000,001 to $5,000,000

Lump Sum Base Bid

4Q 2015

Capital Construction Construction Elevator Modernization– Agency Wide

$1,000,000-$5,000,000

Lump Sum Base Bid

4Q 2015

Capital Construction Construction Altgeld Gardens– Laundry Hook-ups in Bldgs. 1-4

Over $10,000,000

Lump Sum Base Bid

4Q 2015

Comptroller Professional Services

Comprehensive Annual Financial Report (CAFR) Printing Services

Under $10,000

12 4Q 2015 Federal

Comptroller Professional Services

Physical Inventory Services $50,001 to $100,000

24 3Q 2015 Federal

Comptroller Professional Services

Audit Services for Hope VI and other small grants

$50,001 to $100,000

12 2Q 2015 Federal

Comptroller Professional Services

1099 Processing Services for Housing Choice Voucher Program

$50,001 to $100,000

24 4Q 2015 Federal

Development Professional Services

Cabrini Green– Seeking multiple developers to develop up to 5 parcels

TBD N/A 3Q 2015

Page 36: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Chicago Housing Authority Contracting Opportunities

36

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

Ho

usin

g A

uth

ority

Department Contract Type Project Description Estimated Value

Estimated Term

Anticipated Ad Date

Funding Source

Development Professional Services

National Public Housing Museum– Redevelopment of the former Jane Addams

TBD 24 4Q 2015

Development Professional Services

Master Planning at Madden-Wells: Master planning technical services

$100,000-$500,000

12 4Q 2015

Finance Professional Services

Financial Advisory Services $100,001 to $250,000

48 3Q 2015 Federal

General Services Professional Services

Messenger Services $10,001 to $50,000

24 2Q 2015 Federal

General Services Small Orders Furniture Under $10,000

12 2Q 2015 Federal

General Services Small Orders Audio Equipment Under $10,000

12 2Q 2015 Federal

General Services Small Orders Van Rental Services Under $10,000

12 2Q 2015 Federal

General Services Small Orders Windshield Replacement Under $10,000

12 2Q 2015 Federal

General Services Small Orders Carpet Tile Replacement Under $10,000

12 2Q 2015 Federal

General Services Professional Services

Vehicle Maintenance Service $50,001 to $100,000

12 2Q 2015 Federal

General Services Small Orders Trash Removal Services Under $10,000

24 2Q 2015 Federal

General Services Small Orders Extermination Services TBD 12 2Q 2015 Federal

General Services Small Orders Carpet Cleaning Services Under $10,000

12 2Q 2015 Federal

General Services Small Orders Floor Stripping Services Under $10,000

12 2Q 2015 Federal

General Services Professional Services

Real Estate Brokerage and Consulting Services

$50,001 to $100,000

12 2Q 2015 Federal

General Services Small Orders Janitorial Supplies Under $10,000

12 2Q 2015 Federal

Housing Choice Voucher

Professional Services

Market Analysis for Rental Properties

TBD 12 3Q 2015 Non-Federal

Information Technology Services

Information Technology

Vehicle Tracking Maintenance-CHA Fleet

Under $10,000

12 3Q 2015 Federal

Information Technology Services

Information Technology

Digital Recording System Under $10,000

24 3Q 2015 Federal

Page 37: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Chicago Housing Authority Contracting Opportunities

37

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

Ho

usin

g A

uth

ority

Department Contract Type Project Description Estimated Value

Estimated Term

Anticipated Ad Date

Funding Source

Information Technology Services

Information Technology

Check Point Software and Maintenance

$50,001 to $100,000

24 3Q 2015 Federal

Information Technology Services

Information Technology

Data Base Artisan Pro Renewal

Under $10,000

12 2Q 2015 Federal

Information Technology Services

Information Technology

Log/ Event Center Annual Support Maintenance

$50,001 to $100,000

24 2Q 2015 Federal

Information Technology Services

Information Technology

Citrix Renewal Software $100,001 to $250,000

24 2Q 2015 Federal

Information Technology Services

Information Technology

Data Loss Protection Server Maintenance

$50,001 to $100,000

24 2Q 2015 Federal

Information Technology Services

Information Technology

Telecommunication Installation and Services

$10,000,001 to $20,000,000

36 3Q 2015 Federal

Information Technology Services

Information Technology

Enterprise Content Management System (ECMS) Phase II

$500,001 to $1,000,000

24 3Q 2015 Federal

Information Technology Services

Information Technology

Storage Area Network (SAN) Replacement

$3,000,001 to $5,000,000

24 3Q 2015 Federal

Information Technology Services

Small Orders External Hard Drives and Flash Drives

Under $10,000

12 2Q 2015 Federal

Information Technology Services

Small Orders Headsets and Adapters Under $10,000

24 2Q 2015 Federal

Information Technology Services

Information Technology

Microsoft Office 365 Migration

$10,001 to $50,000

12 2Q 2015 Federal

Information Technology Services

Information Technology

Laptops and Tablets Under $10,000

12 2Q 2015 Federal

Information Technology Services

Small Orders Telephone Equipment and Accessories

$10,001 to $50,000

12 2Q 2015 Federal

Information Technology Services

Information Technology

Cisco Maintenance Renewal $10,001 to $50,000

12 2Q 2015 Federal

Information Technology Services

Information Technology

IBM Endpoint Manager Subscription Services

$10,001 to $50,000

12 2Q 2015 Federal

Information Technology Services

Small Orders Desktop Printers Under $10,000

12 2Q 2015 Federal

Office of Diversity Professional Services

Translations and Interpretation Services

TBD TBD 3Q 2015 Federal

Office of Diversity Professional Services

Diversity Outreach Services $50,001 to $100,000

24 2Q 2015 Federal

Office of General Counsel

Professional Services

Fair Housing Testing $50,001 to $100,000

12 2Q 2015 Federal

Page 38: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Chicago Housing Authority Contracting Opportunities

38

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

Ho

usin

g A

uth

ority

Department Contract Type Project Description Estimated Value

Estimated Term

Anticipated Ad Date

Funding Source

Office of General Counsel

Professional Services

Court Reporting Services $50,001 to $100,000

36 2Q 2015 Federal

Office of General Counsel

Professional Services

External Legal Services TBD 36 4Q 2015 Federal

Resident Services Small Orders T–Shirts $10,001 to $50,000

12 3Q 2015 Federal

Resident Services Small Orders Tote Bags Under $10,000

12 3Q 2015 Federal

Resident Services Small Orders Catering Services $50,001 to $100,000

12 2Q 2015 Federal

Resident Services Small Orders Bus Transportation Services $50,001 to $100,000

24 2Q 2015 Federal

Resident Services Professional Services

Payroll Services for Summer Youth Program

$50,001 to $100,000

24 2Q 2015 Federal

Risk Management Professional Services

Brokerage and Insurance Consulting

$10,001 to $2,000,000

60 4Q 2015 Federal

Risk Management Professional Services

Risk Control Inspections $50,001 to $100,000

12 2Q 2015 Federal

Page 39: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Chicago Park District Contracting Opportunities

39

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

Park D

istrict

Contract Type Project Description

Work Services Alarm Monitoring Services

Commodities Purchase of Athletic Field Prep Materials

Work Services Aquatic Areas Maintenance

Commodities Purchase of Arts & Crafts Supplies

Work Services Debris Dumping Services

Commodities Purchase of Electrical Supplies

Commodities Purchase of Trophies & Awards

Commodities Purchase of Landscape Mowers

Work Services Bus Services – District Wide and ADA

Commodities Purchase of Aquatic Supplies

Commodities Purchase of Plastic Lockers and Toilet Partitions

Work Services Natural Areas Maintenance

Work Services Printing of Banners

Construction Rapid Response Construction Services

Construction General Contractor Services

Work Services Elevator Maintenance

Work Services Ambulance and Paramedical Services

Page 40: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Chicago Public Schools Contracting Opportunities

40

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

Pu

blic S

cho

ols

Department Contract Type Project Description Estimated Value

Estimated Term

Anticipated Ad Date

Funding Source

Police Commodities Veterinary Supplies Vaccines & Laboratories

$250,001 to $500,000

36 2Q 2015 Non-Federal

Facilities Construction O&M Contractors for work over $10k (VARIOUS TRADES)

Over $20,000,001

36 2Q 2015 Non-Federal

Facilities Professional Services

Keyless Entry for School Facilities

$2,000,001 to $3,000,000

36 3Q 2015 Non-Federal

Facilities Professional Services

AED Management $500,001 to $1,000,000

36 3Q 2015 Non-Federal

Finance Professional Services

Defined Contribution Retirement Services

TBD 36 3Q 2015 TBD

Teaching and Learning

Commodities Music Instruments $3,000,001 to $5,000,000

36 3Q 2015 Mixed

Accountability Commodities Testing materials for Selective Enrollment placement

$100,001 to $250,000

24 3Q 2015 Mixed

Facilities Information Technology

Capital Project Planning Data and Document Services

$1,000,001 to $2,000,000

60 3Q 2015 Non-Federal

Teaching and Learning

Information Technology

Online Learning Course Providers

$2,000,001 to $3,000,000

24 3Q 2015 Mixed

Law Professional Services

Document destruction $50,001 to $100,000

36 3Q 2015 Mixed

Facilities Professional Services

Pest Control $2,000,001 to $3,000,000

36 3Q 2015 Non-Federal

Facilities Professional Services

Biennial Assessments $5,000,001 to $10,000,000

24 3Q 2015 Non-Federal

Finance Professional Services

Annual Financial Audit $500,001 to $1,000,000

36 3Q 2015 Mixed

Talent Office Professional Services

Employee Benefit Consulting $250,001 to $500,000

36 3Q 2015 TBD

Information & Technology Services

Information Technology

Web Filtering Replacement $1,000,001 to $2,000,000

36 4Q 2015 Mixed

Procurement Professional Services

Custom printing services $5,000,001 to $10,000,000

36 4Q 2015 Mixed

Teaching and Learning

Commodities Classroom Supplies $5,000,001 to $10,000,000

24 4Q 2015 Mixed

Page 41: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Chicago Public Schools Contracting Opportunities

41

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

Pu

blic S

cho

ols

Department Contract Type Project Description Estimated Value

Estimated Term

Anticipated Ad Date

Funding Source

Procurement Professional Services

Standard Printing Services $1,000,001 to $2,000,000

36 4Q 2015 Mixed

Facilities Professional Services

BAS Systems Maintenance, Repair and Training

$500,001 to $1,000,000

24 4Q 2015 Non-Federal

Diverse Learner Support Services (ODLSS)

Commodities HEARING ASSISTIVE TECHNOLOGY (HAT) AND FREQUENCY MODULATION (FM) EQUIPMENT

$100,001 to $250,000

24 4Q 2015 Mixed

Finance Professional Services

Annual Placement of Insurance Policies

TBD 12 1Q 2016 Mixed

Information & Technology Services

Commodities Audio Visual Equipment $1,000,001 to $2,000,000

12 1Q 2016 Mixed

Information & Technology Services

Information Technology

Cellular Services, Applications, Equipment, Accessories and Support Services

$1,000,001 to $2,000,000

36 1Q 2016 Mixed

Information & Technology Services

Information Technology

Voice Network Maintenance, Monitoring, and Advanced Support Services

$3,000,001 to $5,000,000

36 1Q 2016 Mixed

Information & Technology Services

Information Technology

Teletypewriter (TTY) Services and Support

$100,001 to $250,000

36 1Q 2016 Mixed

Information & Technology Services

Information Technology

Network Monitoring and Maintenance Services

Over $20,000,001

36 1Q 2016 Mixed

Information & Technology Services

Information Technology

Oracle Consultant Vendor Pool

$3,000,001 to $5,000,000

36 1Q 2016 Mixed

Information & Technology Services

Information Technology

Various Consultants for computer maintenance and support services

$5,000,001 to $10,000,000

36 1Q 2016 Mixed

Information & Technology Services

Information Technology

Enterprise Server and Network Maintenance Support Services

$500,001 to $1,000,000

36 1Q 2016 Mixed

Information & Technology Services

Information Technology

Enterprise Network Servers $10,000,001 to $20,000,000

36 1Q 2016 Mixed

Family & Community Engagement

Professional Services

Office of Faith Based Initiatives

$500,001 to $1,000,000

36 1Q 2016 Mixed

Teaching and Learning

Commodities Grades K-8 and High School Core Literacy Instructional Resources and Materials

TBD 60 1Q 2016 Mixed

College and Career Success

Professional Services

Out of School Time and Recess Facilitation Services

$10,000,001 to $20,000,000

12 1Q 2016 Mixed

Teaching and Learning

Professional Services

School Based Supports for MTSS

$2,000,001 to $3,000,000

36 1Q 2016 Mixed

Accountability Professional Services

THE PURCHASE OF EARLY LITERACY ASSESSMENT SERVICES

$2,000,001 to $3,000,000

36 1Q 2016 Mixed

Page 42: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Chicago Public Schools Contracting Opportunities

42

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

Pu

blic S

cho

ols

Department Contract Type Project Description Estimated Value

Estimated Term

Anticipated Ad Date

Funding Source

Accountability Professional Services

THE PURCHASE OF EARLY MATHEMATICS ASSESSMENT SERVICES

$250,001 to $500,000

36 1Q 2016 Mixed

Accountability Professional Services

ADAPTIVE GROWTH ASSESSMENT

$3,000,001 to $5,000,000

36 1Q 2016 Mixed

Accountability Professional Services

Testing Administration $500,001 to $1,000,000

24 1Q 2016 Mixed

Facilities Commodities Sale of Real Estate Revenue Generating

N/A TBD N/A

Information & Technology Services

Information Technology

Identity Management $500,001 to $1,000,000

60 TBD Non-Federal

Information & Technology Services

Information Technology

Network and Security Equipment

$5,000,001 to $10,000,000

36 TBD Non-Federal

Page 43: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Chicago Transit Authority Contracting Opportunities

43

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

Transit A

uth

ority

Department Contract Type

Project Description Estimated Value

Estimated Term (months)

Anticipated Ad Date

Sub Oppor-tunities

Sub Cert Type

Funding Source

Construction Design Build Design/Build West Shops Electrical Panel Replacement

$2,000,001 to $3,000,000

TBD 3Q 2015 TBD DBE TBD

Construction Design Build 95th Street Terminal Improvement Project

TBD TBD 2Q 2015 TBD DBE TBD

Construction Construction 77th Bus Garage Inspection Pit Replacements 10 Through 15

$5,000,001 to $10,000,000

TBD 2Q 2015 TBD DBE TBD

Construction Design Build Design/Build Your New Blue O’Hare Signals and Special Track

Over $20,000,001

TBD 1Q 2016 TBD DBE TBD

Construction Construction Your New Blue East Lake, Illinois, Milwaukee, and Broadway Substation Upgrades

Over $20,000,001

TBD 2Q 2016 TBD DBE TBD

Construction Work Services

Harlem Shop Rail Car Washer Replacement

$10,001 to $2,000,000

TBD 4Q 2015 TBD DBE TBD

Construction Work Services

77th Bus Washer Replacement of High Speed Doors

$3,000,001 to $5,000,000

TBD 1Q 2016 TBD DBE TBD

Construction Design Build Design/Build North Mainline Sheridan Station Interim Repairs

$5,000,001 to $10,000,000

TBD 4Q 2015 TBD DBE TBD

Construction Construction Quincy Station Reconstruction/Rehab

TBD TBD 1Q 2016 TBD DBE TBD

Construction Construction Green Line Track Improvements

TBD TBD 2Q 2015 TBD DBE TBD

Construction Design Build Your New Blue Jefferson Park Station

TBD TBD 4Q 2015 TBD DBE TBD

Engineering Professional Services

Digital Printing Service

$50,001 to $100,000

36 2Q 2015 TBD DBE Federal

Facilities Maintenance

Work Services

Cleaning of Interiors of Various CTA Storage Tanks

$100,001 to $250,000

36 1Q 2016 TBD DBE Mixed

Facilities Maintenance

Commodities Emergency Spill Containment Kits

$10,001 to $50,000

24 3Q 2015 None None Non-Federal

Facilities Maintenance

Work Services

Disposal of Hazardous and Non-Hazardous Waste

$250,001 to $500,000

36 3Q 2015 TBD DBE Non-Federal

Page 44: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Chicago Transit Authority Contracting Opportunities

44

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

Transit A

uth

ority

Department Contract Type

Project Description Estimated Value

Estimated Term (months)

Anticipated Ad Date

Sub Oppor-tunities

Sub Cert Type

Funding Source

Facilities Maintenance

Professional Services

Environmental Consulting, Services

$250,001 to $500,000

36 3Q 2015 TBD DBE Mixed

Facilities Maintenance

Commodities Diesel Fuel Filters and Associated Parts

$250,001 to $500,000

36 2Q 2015 None None Non-Federal

Facilities Maintenance

Commodities Modine and Sterling Brand Steam/Hot Water Unit Heaters and Heating Coils

$250,001 to $500,000

36 2Q 2015 None None Non-Federal

Facilities Maintenance/Power and Way

Work Services

Sewer, Trench, and Drain Inspection and Cleaning Services

$250,001 to $500,000

36 3Q 2015 TBD DBE Non-Federal

Facilities Maintenance

Work Services

Pipe, Duct, and Equipment Insulation Services

$250,001 to $500,000

36 2Q 2015 TBD DBE Non-Federal

Facilities Maintenance

Work Services

Repair Parts and Service of Various Hot Water High Pressure Washer Equipment

$250,001 to $500,000

36 1Q 2016 TBD DBE Non-Federal

Facilities Maintenance

Work Services

Landscape Installations

$250,001 to $500,000

36 2Q 2015 TBD DBE Non-Federal

Facilities Maintenance

Work Services

Boiler Water Treatment Program for High Pressure, Low Pressure, and Hot Water Boiler Systems

$100,001 to $250,000

36 2Q 2015 TBD DBE Non-Federal

Facilities Maintenance

Commodities MCA Treated Southern Yellow Pine

$250,001 to $500,000

36 2Q 2015 TBD DBE Federal

Facilities Maintenance

Construction Roof Replacement for Smaller Roofs

$2,000,001 to $3,000,000

36 2Q 2015 TBD DBE TBD

Facilities Maintenance

Work Services

Subway Ventilation Repairs

$500,001 to $1,000,000

36 2Q 2015 TBD DBE TBD

Facilities Maintenance

Work Services

Flooring Materials and Installation Including Carpeting

$100,001 to $250,000

36 2Q 2015 TBD DBE TBD

Facilities Maintenance

Work Services

Scaffolding Rental and Set Up

$100,001 to $250,000

36 2Q 2015 None None TBD

Facilities Maintenance

Work Services

Inspection and Service for Rail Station ADA Doors

$100,001 to $250,000

36 2Q 2015 None None TBD

Facilities Maintenance

Work Services

Duct Cleaning $10,001 to $50,000

36 2Q 2015 None None TBD

Facilities Maintenance

Work Services

Recycling of Various Type Lamps, Batteries, and Ballasts

$10,001 to $50,000

36 3Q 2015 TBD DBE Non-Federal

Page 45: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Chicago Transit Authority Contracting Opportunities

45

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

Transit A

uth

ority

Department Contract

Type Project Description Estimated

Value Estimated Term (months)

Anticipated Ad Date

Sub Oppor-tunities

Sub Cert Type

Funding Source

Facilities Maintenance/Power and Way

Work Services

Cutting Tool Sharpening Service

$10,001 to $50,000

36 3Q 2015 None None Non-Federal

Facilities Maintenance

Commodities Fiberglass Embedment Signs

$100,001 to $250,000

36 3Q 2015 None None Non-Federal

Facilities Maintenance

Work Services

On Site Servicing of Parts Washer Tanks

$500,001 to $1,000,000

36 3Q 2015 TBD DBE Non-Federal

Facilities Maintenance

Commodities Plywood $500,001 to $1,000,000

36 4Q 2015 None None Non-Federal

Facilities Maintenance

Work Services

Repair Part and Services for Various Portable and Stationary Emergency Generators

$500,001 to $1,000,000

24 4Q 2015 None None Non-Federal

Finance Professional Services

Pickup, Processing and Deposit of CTA's Bulk Currency

$500,001 to $1,000,000

24 3Q 2015 None None Non-Federal

Graphics Commodities Printing of Various Informational Signage, Maps, Banners, and Decals

$500,001 to $1,000,000

36 3Q 2015 TBD DBE Non-Federal

Human Resources

Professional Services

Background Investigation Services

$500,001 to $1,000,000

36 3Q 2015 TBD DBE Non-Federal

Human Resources

Professional Services

Flexible Spending Account Program Administration and Cobra Administration

$500,001 to $1,000,000

36 3Q 2015 TBD DBE Non-Federal

Human Resources

Professional Services

CTA Referred Employees and Applicants Medical Exams, Return to Work Exams, Lab Testing, and Drug Collection/Testing

$500,001 to $1,000,000

36 3Q 2015 TBD DBE Non-Federal

Law Professional Services

Investigative Services for the Law Department

$500,001 to $1,000,000

36 3Q 2015 None None Non-Federal

Law Professional Services

Temporary Staffing Services for the Law Department

$500,001 to $1,000,000

36 3Q 2015 None None Non-Federal

Law Professional Services

Professional Insurance Brokerage Services

$500,001 to $1,000,000

60 3Q 2015 None None Non-Federal

Law Professional Services

Web Based Legal E-Billing System and Support Services

$500,001 to $1,000,000

36 4Q 2015 None None Non-Federal

Planning Professional Services

Call for Artists for the Blue Line Jefferson

$500,001 to $1,000,000

TBD 3Q 2015 None None TBD

Power and Way

Commodities Rail Bound Manganese (RBM) Frogs and Switch

$500,001 to $1,000,000

36 2Q 2015 TBD DBE Mixed

Page 46: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Chicago Transit Authority Contracting Opportunities

46

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Ch

icago

Transit A

uth

ority

Department Contract Type

Project Description Estimated Value

Estimated Term (months)

Anticipated Ad Date

Sub Oppor-tunities

Sub Cert Type

Funding Source

Points

Power and Way

Work Services

Furnish, Install, Maintain and Remove Traffic Barricades

$250,001 to $500,000

36 2Q 2015 TBD DBE Non-Federal

Power and Way

Commodities Carbon Steel Tee Rail, Joint Bars, and Tie Pads

$10,001 to $2,000,000

36 2Q 2015 TBD DBE Non-Federal

Power and Way

Work Services

Chemical Treatment of Rapid Transit Ballasted Track Right-of-Way

$250,001 to $500,000

36 1Q 2016 TBD DBE Non-Federal

Power and Way

Commodities Catering for Jamboree 2015

$10,001 to $50,000

One Time 2Q 2015 None None Non-Federal

Power and Way

Work Services

Tree Removal and Trimming on CTA Property

$100,001 to $250,000

36 2Q 2015 TBD DBE Non-Federal

Publications Professional Services

Map Cartography Services for System Update, Website and Other Map Related Services

$10,001 to $50,000

36 4Q 2015 None None Non-Federal

Rail Maintenance

Commodities Traction Motor Air Ducts

$250,001 to $500,000

36 2Q 2015 None None Non-Federal

Signage and Way

Commodities Various Vitreous Porcelain Enamel Signs

$250,001 to $500,000

36 4Q 2015 None None Non-Federal

Technology Commodities Motorola Mobile and Portable Radio Repair Parts

$250,001 to $500,000

36 4Q 2015 None None Non-Federal

Page 47: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Public Building Commission Contracting Opportunities

47

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Pu

blic B

uild

ing

Co

mm

ission

Department Contract Type

Project Description

Estimated Value

Estimated Term

Anticipated Ad Date

M/WBE Subcontracting Opportunities

Funding Source

Public Building Commission

Construction 2015 Air Conditioner Project

TBD 3 2Q 2015 Construction Trades

TBD

Public Building Commission

Construction Jamieson Elementary School Annex

TBD 14 2Q 2015 Construction Trades

TBD

Public Building Commission

Construction Canty Elementary School

TBD 14 2Q 2015 Construction Trades

TBD

Page 48: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

48

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

002 - Department of Human Rights & Ethics

Imaging of Records <$25,000 1Q 2015 (Dec-Feb)

TBD

007 - Revenue Decals <$100,000 1Q 2015 (Dec-Feb)

TBD

007 - Revenue Countywide Citation Management\System

>$5,000,000 2Q 2015 (Mar-May)

TBD

007 - Revenue Security Services <$100,000 2Q 2015 (Mar-May)

TBD

007 - Revenue Folding & stuffing services <$100,000 2Q 2015 (Mar-May)

TBD

007 - Revenue Mail Services <$25,000 2Q 2015 (Mar-May)

TBD

007 - Revenue Messenger Services <$25,000 2Q 2015 (Mar-May)

TBD

007 - Revenue Cigarette Inventory System

<$25,000 2Q 2015 (Mar-May)

TBD

007 - Revenue Training and Staff Development

<$100,000 2Q 2015 (Mar-May)

TBD

007 - Revenue Data Entry Services <$100,000 3Q 2015 (Jun-Aug)

TBD

007 - Revenue Citations booklets <$25,000 3Q 2015 (Jun-Aug)

TBD

007 - Revenue Cigarette Stamps <$500,000 4Q 2015 (Sep-Nov)

TBD

008 - Risk Management Employee Health Insurance

>$5,000,000 2Q 2015 (Mar-May)

TBD

008 - Risk Management Actuarial Services <$500,000 2Q 2015 (Mar-May)

TBD

008 - Risk Management General and Auto Liability Claim Insurance

<$500,000 2Q 2015 (Mar-May)

TBD

008 - Risk Management Unemployment Insurance <$100,000 2Q 2015 (Mar-May)

TBD

008 - Risk Management Employee Dental Insurance

>$5,000,000 3Q 2015 (Jun-Aug)

TBD

008 - Risk Management Excess Liability Insurance >$5,000,000 4Q 2015 (Sep-Nov)

TBD

009 - Technology Policy & Planning Countywide Kiosk >$5,000,000 1Q 2015 (Dec-Feb)

TBD

009 - Technology Policy & Planning Integrated Tax Administration System

<$5,000,000 1Q 2015 (Dec-Feb)

Business Analysis; Project Management

Page 49: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

49

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

009 - Technology Policy & Planning Network Monitoring Tools Solar Winds/Dameware

<$25,000 1Q 2015 (Dec-Feb)

TBD

009 - Technology Policy & Planning Technology research and advisory services

<$25,000 1Q 2015 (Dec-Feb)

TBD

009 - Technology Policy & Planning Countywide Credit and Debit Card Acceptance

>$5,000,000 2Q 2015 (Mar-May)

TBD

009 - Technology Policy & Planning Inmate Communication System

>$5,000,000 2Q 2015 (Mar-May)

TBD

009 - Technology Policy & Planning JD Edwards Technical Support and Maintenance

>$5,000,000 2Q 2015 (Mar-May)

TBD

009 - Technology Policy & Planning Hardware and hardware maintenance

>$5,000,000 2Q 2015 (Mar-May)

TBD

009 - Technology Policy & Planning Legacy PBX Replacement <$5,000,000 2Q 2015 (Mar-May)

TBD

009 - Technology Policy & Planning Enterprise Wi-Fi <$5,000,000 2Q 2015 (Mar-May)

TBD

009 - Technology Policy & Planning Citation Management Code Enforcement and Adjudication

<$5,000,000 2Q 2015 (Mar-May)

TBD

009 - Technology Policy & Planning Enterprise video conferencing

<$500,000 2Q 2015 (Mar-May)

TBD

009 - Technology Policy & Planning Microsoft Software SQL <$500,000 2Q 2015 (Mar-May)

TBD

009 - Technology Policy & Planning Business Productivity Software

<$500,000 2Q 2015 (Mar-May)

TBD

009 - Technology Policy & Planning Enterprise E-Mail Marketing

<$500,000 2Q 2015 (Mar-May)

TBD

009 - Technology Policy & Planning Cigarette Tax Mobile App <$100,000 2Q 2015 (Mar-May)

Project Management; Instruction and Training; Computer System Design; Computer System Management and Operation

009 - Technology Policy & Planning Records Management >$5,000,000 2Q 2015 (Mar-May)

TBD

011 - Office of the Chief Administrative Officer

Business card & Envelope Printer

<$25,000 1Q 2015 (Dec-Feb)

TBD

011 - Office of the Chief Administrative Officer

Thermo Tunnel/UV Light <$25,000 1Q 2015 (Dec-Feb)

TBD

011 - Office of the Chief Administrative Officer

Wide Format printer <$25,000 1Q 2015 (Dec-Feb)

TBD

011 - Office of the Chief Administrative Officer

Business card & Envelope Printer

<$25,000 1Q 2015 (Dec-Feb)

TBD

011 - Office of the Chief Administrative Officer

Paper Recycling <$25,000 1Q 2015 (Dec-Feb)

TBD

Page 50: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

50

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

013 - Planning and Development Provision of Compliance Services for CDBG-DR Program

<$500,000 1Q 2015 (Dec-Feb)

TBD

013 - Planning and Development Provision of Construction Management Services for HUD Programs

<$500,000 1Q 2015 (Dec-Feb)

TBD

013 - Planning and Development Development of New Markets Tax Credit (NMTC) Application

<$100,000 2Q 2015 (Mar-May)

TBD

013 - Planning and Development Creation of Certified Community Development Enterprise (CDE)

<$25,000 2Q 2015 (Mar-May)

TBD

013 - Planning and Development Development of EB5 Program

<$25,000 2Q 2015 (Mar-May)

TBD

016 - IT Solutions & Services Governance, Risk and Compliance Services

<$25,000 1Q 2015 (Dec-Feb)

TBD

016 - IT Solutions & Services Network support services & 1st Level Help Desk

>$5,000,000 2Q 2015 (Mar-May)

TBD

016 - IT Solutions & Services Countywide Avaya phone maintenance and support

<$5,000,000 2Q 2015 (Mar-May)

TBD

016 - IT Solutions & Services Telephone Equipment <$1,000,000 2Q 2015 (Mar-May)

TBD

016 - IT Solutions & Services County-wide Telephone System Upgrade

<$500,000 2Q 2015 (Mar-May)

TBD

016 - IT Solutions & Services TTY Services <$25,000 3Q 2015 (Jun-Aug)

TBD

027 - Office of Economic Development Survey Services <$500,000 3Q 2015 (Jun-Aug)

TBD

027 - Office of Economic Development Title Services <$500,000 3Q 2015 (Jun-Aug)

TBD

027 - Office of Economic Development Architectural services for leasing

<$100,000 3Q 2015 (Jun-Aug)

TBD

031 - Capital Planning and Policy Cook County Hospital Campus Redevelopment

<$5,000,000 1Q 2015 (Dec-Feb)

Program Management, Construction Management, A/E

031 - Capital Planning and Policy JTDC new Chiller <$5,000,000 2Q 2015 (Mar-May)

Mechanical, electrical, specialty

031 - Capital Planning and Policy Criminal Courts Administration Building Floors 7, 8, &9 Renovation

<$5,000,000 2Q 2015 (Mar-May)

General Contracting, carpentry, gyp board, painting, metal studs, drywall, flooring, electrical, mechanical, plumbing, Fire Protection

031 - Capital Planning and Policy Rolling Meadows and Criminal Courts Administration Building - Renovation for new Child Advocacy Rooms

<$5,000,000 2Q 2015 (Mar-May)

General Contracting, carpentry, gyp board, painting, metal studs, drywall, flooring, electrical, mechanical, plumbing, Fire Protection, FF&E

Page 51: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

51

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

031 - Capital Planning and Policy Cook County Health & Hospital Systems Clinics

<$5,000,000 2Q 2015 (Mar-May)

Program Management, Construction Management, A/E

031 - Capital Planning and Policy 118 N Clark Recorder of Deeds - Renovation

<$5,000,000 2Q 2015 (Mar-May)

General Contracting, carpentry, gyp board, painting, metal studs, drywall, flooring, electrical, mechanical, plumbing, FF&E

031 - Capital Planning and Policy Cook County Maywood Campus & Jail Campus

<$5,000,000 2Q 2015 (Mar-May)

Program Management, Construction Management, A/E

031 - Capital Planning and Policy County Building - 118 N Clark Renovations

<$1,000,000 2Q 2015 (Mar-May)

General Contracting, carpentry, gyp board, painting, metal studs, drywall, flooring, electrical, mechanical, plumbing, Fire Protection, FF&E

031 - Capital Planning and Policy Department of Corrections Roofing Replacements

>$5,000,000 3Q 2015 (Jun-Aug)

Roofing, General Contracting, Carpentry, masonry

031 - Capital Planning and Policy Oak Forest Demolition of Vacant Facilities

<$5,000,000 3Q 2015 (Jun-Aug)

Demolition, fencing, landscaping

031 - Capital Planning and Policy JTDC Elevator Modernization

<$5,000,000 3Q 2015 (Jun-Aug)

Mechanical, electrical, specialty

031 - Capital Planning and Policy Oak Forest Campus - Data Center expansion

<$5,000,000 3Q 2015 (Jun-Aug)

General Contracting, board, painting, metal studs, drywall, flooring, electrical, mechanical, plumbing, Fire Protection, technology

031 - Capital Planning and Policy CCB holding area ADA improvements & lock up renovation

<$5,000,000 3Q 2015 (Jun-Aug)

General Contracting, board, painting, metal studs, drywall, flooring, electrical, mechanical, plumbing, specialty

031 - Capital Planning and Policy Job Order Contracting (JOC) program for contractors

<$5,000,000 4Q 2015 (Sep-Nov)

General Contractors, Mechanical, Electrical, and Plumbing Contractors

032 - Department of Human Resources Classification & Compensation Study

<$500,000 1Q 2015 (Dec-Feb)

TBD

032 - Department of Human Resources Professional Development Study

<$500,000 2Q 2015 (Mar-May)

TBD

032 - Department of Human Resources Drug testing services <$25,000 4Q 2015 (Sep-Nov)

TBD

040 - Cook County Assessor Laser Ink 1/2 sheet labels; ML-0200 Maco

<$25,000 1Q 2015 (Dec-Feb)

TBD

040 - Cook County Assessor Commercial Estimator software

<$25,000 1Q 2015 (Dec-Feb)

TBD

Page 52: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

52

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

040 - Cook County Assessor Envelopes <$100,000 2Q 2015 (Mar-May)

TBD

040 - Cook County Assessor Parking Services <$25,000 3Q 2015 (Jun-Aug)

TBD

040 - Cook County Assessor Paper Solutions - Case file folders (Docket Jackets)

<$100,000 4Q 2015 (Sep-Nov)

TBD

060 - County Treasurer Legal Services <$500,000 1Q 2015 (Dec-Feb)

TBD

060 - County Treasurer Crime Bonds <$100,000 2Q 2015 (Mar-May)

TBD

060 - County Treasurer Parking <$25,000 2Q 2015 (Mar-May)

TBD

060 - County Treasurer Tax Bill Printing <$5,000,000 2Q 2015 (Mar-May)

TBD

110 - County Clerk Mailroom Equipment <$25,000 1Q 2015 (Dec-Feb)

TBD

110 - County Clerk Security Paper - Birth <$100,000 3Q 2015 (Jun-Aug)

TBD

130 - Recorder of Deeds Security Doors w/keycard access

<$100,000 2Q 2015 (Mar-May)

TBD

130 - Recorder of Deeds Land Records Digitization-GIS Integration & Development

>$5,000,000 2Q 2015 (Mar-May)

TBD

130 - Recorder of Deeds Core Application for Document Recording

>$5,000,000 2Q 2015 (Mar-May)

TBD

200 - Department of Facilities Management

lock supplies <$500,000 1Q 2015 (Dec-Feb)

TBD

200 - Department of Facilities Management

Hygiene Supplies <$100,000 1Q 2015 (Dec-Feb)

TBD

200 - Department of Facilities Management

Filters <$500,000 2Q 2015 (Mar-May)

TBD

200 - Department of Facilities Management

Pipe Covering <$100,000 2Q 2015 (Mar-May)

TBD

200 - Department of Facilities Management

Lamp Recycling <$100,000 2Q 2015 (Mar-May)

TBD

200 - Department of Facilities Management

Diesel Fuel - generator <$500,000 3Q 2015 (Jun-Aug)

TBD

200 - Department of Facilities Management

Drill bitts <$500,000 3Q 2015 (Jun-Aug)

TBD

200 - Department of Facilities Management

Elevator Repair >$5,000,000 3Q 2015 (Jun-Aug)

TBD

200 - Department of Facilities Management

Testing Maintenance, repairs & Inspection to certify Fire Fighting Systems & Equipment

<$500,000 3Q 2015 (Jun-Aug)

TBD

Page 53: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

53

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

200 - Department of Facilities Management

Service & parts - fire alarm & security

<$100,000 3Q 2015 (Jun-Aug)

TBD

200 - Department of Facilities Management

Carpet <$5,000,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Lamp Supplies <$1,000,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Wire and cable <$100,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Mats <$100,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Signage <$100,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Paint supplies <$500,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Ceiling Tile <$500,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Paint Accessories <$500,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Saws/Saw blades <$100,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Plumbing supplies <$1,000,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Freon <$500,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Glass <$500,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Janitorial Supplies <$500,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Floor tile <$500,000 4Q 2015 (Sep-Nov)

TBD

200 - Department of Facilities Management

Fuses <$100,000 4Q 2015 (Sep-Nov)

TBD

211 - Department of Fiscal Administration and Support Services

Pre-Employment Psychological Testing

<$5,000,000 1Q 2015 (Dec-Feb)

TBD

211 - Department of Fiscal Administration and Support Services

On-Site CDL Drug Testing Services

<$100,000 1Q 2015 (Dec-Feb)

TBD

211 - Department of Fiscal Administration and Support Services

Drug Testing Services <$100,000 2Q 2015 (Mar-May)

TBD

211 - Department of Fiscal Administration and Support Services

Shakman Compliance Officer

<$500,000 4Q 2015 (Sep-Nov)

TBD

211 - Sheriff IT Unit Cloud Storage and Processing

<$100,000 1Q 2015 (Dec-Feb)

TBD

211 - Sheriff IT Unit IT Unit Office Automation <$100,000 1Q 2015 (Dec-Feb)

TBD

Page 54: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

54

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

211 - Sheriff IT Unit Incident & Change Management Software

<$500,000 1Q 2015 (Dec-Feb)

TBD

211 - Sheriff IT Unit New CABS software & Hardware

<$5,000,000 2Q 2015 (Mar-May)

TBD

211 - Sheriff IT Unit Web-Based Applications for use on Mobile Platforms

<$500,000 2Q 2015 (Mar-May)

TBD

211 - Sheriff IT Unit Disaster Recovery Architecture

<$25,000 2Q 2015 (Mar-May)

TBD

211 - Sheriff IT Unit In Car Video Systems <$25,000 2Q 2015 (Mar-May)

TBD

211 - Sheriff IT Unit Inmate Communication System

<$25,000 2Q 2015 (Mar-May)

TBD

211 - Sheriff IT Unit Microsoft StorSimple DR Storage - 50TB & DR Cloud Solution

<$500,000 2Q 2015 (Mar-May)

TBD

211 - Sheriff IT Unit Network Upgrade <$100,000 2Q 2015 (Mar-May)

TBD

211 - Sheriff's Training Institute Maintenance & Decontamination Range Services

<$500,000 1Q 2015 (Dec-Feb)

TBD

212 - Sheriff's Women's Justice Program

Electronic Monitoring <$500,000 4Q 2015 (Sep-Nov)

TBD

214 - Sheriff's Administration & Human Resources

Vehicle, Equipment Parts Mgmt. & Supply

>$5,000,000 1Q 2015 (Dec-Feb)

Oil, lubricants, petroleum

214 - Sheriff's Administration & Human Resources

Auto Maintenance & Repair, Zone 1

<$1,000,000 4Q 2015 (Sep-Nov)

Motor Oils, Car Parts, Office Supplies

214 - Sheriff's Administration & Human Resources

Auto Maintenance & Repair, Zone 8

<$1,000,000 4Q 2015 (Sep-Nov)

Motor Oils, Car Parts, Office Supplies

214 - Sheriff's Administration & Human Resources

Auto Maintenance & Repair, Zone 6

<$1,000,000 4Q 2015 (Sep-Nov)

Motor Oils, Car Parts, Office Supplies

214 - Sheriff's Administration & Human Resources

Auto Maintenance & Repair, Zone 5

<$1,000,000 4Q 2015 (Sep-Nov)

Motor Oils, Car Parts, Office Supplies

214 - Sheriff's Administration & Human Resources

Auto Maintenance & Repair, Zone 7

<$1,000,000 4Q 2015 (Sep-Nov)

Motor Oils, Car Parts, Office Supplies

214 - Sheriff's Administration & Human Resources

Auto Maintenance & Repair, Zone 4

<$1,000,000 4Q 2015 (Sep-Nov)

Motor Oils, Car Parts, Office Supplies

214 - Sheriff's Administration & Human Resources

Auto Maintenance & Repair, Zone 2

<$1,000,000 4Q 2015 (Sep-Nov)

Motor Oils, Car Parts, Office Supplies

214 - Sheriff's Administration & Human Resources

Auto Maintenance & Repair, Zone 3

<$1,000,000 4Q 2015 (Sep-Nov)

Motor Oils, Car Parts, Office Supplies

214 - Sheriff's Administration & Human Resources

Automobile Glass Replacement

<$500,000 4Q 2015 (Sep-Nov)

Vehicle Parts, Office Supplies

231 - Police Department Mortuary <$500,000 2Q 2015 (Mar-May)

TBD

Page 55: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

55

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

231 - Police Department Repair/Recertification of Radar

<$100,000 2Q 2015 (Mar-May)

TBD

239 - Department of Corrections Rental Equipment <$100,000 2Q 2015 (Mar-May)

TBD

239 - Department of Corrections Washer and Dryer Repairs <$25,000 2Q 2015 (Mar-May)

TBD

239 - Department of Corrections Armor Vests <$25,000 2Q 2015 (Mar-May)

TBD

239 - Department of Corrections Badges for Sheriff Office <$500,000 2Q 2015 (Mar-May)

TBD

239 - Department of Corrections Clear Vinyl Mattress/Pillow <$500,000 2Q 2015 (Mar-May)

TBD

239 - Department of Corrections Body Security Maintenance

<$500,000 3Q 2015 (Jun-Aug)

TBD

239 - Department of Corrections Janitorial Supplies <$500,000 4Q 2015 (Sep-Nov)

TBD

249 - Sheriff's Merit Board Parking <$25,000 2Q 2015 (Mar-May)

TBD

249 - Sheriff's Merit Board I/O Solutions Entrance & Promo Exams

<$5,000,000 4Q 2015 (Sep-Nov)

TBD

259 - Medical Examiner Autopsy Supplies <$1,000,000 1Q 2015 (Dec-Feb)

TBD

259 - Medical Examiner Autopsy Saw <$500,000 1Q 2015 (Dec-Feb)

TBD

259 - Medical Examiner Medical Gloves <$100,000 2Q 2015 (Mar-May)

TBD

259 - Medical Examiner Window Washing <$25,000 3Q 2015 (Jun-Aug)

TBD

259 - Medical Examiner Ocular Pathology Consultant

<$100,000 3Q 2015 (Jun-Aug)

TBD

259 - Medical Examiner Evidence/Personal Property Bags

<$25,000 3Q 2015 (Jun-Aug)

TBD

259 - Medical Examiner Transcription Service For Doctors

<$500,000 3Q 2015 (Jun-Aug)

TBD

259 - Medical Examiner Forensic Toxicological Testing

<$1,000,000 4Q 2015 (Sep-Nov)

TBD

259 - Medical Examiner Specialty Gases For Toxicology

<$100,000 4Q 2015 (Sep-Nov)

TBD

259 - Medical Examiner Glassware/Consumables - Toxicology / Histology

<$500,000 4Q 2015 (Sep-Nov)

TBD

259 - Medical Examiner Histology Supplies <$500,000 4Q 2015 (Sep-Nov)

TBD

259 - Medical Examiner Surgical Gowns - Various Kinds

<$100,000 4Q 2015 (Sep-Nov)

TBD

Page 56: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

56

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

259 - Medical Examiner ELISA Test Kits For Toxicology

<$500,000 4Q 2015 (Sep-Nov)

TBD

259 - Medical Examiner Scavenger Service <$25,000 4Q 2015 (Sep-Nov)

TBD

260 - Public Defender Training <$500,000 1Q 2015 (Dec-Feb)

TBD

260 - Public Defender Office Equipment Maintenance

<$25,000 1Q 2015 (Dec-Feb)

TBD

260 - Public Defender Parking Spaces <$100,000 2Q 2015 (Mar-May)

TBD

265 - Department of Homeland Security and Emergency Management

Radios >$5,000,000 2Q 2015 (Mar-May)

TBD

265 - Department of Homeland Security and Emergency Management

Homeland Security Assessment

<$1,000,000 2Q 2015 (Mar-May)

TBD

265 - Department of Homeland Security and Emergency Management

Continuity of Operations Planning

<$500,000 3Q 2015 (Jun-Aug)

TBD

265 - Department of Homeland Security and Emergency Management

Intel Equipment <$25,000 3Q 2015 (Jun-Aug)

TBD

265 - Department of Homeland Security and Emergency Management

Critical Infrastructure Hardening Equipment

<$5,000,000 3Q 2015 (Jun-Aug)

TBD

265 - Department of Homeland Security and Emergency Management

Emergency Operations Plan Development

<$5,000,000 3Q 2015 (Jun-Aug)

TBD

265 - Department of Homeland Security and Emergency Management

Mobile Support Vehicles <$500,000 3Q 2015 (Jun-Aug)

TBD

265 - Department of Homeland Security and Emergency Management

Asset Tracking System <$100,000 3Q 2015 (Jun-Aug)

TBD

280 - Adult Probation Department Vehicle Maintenance <$500,000 1Q 2015 (Dec-Feb)

TBD

280 - Adult Probation Department Ammunition <$500,000 1Q 2015 (Dec-Feb)

TBD

280 - Adult Probation Department Ballistic Vests <$100,000 1Q 2015 (Dec-Feb)

TBD

280 - Adult Probation Department Tire new/repairs <$100,000 2Q 2015 (Mar-May)

TBD

280 - Adult Probation Department Parking spot <$25,000 2Q 2015 (Mar-May)

TBD

300 - Judiciary Stenographic Paper >$5,000,000 1Q 2015 (Dec-Feb)

TBD

300 - Judiciary Interpreter Services <$500,000 1Q 2015 (Dec-Feb)

TBD

300 - Judiciary Calendars <$100,000 2Q 2015 (Mar-May)

TBD

300 - Judiciary Online Parenting Education

<$25,000 2Q 2015 (Mar-May)

TBD

Page 57: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

57

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

310 - Office of the Chief Judge Juror Summons Envelopes

>$5,000,000 1Q 2015 (Dec-Feb)

TBD

310 - Office of the Chief Judge Juror Summons Form >$5,000,000 1Q 2015 (Dec-Feb)

TBD

310 - Office of the Chief Judge Courier Service for Juror Summons

>$5,000,000 1Q 2015 (Dec-Feb)

TBD

310 - Office of the Chief Judge Maintenance of Website >$5,000,000 1Q 2015 (Dec-Feb)

TBD

310 - Office of the Chief Judge Juror Check Paper >$5,000,000 1Q 2015 (Dec-Feb)

TBD

310 - Office of the Chief Judge Juror Badges >$5,000,000 1Q 2015 (Dec-Feb)

TBD

310 - Office of the Chief Judge Foreclosure Mediation Program

<$5,000,000 1Q 2015 (Dec-Feb)

TBD

310 - Office of the Chief Judge Mental Health Patient Care Management

<$1,000,000 1Q 2015 (Dec-Feb)

TBD

326 - Juvenile Probation and Court Services

Bilingual Clinical Services <$5,000,000 1Q 2015 (Dec-Feb)

TBD

326 - Juvenile Probation and Court Services

Detention Reduction Project

<$5,000,000 1Q 2015 (Dec-Feb)

TBD

326 - Juvenile Probation and Court Services

Foster Care Services <$5,000,000 1Q 2015 (Dec-Feb)

TBD

335 - Clerk of the Circuit Court - Office of the Clerk

Printing of City of Chicago Personal Issue Tickets

<$500,000 1Q 2015 (Dec-Feb)

TBD

335 - Clerk of the Circuit Court - Office of the Clerk

Printing of Suburban Issue Tickets

<$500,000 1Q 2015 (Dec-Feb)

TBD

335 - Clerk of the Circuit Court - Office of the Clerk

Implementation of Criminal, Civil, & Traffic Case Management System

<$5,000,000 1Q 2015 (Dec-Feb)

TBD

335 - Clerk of the Circuit Court - Office of the Clerk

Electronic Record Project / Case Management System

<$5,000,000 1Q 2015 (Dec-Feb)

TBD

335 - Clerk of the Circuit Court - Office of the Clerk

Maintenance of Electric Time Stamps and Sealers

<$500,000 1Q 2015 (Dec-Feb)

TBD

335 - Clerk of the Circuit Court - Office of the Clerk

Printing of C and D Bonds <$500,000 1Q 2015 (Dec-Feb)

TBD

335 - Clerk of the Circuit Court - Office of the Clerk

Pre-Sort Mail <$25,000 1Q 2015 (Dec-Feb)

TBD

335 - Clerk of the Circuit Court - Office of the Clerk

Maintenance of Hand Stamps

<$100,000 2Q 2015 (Mar-May)

TBD

335 - Clerk of the Circuit Court - Office of the Clerk

Photographic Services <$500,000 3Q 2015 (Jun-Aug)

TBD

335 - Clerk of the Circuit Court - Office of the Clerk

Electronic Security Services Various Offices

<$500,000 3Q 2015 (Jun-Aug)

TBD

Page 58: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

58

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

335 - Clerk of the Circuit Court - Office of the Clerk

Purchase of New Stamps <$500,000 4Q 2015 (Sep-Nov)

TBD

440 - Juvenile Temporary Detention Center

Janitorial Supply <$100,000 1Q 2015 (Dec-Feb)

TBD

440 - Juvenile Temporary Detention Center

Hygiene Supplies <$100,000 1Q 2015 (Dec-Feb)

TBD

440 - Juvenile Temporary Detention Center

Inmate Uniform Contract <$500,000 2Q 2015 (Mar-May)

TBD

440 - Juvenile Temporary Detention Center

Security Services >$5,000,000 2Q 2015 (Mar-May)

TBD

500 - Highway/501 - MFT Illinois First (1st)

151st Street <$500,000 1Q 2015 (Dec-Feb)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Roberts 111-87 <$5,000,000 1Q 2015 (Dec-Feb)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Kedzie 139-135 <$5,000,000 1Q 2015 (Dec-Feb)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Hintz Road E-M <$5,000,000 1Q 2015 (Dec-Feb)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Sanders T-LCR <$5,000,000 1Q 2015 (Dec-Feb)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Hintz Road/Echo Lake <$500,000 1Q 2015 (Dec-Feb)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Sand (OGL) <$25,000 2Q 2015 (Mar-May)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Center 171-159 >$5,000,000 2Q 2015 (Mar-May)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Central/SW Hwy <$5,000,000 2Q 2015 (Mar-May)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Ashland Avenue/15th TS <$500,000 2Q 2015 (Mar-May)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Truck Repairs <$100,000 2Q 2015 (Mar-May)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Calcium Chloride <$25,000 2Q 2015 (Mar-May)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Old Orchard Road - E-S >$5,000,000 3Q 2015 (Jun-Aug)

TBD

500 - Highway/501 - MFT Illinois First (1st)

CDOT RS <$5,000,000 3Q 2015 (Jun-Aug)

TBD

500 - Highway/501 - MFT Illinois First (1st)

84th Ave <$5,000,000 3Q 2015 (Jun-Aug)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Winnetka SR-H <$500,000 3Q 2015 (Jun-Aug)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Dumping - Spoils/Non Special Waste (Vactor Waste)

<$500,000 3Q 2015 (Jun-Aug)

TBD

Page 59: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

59

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

500 - Highway/501 - MFT Illinois First (1st)

Hibbard/Skokie <$500,000 3Q 2015 (Jun-Aug)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Emerald Ash Borer Tree Removal

<$100,000 3Q 2015 (Jun-Aug)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Vehicle Repairs <$25,000 3Q 2015 (Jun-Aug)

TBD

500 - Highway/501 - MFT Illinois First (1st)

Fuel Tank Maintenance and Inspection

<$500,000 4Q 2015 (Sep-Nov)

TBD

510 - Animal Control Department Rabies Certificate Booklets

<$25,000 2Q 2015 (Mar-May)

TBD

510 - Animal Control Department Wearing Apparel <$25,000 3Q 2015 (Jun-Aug)

TBD

510 - Animal Control Department Vehicle <$500,000 3Q 2015 (Jun-Aug)

TBD

524 - County Clerk - Election Division Fund

Voter Registration Management System

<$5,000,000 1Q 2015 (Dec-Feb)

TBD

524 - County Clerk - Election Division Fund

Support Maintenance of Web Applications

<$1,000,000 1Q 2015 (Dec-Feb)

TBD

524 - County Clerk - Election Division Fund

Mailroom Equipment <$100,000 1Q 2015 (Dec-Feb)

TBD

524 - County Clerk - Election Division Fund

Lobbyist <$500,000 1Q 2015 (Dec-Feb)

TBD

524 - County Clerk - Election Division Fund

Ballot pens <$100,000 1Q 2015 (Dec-Feb)

TBD

524 - County Clerk - Election Division Fund

Security seals <$100,000 1Q 2015 (Dec-Feb)

TBD

524 - County Clerk - Election Division Fund

Security Risk Assessment <$100,000 2Q 2015 (Mar-May)

TBD

524 - County Clerk - Election Division Fund

Ballot Printing <$1,000,000 3Q 2015 (Jun-Aug)

TBD

524 - County Clerk - Election Division Fund

Material Handling Equipment

<$25,000 3Q 2015 (Jun-Aug)

TBD

527 - County Recorder Document Storage System Fund

Facility Work - 1st Floor Reconfiguration

<$500,000 1Q 2015 (Dec-Feb)

TBD

527 - County Recorder Document Storage System Fund

Facility Work - 2nd Floor Reconfiguration

<$500,000 1Q 2015 (Dec-Feb)

TBD

527 - County Recorder Document Storage System Fund

Video Surveillance System Upgrade

<$500,000 1Q 2015 (Dec-Feb)

TBD

528 - Clerk of the Circuit Court Automation Fund

Parking Passes <$25,000 1Q 2015 (Dec-Feb)

TBD

528 - Clerk of the Circuit Court Automation Fund

Maintenance for Kiosk System

<$500,000 2Q 2015 (Mar-May)

TBD

529 - Clerk of the Circuit Court Document Storage Fund

Purchase of New Equipment for Warehouse

<$1,000,000 2Q 2015 (Mar-May)

TBD

Page 60: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

60

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

529 - Clerk of the Circuit Court Document Storage Fund

Maintenance of Power Equipment

<$100,000 3Q 2015 (Jun-Aug)

TBD

529 - Clerk of the Circuit Court Document Storage Fund

Purchase of Vehicles <$25,000 3Q 2015 (Jun-Aug)

TBD

529 - Clerk of the Circuit Court Document Storage Fund

Purchase of Handheld Radios

<$100,000 3Q 2015 (Jun-Aug)

TBD

529 - Clerk of the Circuit Court Document Storage Fund

Battery Packs for Pallet Jacks

<$100,000 4Q 2015 (Sep-Nov)

TBD

529 - Clerk of the Circuit Court Document Storage Fund

Printing of File Jackets <$5,000,000 4Q 2015 (Sep-Nov)

TBD

529 - Clerk of the Circuit Court Document Storage Fund

Out guides and Poly Pouches

<$500,000 4Q 2015 (Sep-Nov)

TBD

529 - Clerk of the Circuit Court Document Storage Fund

Purchase of Reader Printer

<$100,000 4Q 2015 (Sep-Nov)

TBD

530 - Cook County Law Library Millennium- Innovative Acquisition/Cataloguing Software

<$100,000 1Q 2015 (Dec-Feb)

TBD

530 - Cook County Law Library Municipal Code Corp- Web Hosting & Supply Services

<$25,000 1Q 2015 (Dec-Feb)

TBD

532 - Adult Probation/Probation Service Fee Fund

Drug testing <$5,000,000 2Q 2015 (Mar-May)

TBD

534 - County Treasurer - Tax Sales Automation Fund

Increase Server Storage <$500,000 1Q 2015 (Dec-Feb)

TBD

534 - County Treasurer - Tax Sales Automation Fund

Maintenance kits for HP Printers

<$100,000 1Q 2015 (Dec-Feb)

TBD

534 - County Treasurer - Tax Sales Automation Fund

IT Hardware <$25,000 1Q 2015 (Dec-Feb)

TBD

534 - County Treasurer - Tax Sales Automation Fund

Custom Labels <$500,000 2Q 2015 (Mar-May)

TBD

534 - County Treasurer - Tax Sales Automation Fund

Software Training <$100,000 2Q 2015 (Mar-May)

TBD

534 - County Treasurer - Tax Sales Automation Fund

IT Security - Implement recommendations from assessment

<$500,000 2Q 2015 (Mar-May)

TBD

534 - County Treasurer - Tax Sales Automation Fund

Hardware Maintenance on high-speed scanners

<$100,000 2Q 2015 (Mar-May)

TBD

541 - Social Service/Probation and Court Services Fund

DV and Sex Offender Treatment

<$1,000,000 2Q 2015 (Mar-May)

TBD

545 - Geographic Information Systems Aerial Oblique Project <$500,000 2Q 2015 (Mar-May)

Project Management, Programming and Coding

545 - Geographic Information Systems CCAO I/C Automation <$25,000 2Q 2015 (Mar-May)

Project Management, Programming and Coding

545 - Geographic Information Systems CCDPH Dashboard <$25,000 2Q 2015 (Mar-May)

Project Management, Programming and Coding

Page 61: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Cook County Contracting Opportunities

61

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Co

ok C

ou

nty

Agency Project Description Estimated Value

Anticipated Ad Date

Subcontracting Opportunities

545 - Geographic Information Systems CCDTH Drainage Database, Imaging and Application

<$25,000 2Q 2015 (Mar-May)

Project Management, Programming and Coding

545 - Geographic Information Systems Countywide Building Outline

<$25,000 2Q 2015 (Mar-May)

Project Management, Programming and Coding

545 - Geographic Information Systems Elections Group Maker Application

<$25,000 2Q 2015 (Mar-May)

Project Management, Programming and Coding

545 - Geographic Information Systems Streetview Property Image Update

<$25,000 2Q 2015 (Mar-May)

Project Management, Programming and Coding

545 - Geographic Information Systems Lidar Acquisition <$1,000,000 2Q 2015 (Mar-May)

TBD

545 - Geographic Information Systems Clerk's Ground Imagery Update

<$1,000,000 2Q 2015 (Mar-May)

TBD

545 - Geographic Information Systems Drainage GIS <$1,000,000 2Q 2015 (Mar-May)

TBD

545 - Geographic Information Systems Municipal Applications (Village and Incorporation)

<$500,000 2Q 2015 (Mar-May)

TBD

545 - Geographic Information Systems Metadata <$25,000 2Q 2015 (Mar-May)

TBD

545 - Geographic Information Systems Municipal Incorporation Inventory

<$25,000 2Q 2015 (Mar-May)

TBD

545 - Geographic Information Systems Section Corner Survey QA <$25,000 2Q 2015 (Mar-May)

Project Management, Programming and Coding

545 - Geographic Information Systems Planimetric Update <$25,000 2Q 2015 (Mar-May)

TBD

545 - Geographic Information Systems Vendor Portal for Procurement

<$500,000 2Q 2015 (Mar-May)

TBD

545 - Geographic Information Systems Cloud Based MuniChange Application

<$500,000 2Q 2015 (Mar-May)

TBD

545 - Geographic Information Systems Aerial Orthoimagery <$25,000 2Q 2015 (Mar-May)

Project Management, Programming and Coding

545 - Geographic Information Systems Clerk's Office Website Revamp

<$25,000 2Q 2015 (Mar-May)

TBD

Countywide Armed Security Guard Services

<$1,000,000 1Q 2015 (Dec-Feb)

TBD

Countywide Roofing supplies and related products

<$500,000 1Q 2015 (Dec-Feb)

TBD

Countywide Publication Legal Notices <$500,000 4Q 2015 (Sep-Nov)

TBD

Countywide County-Wide Armored Car Service

<$500,000 4Q 2015 (Sep-Nov)

TBD

Page 62: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

62

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

DCEO Information Technology

Customer Relations Management Tool

$100,001 to $250,000

24 3Q 2015 Database Management/Help Desk

BEP Non-Federal

DCEO Professional Services

LIHEAP IT Services

$100,001 to $250,000

24 4Q 2015 Rewrite of Energy Assistance System

BEP Non-Federal

DCEO Information Technology

Office of Trade Investment IT Services

$250,001 to $500,000

24 3Q 2015 Creation of IT system

BEP Non-Federal

DCEO Information Technology

ESB Knowledgebase

$100,001 to $250,000

36 3Q 2016 IT Hosting Services

None Mixed

DCEO Professional Services

IL Travel Guide Printing

$100,001 to $250,000

12 4Q 2015 Printing BEP Non-Federal

DCFS Revenue Generating

Revenue Enhancement

$10,000,001 to $20,000,000

60 4Q 2015 BEP Mixed

DCFS Revenue Generating

Cost Recovery Services

$500,001 to $1,000,000

60 4Q 2015 None N/A Non-Federal

DCFS Work Services

Archive Record Preparation

$500,001 to $1,000,000

60 4Q 2015 None N/A Mixed

DCFS Work Services

Downstate Moving outside Sangamon County

$250,001 to $500,000

60 3Q 2016 None N/A Mixed

DCFS Professional Services

Toxicology Specimen Collection

$5,000,001 to $10,000,000

60 1Q 2016 Specimen Collection

BEP Mixed

DCFS Information Technology

IT Development Services

$10,001 to $2,000,000

12 4Q 2015 None N/A federal

DCFS Information Technology

Informatica Software

$10,001 to $2,000,000

60 4Q 2015 None N/A federal

DCFS Work Services

Court Reporting and Transcription Services

$500,001 to $1,000,000

60 4Q 2015 Court Reporting & Transcription Services

BEP Non-Federal

DCFS Work Services

Purchase of Care RFP - Client Transportation Statewide

$5,000,001 to $10,000,000

60 4Q 2015 Client Transportation

BEP Non-Federal

Page 63: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

63

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

DCFS Professional Services

Purchase of Care RFP - Healthworks Lead Agency

$10,000,001 to $20,000,000

60 4Q 2015 None N/A Mixed

DCFS Information Technology

Various Small purchases of annual IT Licenses, Subscriptions, Support and Maintenance.

$100,001 to $250,000

12 4Q 2015 None N/A federal

DCFS Commodities

Collator for Print Shop

$50,001 to $100,000

TBD 1Q 2016 None N/A Non-Federal

Insurance Work Services

Records Management Services

$50,001 to $100,000

36 1Q 2016 None SBSP Non-Federal

DJJ - IYC Pere Marquette

Work Services

Heating & Cooling

$10,001 to $50,000

TBD 3Q 2016 no Non-Federal

DJJ - IYC Pere Marquette

Work Services

Dietary Equipment

$10,001 to $50,000

TBD 3Q 2016 no Non-Federal

DJJ - IYC Pere Marquette

Work Services

Electrician $10,001 to $50,000

TBD 3Q 2016 no Non-Federal

DJJ - IYC Pere Marquette

Work Services

Fire Alarm Testing & Maintenance

$10,001 to $50,000

TBD 3Q 2016 no Non-Federal

DJJ - IYC Pere Marquette

Work Services

Pest Control $10,001 to $50,000

TBD 3Q 2016 no Non-Federal

DJJ - IYC Pere Marquette

Work Services

Plumbing $50,001 to $100,000

TBD 3Q 2016 no Non-Federal

DJJ - IYC Pere Marquette

Work Services

Waste Removal

$50,001 to $100,000

TBD 3Q 2016 no Non-Federal

DJJ - IYC Pere Marquette

Work Services

Barber Under $10,000

36 3Q 2016 no Non-Federal

DJJ - IYC Pere Marquette

Work Services

Carpentry $10,001 to $50,000

TBD 3Q 2016 no Non-Federal

DJJ - IYC Pere Marquette

Work Services

Copiers $10,001 to $50,000

36 3Q 2016 no Non-Federal

DOC Vienna CC

Construction

On Demand Repair of Absorber Unit/Chiller

$50,001 to $100,000

24 TBD Non-Federal

DOC Vienna CC

Construction

On Demand Emergency Generator Rental

$50,001 to $100,000

24 TBD Non-Federal

Environmental Protection

Work Services

Coliform Testing (Laboratory Services

$250,001 to $500,000

36 2Q 2016 N/A N/A Non-Federal

Page 64: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

64

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

Environmental Protection

Work Services

Medical Monitoring

$100,001 to $250,000

60 1Q 2016 N/A N/A Mixed

Environmental Protection

Work Services

Imaging $10,001 to $2,000,000

60 1Q 2016 Document Imaging

BEP Mixed

Environmental Protection

Work Services

BioWatch Sample Collection

$10,000,001 to $20,000,000

84 2Q 2015 BioWatch Filter Collection

BEP Federal

Environmental Protection

Work Services

Temp Services

$10,001 to $2,000,000

36 2Q 2015 Small Business Set-Aside

Mixed

Gaming Board Information Technology

Independent Testing Lab

$5,000,001 to $10,000,000

60 4Q 2015 BEP Non-Federal

Gaming Board Professional Services

Riverboat Audit Firms

$2,000,001 to $3,000,000

48 1Q 2016 Accounting, Information Technology

BEP Non-Federal

Healthcare and Family Services

Professional Services

Inpatient Hospital Reviews

$3,000,001 to $5,000,000

36 3Q 2015 Unknown Unknown Mixed

Healthcare and Family Services

Professional Services

Accounting Services for Illinois Office of the Comptroller

$100,001 to $250,000

60 1Q 2016 None None Mixed

Healthcare and Family Services

Commodities

Mail Machine Replacement

$50,001 to $100,000

12 3Q 2015 Unknown Unknown Mixed

Healthcare and Family Services

Information Technology

Datacap Programming Services for Fingerprinting for IES Project

$100,001 to $250,000

12 4Q 2015 Unknown Unknown Non-Federal

Healthcare and Family Services

Professional Services

CARES Program

$3,000,001 to $5,000,000

36 1Q 2016 Yes Unknown

IDES Benefit Banking Services

$500,001 to $1,000,000

TBD 3Q 2015 None N/A Federal

IDES Information Technology

Data routing numbers database

$10,001 to $50,000

48 4Q 2015 Federal

IDES Uniform Cleaning Services

$10,001 to $50,000

24 2Q 2015 Delivery, cleaning, etc.

BEP, VOSB,

Federal

IDES Scanning of Images

$50,001 to $100,000

12 2Q 2015 None N/A Federal

IDES New Hire Directory

$100,001 to $250,000

12 4Q 2015 Receiving faxes, data input

BEP, VOSB,

Federal

IDES Information Technology

Technology Enhancements

$3,000,001 to $5,000,000

36 2Q 2015 IT consulting BEP, VOSB,

Federal

IDES Mailroom Equipment

$100,001 to $250,000

36 3Q 2016 Federal

Page 65: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

65

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

IDES Locksmith Services

$50,001 to $100,000

36 3Q 2015 Locksmith services

BEP, VOSB,

Federal

IDES Maintenance of Warehouse Equipment

Under $10,000

24 3Q 2015 Maintenance and repair services

BEP, VOSB,

Federal

IDES Maintenance Workers

$500,001 to $1,000,000

48 3Q 2015 Maintenance workers

BEP, VOSB,

Federal

IDES Information Technology

Central Office Closed Circuit Camera Maintenance

$10,001 to $50,000

24 2Q 2015 Federal

IDES Information Technology

Software $10,001 to $50,000

36 2Q 2015 Federal

IDFPR Professional Services

Testing services for Real Estate Licensees

TBD 36 3Q 2015 TBD TBD Non-Federal

IDFPR Professional Services

Consulting Service for Department-Wide Operations, Legislative, and Tech Continuity

$500,001 to $1,000,000

TBD 4Q 2015 TBD TBD Non-Federal

IDFPR Information Technology

Implementation OD department-wide Technology Continuity

$10,001 to $2,000,000

12 3Q 2016 TBD TBD Non-Federal

IDFPR Information Technology

Information gathering for Division of Banking and Division of Financial Institutions use of licensing/regulatory system (CLEAR)

TBD TBD 1Q 2016 TBD TBD TBD

IDFPR Commodities

Postal Machine Rental

$10,001 to $50,000

12 3Q 2015 TBD TBD Non-Federal

IDFPR Professional Services

Background Check Services

$250,001 to $500,000

24 3Q 2015 TBD TBD Non-Federal

IDOC Centralia Correctional Ctr

Work Services

Repair and Maintenance of Door Control System

$100,001 to $250,000

72 2Q 2016 N/A N/A Non-Federal

IDOC Centralia Correctional Ctr,

Work Services

Repair & Maintenance of Electrical Equipment

$100,001 to $250,000

72 2Q 2016 N/A N/A Non-Federal

Page 66: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

66

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

IDOC Centralia Correctional Ctr,

Work Services

Repair & maintenance of Emergency Generator

$100,001 to $250,000

72 2Q 2016 N/A N/A Non-Federal

IDOC Centralia Correctional Ctr.

Work Services

Fire Extinguisher Testing & Maintenance

$100,001 to $250,000

60 1Q 2016 N/A N/A Non-Federal

IDOC Centralia Correctional Ctr.

Work Services

SCBA Testing & Maintenance

$100,001 to $250,000

60 1Q 2016 N/A N/A Non-Federal

IDOC Centralia Correctional Ctr.

Work Services

Heating and Cooling

$100,001 to $250,000

60 1Q 2016 N/A N/A Non-Federal

IDOC Centralia Correctional Ctr.

Work Services

Fire & Smoke Alarm System

$50,001 to $100,000

60 1Q 2016 N/A N/A Non-Federal

IDOC Danville Correctional Center

Professional Services

Pest Control $50,001 to $100,000

TBD 4Q 2015 N/A N/A Non-Federal

IDOC Danville Correctional Center

Professional Services

Dish Machine R&M

$100,001 to $250,000

60 4Q 2015 N/A N/A Non-Federal

IDOC Pinckneyville Correctional Ctr

Professional Services

Heating/Air Conditioning/Fire Control System Repair & Maintenance

$500,001 to $1,000,000

72 4Q 2015 N/A Non-Federal

IDOC Pinckneyville Correctional Ctr

Professional Services

DQIIP Fire Control System

$100,001 to $250,000

TBD 4Q 2015 N/A Non-Federal

IDOC Pinckneyville Correctional Ctr

Professional Services

Elevator Maintenance

$50,001 to $100,000

36 4Q 2015 N/A Non-Federal

IDOC Pinckneyville Correctional Ctr

Professional Services

Generator Maintenance & Emergency Repair

$100,001 to $250,000

TBD 4Q 2015 N/A Non-Federal

IDOC - Taylorville Correctional Center

Work Services

Mail Machine Lease

Under $10,000

36 4Q 2015 Non-Federal

IDOC - Taylorville Correctional Center

Professional Services

Sprinkler R&M Inspections

$10,001 to $50,000

72 1Q 2016 Non-Federal

IDOC - Taylorville Correctional Center

Information Technology

Copier Lease $50,001 to $100,000

36 4Q 2015 Non-Federal

IDOC - Taylorville Correctional Center

Work Services

Refrigeration R&M

$100,001 to $250,000

60 2Q 2016 Non-Federal

IDOC - Taylorville Correctional Center

Professional Services

Inmate Cable Service

$100,001 to $250,000

72 1Q 2016 Non-Federal

Page 67: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

67

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

IDOC - Taylorville Correctional Center

Professional Services

Fire Extinguisher R &M and Inspections

$10,001 to $50,000

72 4Q 2015 Non-Federal

IDOC - Taylorville Correctional Center

Construction

Gym Floor Replacement

$50,001 to $100,000

12 2Q 2016 Non-Federal

IDOC - Taylorville Correctional Center

Professional Services

Water Analysis

$10,001 to $50,000

72 2Q 2016 Non-Federal

IDOC - Taylorville Correctional Center

Professional Services

SCBA R & M and Inspections

$10,001 to $50,000

84 1Q 2016 Non-Federal

IDOC - Taylorville Correctional Center

Professional Services

Generator R & M

$100,001 to $250,000

60 2Q 2016 Non-Federal

IDOC - Taylorville Correctional Center

Professional Services

Boiler R & M $100,001 to $250,000

60 2Q 2016 Non-Federal

IDOC - Taylorville Correctional Center

Professional Services

Ansul Hood R&M and Inspections

$10,001 to $50,000

72 4Q 2015 Non-Federal

IDOC Centralia Correctional Ctr,

Work Services

Repair & Maintenance of Dietary Equipment

$100,001 to $250,000

72 1Q 2016 N/A N/A Non-Federal

IDOC Centralia Correctional Ctr,

Work Services

Repair and Maintenance of Boilers

$100,001 to $250,000

72 2Q 2016 N/A N/A Non-Federal

IDOC Danville Correctional Center

Professional Services

Liquid Waste Removal

$100,001 to $250,000

TBD 4Q 2015 N/A N/A Non-Federal

IDOC Decatur CC

Commodities

Fire Alarm Testing

$50,001 to $100,000

60 1Q 2016 Non-Federal

IDOC East Moline CC

Professional Services

Elevator Maintenance

$50,001 to $100,000

60 4Q 2015 Inspection and repairs.

Non-Federal

IDOC East Moline CC

Professional Services

Pest Control $50,001 to $100,000

60 1Q 2016 Pest control. Non-Federal

IDOC East Moline CC

Professional Services

Fire Alarm Maintenance

$100,001 to $250,000

60 4Q 2015 Inspection and repairs.

Non-Federal

IDOC East Moline CC

Professional Services

Fence Repair and Replacement

$50,001 to $100,000

12 3Q 2015 Fence repair. Non-Federal

IDOC East Moline CC

Professional Services

Cable TV installation and replacement

$100,001 to $250,000

12 TBD Wire installation.

Non-Federal

Page 68: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

68

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

IDOC East Moline CC

Professional Services

Electrical Maintenance and Repairs

$50,001 to $100,000

60 TBD Electrical system repairs.

IDOC East Moline CC

Professional Services

Refrigeration Maintenance and Repairs

$50,001 to $100,000

60 TBD Dietary equipment inspection, repair and maintenance.

IDOC East Moline CC

Professional Services

HVAC Maintenance and Repairs

$250,001 to $500,000

60 TBD Unit replacement and/or repairs.

IDOC East Moline CC

Professional Services

Plumbing Maintenance and Repairs

$100,001 to $250,000

60 TBD Large water supply system (water main breaks).

IDOC East Moline CC

Professional Services

Roofing Repair and Replacement.

$100,001 to $250,000

60 TBD Roof replacement and/or repairs.

IDOC East Moline CC

Professional Services

Fire Extinguisher Testing and Maintenance

$10,001 to $50,000

60 TBD Fire extinguisher testing and replacement.

IDOC East Moline CC

Professional Services

Grease Pumping Service.

$10,001 to $50,000

60 TBD Grease and/or root extraction.

IDOC East Moline CC

Professional Services

Boiler Replacement, Repair or Maintenance

$500,001 to $1,000,000

60 TBD Repair and/or replacement of boiler system components.

IDOC East Moline CC

Professional Services

Door Control System Repair

$50,001 to $100,000

60 TBD Repair door controller panels.

IDOC East Moline CC

Professional Services

Cable Rewire of Housing Unit

$100,001 to $250,000

12 4Q 2015 Non-Federal

IDOC General Office

Professional Services

GAAP & ARRA Assistance

$5,000,001 to $10,000,000

36 1Q 2016 None Non-Federal

IDOC Graham CC

Services Waste removal

390000 to 450000

120 2Q 2015 Open Bidding (depending on Mandatory code)

GRF

IDOC Graham CC

Services Repair and Maintenance of Dietary Equipment

77000 to 87000

120 1Q 2016 Open Bidding (depending on Mandatory code)

GRF

IDOC Graham CC

Services Monthly Inspection and Pest Control

190000 to 200000

120 1Q 2016 Open Bidding (depending on Mandatory code)

GRF

Page 69: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

69

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

IDOC Graham CC

Services Repair and Maintenance of Fire Alarm System

103000 to 113000

120 1Q 2016 Open Bidding (depending on Mandatory code)

GRF

IDOC Graham CC

Services Repair and Maintenance of Temperature Control Systems

103000 to 113000

120 1Q 2016 Open Bidding (depending on Mandatory code)

GRF

IDOC Graham CC

Services Repair and Maintenance of Refrigerator & Freezer Equipment

390000 to 450000

120 1Q 2016 Open Bidding (depending on Mandatory code)

GRF

IDOC Graham CC

Services Repair and Maintenance of AC/Heating Systems

390000 to 450000

120 1Q 2016 Open Bidding (depending on Mandatory code)

GRF

IDOC Graham CC

Services Grease Trap Pumping Service For Dietary (Waste Pumping)

120000 to 130000

120 1Q 2016 Open Bidding (depending on Mandatory code)

GRF

IDOC Graham CC

Services 4 Yard Port-A-Poddies

40000 to 50000

120 2Q 2016 Open Bidding (depending on Mandatory code)

Locally held funds

IDOC Graham CC

Services Multipurpose Copier/Printing/Fax Machine Lease

337000 to 347000

120 2Q 2015 Open Bidding (depending on Mandatory code)

GRF

IDOC Hill CC Work Services

Building Automation Repair and Maintenance

$250,001 to $500,000

60 4Q 2015 Non-Federal

IDOC Hill CC Work Services

Air Conditioning and Refrigeration Repair and Maintenance

$50,001 to $100,000

60 4Q 2015 Non-Federal

IDOC Hill CC Work Services

Boiler Repair and Maintenance

$100,001 to $250,000

60 4Q 2015 Non-Federal

IDOC Illinois River CC

Work Services

Waste Hauling

$10,001 to $2,000,000

TBD 3Q 2016 Non-Federal

Page 70: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

70

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

IDOC Jacksonville CC

Work Services

R&M HVAC, Refrigeration

$250,001 to $500,000

TBD 1Q 2016 Non-Federal

IDOC Jacksonville CC

Work Services

R&M Fire Alarm System

$100,001 to $250,000

72 4Q 2015 Non-Federal

IDOC Jacksonville CC

Work Services

R&M Generators

$250,001 to $500,000

TBD 1Q 2016

IDOC Jacksonville CC

Work Services

Dietary Hood Cleaning

$10,001 to $50,000

72 1Q 2016

IDOC Jacksonville CC

Work Services

R&M Elevator $10,001 to $50,000

72 2Q 2016

IDOC Jacksonville CC

Work Services

R&M Washers/Dryers

$10,001 to $50,000

72 2Q 2016

IDOC Jacksonville CC

Work Services

Dietary Grease Removal

$10,001 to $50,000

72 2Q 2016

IDOC Jacksonville CC

Work Services

Fire Extinguisher Test/Maint

$10,001 to $50,000

72 2Q 2016

IDOC Jacksonville CC

Work Services

SCBA Test/Maint

$10,001 to $50,000

72 2Q 2016

IDOC Jacksonville CC

Small Orders

Duplicator Purchase

$10,001 to $50,000

72 4Q 2015

IDOC Lincoln Correctional Center

Work Services

Fire Alarms/ Maintenance

$50,001 to $100,000

TBD 1Q 2016 none none Non-Federal

IDOC Logan CC

Work Services

Alarm system R&M

$10,001 to $50,000

72 2Q 2015 NA NA Non-Federal

IDOC Logan CC

Work Services

Mail Machine Lease

$10,001 to $50,000

36 4Q 2015 NA NA Non-Federal

IDOC Menard CC

Professional Services

Fire Alarm R & M

$250,001 to $500,000

60 1Q 2016 Backflow and Fire Pumps

Veteran Non-Federal

IDOC Pontiac CC

Professional Services

Dietary Hoods Cleaning

$10,001 to $50,000

84 1Q 2016 TBD

IDOC Pontiac CC

Professional Services

Demolish Building, CO 723, and Replace with Larger Modern Steel Building at New Location on MSU

$100,001 to $250,000

12 2Q 2016 TBD

Page 71: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

71

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

IDOC Pontiac CC

Professional Services

Remove High Mast Lighting from Dwight Correctional, Convert to LED and Relocate to Pontiac

$100,001 to $250,000

12 2Q 2016 TBD

IDOC Pontiac CC

Professional Services

Remove Ash Silo at Power House CO 758 and Replace with Lean Storage Area

$50,001 to $100,000

12 3Q 2016 TBD

IDOC Pontiac CC

Construction

Replace Steps With Handicap Accessible Ramp

$50,001 to $100,000

12 3Q 2016 TBD

IDOC Pontiac CC

Professional Services

Emergency Generator

$250,001 to $500,000

84 1Q 2016 TBD

IDOC Pontiac CC

Professional Services

High Voltage, Perimeter Lighting

$100,001 to $250,000

84 1Q 2016 TBD

IDOC Pontiac CC

Professional Services

Building Automation System

$100,001 to $250,000

84 3Q 2016 TBD

IDOC Pontiac CC

Professional Services

Boiler Repairs and Maintenance

$250,001 to $500,000

84 1Q 2016 TBD

IDOC Pontiac CC

Professional Services

Plumbing Services

$100,001 to $250,000

84 2Q 2016 TBD

IDOC Pontiac CC

Commodities

Tractors & Utility Vehicles

$100,001 to $250,000

36 3Q 2016 TBD

IDOC Pontiac CC

Professional Services

Camera Repair Services

$250,001 to $500,000

84 2Q 2016 TBD

IDOC Pontiac CC

Professional Services

Portable Toilets

$10,001 to $50,000

84 1Q 2016

IDOC Robinson CC

Facilities Building Automation

500,000 60 3Q 2016 No Small Business

General Revenue

IDOC Robinson CC

Facilities Cable TV 300,000 60 3Q 2016 No Small Business

Inmate Benefit Fund

IDOC Robinson CC

Facilities Waste Removal

100,000 60 4Q 2016 No Small Business

General Revenue

IDOC Sheridan CC

Commodities

Duplicator/Printer for General Office Print Shop

$100,001 to $250,000

72 4Q 2015 N/A N/A Non-Federal

IDOC Sheridan CC

Commodities

IDOC Inmate Boots

$10,001 to $2,000,000

48 4Q 2015 Delivery, Supplies

BEP Non-Federal

Page 72: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

72

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

IDOC Sheridan CC

Commodities

Ammunition $250,001 to $500,000

12 1Q 2016 N/A N/A Non-Federal

IDOC Sheridan CC

Commodities

Annual Print Order

$50,001 to $100,000

12 1Q 2016 N/A N/A Non-Federal

IDOC Sheridan CC

Commodities

Food surveys $10,000,001 to $20,000,000

1Q 2016 Delivery, Supplies

BEP Non-Federal

IDOC Sheridan CC

Commodities

Food surveys $10,000,001 to $20,000,000

3Q 2016 Delivery, Supplies

BEP Non-Federal

IDOC Southwestern Illinois Correctional Center

Work Services

Repair and Maintenance of Boilers

$50,001 to $100,000

84 2Q 2016 N/A N/A Non-Federal

IDOC Southwestern Illinois Correctional Center

Work Services

Repair & Maintenance of Dietary Equipment

$100,001 to $250,000

84 1Q 2016 N/A N/A Non-Federal

IDOC Southwestern Illinois Correctional Center

Work Services

Repair and Maintenance of Door Control System

$50,001 to $100,000

84 2Q 2016 N/A N/A Non-Federal

IDOC Southwestern Illinois Correctional Center

Work Services

Repair & Maintenance of Electrical Equipment

$100,001 to $250,000

84 2Q 2016 N/A N/A Non-Federal

IDOC Southwestern Illinois Correctional Center

Work Services

Repair & maintenance of Emergency Generator

$100,001 to $250,000

84 2Q 2016 N/A N/A Non-Federal

IDOC Southwestern Illinois Correctional Center

Work Services

Fire Extinguisher Testing & Maintenance

$50,001 to $100,000

60 2Q 2016 N/A N/A Non-Federal

IDOC Southwestern Illinois Correctional Center

Work Services

SCBA Testing & Maintenance

$50,001 to $100,000

60 2Q 2016 N/A N/A Non-Federal

IDOC Southwestern Illinois Correctional Center

Work Services

Fire & Smoke Alarm System

$50,001 to $100,000

60 2Q 2016 N/A N/A Non-Federal

IDOC/IDJJ-Purchasing

Commodities

Duplicator/Printer for General Office Print Shop

$100,001 to $250,000

72 4Q 2015 N/A N/A Non-Federal

IDOC/IDJJ-Purchasing

Commodities

IDOC Inmate Boots

$10,001 to $2,000,000

48 4Q 2015 Delivery, Supplies

BEP Non-Federal

Page 73: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

73

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

IDOC/IDJJ-Purchasing

Commodities

Ammunition $250,001 to $500,000

12 1Q 2016 N/A N/A Non-Federal

IDOC/IDJJ-Purchasing

Commodities

Annual Print Order

$50,001 to $100,000

12 1Q 2016 N/A N/A Non-Federal

IDOC/IDJJ-Purchasing

Commodities

Food surveys $10,000,001 to $20,000,000

1Q 2016 Delivery, Supplies

BEP Non-Federal

IDOC/IDJJ-Purchasing

Commodities

Food surveys $10,000,001 to $20,000,000

3Q 2016 Delivery, Supplies

BEP Non-Federal

IEMA Commodities

Catering services

$10,001 to $50,000

36 2Q 2015 Mixed

IEMA Work Services

Maintenance and Break/Fix for Uninterruptable Power Supply

$250,001 to $500,000

36 3Q 2015 Non-Federal

IEMA Information Technology

.Net Developer

$10,001 to $50,000

12 3Q 2015 Mixed

IEMA Work Services

Maintenance and Break/Fix for HVAC

$10,001 to $50,000

36 3Q 2015 Non-Federal

IL Power Agency

Small Orders

Print Annual Renewables Report

Under $10,000

4Q 2015 Non-Federal

IL Student Assistance Commission

Small Orders

Production of Film Output for Printing

Under $10,000

12 4Q 2015 N/A N/A Federal

IL Student Assistance Commission

Small Orders

Maintenance for Truper 3600 Scanner

Under $10,000

12 4Q 2015 N/A N/A Federal

IL Student Assistance Commission

Small Orders

Sophos Complete Security Suite

Under $10,000

12 4Q 2015 N/A N/A Federal

IL Student Assistance Commission

Small Orders

CA Erwin Data Modeler Software Maintenance

Under $10,000

12 4Q 2015 N/A N/A Federal

IL Student Assistance Commission

Small Orders

Kodak Maintenance for Kodak Imagelink Equipment

Under $10,000

12 4Q 2015 N/A N/A Federal

IL Student Assistance Commission

Small Orders

Eye Beyond Trust Secures Software Maintenance

Under $10,000

12 4Q 2015 N/A N/A Federal

IL Student Assistance Commission

Small Orders

Audio for Commission Meeting

Under $10,000

12 4Q 2015 N/A N/A Federal

IL Student Assistance Commission

Small Orders

Vipre Anti-virus/Anti-spyware

Under $10,000

12 1Q 2016 N/A N/A Federal

Page 74: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

74

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

IL Student Assistance Commission

Small Orders

YourKit Java Profiler Institution License

Under $10,000

12 1Q 2016 N/A N/A Federal

IL Student Assistance Commission

Small Orders

IT Watch Relay Goose II extended warranty

Under $10,000

12 1Q 2016 N/A N/A Federal

IL Student Assistance Commission

Small Orders

TeamViewer Premium 9

Under $10,000

12 2Q 2016 N/A N/A Federal

IL Student Assistance Commission

Small Orders

Zenworks Asset management Standard maintenance

Under $10,000

12 2Q 2016 N/A N/A Federal

IL Student Assistance Commission

Small Orders

Active Administrator Software Maintenance

Under $10,000

12 3Q 2016 N/A N/A Federal

IL Student Assistance Commission

Small Orders

IS Decisions User Lock software maintenance

Under $10,000

12 3Q 2016 N/A N/A Federal

IL Student Assistance Commission

Small Orders

Loadbalancer.org VA clustered pair standard technical support

Under $10,000

12 3Q 2016 N/A N/A Federal

IL Student Assistance Commission

Professional Services

Intermediate Fixed Income Fund Manager

$500,001 to $1,000,000

TBD 3Q 2015 N/A N/A Non-Federal

IL Student Assistance Commission

Professional Services

Core Fixed Income Fund Manager

$3,000,001 to $5,000,000

TBD 3Q 2015 N/A N/A Non-Federal

IL Student Assistance Commission

Professional Services

Large Cap International Investment Manager

$2,000,001 to $3,000,000

TBD 3Q 2015 N/A N/A Non-Federal

IL Student Assistance Commission

Information Technology

Internet Portal, transcripts

$2,000,001 to $3,000,000

60 4Q 2015 IT BEP/VOSB

Non-Federal

IL Student Assistance Commission

Professional Services

Central Marketing Agent

$3,000,001 to $5,000,000

36 1Q 2016 marketing BEP/VOSB

Non-Federal

IL Student Assistance Commission

Professional Services

Investment Advisor

$10,001 to $2,000,000

60 3Q 2016 none N/A Non-Federal

IL Student Assistance Commission

Professional Services

Facility Rental for Counselor Training

$100,001 to $250,000

24 4Q 2015 food service N/A

ILETSB 36 4Q 2015 Delivery, Supplies

BEP Non-Federal

Page 75: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

75

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

Illinois Commerce Commission

Professional Services

Sullivan's Court Reporting Renewal

$250,001 to $500,000

24 3Q 2016 court reporting Small Business

Non-Federal

Illinois Commerce Commission

Professional Services

Renewal Electric Procurement Monitor

$3,000,001 to $5,000,000

48 4Q 2015 Non-Federal

Illinois Commerce Commission

Information Technology

Online Legal Research

$100,001 to $250,000

48 1Q 2016 N/A Non-Federal

Illinois Commerce Commission

Commodities

Printing of Ticket Forms

$10,001 to $50,000

12 1Q 2016 N/A Small Business

Non-Federal

Illinois Commerce Commission

Professional Services

Feasibility for Implementation of Statewide Next Generation 9-1-1 Network

$500,001 to $1,000,000

12 3Q 2016 Non-Federal

Illinois Community College Board

Information Technology

Mac Laptops for Traveling Lab

$10,001 to $50,000

12 1Q 2016 Delivery, Supplies

BEP Mixed

Illinois Finance Authority

Information Technology

IT Project Management

$50,001 to $100,000

12 4Q 2015 Yes BEP TBD

Illinois Finance Authority

Professional Services

Legislative/Lobbying Services

$100,001 to $250,000

36 4Q 2015 No TBD

Illinois Finance Authority

Professional Services

Loan Servicing/Paying Agent

$250,001 to $500,000

60 4Q 2015 No TBD

Illinois Finance Authority

Professional Services

Insurance Brokering Services

$100,001 to $250,000

60 4Q 2015 No TBD

Illinois Finance Authority

Professional Services

Specialty Accounting and Auditing

$250,001 to $500,000

60 4Q 2015 Yes BEP TBD

Illinois Finance Authority

Professional Services

Employee Benefits

$100,001 to $250,000

60 4Q 2015 No TBD

Illinois Finance Authority

Information Technology

IT Network Consulting

$100,001 to $250,000

60 1Q 2016 Yes BEP TBD

Illinois Finance Authority

Professional Services

Typesetting and Printing Services

$50,001 to $100,000

36 1Q 2016 Yes BEP TBD

Illinois Finance Authority

Professional Services

Payroll Services

$250,001 to $500,000

60 4Q 2015 Yes BEP TBD

Illinois Finance Authority

Professional Services

Marketing Services

$100,001 to $250,000

60 1Q 2016 No TBD

Illinois Finance Authority

Professional Services

Cash Management/Financial Institutions

$100,001 to $250,000

60 1Q 2016 No TBD

Page 76: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

76

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

Illinois Finance Authority

Professional Services

Records Storage

$10,001 to $50,000

36 4Q 2015 No TBD

Illinois Finance Authority

Professional Services

Temporary Staffing

$50,001 to $100,000

36 4Q 2015 Yes BEP TBD

Illinois Finance Authority

Professional Services

Investment Advisor

$50,001 to $100,000

60 1Q 2016 No TBD

Illinois Finance Authority

Professional Services

Investment Manager

$50,001 to $100,000

60 1Q 2016 No TBD

Illinois River CC

Work Services

Building Automation & Fire Detection System

$500,001 to $1,000,000

TBD 4Q 2015 Non-Federal

ISBE Professional Services

RFP Readers $10,001 to $50,000

12 4Q 2015 Federal

ISBE Professional Services

Hearing Officers

$100,001 to $250,000

12 4Q 2015 Non-Federal

ISBE Commodities

Mail Machine $50,001 to $100,000

36 4Q 2015 Non-Federal

IYC-Chicago Work Services

Building Automation

$250,001 to $500,000

84 TBD No BEP Non-Federal

IYC-Chicago Work Services

Dietary Equipment

$50,001 to $100,000

84 TBD No BEP Non-Federal

IYC-Chicago Work Services

Door Control $250,001 to $500,000

84 TBD No BEP Non-Federal

IYC-Chicago Work Services

Electrical Repair

$50,001 to $100,000

84 TBD No BEP Non-Federal

IYC-Chicago Work Services

Fire Alarm $50,001 to $100,000

84 TBD No BEP Non-Federal

IYC-Chicago Work Services

Fire Extinguishers

$10,001 to $50,000

84 TBD No BEP Non-Federal

IYC-Chicago Work Services

Refrigeration $10,001 to $50,000

84 TBD No BEP Non-Federal

IYC-Chicago Work Services

SCBA Tanks $50,001 to $100,000

84 TBD No BEP Non-Federal

IYC-Chicago Work Services

Trash $50,001 to $100,000

84 TBD No BEP Non-Federal

IYC-Chicago Work Services

Backup Generator

$100,001 to $250,000

84 TBD No BEP Non-Federal

Lottery Professional Services

System & Testing ICS

$250,001 to $500,000

TBD 1Q 2016 Non-Federal

Page 77: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

77

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

Lottery Professional Services

Drawing Auditors

$100,001 to $250,000

TBD 1Q 2016 Auditing BEP Non-Federal

Lottery Professional Services

PMA TBD TBD 1Q 2016 Marketing/Advertising

BEP Non-Federal

Military Affairs Work Services

Armed Security Guard Services at six IL National Guard MEVA (Mission Essential Vulnerable Area) locations.

$5,000,001 to $10,000,000

60 4Q 2015 NA NA Federal

Military Affairs Work Services

Commercial Laundry Services for Cadets at Lincoln's Challenge Academy, Rantoul, IL

$100,001 to $250,000

60 2Q 2016 Delivery, Supplies

Any/All Federal

Public Health Professional Services

EMT Testing $10,001 to $2,000,000

36 2Q 2016 Non-Federal

Public Health Professional Services

24/7 Perinatal HIV Hotline

$10,001 to $2,000,000

72 2Q 2016 Non-Federal

Public Health Professional Services

Cost Allocation Services

$50,001 to $100,000

36 2Q 2016 Non-Federal

Public Health Professional Services

IRB Chair, Misc. Medical Consultation

$100,001 to $250,000

36 3Q 2016 Non-Federal

Public Health Information Technology

Adverse Health Care Events Reporting System

$5,000,001 to $10,000,000

TBD TBD Non-Federal

Public Health Commodities

Purchase of Vaccines

$5,000,001 to $10,000,000

36 3Q 2016 Mixed

Public Health Commodities

Newborn Screening Tests

$10,001 to $2,000,000

36 3Q 2016 Mixed

Public Health Commodities

Reagents for E Coli Testing

$100,001 to $250,000

24 2Q 2016 Mixed

Public Health Commodities

HIV Test Kits $250,001 to $500,000

24 2Q 2016 Mixed

Public Health Commodities

Cystic Fibrosis Reagents

$500,001 to $1,000,000

24 2Q 2016 Mixed

Public Health Commodities

Family Planning

$250,001 to $500,000

24 3Q 2016 Mixed

Page 78: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

78

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

Public Health Commodities

Hepatitis C Detection Kits

$500,001 to $1,000,000

24 1Q 2016 Mixed

Public Health Commodities

Purchase of Lab Supplies

$10,000,001 to $20,000,000

24 1Q 2016 Mixed

Public Health Commodities

Purchase of Collection Devices

$50,001 to $100,000

24 3Q 2016 Mixed

Public Health Commodities

West Nile Detection Kits

$10,001 to $50,000

24 1Q 2016 Mixed

Public Health Commodities

Isotopically Labeled Kits

$50,001 to $100,000

24 2Q 2016 Mixed

Public Health Commodities

Detection Kits Gonorrhea & Chlamydia

$100,001 to $250,000

24 2Q 2016 Mixed

Public Health Commodities

Food Supplements/Baby Formulas

$5,000,001 to $10,000,000

24 2Q 2016 Mixed

Revenue Professional Services

Installation of New Security Devices at JRTC

$10,001 to $2,000,000

12 1Q 2016 Possibly some wiring or construction

Small Business

Non-Federal

Revenue Professional Services

Serialized Revenue Cigarette Stamps and Security Readers

$10,001 to $2,000,000

36 4Q 2015 Possibly, depends on vendor

Small Business

Non-Federal

Revenue Professional Services

Statewide Underage Drinking Media Campaign

$100,001 to $250,000

12 4Q 2015 Possibly to distribute materials

Small Business

Non-Federal

State Police Commodities

Veterinary Supplies Vaccines & Laboratories

$250,001 to $500,000

36 4Q 2015 Delivery, Supplies

BEP Non-Federal

State Police Commodities

Robotic Total Stations

$100,001 to $250,000

12 3Q 2015 TBD TBD TBD

State Police Professional Services

Drug Testing $100,001 to $250,000

48 2Q 2015 TBD TBD Non-Federal

State Police Commodities

Gas Chromatographs

$100,001 to $250,000

12 3Q 2015 TBD TBD TBD

State Police Commodities

FT-IRS $100,001 to $250,000

12 3Q 2015 TBD TBD TBD

State Police Professional Services

Cadet Medicals

$100,001 to $250,000

48 2Q 2015 TBD TBD TBD

State Police Vehicles & Heavy Equipment

Full Size Ext. Length SUV

$100,001 to $250,000

36 2Q 2015 TBD TBD TBD

Page 79: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

79

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

State Police Commodities

Mail Processing Equipment

$100,001 to $250,000

TBD 2Q 2015 TBD TBD TBD

State Police Vehicles & Heavy Equipment

Motorcycles $250,001 to $500,000

36 3Q 2015 TBD TBD TBD

State Police Commodities

AFIS Upgrade $5,000,001 to $10,000,000

60 3Q 2015 TBD TBD TBD

State Police Commodities

Humidity Chambers

$100,001 to $250,000

12 3Q 2015 TBD TBD Non-Federal

State Police Merit Board

Professional Services

Legal Services

$50,001 to $100,000

84 4Q 2015 NONE NONE Non-Federal

State Police Merit Board

Professional Services

Hearing Officer Services

$50,001 to $100,000

TBD 4Q 2015 NONE NONE

State Police Merit Board

Professional Services

Legislative Services

$10,001 to $50,000

TBD 4Q 2015 NONE NONE

State Police Merit Board

Professional Services

State Trooper Testing

$100,001 to $250,000

60 4Q 2015 NONE NONE

State Police Merit Board

Professional Services

Public Affairs $10,001 to $50,000

TBD 1Q 2016 NONE NONE

Toll Highway Authority

Equipment Automatic Number Plate Recognition System

Over $20,000,001

60 2Q 2015 Non-Federal

Toll Highway Authority

General Services

Backflow Inspection and Repair Services

$100,001 to $250,000

60 2Q 2015 Non-Federal

Toll Highway Authority

General Services

Building Glass Replacement and Repair Services

$10,001 to $50,000

24 2Q 2015 Non-Federal

Toll Highway Authority

Commodities

Ceratech Fast-Setting Cement

$100,001 to $250,000

60 2Q 2015 Non-Federal

Toll Highway Authority

Commodities

Concrete Equipment and Saws

$100,001 to $250,000

One-Time Purchase

2Q 2015 Non-Federal

Toll Highway Authority

Commodities

Electronic Parts, Miscellaneous

$50,001 to $100,000

24 2Q 2015 Non-Federal

Toll Highway Authority

Information Technology

Enterprise Resource Planning (ERP) Software and Services

Over $20,000,001

72 2Q 2015 Non-Federal

Page 80: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

80

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

Toll Highway Authority

General Services

Hazardous Waste Characterization and Disposal Services

$10,001 to $50,000

24 2Q 2015 Non-Federal

Toll Highway Authority

General Services

Landfill Services

$100,001 to $250,000

36 2Q 2015 Non-Federal

Toll Highway Authority

Information Technology

Liferay Software Licenses with Support and Maintenance

$50,001 to $100,000

12 2Q 2015 Non-Federal

Toll Highway Authority

Commodities

Lumber and Plywood

$50,001 to $100,000

36 2Q 2015 Non-Federal

Toll Highway Authority

Equipment Mobile Work Zone Barrier Unit

$100,001 to $250,000

One-Time Purchase

2Q 2015 Non-Federal

Toll Highway Authority

General Services

Overhead Door Repair

$100,001 to $250,000

36 2Q 2015 Non-Federal

Toll Highway Authority

General Services

Preventative Maintenance and Repair of Boilers and Hot Water Heaters

$50,001 to $100,000

12 2Q 2015 Non-Federal

Toll Highway Authority

Commodities

Printer Cartridges

$10,001 to $50,000

24 2Q 2015 Non-Federal

Toll Highway Authority

General Services

Rockford Metro Retail Placement

$100,001 to $250,000

60 2Q 2015 Non-Federal

Toll Highway Authority

Commodities

Allison Transmission Repair Parts

$50,001 to $100,000

24 3Q 2015 Non-Federal

Toll Highway Authority

General Services

Automated Vehicle Locating System

$500,001 to $1,000,000

60 3Q 2015 Non-Federal

Toll Highway Authority

Equipment Automatic Toll Payment Machines (ATPMs) Purchase

Over $20,000,001

60 3Q 2015 Non-Federal

Toll Highway Authority

General Services

Cafeteria Services

TBD 36 3Q 2015 Non-Federal

Toll Highway Authority

Commodities

Chains, Hooks, and Links

$10,001 to $50,000

24 3Q 2015 Non-Federal

Toll Highway Authority

Commodities

Crack-Sealing Material

$100,001 to $250,000

12 3Q 2015 Non-Federal

Toll Highway Authority

Commodities

Electrical Wire and Cable

Under $10,000

24 3Q 2015 Non-Federal

Page 81: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

81

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

Toll Highway Authority

Vehicles & Heavy Equipment

Equipment Trailers

$250,001 to $500,000

12 3Q 2015 Non-Federal

Toll Highway Authority

Commodities

FG300 Curb Barrier System Replacement Parts

$50,001 to $100,000

24 3Q 2015 Non-Federal

Toll Highway Authority

Commodities

Hydraulic Motor, Pump and Valve Body Parts and Repair Services

$10,001 to $50,000

24 3Q 2015 Non-Federal

Toll Highway Authority

General Services

In-Kind Marketing Services

TBD TBD 3Q 2015 Non-Federal

Toll Highway Authority

General Services

Job Order Contracting - General Contractors

Over $20,000,001

60 3Q 2015 Non-Federal

Toll Highway Authority

General Services

Legislative Liaison Services

$250,001 to $500,000

60 3Q 2015 Non-Federal

Toll Highway Authority

Vehicles & Heavy Equipment

Light-Duty Trucks

$3,000,001 to $5,000,000

12 3Q 2015 Non-Federal

Toll Highway Authority

Commodities

Luminaires and Components

$10,001 to $50,000

One-Time Purchase

3Q 2015 Non-Federal

Toll Highway Authority

Information Technology

Network Operation Center System

$250,001 to $500,000

60 3Q 2015 Non-Federal

Toll Highway Authority

Commodities

Nucor Barrier System Replacement Parts

$100,001 to $250,000

24 3Q 2015 Non-Federal

Toll Highway Authority

Information Technology

PBX Phone System Replacement, Maintenance, and Support Services

$3,000,001 to $5,000,000

72 3Q 2015 Non-Federal

Toll Highway Authority

Commodities

Plumbing Supplies, Miscellaneous

$10,001 to $50,000

24 3Q 2015 Non-Federal

Toll Highway Authority

Commodities

Shop Equipment

$50,001 to $100,000

One-Time Purchase

3Q 2015 Non-Federal

Toll Highway Authority

Commodities

Thermal Receipt Paper

$50,001 to $100,000

24 3Q 2015 Non-Federal

Toll Highway Authority

Commodities

Tingley Rainwear

$10,001 to $50,000

24 3Q 2015 Non-Federal

Page 82: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

82

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

Toll Highway Authority

General Services

Aerial Lift Maintenance and Repair Services

$50,001 to $100,000

24 4Q 2015 Non-Federal

Toll Highway Authority

Vehicles & Heavy Equipment

Air Compressors, Tow-Behind

$50,001 to $100,000

12 4Q 2015 Non-Federal

Toll Highway Authority

Commodities

Aluminum Sign Blanks

$100,001 to $250,000

One-Time Purchase

4Q 2015 Non-Federal

Toll Highway Authority

Commodities

Breakaway Light Pole Bases

TBD TBD 4Q 2015 Non-Federal

Toll Highway Authority

General Services

Commercial Property Insurance

TBD TBD 4Q 2015 Non-Federal

Toll Highway Authority

Vehicles & Heavy Equipment

Mowing Tractors and Equipment

$1,000,001 to $2,000,000

One-Time Purchase

4Q 2015 Non-Federal

Toll Highway Authority

Vehicles & Heavy Equipment

Off-Road Equipment

$1,000,001 to $2,000,000

12 4Q 2015 Non-Federal

Toll Highway Authority

General Services

Radiator Repair Services

TBD TBD 4Q 2015 Non-Federal

Toll Highway Authority

Commodities

Drill Bits and Cutting Tools

TBD TBD 1Q 2016 Non-Federal

Toll Highway Authority

General Services

Fire Alarm Inspection and Repair Services

Under $10,000

24 1Q 2016 Non-Federal

Toll Highway Authority

General Services

Liability Insurance

TBD TBD 1Q 2016 Non-Federal

Toll Highway Authority

General Services

Merchant Card Services

Over $20,000,001

48 1Q 2016 Non-Federal

Toll Highway Authority

Vehicles & Heavy Equipment

Message Signs, Arrow Boards, and Light Towers

TBD TBD 1Q 2016 Non-Federal

Toll Highway Authority

Commodities

Professional Paint Supplies

TBD TBD 1Q 2016 Non-Federal

Toll Highway Authority

General Services

Workers' Compensation Actuarial Services

$10,001 to $50,000

60 1Q 2016 Non-Federal

Toll Highway Authority

Information Technology

Lane Hardware and Maintenance

TBD TBD TBD Non-Federal

Transportation Commodities

Contract for Traffic Signal Components

$100,001 to $250,000

12 1Q 2016 Delivery, Supplies

Non-Federal

Transportation Vehicles & Heavy Equipment

Purchase of Off-Road Equipment

$10,001 to $2,000,000

TBD 1Q 2016 Delivery, Supplies

BEP Non-Federal

Page 83: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

State of Illinois Contracting Opportunities

83

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

State o

f Illino

is

Department Contract Type

Project Description

Estimated Value

Estimated Term (months)

Anticipated Ad Date

Subcon-tracting Opportunities

Subcon-tracting Cert Type

Funding Source

Transportation Commodities

Contract for Liquid Asphalt

$10,001 to $2,000,000

24 4Q 2015 N/A Non-Federal

Page 84: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Assist Agencies 84

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Assist Agencies are comprised of not-for-profit agencies and/or chamber of commerce agencies that represent the interest of small, minority and/or women owned businesses. 51st Street Business Association 220 E. 51st Street Chicago, IL 60615 Phone: 773-285-3401 Fax: 773-285-3407 Email: [email protected] 51stStreetWeekly.com

Asian American Business Expo 207 E. Ohio St. Suite 218 Chicago, IL 60611 Phone: 312-233-2810 Fax: 312-268-6388 Email: [email protected]

Asian American Institute 4753 N. Broadway St. Suite 502 Chicago, IL 60640 Phone: 773-271-0899 Fax: 773-271-1982 Email: [email protected] Web: www.aaichicago.org

Association of Asian Construction Enterprises 5500 Touhy Avenue Skokie, IL 60077 Phone: 847-673-7377 Email: [email protected]

Black Contractors United 12000 S. Marshfield Ave. Calumet Park, IL 60827 Phone: 708-275-4622 Fax: 708-389-5735 Email: [email protected] Web: www.blackcontractorsunited.com

Chatham Business Association Small Business Development, Inc. 800 E. 78th Street Chicago, IL 60619 Phone: 773-994-5006 Fax: 773-994-9871 Email: [email protected] Web: www.cbaworks.org

Chicago Area Gay & Lesbian Chamber of Commerce 3179 N. Clark St. Chicago, IL 60657 Phone: 773-303-0167 Fax: 773-303-0168 Email: [email protected] Web: www.glchamber.org

Chicago Minority Supplier Development Council, Inc. 105 W. Adams, Suite 2300 Chicago, IL 60603-6233 Phone: 312-755-8880 Fax: 312-755-8890 Email: [email protected] Web: www.chicagomsdc.org

Chicago Urban League 4510 S. Michigan Ave. Chicago, IL 60653 Phone: 773-285-5800 Fax: 773-285-7772 Email: [email protected] Web: www.cul-chicago.org

Chicago Women in Trades (CWIT) 2444 W. 16th Street Chicago, IL 60608 Phone: 773-942-1444 Fax: 312-942-1599 Email: [email protected] Web: www.chicagowomenintrades.org

Coalition for United Community Labor Force 1253 W. 63rd Street Chicago, IL 60636 Phone: 312-243-5149 Email: [email protected]

Contractor Advisors Business Development 1507 E. 53rd Street, Suite 906 Chicago, IL. 60615 Phone: 312-436-0301 Email: [email protected] Web: www.contractoradvisors.us

Cosmopolitan Chamber of Commerce 30 E. Adams Suite 1050 Chicago, IL 60603 Phone: 312-499-0611 Fax: 312-701-0095 Email: [email protected] Web: www.cosmochamber.org

Developing Communities Project, Inc. 212 East 95th Street Chicago, Illinois 60619 Phone: 773-928-2500 Fax: 773-928-2513 Email: [email protected] Web: www.dcpchicago.org

Page 85: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction

Assist Agencies 85

This guide has been prepared to serve as informational purposes only to the City’s contracting process and as a reference for the future. The City may revise this plan at any time without notice.

Eighteenth Street Development Corporation 1843 S. Carpenter Chicago, IL. 60608 Phone: 312-733-2287 [email protected] www.eighteenthstreet.org

Federation of Women Contractors 5650 S. Archer Avenue Chicago, IL 60638 Phone: 312-360-1122 Fax: 312-360-0239 Email: [email protected] Web: www.fwcchicago.com

Greater Englewood Community Development Corp. 6957 S. Halsted Chicago, IL 60621 Phone: 773-891-1310 Email: [email protected] www.greaterenglewoodcdc.org

Greater Pilsen Economic Development Assoc. 1801 S. Ashland Chicago, IL 60608 Phone: 312-520-2745 Email: [email protected] Web: www.greaterpilsen.org

Hispanic American Construction Industry Association (HACIA) 650 W. Lake St. Chicago, IL 60661 Phone: 312-575-0389 Fax: 312-575-0544 Email: [email protected] Web: www.haciaworks.org

Illinois Black Chamber of Commerce 331 Fulton Street Suite 530 Chicago, Illinois 60602 Phone: 309-740-4430 Email: [email protected] www.illinoisblackchamberofcommerce.org

Illinois Hispanic Chamber of Commerce 855 W. Adams, Suite 100 Chicago, IL 60607 Phone: 312-425-9500 Fax: 312-425-9510 Email: [email protected] Web: www.ihccbusiness.net

Latin American Chamber of Commerce 3512 W. Fullerton Avenue Chicago, IL 60647 Phone: 773-252-5211 Fax: 773-252-7065 Email:[email protected] Web: www.latinamericanchamberofcommerce.com

National Association of Women Business Owners 3332 W. Foster #121 Chicago, IL 60625 Phone: 312-224-2605 Fax: 847-679-6291 Email: [email protected] Web: www.nawbochicago.org

National Organization of Minority Engineers 33 W. Monroe Suite 1505 Chicago, IL 60603 Phone: 312-425-9560 Fax: 312-425-9564 Email: [email protected] Web: www.nomeonline.org

Rainbow/PUSH Coalition International Trade Bureau 930 E. 50th Street Chicago, IL 60615 Phone: 773-373-3366 Fax: 773-373-3571 Email: [email protected] Web: www.rainbowpush.org

Resurrection Project 1818 S. Paulina Street Chicago, IL 60608 Phone: 312-763-3228 Email: [email protected] www.resurrectionproject.org

South Shore Chamber, Incorporated Black United Funds Bldg. 1750 E. 71st Street Chicago, IL 60649-2000 Phone: 773-955- 9508 Email: [email protected] Web: www.southshorechamberinc.org

US Minority Contractors Association, Inc. 1250 Grove Ave. Suite 200 Barrington, IL 60010 Phone: 847-852-5010 Fax: 847-382-1787 Email: [email protected] Web: USMinorityContractors.org

Women’s Business Development Center 8 S. Michigan Ave., Suite 400 Chicago, IL 60603 Phone: 312-853-3477 Fax: 312-853-0145 Email: [email protected] Web: www.wbdc.org

Women Construction Owners & Executives (WCOE) Chicago Caucus 308 Circle Avenue Forest Park, IL 60130 Phone: 708-366-1250 Fax: 708-366-5418 Email: [email protected] Web: www.wcoeusa.org

Page 86: 2Q 2015 4Q 2016 - Chicago · 2Q 2015 – 4Q 2016. GOVERNMENT PROCUREMENT COMPLIANCE (GPC) FORUM ... Aviation Construction Baggage Service Alley Retaining Wall Repair - Construction