2s module geometry updates module positioning concepts towards first 2s dummy modules
DESCRIPTION
Tracker Phase 2 Upgrade Meeting, 24 May 2012 Report on 2S module mechanics Refers to work and inputs by Tristan Falcy, Antonio Conde Garcia , Luc Kottelat, Stefano Mersi, Giovanni Bianchi, Duccio Abbaneo, Andreas Mussgiller, Nick Lumb, Antti Onnela. 2S module geometry updates - PowerPoint PPT PresentationTRANSCRIPT
Tracker Phase 2 Upgrade Meeting, 24 May 2012Report on 2S module mechanics
Refers to work and inputs by Tristan Falcy, Antonio Conde Garcia, Luc Kottelat, Stefano Mersi, Giovanni Bianchi,
Duccio Abbaneo, Andreas Mussgiller, Nick Lumb, Antti Onnela
2S module mechanics, 24 May 2012 Antti Onnela, CERN
2S module geometry updates Module positioning concepts Towards first 2S dummy modules
2S module geometry updates
2S module mechanics, 24 May 2012 Antti Onnela, CERN
“End-cap” and “Barrel” 2S modules• “End-cap” 2S module with 4 mm sensor distance (“air gap”).
– Version under study since 2011, used in FE analysis (Desy) and End-cap geometry studies (Lyon). – Now only minor geometry updates in the module supports and hybrids.
• New “Barrel” 2S module with 1.4 mm sensor distance. – Due geometry effect, for the same track momentum cut the sensor distance in the barrel module shall be
smaller than in the end-cap.
• Updated End-cap and Barrel module 3D models will soon be available in the Upgrade website: https://espace.cern.ch/Tracker-Upgrade/2S-Module/SitePages/Home.aspx
• Following further tracker layout studies these sensor gaps may still evolve in future.2S module mechanics, 24 May 2012 Antti Onnela, CERN
Base-line sensor spacing, following the current TK layout studies:4 mm in “End-cap” modules1.4 mm in “Barrel” modules
Silicon sensor
Silicon sensor
2S modules in barrel (Rod) geometry
• 2 alternatives being studied: Modules upside up or upside down.
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Modules upside down+ Total thickness minimized (here 15 mm), allowing compact barrel layers
+ Components are not exposed (= better protected) in the final assembly
+ Good space for module supports and thermal contacts- Radial distance between adjacent sensors is big.- Difficult access to connectors on the module
Modules upside up+ Radial distance between adjacent sensors is minimized+ Connectors are well exposed- Total thickness is potentially rather big (here 24 mm). Thickness depends directly on the biggest components
- Tight space for module supports and thermal contacts
Module positioning concepts
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Module support and positioning: TOB
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Module
Support structure(Rod)
Positioning
Module support and positioning: TIB
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Support structure(Cylinder)
Module
Positioning
Module
Module support and positioning: TEC
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Support structure(Petal)
Positioning
And the net result with TK precision?
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Already after first cosmic runs the total residuals with Track Based Alignment are at ~50um rms, and improve within 2008 to ~30um.Much better than what the mechanics can (reasonably) do!
Choice of module positioning concept?
• All used module positions solutions in the present Tracker have shown to be sufficiently precise, especially after track-based software alignment.
• TIB / TEC module positioning is more compact and lighter than the TOB solution.
• Use the TIB / TEC solution as basis in the 2S module• Try to also include captive screws, which do not need to be
handled individually during module testing and assembly phases.
2S module mechanics, 24 May 2012 Antti Onnela, CERN
2S module positioning: First thoughts
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Module
Support structure
Positioning
Module placed on supports
Screws tightened
• Positioning similar to TIB/TEC• Captive screws
Towards first 2S dummy modules
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Towards first 2S dummy modules
• Soon we will be able to produce the first dummy modules– Dummy sensors are in procurement
• Include heating, temp measurement, bond pads, positioning targets– Different R&D / dummy versions of other module components will be available.
• How to make first thermo-mechanical tests on the dummy modules?
• One option is to use our ~30 existing spare TOB Rod frames– Carbon fibre structure– Cooling is included– Setups for supporting and cooling rods exist– But, module supports in wrong places for 2S modules Adaptors needed.
2S module mechanics, 24 May 2012 Antti Onnela, CERN
TOB Rod with 2S modules
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Adaptor
2S module
TOB Rod frame
TOB Rod with 2S modules
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Adaptor• First adaptors are being made now.• Will be tried in June with ultra-dummy modules in aluminium.• Then towards more intelligent dummies...
2S module mechanics, 24 May 2012 Antti Onnela, CERN
4 support/cooling contacts in aluminium
3 connection bars in carbon-fibre composite
Summary
• Progressing with 3D modelling of the 2S modules– New updated versions of the Barrel and End-cap 2S modules will be made soon
available (in ~1 week) on the Upgrade Sharepoint site https://espace.cern.ch/Tracker-Upgrade/2S-Module/SitePages/Home.aspx
• Module positioning studies have started– First mechanical samples and tests within June-July
• Producing adaptors for mounting 2S modules on TOB Rod frame.– Will be tried in June.– If proven ok, further adaptors can be made and TOB Rod frames provided for
test use in different labs. Contact me if you are interested in receiving such test material.
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Thank you for your attention.
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Spare slides
2S module mechanics, 24 May 2012 Antti Onnela, CERN
2S module, Jan 2012 version
2S module mechanics, 24 May 2012 Antti Onnela, CERN
3D models by A. Conde Garcia / CERN
Module positioning: TIB
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Inputs from A. Basti / INFN Pisa
Precision insert
Slot insert
Inserts with clearance
Module positioning: TEC
2S module mechanics, 24 May 2012 Antti Onnela, CERN
Inputs from M. Wlochal / Aachen
Module positioning: TOB
2S module mechanics, 24 May 2012 Antti Onnela, CERN