30 - santabarbaraca.gov · 30 speed limit 30 speed limit 30 speed limit speedlimit30 speedlimit30...

8

Upload: hoangdat

Post on 04-Oct-2018

230 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 30 - santabarbaraca.gov · 30 SPEED LIMIT 30 SPEED LIMIT 30 SPEED LIMIT SPEEDLIMIT30 SPEEDLIMIT30 SPEEDLIMIT30 Alameda Padre Serra Install SW24-4 School Ahead on Existing Pole Install
Page 2: 30 - santabarbaraca.gov · 30 SPEED LIMIT 30 SPEED LIMIT 30 SPEED LIMIT SPEEDLIMIT30 SPEEDLIMIT30 SPEEDLIMIT30 Alameda Padre Serra Install SW24-4 School Ahead on Existing Pole Install

30

S

P

E

E

D

LIM

IT

30

SP

EE

D

LIM

IT

3

0

S

P

E

E

D

L

I

M

I

T

30

SP

EE

D

LIM

IT

3

0

S

P

E

E

D

L

IM

IT

30

S

P

E

E

D

LIM

IT

Alameda Padre Serra

Install SW24-4 SchoolAhead on Existing Pole

Install R2-1 30mph SIGNon the No Parking sign

Install R2-1 30mph SIGNon the No Parking sign

Install R2-1 30mph SIGNon the empty pole

Install SR4-1 School Assembly C on empty Existing Pole

AutoCAD SHX Text
ROAD
AutoCAD SHX Text
ALTURAS
AutoCAD SHX Text
LAS
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
CANYON
AutoCAD SHX Text
SYCAMORE
AutoCAD SHX Text
STREET
AutoCAD SHX Text
PADRE
AutoCAD SHX Text
ALAMEDA
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
CHIQUITA
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
MORENO
AutoCAD SHX Text
LOS
AutoCAD SHX Text
STREET
AutoCAD SHX Text
STREET
AutoCAD SHX Text
HALEY
AutoCAD SHX Text
COTA
AutoCAD SHX Text
MEDIA
AutoCAD SHX Text
LOMA
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
DE LA GUERRA
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
DOVER
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
GARCIA
AutoCAD SHX Text
RD
AutoCAD SHX Text
NEWTON
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
JIMENO
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
ARGUELLO
AutoCAD SHX Text
SERRA
AutoCAD SHX Text
PADRE
AutoCAD SHX Text
ALAMEDA
AutoCAD SHX Text
PASEO
AutoCAD SHX Text
ALICANTE
AutoCAD SHX Text
GRANADA
AutoCAD SHX Text
VIA
AutoCAD SHX Text
LASUEN
AutoCAD SHX Text
STREET
AutoCAD SHX Text
PEDREGODA
AutoCAD SHX Text
WAY
AutoCAD SHX Text
BONITA
AutoCAD SHX Text
GRAND
AutoCAD SHX Text
PLAZA
AutoCAD SHX Text
BONITA
AutoCAD SHX Text
2000
AutoCAD SHX Text
1500
AutoCAD SHX Text
1000
AutoCAD SHX Text
500
AutoCAD SHX Text
SANTA BARBARA
AutoCAD SHX Text
MIDDLE SCHOOL
AutoCAD SHX Text
MISSION
AutoCAD SHX Text
PARK
AutoCAD SHX Text
GUTIERREZ
AutoCAD SHX Text
OLIVOS
AutoCAD SHX Text
AVE.
AutoCAD SHX Text
SERRA
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
W3-1
AutoCAD SHX Text
R2-1
AutoCAD SHX Text
(25mph)
AutoCAD SHX Text
LOS
AutoCAD SHX Text
SANTA
AutoCAD SHX Text
BARBARA
AutoCAD SHX Text
MISSION
AutoCAD SHX Text
OLIVOS
AutoCAD SHX Text
STREET
AutoCAD SHX Text
W13-1
AutoCAD SHX Text
W1-5
AutoCAD SHX Text
STOP
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
W3-2
AutoCAD SHX Text
YIELD AT
AutoCAD SHX Text
(30MPH)
AutoCAD SHX Text
MTD BUS
AutoCAD SHX Text
R2-2L
AutoCAD SHX Text
LASUEN
AutoCAD SHX Text
W11-2
AutoCAD SHX Text
G30
AutoCAD SHX Text
STOP
AutoCAD SHX Text
MTD BUS
AutoCAD SHX Text
R2-1
AutoCAD SHX Text
(30MPH)
AutoCAD SHX Text
R2-1
AutoCAD SHX Text
(30MPH)
AutoCAD SHX Text
NO RV
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
R2-1
AutoCAD SHX Text
(30MPH)
AutoCAD SHX Text
W1-4
AutoCAD SHX Text
TYPE N
AutoCAD SHX Text
R4-7
AutoCAD SHX Text
TYPE N
AutoCAD SHX Text
R4-7
AutoCAD SHX Text
TYPE N
AutoCAD SHX Text
R3-4
AutoCAD SHX Text
G8-22
AutoCAD SHX Text
ARBOLADO
AutoCAD SHX Text
R4-7
AutoCAD SHX Text
TYPE N
AutoCAD SHX Text
W1-58
AutoCAD SHX Text
W13-1
AutoCAD SHX Text
(25mph)
AutoCAD SHX Text
R2-1
AutoCAD SHX Text
(30MPH)
AutoCAD SHX Text
W6-3
AutoCAD SHX Text
R5-1
AutoCAD SHX Text
R4-7
AutoCAD SHX Text
TYPE N
AutoCAD SHX Text
W11-3
AutoCAD SHX Text
(20mph)
AutoCAD SHX Text
W13-1
AutoCAD SHX Text
W1-5
AutoCAD SHX Text
R4-7
AutoCAD SHX Text
TYPE N
AutoCAD SHX Text
R4-7
AutoCAD SHX Text
TYPE N
AutoCAD SHX Text
(25mph)
AutoCAD SHX Text
W13-1
AutoCAD SHX Text
W1-5
AutoCAD SHX Text
R3-4
AutoCAD SHX Text
(20mph)
AutoCAD SHX Text
W13-1
AutoCAD SHX Text
W1-5
AutoCAD SHX Text
W2-2R
AutoCAD SHX Text
W2-2L
AutoCAD SHX Text
W1-8L
AutoCAD SHX Text
W1-5
AutoCAD SHX Text
(25mph)
AutoCAD SHX Text
W13-1
AutoCAD SHX Text
W1-5
AutoCAD SHX Text
W2-2R
AutoCAD SHX Text
ROUNDABOUT
AutoCAD SHX Text
G3-2
AutoCAD SHX Text
MARKER 144
AutoCAD SHX Text
R1-2
AutoCAD SHX Text
R1-2
AutoCAD SHX Text
R1-2
AutoCAD SHX Text
R1-2
AutoCAD SHX Text
R1-2
AutoCAD SHX Text
R2-1
AutoCAD SHX Text
(30MPH)
AutoCAD SHX Text
R1-1
AutoCAD SHX Text
R3-4
AutoCAD SHX Text
ORPET
AutoCAD SHX Text
PARK
AutoCAD SHX Text
N. SALINAS
AutoCAD SHX Text
STREET
AutoCAD SHX Text
E. MONTECITO
AutoCAD SHX Text
STREET
AutoCAD SHX Text
CHURCHES
AutoCAD SHX Text
SCHOOLS
AutoCAD SHX Text
SENIOR CENTERS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CITY OF SANTA BARBARA
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
TO
AutoCAD SHX Text
FROM
AutoCAD SHX Text
T
AutoCAD SHX Text
H
AutoCAD SHX Text
E
AutoCAD SHX Text
C
AutoCAD SHX Text
I
AutoCAD SHX Text
T
AutoCAD SHX Text
Y
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
S
AutoCAD SHX Text
A
AutoCAD SHX Text
N
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
B
AutoCAD SHX Text
A
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
S
AutoCAD SHX Text
E
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
R
AutoCAD SHX Text
N
AutoCAD SHX Text
I
AutoCAD SHX Text
A
AutoCAD SHX Text
(CODE NO.)
AutoCAD SHX Text
SPEED ZONE SURVEY
AutoCAD SHX Text
TRAFFIC SIGNALS
AutoCAD SHX Text
REGULATORY & WARNING
AutoCAD SHX Text
ROAD SIGNS
AutoCAD SHX Text
REMARKS:
AutoCAD SHX Text
GRADIENT
AutoCAD SHX Text
East Los Olivos Street
AutoCAD SHX Text
Sycamore Canyon Road
AutoCAD SHX Text
PREPARED BY:
AutoCAD SHX Text
March 17, 2017
AutoCAD SHX Text
PROPOSED SPEED LIMIT
AutoCAD SHX Text
1" = 500'
AutoCAD SHX Text
33'
AutoCAD SHX Text
EXISTING SIGNED ZONE
AutoCAD SHX Text
OBSERVED SPEED 10 mph PACE
AutoCAD SHX Text
ROADSIDE DEVELOPMENT
AutoCAD SHX Text
OBSERVED SPEED CRITICAL
AutoCAD SHX Text
TYPE OF DIVISION STRIPE
AutoCAD SHX Text
NO. OF STRIPED LANES
AutoCAD SHX Text
AVERAGE DAILY TRAFFIC
AutoCAD SHX Text
ROADWAY WIDTH
AutoCAD SHX Text
CRITICAL SPEED - 85%%%
AutoCAD SHX Text
LOWER LIMIT OF 10mph PACE
AutoCAD SHX Text
DOUBLE YELLOW CENTER LINE
AutoCAD SHX Text
TWO
AutoCAD SHX Text
SOLID RESIDENTIAL
AutoCAD SHX Text
40
AutoCAD SHX Text
20
AutoCAD SHX Text
30
AutoCAD SHX Text
MPH
AutoCAD SHX Text
40
AutoCAD SHX Text
20
AutoCAD SHX Text
30
AutoCAD SHX Text
30'
AutoCAD SHX Text
36'
AutoCAD SHX Text
32'
AutoCAD SHX Text
38'
AutoCAD SHX Text
33'
AutoCAD SHX Text
36'
AutoCAD SHX Text
28'
AutoCAD SHX Text
SPT LEVEL
AutoCAD SHX Text
15'
AutoCAD SHX Text
19'
AutoCAD SHX Text
17'
AutoCAD SHX Text
23'
AutoCAD SHX Text
36'
AutoCAD SHX Text
SPT LEVEL
AutoCAD SHX Text
16'
AutoCAD SHX Text
14'
AutoCAD SHX Text
16'
AutoCAD SHX Text
14'
AutoCAD SHX Text
24'
AutoCAD SHX Text
20'
AutoCAD SHX Text
25'
AutoCAD SHX Text
30'
AutoCAD SHX Text
SPT LEVEL
AutoCAD SHX Text
DBL YELLOW
AutoCAD SHX Text
8,520
AutoCAD SHX Text
30 mph - EXISTING SIGNED ZONE
AutoCAD SHX Text
25 to 34 mph - OBSERVED 10mph PACE
AutoCAD SHX Text
32 mph - OBSERVED 85th PERCENTILE SPEED
AutoCAD SHX Text
30 MPH
AutoCAD SHX Text
6,146
AutoCAD SHX Text
SOLID RESIDENTIAL
AutoCAD SHX Text
BUSINESS\RESIDENTIAL
AutoCAD SHX Text
SPEED STUDY LOCATION
AutoCAD SHX Text
0
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
9
AutoCAD SHX Text
10
AutoCAD SHX Text
11
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
17
AutoCAD SHX Text
18
AutoCAD SHX Text
19
AutoCAD SHX Text
20
AutoCAD SHX Text
21
AutoCAD SHX Text
22
AutoCAD SHX Text
23
AutoCAD SHX Text
30 mph - EXISTING SIGNED ZONE
AutoCAD SHX Text
24 to 33 mph - OBSERVED 10mph PACE
AutoCAD SHX Text
32 mph - OBSERVED 85th PERCENTILE SPEED
AutoCAD SHX Text
30 MPH
AutoCAD SHX Text
DBL YELLOW
AutoCAD SHX Text
DBL YELLOW
AutoCAD SHX Text
DISTANCE IN FEET (1" = 500')
AutoCAD SHX Text
2009 DISTRICT 5 (URBAN) 2LN
AutoCAD SHX Text
2009 STATEWIDE (URBAN) 3yr 2LN
AutoCAD SHX Text
SEGMENT COLLISION RATE
AutoCAD SHX Text
1.49 acc/MVM
AutoCAD SHX Text
1.43 acc/MVM
AutoCAD SHX Text
J. Rousseau
AutoCAD SHX Text
SCHOOL
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
(1.59 acc/MVM)
AutoCAD SHX Text
(1.42 acc/MVM)
AutoCAD SHX Text
(1.59 acc/MVM)
AutoCAD SHX Text
(1.42 acc/MVM)
AutoCAD SHX Text
MPH
Page 3: 30 - santabarbaraca.gov · 30 SPEED LIMIT 30 SPEED LIMIT 30 SPEED LIMIT SPEEDLIMIT30 SPEEDLIMIT30 SPEEDLIMIT30 Alameda Padre Serra Install SW24-4 School Ahead on Existing Pole Install

Location: Date:

Weather: Recorded By:

Start Time: Checked By:

5 10 15 20 25 3059 0 -58 0 -57 0 -56 0 -55 0 -54 0 -53 0 -52 0 -51 0 -50 0 -49 0 -48 0 -47 0 -46 0 -45 0 -44 0 -43 0 -42 0 -41 0 -40 0 -39 x 1 10038 x 1 9937 0 -36 x 1 9835 x x x 3 9734 x x x x 4 9433 x x x 3 9032 x x x x x x x 7 8731 x x x x x x x x x 9 8030 x x x x x x x x x x x 11 7129 x x x x x x x x x x x x x 13 6028 x x x x x x x x x x x 11 4727 x x x x x x x x x x x 11 3626 x x x x x x x x 8 2525 x x x x x x x x x x x 11 1724 x 1 623 x x 2 522 x 1 321 0 -20 x 1 219 0 -18 0 -17 x 1 116 0 -15 0 -

100

85

Step 3: # to count up (step 2 rounded to nearest whole number if decimal): 85

25 to32 mph Average Speed 28.8

End Time:

Posted Speed:

10:00 AM

85th Percentile Speed mph

85th Percentile Calculation

MPH

Step 2: Determine 85th percentile vehicle: Total number of cars (Step 1) times 0.85:

Step 1: Number of Free Flowing Vehicles:

10 MPH Pace Speed

VEHICLE SPEED SURVEY SHEET

Number of Vehicles Total Cumalative Total

mph

Clear

2000 Alameda Padre Serra Febuary 16, 2017

BG

JR

34

30 mph

10:50 AM

Page 4: 30 - santabarbaraca.gov · 30 SPEED LIMIT 30 SPEED LIMIT 30 SPEED LIMIT SPEEDLIMIT30 SPEEDLIMIT30 SPEEDLIMIT30 Alameda Padre Serra Install SW24-4 School Ahead on Existing Pole Install

Day: City: Santa BarbaraDate: Project #: CA16_8148_003

NB SB EB WB0 0 3,396 2,750

AM Period NB SB EB WB NB SB EB WB0:00 4 2 6 57 34 91 0:15 1 0 1 49 47 960:30 0 0 0 39 39 780:45 2 7 2 4 4 11 47 192 39 159 86 3511:00 1 1 2 59 60 1191:15 0 1 1 45 60 1051:30 1 0 1 59 38 971:45 0 2 1 3 1 5 70 233 50 208 120 4412:00 0 0 0 66 36 102 2:15 2 1 3 63 42 105 2:30 2 0 2 62 52 114 2:45 0 4 0 1 0 5 78 269 64 194 142 4633:00 0 0 0 95 72 167 3:15 0 1 1 94 75 169 3:30 0 1 1 151 55 206 3:45 1 1 0 2 1 3 120 460 49 251 169 7114:00 1 1 2 99 60 159 4:15 0 1 1 73 45 118 4:30 4 0 4 109 50 159 4:45 2 7 1 3 3 10 99 380 70 225 169 6055:00 1 0 1 128 69 197 5:15 1 1 2 107 59 166 5:30 1 4 5 100 47 147 5:45 4 7 6 11 10 18 76 411 47 222 123 6336:00 4 9 13 51 40 91 6:15 7 8 15 34 49 83 6:30 15 21 36 41 17 58 6:45 17 43 26 64 43 107 27 153 19 125 46 2787:00 23 28 51 34 23 57 7:15 25 45 70 25 21 46 7:30 39 78 117 19 9 28 7:45 69 156 102 253 171 409 22 100 14 67 36 1678:00 67 100 167 26 13 39 8:15 87 82 169 16 14 30 8:30 72 73 145 14 17 31 8:45 56 282 74 329 130 611 10 66 14 58 24 1249:00 53 60 113 16 13 29 9:15 40 50 90 34 17 51 9:30 35 38 73 14 7 21 9:45 31 159 35 183 66 342 9 73 9 46 18 119

10:00 44 36 80 18 14 32 10:15 35 35 70 11 8 19 10:30 44 32 76 4 11 15 10:45 39 162 29 132 68 294 4 37 4 37 8 7411:00 36 38 74 3 1 4 11:15 40 46 86 5 6 11 11:30 43 31 74 3 5 8 11:45 57 176 45 160 102 336 5 16 1 13 6 29

TOTALS 1006 1145 2151 2390 1605 3995

SPLIT % 46.8% 53.2% 35.0% 59.8% 40.2% 65.0%

NB SB EB WB0 0 3,396 2,750

AM Peak Hour 7:45 7:30 7:45 15:15 14:45 15:00AM Pk Volume 295 362 652 464 266 711

Pk Hr Factor 0.848 0.887 0.953 0.768 0.887 0.8637 - 9 Volume 0 0 438 582 1020 0 0 791 447 1238

7 - 9 Peak Hour 7:45 7:30 7:45 16:30 16:30 16:307 - 9 Pk Volume 0 0 295 362 652 0 0 443 248 691

Pk Hr Factor 0.000 0.000 0.848 0.887 0.953 0.000 0.000 0.865 0.886 0.877

VOLUMEPrepared by NDS/ATD

13:1513:3013:45

12:0012:1512:3012:4513:00

16:1516:30

14:0014:1514:30

11/30/2016

14:4515:00

DAILY TOTALS

PM Period

16:4517:0017:15

Wednesday

17:3017:45

15:1515:3015:4516:00

18:0018:1518:3018:4519:0019:15

Alameda Padre Serra W/O Dover Rd

21:3021:4522:00

Total6,146

19:3019:4520:0020:15

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

TOTAL

23:45TOTALS

Total6,146

DAILY TOTALS

21:0021:15

20:30

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

Page 5: 30 - santabarbaraca.gov · 30 SPEED LIMIT 30 SPEED LIMIT 30 SPEED LIMIT SPEEDLIMIT30 SPEEDLIMIT30 SPEEDLIMIT30 Alameda Padre Serra Install SW24-4 School Ahead on Existing Pole Install

Segement length in feet 5,808Number of collisions = 11AADT 6,146Time period in years = 3Segment Collision Rate = 1.49 ACC/MVM2009 District 5 Urban 2 and 3LN = 1.59 ACC/MVM2009 Statewide 3 yr, 2 and 3 LN = 1.42 ACC/MVM

CASE ID STREET 1 STREET 2 DateDistance From

IntersectionDirection From

IntersectionType of Collision

6467663 ALAMEDA PADRE SERRA LOS OLIVOS ST (N) 03-Apr-14 1584 Not Stated Rear-End6558117 ALAMEDA PADRE SERRA LOS OLIVOS ST (N) 21-May-14 1056 South Not Stated6732093 ALAMEDA PADRE SERRA 900 Alameda Padre Serra 30-Nov-14 24 North Hit Object7155668 ALAMEDA PADRE SERRA GARCIA RD 07-Jan-15 327 South Hit Object6835102 ALAMEDA PADRE SERRA GARCIA RD 24-Jan-15 240 South Not Stated6907442 ALAMEDA PADRE SERRA JIMENO RD 29-Apr-15 0 Not Stated Hit Object7093496 ALAMEDA PADRE SERRA DOVER RD 20-Oct-15 0 Not Stated Not Stated7137988 ALAMEDA PADRE SERRA JIMENO RD 13-Dec-15 409 North Hit Object8036318 ALAMEDA PADRE SERRA LOS OLIVOS ST (N) 24-Apr-16 1088 South Sideswipe8085469 ALAMEDA PADRE SERRA GRANADA 08-Jul-16 135 South Broadside8115567 ALAMEDA PADRE SERRA LOS OLIVOS ST (N) 26-Aug-16 0 Not Stated Broadside

Alameda Padre SerraLos Olivos St to Dover Rd

Date Range

Page 6: 30 - santabarbaraca.gov · 30 SPEED LIMIT 30 SPEED LIMIT 30 SPEED LIMIT SPEEDLIMIT30 SPEEDLIMIT30 SPEEDLIMIT30 Alameda Padre Serra Install SW24-4 School Ahead on Existing Pole Install

Location: Date:

Weather: Recorded By:

Start Time: Checked By:

5 10 15 20 25 3059 0 -58 0 -57 0 -56 0 -55 0 -54 0 -53 0 -52 0 -51 0 -50 0 -49 0 -48 X 1 10047 0 -46 0 -45 0 -44 0 -43 0 -42 0 -41 0 -40 0 -39 0 -38 0 -37 0 -36 X 1 9935 X 1 9834 X 1 9733 X X X X 4 9632 X X X X X X X X X X X 11 9231 X X X X X X 6 8130 X X X X X X X X X X X X 12 7529 X X X X X X X X X X X X X 13 6328 X X X X X X X X X 9 5027 X X X X X X X X X X X X X X 14 4126 X X X X X X X X X 9 2725 X X X X X X X X X 9 1824 X X 2 923 X X X 3 722 X 1 421 X 1 320 X 1 219 0 -18 X 1 117 0 -16 0 -15 0 -

100

85

Step 3: # to count up (step 2 rounded to nearest whole number if decimal): 85

VEHICLE SPEED SURVEY SHEET

Number of Vehicles Total Cumalative Total

mph

Clear

800 Alameda Padre Serra Febuary 15, 2017

BG

JR

33

30 mph

2:45 PMEnd Time:

Posted Speed:

2:00 PM

85th Percentile Speed mph

85th Percentile Calculation

MPH

Step 2: Determine 85th percentile vehicle: Total number of cars (Step 1) times 0.85:

Step 1: Number of Free Flowing Vehicles:

10 MPH Pace Speed 24 to32 mph Average Speed 28.5

Page 7: 30 - santabarbaraca.gov · 30 SPEED LIMIT 30 SPEED LIMIT 30 SPEED LIMIT SPEEDLIMIT30 SPEEDLIMIT30 SPEEDLIMIT30 Alameda Padre Serra Install SW24-4 School Ahead on Existing Pole Install

Day: City: Santa BarbaraDate: Project #: CA16_8148_002

NB SB EB WB3,880 4,640 0 0

AM Period NB SB EB WB NB SB EB WB0:00 4 5 9 58 77 135 0:15 1 2 3 71 64 1350:30 2 4 6 60 74 1340:45 3 10 4 15 7 25 50 239 73 288 123 5271:00 5 2 7 62 77 1391:15 1 0 1 57 74 1311:30 0 1 1 62 72 1341:45 1 7 1 4 2 11 59 240 73 296 132 5362:00 1 0 1 49 101 150 2:15 1 2 3 69 70 139 2:30 1 0 1 85 86 171 2:45 0 3 0 2 0 5 82 285 96 353 178 6383:00 0 0 0 83 136 219 3:15 0 1 1 82 141 223 3:30 0 1 1 80 157 237 3:45 0 1 3 1 3 78 323 164 598 242 9214:00 1 0 1 85 139 224 4:15 2 0 2 61 118 179 4:30 3 2 5 80 136 216 4:45 2 8 2 4 4 12 81 307 145 538 226 8455:00 2 1 3 90 168 258 5:15 6 4 10 95 149 244 5:30 3 8 11 65 133 198 5:45 13 24 11 24 24 48 96 346 113 563 209 9096:00 15 5 20 59 58 117 6:15 22 16 38 65 58 123 6:30 29 24 53 30 49 79 6:45 44 110 40 85 84 195 29 183 31 196 60 3797:00 43 34 77 41 37 78 7:15 63 42 105 35 28 63 7:30 83 58 141 22 30 52 7:45 129 318 72 206 201 524 20 118 28 123 48 2418:00 140 86 226 24 29 53 8:15 148 89 237 17 17 34 8:30 139 115 254 21 19 40 8:45 87 514 106 396 193 910 19 81 25 90 44 1719:00 70 73 143 19 20 39 9:15 42 59 101 26 20 46 9:30 51 49 100 16 37 53 9:45 57 220 67 248 124 468 17 78 9 86 26 164

10:00 52 71 123 17 22 39 10:15 30 49 79 11 7 18 10:30 59 51 110 10 6 16 10:45 39 180 63 234 102 414 11 49 4 39 15 8811:00 51 54 105 5 9 14 11:15 52 56 108 7 5 12 11:30 60 50 110 7 4 11 11:45 54 217 66 226 120 443 1 20 5 23 6 43

TOTALS 1611 1447 3058 2269 3193 5462

SPLIT % 52.7% 47.3% 35.9% 41.5% 58.5% 64.1%

NB SB EB WB3,880 4,640 0 0

AM Peak Hour 7:45 8:00 7:45 16:30 15:15 16:30AM Pk Volume 556 396 918 346 601 944

Pk Hr Factor 0.939 0.861 0.904 0.911 0.916 0.9157 - 9 Volume 832 602 0 0 1434 653 1101 0 0 1754

7 - 9 Peak Hour 7:45 8:00 7:45 16:30 16:30 16:307 - 9 Pk Volume 556 396 0 0 918 346 598 0 0 944

Pk Hr Factor 0.939 0.861 0.000 0.000 0.904 0.911 0.890 0.000 0.000 0.915

4 - 6 Peak Hour4 - 6 Pk Volume

SPLIT %

TOTAL

Pk Hr Factor

PM Peak HourPM Pk Volume

Pk Hr Factor4 - 6 Volume

20:45

TOTAL

23:45TOTALS

Total8,520

DAILY TOTALS

21:0021:15

20:30

DAILY TOTALS

22:1522:3022:4523:0023:1523:30

Alameda Padre Serra N/O Gutierrez St

21:3021:4522:00

Total8,520

19:3019:4520:0020:15

18:0018:1518:3018:4519:0019:15

16:4517:0017:15

Wednesday

17:3017:45

15:1515:3015:4516:0016:1516:30

14:0014:1514:30

11/30/2016

14:4515:00

DAILY TOTALS

PM Period

VOLUMEPrepared by NDS/ATD

13:1513:3013:45

12:0012:1512:3012:4513:00

Page 8: 30 - santabarbaraca.gov · 30 SPEED LIMIT 30 SPEED LIMIT 30 SPEED LIMIT SPEEDLIMIT30 SPEEDLIMIT30 SPEEDLIMIT30 Alameda Padre Serra Install SW24-4 School Ahead on Existing Pole Install

Segement length in feet 6,336Number of collisions = 16AADT 8,520Time period in years = 3Segment Collision Rate = 1.43 ACC/MVM2009 District 5 Urban 2 and 3LN = 1.59 ACC/MVM2009 Statewide 3 yr, 2 and 3 LN = 1.42 ACC/MVM

CASE ID STREET 1 STREET 2 DateDistance From

IntersectionDirection From

IntersectionType of Collision

6373459 ALAMEDA PADRE SERRA GUTIERREZ ST 20-Jan-14 45 South Rear-End6377342 ALAMEDA PADRE SERRA GUTIERREZ ST 22-Feb-14 78 South Head-On6562925 ALAMEDA PADRE SERRA NEWTON RD 04-Jul-14 0 East Sideswipe6573655 ALAMEDA PADRE SERRA DE LA GUERRA RD 21-Jul-14 0 Not Stated Hit Object6703442 ALAMEDA PADRE SERRA LAS ALTURAS RD 12-Nov-14 225 North Overturned6803215 ALAMEDA PADRE SERRA LAS ALTURAS RD 24-Jan-15 200 North Hit Object6976871 ALAMEDA PADRE SERRA GARCIA RD 28-Jun-15 636 South Rear-End7046427 ALAMEDA PADRE SERRA GUTIERREZ ST 19-Aug-15 275 North Sideswipe7042048 ALAMEDA PADRE SERRA LOMA MEDIA RD 22-Aug-15 520 South Sideswipe7095654 ALAMEDA PADRE SERRA GUTIERREZ ST 18-Sep-15 0 Not Stated Broadside

7183208 SALINAS ST ALAMEDA PADRE SERRA 11-Mar-16 0 Not Stated Sideswipe

8074541 ALAMEDA PADRE SERRA COTA ST 25-Jun-16 0 Not Stated Hit Object

8077081 ALAMEDA PADRE SERRATELEPHONE POLE

#106838E02-Jul-16 39 North Hit Object

8077118 ALAMEDA PADRE SERRA COTA ST 02-Jul-16 450 South Rear-End8071898 ALAMEDA PADRE SERRA DE LA GUERRA RD 21-Jul-16 509 North Broadside8127577 ALAMEDA PADRE SERRA LOMA MEDIA RD 20-Sep-16 250 North Not Stated

Alameda Padre SerraDover Rd to Sycamore Rd

1/1/2014 to 12/31/16