3d bim electrical services - pinnaclecad · building information modeling (bim) allows stakeholders...

16
www.pinnaclecad.com 3D BIM ELECTRICAL SERVICES FOR ELECTRICAL CONTRACTORS / CONSULTANTS 3D ELECTRICAL MODEL DESIGN VALIDATION COORDINATION AND CLASH RESOLUTION SHOP DRAWING CONSTRUCTION DRAWINGS QUANTITY TAKE-OFF

Upload: others

Post on 20-Oct-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

  • ww

    w.p

    innacl

    eca

    d.c

    om

    3D BIM ELECTRICAL SERVICESFOR ELECTRICAL CONTRACTORS / CONSULTANTS

    3D ELECTRICAL MODEL

    DESIGN VALIDATION

    COORDINATION AND CLASH RESOLUTION

    SHOP DRAWING

    CONSTRUCTION DRAWINGS

    QUANTITY TAKE-OFF

  • 05

    Design Validation

    12

    Why Pinnacle?

    14Testimonials

    15Project Snap Shots

    Revolutionizing Electrical Construction

    03

    Benefits of Electrical Modeling 03

    3D Modeling 04

    11Work Process

    Electrical Fixture & Equipment Modeling

    Constructability Analysis

    05

    Conduit Modeling and Fabrication

    06Electrical Coordination and Clash Resolution

    06

    QC Process

    13

    Maximizing client value by adopting the latest technologies and innovations.

    Improving project efficiency by streamlining workflow and providing high quality services.

    Saving time by using a large global team to leverage time zone advantages.

    Reducing client costs by up to 15% by harnessing a highly experienced global work force.

    We are committed to our core values and corporate mission:

    07

    Lumen Intensity Verification 08

    Shop and Penetration Drawings 09

    Quantity Take-off 10

    COMMITMENT

    INDEX

  • 03

    Revolutionizing Electrical Construction

    Benefits of Electrical Modeling

    | COORDINATION: Streamlining communication through 3D visualization, enabling all stakeholders in quick decision making during the design and preconstruction phase

    | EFFICIENCY: Eliminating RFIs, work stoppages, and reworks by checking the accuracy and completeness of drawings before starting construction on-site/off-site

    | QUALITY: Improving quality by producing accurate Shop Drawings directly from the 3D BIM which can also be used for prefabrication.

    Our clients have reported cost savings up to 15% by successfully implementing BIM.

    | SAVINGS: Preconstruction and prefabrication reviews mean better use of manpower, better quality of construction, and reduced rework and wastage, all of which translate into lower costs.

    | PROJECT MANAGEMENT: Detailed Material BOQ and Shop Drawings with 3D visualization enable a better look at “The Big Picture” and aid in the review, scheduling, and monitoring of each project.

    Proper planning and coordination are the keys to the successful execution of projects in the construction industry. Building Information Modeling (BIM) allows stakeholders to create and examine virtual representations of the Mechanical, Electrical and Plumbing (MEP) systems and other utilities. The simulated 3D construction can be used to show design intent to owners with greater visualization, generate coordinated drawings for eliminating rework & change order and eradicate work-stoppages due of RFIs in view of availability of high degree of detailing within the model itself.

    Pinnacle Infotech has been acknowledged as the global leader in providing innovative BIM solutions. We have received several awards and recognitions for our expertise, from the government and from various trade associations, including excellence awards, innovation awards and top exporter and highest job creator awards. NASSCOM, the

    leading IT trade association, has acknowledged Pinnacle among the Top IT Innovators for 6 years, between 2007 and 2017. We are now an ISO 9001:2015 and Environment Management System (EMS) 14001:2015 certified company.

    The successful completion of more than 5051+ BIM projects in 36 countries has provided Pinnacle with a deep understanding of international building codes and procedures. We recognize the importance of effective work process management and regular communication while delivering outsourced services. Our global delivery system allows us to maintain constant contact with our clients, making geographical separation meaningless. We have developed an ideal mix of infrastructure, experience, global presence and commitment to excellence that has led to long-term relationship with more than 1151 clients worldwide.

  • 04

    Conduit RackElectrical Room

    SubstationOverhead Conduit Rack

    Electrical Modeling

    Pinnacle specializes in the virtual construction of 3D BIM electrical models of conduits, cable trays, lighting fixtures, fire alarms, and other electrical equipment based on contract drawings, manufacturer specifications and client standards. We create detailed electrical room models showing electrical connections among the panels and transformers. Value Engineering and Design Validations are also offered to clients to improve the efficiency of the project and save costs.

    Branch Circuit Conduit RackFeeder Conduit

  • 05

    Electrical Fixture and Equipment Modeling

    We create 3D lighting fixture models from the manufacturer's 2D drawings and specifications. Also, we provide accurately modeled electrical equipment and fixtures.

    Circuit Breaker Generators Transformer

    Input hand sketch drawing (Underground)

    Input Documentation

    We are adept at using different types of inputs to create 3D representations of individual systems and complete buildings. Some of the input formats used are pdf, *dwg, *dgn, Revit, hand sketches, etc.

    LV & ELV Cable TrayFeeder and Branch Circuit Conduits

    Conduit Modeling and Fabrication

    We create virtual model of conduits arranged in a rack system based on detailed shop drawings and installation information. Optimization of conduit layout reduces time, site conflict, and cost, thus increasing the efficiency of the project.

  • RFI Sample RFI Sample

    Electrical Coordination and Clash Resolution

    We generate a coordinated BIM model after resolving the clashes among all the trades (Architecture, Structure, Concrete, Mechanical, Electrical, Plumbing, Fire Protection, etc.). The coordinated electrical BIM model helps in visualizing the complete project before construction starts, thus enabling better design review, project planning, and construction management.

    Before coordination process After coordination process

    06

    Constructability Analysis

    Virtual Construction of a project in BIM enables independent review of the construction plans and specifications. This identifies discrepancies in drawings and all constructability issues at preconstruction stage. During the constructability review, our BIM team generates a series of RFI’s to help identify following type of constructability and operational issues:

    Missing information / documents

    Input inconsistencies

    Conflicting data

    Operation clearance issues

    Maintenance access

    BIM model is updated based on responses of RFIs. Status of all RFIs is maintained in a log and follow-up is done to resolve them at preconstruction stage. This eliminates work stoppages and reworks during construction.

  • 07

    Design Validation

    Load Validation (CB Rating by REVIT MEP)

    Validation of connected loads is done by generating the circuits in Revit MEP and the required CB Rating of each circuit can be quantified to design an efficient wiring system.

    PP-1:Locations: Votls: 120/208 Wye A.I.C. Rating:

    Supply From: Phases: 3 Maints Type:Supply From: Phases: 3 Maints Type:

    Mounting: Surface Wires: 4 Maints Rating: 200A

    Enclosure: MCB Rating: 200A

    Notes:Notes:

    CKT Circuit Description Trip Pole Pole Trip Circuit Description CKTA B CCKT Circuit Description Trip Pole Pole Trip Circuit Description CKT

    1 EX LTS.-FIRE TRUCK GARAGE 20A 1 78VA 182VA 1 20A LIGHTS MAINT STORAGE 2

    3 EXTERIOR BLODG LIGHTS 20A 1 700VA 720VA 1 20A EX RECEPTS-MAIN STORAGE 4

    A B C

    3 EXTERIOR BLODG LIGHTS 20A 1 700VA 720VA 1 20A EX RECEPTS-MAIN STORAGE 4

    5 EX RECEPTS-MAIN STORAGE 20A 1 720VA 540VA 1 20A EX LTS.-FIRE TRUCK GARAGE 6

    7 ……. …… 1 1000VA 1 20A EX CEILING FAN 8

    9 MAINT. LTG ZONE 2 20A 1 1478VA 250VA 3 20A EX EF-2 109 MAINT. LTG ZONE 2 20A 1 1478VA 250VA 3 20A EX EF-2 10

    11 EX EF-1(3 POLE) 20A 1 424VA 250VA …… …… ……. 12

    13 ……. …… 2 424VA 250VA …… …… ……. 14

    15 ……. …… …… 424VA 2311VA 3 45A EX HWH-2 1615 ……. …… …… 424VA 2311VA 3 45A EX HWH-2 16

    17 MAINT. LTG ZONE 3 20A 1 1050VA 2311VA …… …… ……. 18

    19 RECEPTACLE FIRE GARAGE 20A 3 1440VA 2311VA …… …… ……. 20

    21 GD SWITCH UNIT 2 20A …… 500VA 500VA 3 20A GD SWITCH UNIT 1 2221 GD SWITCH UNIT 2 20A …… 500VA 500VA 3 20A GD SWITCH UNIT 1 22

    23 ……. …… …… 500VA 500VA …… …… ……. 24

    25 ……. …… 3 500VA 500VA …… …… ……. 26

    27 AIR COMPRESSOR FIRE TRUNK 30A …… 2666VA 500VA 3 20A GD SWITCH UNIT 3 2827 AIR COMPRESSOR FIRE TRUNK 30A …… 2666VA 500VA 3 20A GD SWITCH UNIT 3 28

    29 ……. …… …… 2666VA 500VA …… …… ……. 30

    31 ……. …… 3 2666VA 500VA …… …… ……. 32

    33 ……. …… …… 5000VA 2 60A SWITCH UNIT FOR EX MEDICAL BUILDING 34

    35 ……. …… …… 5000VA …… …… ……. 3635 ……. …… …… 5000VA …… …… ……. 36

    37 RECEPTACLE MAINT 20A 3 1080VA 0VA …… …… Space 38

    39 FIRE TRUNK ZONE 2 LTG. 20A …… 1452VA 0VA …… …… Space 40

    41 RECEPTACLE MAINT 20A …… 900VA 0VA …… …… Space 4241 RECEPTACLE MAINT 20A …… 900VA 0VA …… …… Space 42

    Total Load:

    Total Amps: 91A 138A 128A

    10931VA 16502VA 15362VA

    10340VATotal Conn. Load:

    Panel Totals

    Lighting 4240VA 125.00%

    Other 6100VA 100.00%

    Load Classification Connected Load Demand Factor Estimated Demand

    10340VA

    11400VA

    29A

    32ATotal Est. Demand:

    Total Conn. Load:

    Total Est. Demand:

    Total Conn:

    Other 6100VA 100.00%

    32ATotal Est. Demand:

    Connected Load Validation

    Validation of System Voltage (120/208V, 277/408V and others)

    Voltage rating is checked and verified for components, equipments and distribution system.

    Lighting fixture voltage is given 277that differ from distribution voltage

    System Voltage Validation

    Validation of Wire/Cable Sizes for Main and Branch circuits

    After connecting the electrical loads in the panel, the wire size is reflected in the panel’s schedule and re-checked with design drawings. Potential wire size problems can be identified.

    USAGE: 208/120V DISTRIBUTION PONEL PANEL TYPE: SEE SPECIFICATIONS

    LOCATION: ELECTRICAL ROOMLOCATION: ELECTRICAL ROOM

    PHASE/FREQUENCY: 3 60Hz

    L-L VOLTS 208

    L-G VOLTS 120L-G VOLTS 120

    BUS APMS 200

    FAULT CURRENT RATING: 65,000

    MAIN CB AMPS: 200MAIN CB AMPS: 200

    AMBIENT TEMP. deg. C.: 40

    PANEL NOTES:

    EQUIPPED WITH GROUND BUSEQUIPPED WITH GROUND BUS

    EQUIPPED WITH FULL SIZE NEUTRAL BUS

    *- INDICATES C.B. EQUIPPED WITH "LOCK-ON" DEVICE

    **- INDICATES C.B.B IS GFCI TYPE 5mA FOR RECEPTACLE CIRCUITS, 30mA FOR TRACING CIRCUITS**- INDICATES C.B.B IS GFCI TYPE 5mA FOR RECEPTACLE CIRCUITS, 30mA FOR TRACING CIRCUITS

    CONDUIT SIZE VALID FOR WIRE WITH THHN INSULATION ONLY

    CONDUIT PHASE &

    NEURTRAL EGE

    CKT AMPS LOAD DESCRIPTIONC.B.

    C.B. TRIP

    CIRCUIT

    NUMBER C.B. TRIPC.B.

    LOAD DESCRIPTION CKT AMPSCONDUIT

    PHASE &

    NEURTRAL EGE SIZECONDUIT

    SIZENEURTRAL

    SIZE

    EGE

    SIZECKT AMPS LOAD DESCRIPTION

    C.B.

    POLESC.B. TRIP NUMBER

    A B C

    C.B. TRIPC.B.

    POLESLOAD DESCRIPTION CKT AMPS

    CONDUIT

    SIZENEURTRAL

    SIZE

    EGE SIZE

    3/4" #12 #12 6.67 EX LTS. FIRE TRUNK GARAGE 1 20 1 A 2 20 1 EX LIGHTS-MAINT. STORAGE 13.33 3/4" #12 #123/4" #12 #12 6.67 EX LTS. FIRE TRUNK GARAGE 1 20 1 A 2 20 1 EX LIGHTS-MAINT. STORAGE 13.33 3/4" #12 #12

    3/4" #12 #12 7.50 EX EXTERIOR BLDG LIGHTS 1 20 3 B 4 20 1 EX RECEPTS. MAINT STORAGE 6.67 3/4" #12 #12

    3/4" #12 #12 6.67 EX RECEPTS. MAINT STORAGE 1 20 5 C 6 20 1 EX RECEPTS.-FIRE TRUNK GARAGE 5.00 3/4" #12 #12

    3/4" #12 #12 8.33 EX UNIT HEATER 1 20 7 A 8 20 1 EX CEILING FAN 8.33 3/4" #12 #123/4" #12 #12 8.33 EX UNIT HEATER 1 20 7 A 8 20 1 EX CEILING FAN 8.33 3/4" #12 #12

    3/4" #12 #12 13.33 MAINT. LTG ZONE 2 1 20 9 B 10 20 3 EF-2(3-POLE0 2.08 3/4" #12 #12

    3/4" #12 #12 3.53 EX EF-1 (3-POLE) 3 20 11 C 12 … … … 2.08 … … …

    …. …. …. 3.53 …. … 13 C 14 … … … 2.08 … … ……. …. …. 3.53 …. … 13 C 14 … … … 2.08 … … …

    …. …. …. 3.53 …. … 15 B 16 45 3 EX HWH-2 (3-POLE) 33.33 3/4" #12 #10

    3/4" #12 #12 9.17 MAINT. LTG. ZONE 3 1 20 19 A 20 … … … 0.00 … … …

    3/4" #12 #12 13.50 RECEPT. FIRE GARAGE 1 … 21 A 22 … … … 0.00 … … …3/4" #12 #12 13.50 RECEPT. FIRE GARAGE 1 … 21 A 22 … … … 0.00 … … …

    3/4" #12 #12 4.17 EX GARAGE ROOD GD-2 3 20 21 B 22 20 3 EX GARAGE ROOD DG-1 4.17 3/4" #12 #12

    …. …. …. 4.17 …. … … 23 C 24 … … … 4.17 … … …

    …. …. …. 4.17 …. … … 25 A 26 … … … 4.17 … … ……. …. …. 4.17 …. … … 25 A 26 … … … 4.17 … … …

    3/4" #8 #10 22.22 EX AIR COMPRESSOR 3 30 27 B 28 20 3 EX GARAGE ROOD DG-3 4.17 3/4" #12 #12

    …. …. …. 22.22 FIRE TRUNK … … 29 C 30 … … … 4.17 … … …

    …. …. …. 22.22 …. … … 31 A 32 … … … 4.17 … … ……. …. …. 22.22 …. … … 31 A 32 … … … 4.17 … … …

    3/4" #12 #12 4.17 EX CO DETECTOR 1 20 33 B 34 60 3 EX MEDICAL WASTE BUILDING 41.67 3/4" #12 #10

    3/4" #12 #12 8.33 EX CONTROL POWER HVAC 1 20 35 C 36 … … … 41.67 … … …

    3/4" #12 #12 9.00 RECEPTACLE MAINT. FIRE TRUNK ZONE 2 LTG. 1 20 37 A 38 … BLANK 0.00 … … …3/4" #12 #12 9.00 RECEPTACLE MAINT. FIRE TRUNK ZONE 2 LTG. 1 20 37 A 38 … BLANK 0.00 … … …

    3/4" #12 #12 12.75 FIRE TRUNK ZONE 2 LTG 1 20 39 B 40 … BLANK 0.00 … … …

    3/4" #12 #12 9.00 RECEPTACLE MAINT. 1 20 41 C 42 … BLANK 0.00 … … …

    MOTOR KVA: 18.00 KVA PHASE A CONNECTED AMPS: 99.5

    RECEPTACLE KVA: 16.00 KVA PHASE B CONNECTED AMPS: 159.8

    HID LIGHTING KVA: 7.50 KVA PHASE C CONNECTED AMPS: 120.2HID LIGHTING KVA: 7.50 KVA PHASE C CONNECTED AMPS: 120.2

    HEATING KVA 4.00 KVA

    INCANDESCENT LIGHTING KVA: 0.00 KVA

    Designed Panel Schedule Panel Schedule generated from Revit

  • 08

    PP-1-/PP-1-27,29,31/ AIR COMPRESSOR FIRE TRUCK 4 V/208 V 20 A 3 2666 VA 500 VA 3 20 A 1 V/208 V GD SWITCH UNIT 3 PP-1-/PP-1-28,30,32/

    -- -- -- -- -- 500 VA 500 VA -- -- -- -- --

    -- -- -- -- -- 500 VA 500 VA -- -- -- -- --

    PP-1-/PP-1-21,23,25/ EX GARAGE DOOR GD SWITCH UNIT 2 1 V/208 V 20 A 3 500 VA 500 VA 3 20 A 1 V/208 V GD SWITCH UNIT 1 PP-1-/PP-1-22,24,26/

    PP-1-/PP-1-19/ RECEPT. FIRE GARAGE 2 V/120 V 20 A 1 1440 VA 2311 VA -- -- -- -- --

    PP-1-/PP-1-17/ MAINT LTG ZONE 3 1 V/120 V 20 A 1 1050 VA 2311 VA -- -- -- -- --

    -- -- -- -- -- 424 VA 2311 VA 3 45 A 1 V/208 V EX HWH-2 PP-1-/PP-1-16,18,20/

    -- -- -- -- -- 424 VA 250 VA -- -- -- -- --

    PP-1-/PP-1-11,13,15/ EX EF-1(3 POLE) 0 V/208 V 20 A 3 424 VA 250 VA -- -- -- -- --

    PP-1-/PP-1-9/ MAINT. LTG ZONE 2 2 V/120 V 20 A 1 1478 VA 250 VA 3 20 A 0 V/208 V EX EF-2(3 POLE) PP-1-/PP-1-10,12,14/

    PP-1-/PP-1-7/ SWITCH UNIT FOR EXUNIT HEATER 1 V/120 V 20 A 1 1000 VA 1000 VA 1 20 A 0 V/120 V EX CEILING FAN PP-1-/PP-1-8/

    PP-1-/PP-1-5/ EX RECEPTS- MAINT STORAGE 1 V/120 V 20 A 1 720 VA 540 VA 1 20 A 1 V/120 V EX RECEPTS- FIRE TRUCK GARAG PP-1-/PP-1-6/

    PP-1-/PP-1-3/ EX EXTERIOR BLDG LIGHTS 2 V/120 V 20 A 1 700 VA 720 VA 1 20 A 1 V/120 V EX RECEPTS - MAINT STORAGE PP-1-/PP-1-4/

    PP-1-/PP-1-1/ Lighting Space 20 0 V/120 V 20 A 1 78 VA 182 VA 1 20 A 0 V/120 V EX LIGHTS- MAINT. STORAGE PP-1-/PP-1-2/

    CircuitNumber

    CircuitDescription

    VoltageDrop Trip Poles A B C

    CircuitNumber

    CircuitDescription

    VoltageDropTripPoles

    Lumen Intensity Verification

    The luminance of working plane is calculated by incorporating a proper photometric web file (.ies) into the lighting fixture family.

    The photometric report can be generated as per the design drawings and this report is used for designing the lighting fixtures and its wattage rating.

    Actual Lighting Load Actual Lighting Load Illuminance Average Illuminance Maximum Illuminance Minimum Name Number

    260VA 2710W 241.27lx 424.11lx 51.16lx Space 21

    130VA 1530W 275.88lx 389.75lx 163.67lx Space 20

    700W 15.51lx 42.05lx 1.73lx Space 22

    LIGHT SCHEDULE

    Voltage Drop Validation for Main and Branch circuits

    The voltage drop of each circuit is calculated and reflected in the panel’s schedule. Voltage drop is re-checked using design and other drawings for validation.

    The photometric report (luminance) of a room/space/building is extracted in *.pdf format and sent to the client for the validation of design drawings.

  • 09

    Electrical Shop Drawings

    Small Power Layout Containment Layout

    Lighting Layout Speciality System

    Shop Drawings are created on the basis of project standards and are useful to contractors, fabricators, suppliers, and manufacturers during construction. BIM is highly useful for construction of any irregular or complex structures. We generate a coordinated Electrical model before start of construction. These drawings can be directly downloaded into GPS instruments for fast and accurate layout at site. These drawings are generated directly from coordinated BIM models and are detailed enough for workshop fabrication.

    Structured Cabling System Layout Fire Alarm System Layout

  • FRESH AIR LOUVER

    FRESH AIR LOUVER

    46

    47

    S3

    48

    S3

    49

    S3

    50

    S3

    51

    S3

    52

    S3

    53

    S3

    54

    S3

    55

    S3

    56

    S3

    57

    S3

    58

    S3

    59

    S4

    60

    S4

    62

    S4

    Wall Penetration Layout

    Electrical Penetration Drawings

    Wall Penetration Section

    Penetration Drawings are required by the contractors to create wall openings before the installation of electrical cable trays and conduits. These drawings are developed from the coordinated Electrical model. All necessary views are shown in Penetration Drawings with proper clearance so that they are easily comprehendible on construction site.

    10

    Quantity Take-Off

    BIM model generates accurate quantity of all materials. These quantities are automatically updated with any changes in the BIM model. Quantity Take-Off (QTO) reports can be formatted in MS Excel and exported to a database for detailed analysis. Quantities can be generated for a specific time period or project area (4D/5D) to help manage material procurement and save inventory costs.

    Quantity Take-Off covers all conduits, cable trays, hangers, light fittings, switches, outlets and other electrical equipments, fire alarm devices, security devices, communication devices, etc.

  • 11

    Work Process

    CLIENTArchitects / Engineers / General Contractors / Sub-Contractors

    ESTIMATION TEAM

    CO

    NTR

    AC

    T S

    TAG

    E

    US BASEDRELATIONSHIP MANAGER

    Inputs/Redline Markups/ Comments

    PROJECT

    FEEDBACK

    Deliv

    era

    ble

    s Escalation

    BIM PROJECT MANAGER (Point of Contact)

    • Kick off Meeting(Upon receipt of Project Order)• Web Meetings• RFIs/Clarifications• Progress Status• Change Management• File Delivery• Quality Check - Stage3(Checklists, Coordinated Model, Client standard, RFIs)• Invoice• Project Closure

    SERVICE DETAILS1• Bill of Material• Rendering• Walkthrough/Animation

    • 4D/5D Phasing

    23

    Architecture Civil Structure• 3D Model• General Arrangement Plans• Assist Material Selection Detailing• Code interpretation• Concept 3D Model (LOD100/200)• Outline Drawings• Concrete volume• Rendering and Animation

    Architecture Civil Structure• 3D Model• Construction documentation• Assist Design options• Assist Space Planning• Constructability Report• Rendering /Animation• Shop/Lift Drawing and Details• Reinforcement Drawings and Bar bending

    Schedule (BBS)• Detailing• Redline updates• RFI• Bill of Materials

    Mechanical Electrical Plumbing Fire Protection• 3D Model• General Service Layout• Design Assist

    Mechanical Electrical Plumbing Fire Protection• 3D Model• Individual Service Drawings• Combined Service Drawings• Assist Load Calculation• Assist Design Development• Constructability Review• RFI

    4

    Architecture Civil Structure• 3D Model• Constructability ReviewMechanical Electrical Plumbing Fire Protection• 3D Model• Constructability Review• Service Layout Modification• Clash Report Generation• Lead in Coordination Process• Project Sign-off• Combine Service Drawing• RFI Management

    5

    Architecture Civil Structure• Shop Drawing• Lift Drawing and Details• Bill of Material

    Mechanical Electrical Plumbing Fire Protection• Shop Drawing• Fabrication Drawing• Spool Drawing• Bill of Material

    6• Scan to BIM• Asset Information Model• COBie• 2D Drawings/Redline Update• Document Collaboration• Bill of Materials

    Center of Excellence

    • Process Monitoring• Tool Support• Technical Support• Research & Development• Knowledge Sharing• Project Health Check

    SERVICES

    OU

    TPU

    T

    EXEC

    UTIO

    N S

    TAG

    E

    QU

    ALI

    TY C

    HEC

    K -

    Sta

    ge 1

    & S

    tage

    2As p

    er S

    chem

    atic, IF

    C, R

    ece

    ived In

    form

    ation, L

    ate

    st I

    nputs

    , Code, S

    peci

    fica

    tion C

    heck

    list, Q

    ualit

    y C

    heck

    list, E

    quip

    ment s

    ubm

    itta

    l, R

    FI re

    sponse,

    Constr

    uct

    abili

    ty, M

    ark

    up, C

    om

    ments

    1

    Business Presentation

    2

    Design Development Support

    3

    Pre-Construction Support

    4

    BIM Modeling & Coordination Support

    5

    Construction Support

    6

    As-Built Support

    MARKETING TEAM

    Request For Proposal/Scope

    Scope Clarification&

    Proposal

    Agreement / Purchase Order

    SERVICES

  • 12

    Quality Control Process

    QC 2

    Screen Check

    Performed by QC Dept./Team

    DELIVERY

    TO

    CLIENT

    100% Quality

    QC 1

    Plot Check

    Performed by Production Team

    QC 3

    Pre-Shipment Check

    Performed by Project Manager

    QC Check Phase I

    The model is plotted on paper and a preliminary grid by grid check is done comparing it with the original contract documents. Member of the Project Management team assists in this process.

    The project team leader sends status report to the QC Department to begin QC Phase II.

    QC Check Phase III

    The Project Manager conducts the pre-shipment check before sending them to the client.

    QC Check Phase II

    The QC Team performs a more detailed comparison of the Contract Documents against the 3D BIM model. Specific Checklist is prepared to review/check the deliverables. Their main objective is to review, identify and address the following:

    The QA/QC Team continuously interacts with the Project Lead and other team members to resolve all technical issues related to the project.

    Missing data (if any)Mismatches with the contract documentsClashes (Old/New), Elevation, Routing, Fittings, etc.Construction point of view.Fly-Zones requirementsAttribute Checking (Pressure class, Pipe material, etc.)Location of Equipment such as VAV, Sleeves, Hangers, Valves.Equipment Connection details as per Schematic Drawings.Equipment Models as per Technical Submittals.Annotations & Dimensions, Aesthetic View.Miscellaneous issues

    Our QC process is ISO 9001:2008 certified and managed by an independent QC team. We have implemented Environment Management Systems (EMS) 14001:2015.

    The main objective of the quality control (QC) process is to detect errors and rectify it. Ensuring quality is a group effort and our dedicated QC team is led by a highly qualified and experienced Manager in M&E Coordination and Quality Control.

    The entire QC process is handled in three phases:

  • 13

    Why Pinnacle?

    Quality Output

    Our Quality Control Team is led by employees who have more than 30 years of experience. Our process orientation & quality control is as per ISO 9001:2015 and ISO 14001:2015 standards. Our Pre-construction & Pre-fabrication reviews with RFI generation help clients make better use of manpower and improve the quality of construction, reducing rework and wastage. Detailed Material BOQ & Shop Drawings with 3D visualization enable a better look at “The Big Picture” and aid in the review, scheduling and monitoring of each project.

    Pinnacle is a global leader in providing innovative BIM services. Our in-house team of more than 1250+ experienced Architects, Engineers and BIM professionals helps us provide end-to-end solutions to discerning clients around the world. Our 3,80,000 sq. ft., multi locational, world-class production facility is equipped with high-end workstations, advanced servers with real time backup and a high speed data and voice network. Prompt interaction with US Based Relationship Mangers for Consultation and Solution. There is a 24 x 7 uninterrupted power supply security system by CISCO.

    Fast Turnaround

    Our skilled team of professionals can provide quick turnarounds on complex projects. Pinnacle has successfully completed several large-scale projects across multiple verticals.

    Less Expensive

    Clients rely on us for our top-of-the-line services at reasonable rates. We help clients assemble projects in a virtual environment for identifying and correcting potential problems before construction. We offer cutting-edge advantage in terms of Building Information Modeling services, facilitating project coordination, collaboration, asset management, risk mitigation, logistic planning and cost optimization.

    Technical Strengths

    Our professionals use the latest BIM software: Autodesk Suite (Revit, all versions), AutoCAD Architecture, MicroStation, Navisworks, Inventor, AutoCAD Civil 3D, Plant Design Suite, Pro/Engineer, SysQue, All Plan, Adobe Photoshop, Adobe Illustrator, Adobe After Effects, 3DS Max, Tekla Structure, SolidWorks, Autodesk Fabrication Suite, SketchUp, Bluebeam, PIPENET, and other design software. As we have a deep understanding of global and regional codes and standards, we have ensured that our Quality Management System is as per ISO 9001:2015.

    Global Presence

    Pinnacle has offices around the world (USA, UK, UAE, ITALY, INDIA - Durgapur, Kolkata & Jaipur) enabling us to serve our clients around the clock.

    Experience in BIM Domain

    We have a global experience of 15+ years and have successfully collaborated with several leading contractors on BIM projects for specialty hospitals, stadiums, universities, dams, apartment

    Communication

    Pinnacle's Project Management team is available to clients through a number of communication channels including: 1. Global telephone networks for instant communication2. Amazon Web Service (S3) for file transfers3. Email (on Google server) for reports and interactions4. Video and teleconferencing for presentations and conversations5. Web conferences with US based phone systems6. BIM collaboration through BIM 360, Revizto, Bluebeam Studio etc.7. Newforma project information management system8. Engagement of US based Relationship Managers

    complexes, hotels, casinos, large retail center, high school, airport, commercial buildings, convention center, high rise towers, and industrial projects.

    Canada

    CA

    Aruba

    Brazil

    FinlandSwedenNorway

    Ireland

    France

    Turkey

    SAUDI ARABIA

    Delhi

    Hyderabad

    Sanghai

    Japan

    Singapore

    WA

    Production Centres

    AZ

    Puerto Rico

    Australia

    Columbia

    Iraq

    Kazakhstan

    LibyaMexico

    Rwanda

    Sri Lanka

    OR

    NV

    MT

    TX

    PA

    NYMI

    MA

    NJRI

    CO

    MN

    OK

    OHIN VANC

    ALGASC

    FL

    MDDCIL

    West Indies

    LA

    TNKY

    Lebanon

    USA

    INDIAOman

    Kuwait

    UAE

    BahrainJordan

    Israel

    QatarRiyadh

    SWITZERLAND

    Denmark EUROPE

    BelgiumNetherlands

    Malaysia

    China

    UK

    DURGAPUR

    KOLKATA

    JAIPURDUBAI

    Abu Dhabi

    ITALY

    LONDON

    HOUSTON

    Germany

    Global Leader in BIM Engineering

  • 14

    "Very good and helpful project manager, especially with the assistance in working the programs. Pushing on my end to have more projects go through Pinnacle. Look forward to doing more business with Pinnacle in the future".

    Hawaiian Dredging Construction Company, Inc.

    "Very professional and timely work, all revisions were made quickly and correctly. Thank you for the great service".

    Gephart Electric

    "Great response to our urgent needs. I will send more work to pinnacle shortly.”

    Kurtzon Lighting, Inc.

    “The project went very smoothly. I was given everything that I expected and with a quick response. Pinnacle is very helpful in getting everything together, even when they did not have all of the appropriate information at the beginning. Overall this was a successful effort and I will be happy to use Pinnacle in the future."

    The Whiting-Turner Contracting Company

    "Pinnacle has been a pleasure to work with on this project. Pinnacle is always willing to do what it takes to get a job done. Even though the proposals have been pushed out, Pinnacle met all deliverable dates and provided a quality product for the proposal phase of this project. I look forward to more projects working with the pinnacle staff.”

    Harper Construction Company, Inc.

    "Job went very well for this client. Client is happy.”

    Advantage Electric

    “Thank you for your cooperation and also for a job well done."

    NJS Electrical Services Corp.

    “Pinnacle has revolutionized the BIM elements of our company. They are extremely professional and skilled at what they do and develop a personal relationship with ease. Since our first project, we have used Pinnacle for over a dozen and will continue to do so consistently in the future.”

    C.W. Driver

    MCC Group

    “We are thrilled to have find a group like yours that service all our MEP drafting needs, and at record response. We truly feel like you have met and exceeded everything we could have asked of your group. We look forward to a long and bright future together.”

    “Very good at following up. This is our fist BIM project and also very early into the job. As of now everything looks good. Thank you."

    Stryker Electric

    Turner Construction

    “Pinnacle delivers a great deal of value for a very reasonable price. They consistently deliver my expectations on-time.”

    "I was a littel apprehensive at first but was quickly and pleasantly surprised at the professionalism, communication and timely turn around of the product requested. I look forward to work with you in the future."

    Baker Electric

    Testimonials

    “It was a pleasure working with Pinnacle and I most certainly look forward to teaming with you in future projects requiring BIM.”

    Critical Electric Systems Group

    “Pinnacle team was extremely helpful and patient. This was my first time using 3D modeling and they guided me through the project and responded promptly to any queries and requested changes. I know they also spent many late nights to ensure I was able to meet my deadlines.”

    Marrs Electric

  • 15

    LOCATIONCLIENT PROJECT NAME

    DETAILSTIME LINE MANPOWER

    SECTOR PROJECT AREA

    Project Snap Shots

    Medical Center NEA Baptist Health System

    JonesboroArkansas

    Electrical Contractor Pinnacle created the model of lighting, power and telecom systems

    for coordination purpose. The model was coordinated with all MEP service.

    May2011-2012

    107,639 sq ft

    15 Electrical Engineers

    Hospital

    RiyadhSaudi Arabia

    MainConsultant

    Design Validation, Load Calculation, Layout Generation, Technical Scheduling, Design Review, Modeling, Clash Detection, 95% Tender and 50% Design Drawing Set Creation, Quantity Take Off, Constructibility And Aesthetic Review, Technical Documentation.

    King Faisal Padiatric Hospital December2013

    1,151,738 sq ft

    18 Engineers (35 at peak)

    JeddahSaudi Arabia

    Mixed-Use The Kingdom TowerEngineering Consultant Pinnacle provided complete Electrical Modeling above and below

    ceiling with clash coordination of MEP services in Navis work for this super tall skyscraper. Created families for all electrical items respect to technical cut sheets and provided Electrical shop drawing includes Lighting, power, fire alarm and containment services. Design review and value engineering is provided for containment services.

    May2018

    4,928,159 Sq ft

    12 Electrical Engineers

    TexasUSA

    Office BNSF RailwayElectrical Contractor Pinnacle provided a coordinated detailed (LOD-400) 3D electrical

    model of lighting, power, fire alarm and telecom services along with a final signed-off shop drawings based on the weekly coordination meeting.

    July2014

    215,500 sq ft

    4 Electrical Engineers

    TennesseeUSA

    56,500 sq ftElectrical Contractor

    Le Bonheur Children’s Hospital February2015 2 Engineers

    Hospital Officeand Parking

    3D Model, Coordination and shop drawing of all Electrical Panels, Transformers, Main Distribution Board, etc. Equipment, Ceiling Mounted Lighting Fixtures only, Conduits(feeders and Home runs) as per sketch layout, Ceiling Mounted Fire Alarm and other devices Only.

    Educational Building

    Clark Elementary School

    Monroe, Washington, USA

    ElectricalContractor

    Our Scope of Work for the Project included 3D Model Creation of Electrical & Communication Services, Basic Coordination as well as Other Trade Coordination as per clash report provided by the client and Shop Drawing preparation. We were also responsible for producing BOQ or Quantity Take off upon the approval of the model from the client.

    October2016

    580,000 sq ft

    3 Electrical Engineers

    Phoenix, Arizona, USA

    Hospital Solterra MidtownElectricalContractor

    Our scope of work for the project included creation of 3D Models of Sheet Metal, Mechanical Piping and Plumbing (accessory, equipment and fittings) of all buildings, Basic & Other trade coordination as well as preparation of Shop Drawing/2D Drawings for HVAC, MP and PL trades.

    August2016

    164,500 sq ft

    4 Electrical Engineers

    Hospital Tallahassee Memorial Hospital

    Tallahassee,Florida,USA

    ElectricalContractor Our scope of work included developing the 3D models in Revit 2016

    as per the design documents including all the lighting fixtures & controls, panels, transformers, power receptacles, communication devices, fire alarm devices and conduits from 3/4" and above. We were responsible for updating the model as per the clash report suggested by client, prepared the Quantity take off and generated the detailed 2D drawings with all the annotations, dimensions and taggings.

    February2017

    422,767 Sq ft

    4 Electrical Engineers

    Office Building Sterling Bay

    Chicago,Illinois, USA

    ElectricalContractor Our scope of work for the project included 3D Model Creation of

    Electrical Services (Switch Gear Panels / Transformers / DG Set, Branch Circuit Conduit Racks, Feeder Conduits, Pull Box & Junction Box, Ceiling Mounted Light Fittings, Wall mounted Light Fittings, Cable Tray & Raceway, Receptacles & Switches & Electrical Site Utility), Inter-trade Coordination, Electrical Shop Drawings, Quantity Take-off for Electrical Components. We also provided Value Engineering for (Electrical Power & Lighting document validation) in REVIT MEP and generated detailed QTO from clash free 3D Model.

    June2017

    800,000 Sq ft

    3 Electrical Engineers

  • ww

    w.p

    innacl

    eca

    d.c

    om

    Italy Office

    Phone: + 39 0341630070Email: [email protected]

    Nunki di M.Brossa,Via Calvi, 10 - 23801Calolziocorte, LC - Italy

    Jaipur Office

    Plot No - IT-A-016-E, Mahindra World City, (Jaipur) LTD, PO - Mahindra World City, Tehsil - Sanganer, Jaipur - 302037

    Pinnacle Infotech Solutions

    Texas, USA

    Dubai, UAE

    Lecco, Italy

    Kolkata, India

    Durgapur, IndiaJaipur, India

    London, UK

    Pinnacle Infotech Inc.

    6161 Savoy Drive #1125,Houston, TX 77036Phone: 713 780 2135Fax: 713 780 8784Email: [email protected]

    USA Office

    Biswanath TodiOperations ManagerCell: 832 283 6628

    International Office Locations

    UAE Office

    Office No – 307, 3rd Floor, Building No. 7 PO Box - 345869, Dubai Outsource ZoneDubai, UAE

    Pinnacle Infotech Technologies FZ-LLC

    Kuntal Chakraborty

    Phone: +971 55 736 3498Email: [email protected]

    Zurich, Switzerland

    India Office Locations

    Pinnacle Infotech Solutions

    S.S.B. Sarani, Bidhannagar, DurgapurWest Bengal, India - 713212Phone: +91 343 6602222 / 6602231–35Fax: +91 343 6602230

    Durgapur Office UK Office

    Pinnacle Infotech Limited

    Switzerland Office

    c/o, Transcon InternationalSpirackerstrasse 258044 GockhausenSwitzerland

    Kolkata Office

    Plot - II/F/11, Block - 4B, 4th Floor, Room No. 402,Ecospace Business Park, New Town, Rajarhat, Kolkata - 700156

    Pinnacle Infotech Solutions

    Email: [email protected]

    Email: [email protected]

    Pinnacle Infotech Inc.

    Phone: +91 141 722444Email: [email protected]

    David BrownPhone: +44 77 9852 8673Email: [email protected]

    Bernhard Kössler

    Email: [email protected]

    Phone: +41 56 535 3267

    The Barley Mow Centre, 10 Barley Mow Passage, London, W4 4PH, UK