4593-4 sept. 2008efw inst+soc pdr rbsp efw soc and conops science operations center and concept of...

24
1 3-4 Sept. 2008 EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences Laboratory University of California, Berkeley

Upload: rosalyn-ferguson

Post on 03-Jan-2016

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

1 3-4 Sept. 2008 EFW INST+SOC PDR

RBSP EFWSOC and ConOps

Science Operations Center and Concept of Operations

(SOC and ConOps)

John Bonnell

Space Sciences Laboratory

University of California, Berkeley

Page 2: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

2 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOC and ConOpsOutline

• Science Operations Center (SOC)– Requirements– Organization– Description:

• Data Products• Data Processing Flow

– Development:• Schedule and Milestones• Test Plan• Status

• EFW Concept of Operations (ConOps)– Instrument Commissioning:

• Turn-On and Check Out• Boom Deploys

– Nominal Operations:• Conditions for Nominal Operations• State-of-Health Monitoring and Trending• Commanding and Day-to-Day Operations

Page 3: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

3 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCRequirements

• The EFW SOC allows the EFW SOC and Science teams to:– Process and distribute EFW science data in a timely, accurate, and

configuration-controlled fashion.

– Efficiently command and control the EFW instrument, both during ground testing and on-orbit operations.

• Governing documents:– RBSP Mission Requirements Document.

– RBSP Data Management Plan.

– RBSP EFW SOC Requirements Document.

– RBSP EFW SOC Software Development Plan.

Page 4: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

4 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCOrganization

EFW PMKeith Goetz (UMN)

EFW SysEngDave Curtis (UCB)

EFW SOC LeadJohn Bonnell (UCB)

EFW CTG LeadWilliam Rachelson

(UCB)

EFW SDC LeadTBD (UCB)

• The EFW SOC will be:• Developed at UCB.• Hosted from UCB.

• UCB has played a similar role on previous missions:

• CRRES, Polar, FAST, THEMIS.

• EFW Instrument I&T occurs at UCB, and SOC development builds on the GSE required to support that effort:

• GSE→Test SOC→FLT SOC.

Page 5: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

5 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCData Products

Data Level Description Time to Availability Users

L0 Raw de-commutated telemetry data retrieved from MOC. APID-separated daily files generated by SOC (EFW L0+).Binary files.

Typically daily retrieval and processing and/or reprocessing to pick up long-latency Burst data.Processing time < 6 hours.

SOC, archives.

L1 L0 + Time-tagged RAW waveform and spectral in spinning spacecraft coordinate system.Software and CAL files read L1 data files and produce data in physical units.ISTP-Compliant CDFs.

Daily production and/or re-processing.Processing time < 6 hours.

SOC, EFW Team, archives.

L2 L1 + Time-tagged waveform and spectral data in calibrated physical units [V, mV/m, (V/m)2/Hz, etc.] in despun spacecraft coordinate system and relevant geophysical coordinate systems.ISTP-Compliant CDFs.QuickLook L2 data and Summary Plots.JPG and PDF (TBD) plot files (6 and 24-hr).

Available internally daily for purposes of instrument operations and data validation.Pushed weekly or bi-weekly to MOC as validated by EFW-SOC and SCI teams. [Requirement is XXX/YYY days]

SOC, EFW Team, RBSP Science Team, Other End Users (Archives, Virtual Observatories, GIs, etc.).

L3 L2 + VxB removal for DC E-field estimate. < 2 months.

L4 L3 + global E field pattern estimates < 1 year.

Page 6: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

6 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCTop-Level Data Processing Diagram

RBSP MOCCTG-CTG

SOC-NRT

SOC-PDP SDC-MDP

EFWInstrument

DATAARCHIVES:

SOHL0+, L1, L2, QL,

CAL,L3+

SDC-DVAL

SDC-BSEL

RBSP EFW SOC Command-Telemetry-Ground Support (CTG) and Science Data Center (SDC) elements.

SDC-ODPSDC-MAG

SDC-SDA

SDC-CAL

EMFISISSOC

MAG data

OTHERRBSPand

GEOPHYSICAL DATA

Sources

EFWSupporting

DATAARCHIVES:

EMF-MAGSTATEMOCOGPD

SOC-logs

Page 7: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

7 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCData Processing Organization

SOC is divided into two parts:• Command, Telemetry, and Ground Support (CTG).• Science Data Center (SDC)

CTG consists of a single CSCI, CTG.SDC consists of 9 CSCIs:• NRT – Near-real Time data processing and display.• METUTC -- MET↔UTC Time Conversion• PDP – Processed Data Production.• DVAL – Data Validation• BSEL – Burst Data Selection• MDP – MOC Data Products Processing.• MAG – MOC and EMFISIS Data Products Processing.• ODP – Other RBSP and Geophysical Data Products Processing.• SDA – Science Data Analysis.• CAL – EFW Calibration Parameter Production.

Page 8: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

8 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCCTG Block Diagram

GSE

Page 9: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

9 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCNRT Block Diagram

RBSP MOCEFW SOC

CTG

MOC L0 to

SOC L0+ processing

L0+ to L1 Processing

EFWL0+

Archive

EFWL1

Archive

SOC and SCI team input required

Autonomous Operation

External Process or Resource

NRT DataAnalysis

And Display

Near-Real Time Data Acquisition, Processing, and Display (Science and SOH)

Page 10: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

10 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCPDP and DVAL Block Diagram

RBSP MOC

MOC L0 to

SOC L0+ processing

L0+ to L1 Processing

L1 to L2 Processing

QL Data and Plot Production.

EFWL0+

Archive

EFWL1

Archive

EFWL2

Archive(internal)

EFWQL

Archive(internal)

L2 and QL Validation

L2 and QL transfer to

external access

EFWL2 and QL

Archive(ext. access)

SOC and SCI team input required

Autonomous Operation

EFWEMF-MAG Archiv

e

External Process or Resource

Processed Data Products (PDP and DVAL):Acquisition, Production, Validation, and Delivery.

STATE (EPHE

M/ATT)Archive

CALArchiv

e

CTG

Page 11: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

11 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCBSEL Block Diagram

RBSP MOCEFW SOC

CTG

EFWL2

Archive(internal)

EFWQL

Archive(internal)

SOC and SCI team input requiredAutonomous Operation

EFW Burst(B1 and B2)

Ground Selection

External Process or Resource

EFWEMF-MAG Archiv

e

STATE (EPHE

M/ATT)Archive

OTHER Data Source

s

OTHERData Acq.

EFW Comman

d Archive

Burst Selection ( BSEL):Generation, Validation, Delivery, and Archiving.

MET↔UTC Conversion

Page 12: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

12 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCMDP and MAG Block Diagrams

RBSP MOC

MOC Data Products Retrieval

(non-Data, non-SOH)

EFWSTAT

E Archiv

e

SOC and SCI team input requiredAutonomous Operation

EMFISISSOC

MAG data

EMF-MAGData Acq

EFWEMF-MAG Archiv

eSOH

Archive

External Process or Resource

RBSP MOCQuickLookMAG data

ATT/EPHEM to STATE Processing

Other MOC Data Products

(OMDP) Processing

MOC Data

Products

Archive

EFWOMDPArchiv

e

SCLK (MET↔UTC), MOC Data Products and MAG Data Processing:Retrieval, Validation, Processing, and Archiving.

SCLK Kernel Processing

EFWSCLKArchiv

e

Page 13: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

13 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCSDA and CAL Block Diagrams

L1 to L2 Processing(TDAS or

SDT)

EFWL1

Archive

EFWL2

Archive(internal or external)

SOC and SCI team input requiredAutonomous Operation

EFWEMF-MAG Archiv

e

External Process or Resource

Science Data Analysis (Internal and External)CAL Parameter Estimation and Production

STATE (EPHE

M/ATT)Archive

CALArchiv

e

L2 to L3+ Processing(TDAS or

SDT)

External Users

(ISTP CDF End Users)

CAL Production

EFWL1

Archive

EFWL2

Archive

EFWEMF-MAG

Archive

STATE (EPHEM

/ATT)Archive

CALArchiv

e

EFW SOH/HS

KArchive

Plasma Data(eg.

ECT-HOPE Vion)

CALArchiv

e

Page 14: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

14 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCDevelopment Plan: Schedule and Milestones

Phase CSCIs/Modules Milestone Date

(no later than)

Supports

I

(Core Instrument Support)

GSE

GSE

CTG

NRT

Nov 2008 EFW IDPU ETU Board-Level Tests and Instrument I&T

II

(Core MOC Data Products)

Test SOC

Phase I +

METUTC

MDP-I (SCLK only)

Oct-Nov 2009 EFW IDPU FLT

Board-Level Tests and Instrument I&T

III

(Core SDC)

Flight SOC

Phase II +

PDP, MDP-II, ODP, SDA, CAL-I (Ground).

Launch – 6 m (TBD)

(Oct 2011 – 6 m)

Mission Sims

SDC Inter-Operability.

EFW Commissioning.

IV

(Full SDC)

Flight SOC

Phase III +

DVAL, BSEL, MAG, CAL-II (On-Orbit).

Launch + 60 days

(Dec 2011)

Normal Mission Ops.

Page 15: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

15 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCTest Plan

• Detailed GSE-SOC test plan under development (due Q2 or Q3, 2009; supports SDP Phase II).

• CSCI elements will be tested in isolation to establish basic functionality (test cases; error cases and signaling).

– Example: phased introduction of DCB functions and testing using GSE.

• Elements are brought together into full modules and fed instrument data from known sensor excitations to verify module-level functionality and requirements fulfillment.

– Example: basic instrument functional tests during I&T.

• End-to-end testing at each stage of integration to weed out problems early.

– Example: testing of complete PDP chain as early as possible during Phase D using data from SC I&T and environmental tests.

Page 16: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

16 3-4 Sept. 2008 EFW INST+SOC PDR

EFW SOCCurrent Status

• Current Status consistent with Phase I Development (Core Instrument Support through GSE):– GSE module can:

• Communicate with the DCB via the SC Emulator and GSEOS– Raw data.

– CCSDS packetized data.

• Display received data in hexdump format.• Detect errors in CCSDS/ITF data.• Generate PPS/SP signals with SC Mini-Emulator.

• Upcoming efforts include (Nov 2008):– Development of board-level GSE support (BEB and BEB SciCal esp.).

– Modification of existing NRT IDL modules for EFW packet formats.

Page 17: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

17 3-4 Sept. 2008 EFW INST+SOC PDR

EFW ConOpsInstrument Commissioning

• EFW Commissioning consists of two phases:– Initial instrument turn on and check out.– Radial and axial boom deploys.– May occur at RBSP MOC (using Test SOC) or at EFW SOC (using Flight SOC).

• Turn-On and Checkout consists of stowed functional tests (duplicates of SC-level I&T procs and data).

Instrument ActivityActivity Duration

Telemetry Requirements

Constraints & Notes

EFW Turn-On and Check Out

2x2 hrs NRT: ~4 kbps.

Stored: ~8 kbps.

Should occur after or in conjunction with EMFISIS Turn-On and Check Out b/c of shared analog data (EFW, MAG, and SCM).

EFW Boom Deploys 2 weeks

(both observatories in parallel)

NRT: ~4 kbps for initial step; 1-2 kbps thereafter.

Stored: <5.25 kbps (Survey TM).

Boom deploys must occur in sunlight.

Sensor Diagnostic Tests will drive spacecraft floating potential.

Page 18: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

18 3-4 Sept. 2008 EFW INST+SOC PDR

EFW ConOpsInstrument Commissioning: Radial Booms Deploy

• Initial EFW boom deploy plan already developed: RBSP_EFW_TN_003C_EFW_BoomDeploySequence.doc.• Boom deploy power controlled by MOC (SC service).• Boom deploy commanding through EFW SOC (test or flight).• Spin rate changes during staged, pairwise boom deploy illustrated below.• Spin rate vs. boom stroke and time during deploy used to monitor state of deploy and abort, if required.• Baseline 13-day parallel deploy schedule between both observatories; required durations based on recent

THEMIS-EFI experience (parallel ops on THD and THE, June 2007).

RBSP-EFW SPB Deploy

0.00

2.00

4.00

6.00

8.00

10.00

12.00

14.00

16.00

0 10 20 30 40 50 60

Boom Stroke (cable+fine wire)

Spin Rate [RPM]

X-Deploy (predicted)

Y-Deploy (predicted)

Fine wire unfurling

Page 19: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

19 3-4 Sept. 2008 EFW INST+SOC PDR

EFW ConOpsInstrument Commissioning: Axial Booms Deploy

• Axial boom deploy occurs after radial boom deploy is complete, and observatory mass properties and dynamics confirmed (typically no significant delay required).

• Axial booms deployed singly, in stages using motor deploy system to ≈5-m stroke (≈10-m tip-to-tip).

• Final deploy lengths trimmed in roughly 10-cm increments using Survey axial E-field and SC potential estimates to reduce common-mode signal (expected duration of trim phase is 2 weeks, but is outside of commissioning phase).

Page 20: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

20 3-4 Sept. 2008 EFW INST+SOC PDR

EFW ConOpsValidity Conditions for Nominal Operations

• Sensors Illuminated -- All EFW sensors illuminated (goal for aft axial sensor).

• Attitude Known -- Post-processed Observatory attitude (spin axis pointing and spin phase) known to accuracy better than 3 deg.

• Ephemerides Known -- Post-processed Observatory position and velocity known to accuracy better than (10 km, 30 m/s, 0.1 deg; 3-sigma).

• Booms Settled -- EFW radial booms within 0.5 deg of nominal position.

• DC B-Field Known – Post-Processed DC B-field known to accuracy better than 1%.

• EFW-MAG-SCM Relative Orientation Known – Post-processed relative orientation of EFW, MAG, and SCM sensor axes known to better than 2 degrees.

Page 21: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

21 3-4 Sept. 2008 EFW INST+SOC PDR

EFW ConOpsInstrument Health and Status Monitoring

• Instrument State-of-Health (SOH) monitored through near-real-time or playback engineering data via the SOC-CTG.

• SOH compared against red/yellow limit database.• Off-Nominal conditions leads to:

– Notification of EFW SOC personnel (page, e-mail).

– Issuance of scripted commands, for certain, well-known off-nominal conditions (example: CRRES DDD-false commanding and resets).

• Long-term trending and storage of SOH data:– New solution in GSEOS as part of CTG efforts or…

– Incorporation into existing UCB MOC BTAPS database (decision: part of Phase III development, 2010 time frame).

Page 22: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

22 3-4 Sept. 2008 EFW INST+SOC PDR

EFW ConOpsNormal On-Orbit Operations

• Commanding– Complete instrument state (sensor biasing and data collection) set by ~50 commands.– Instrument configuration changes infrequently (~1/few weeks, after initial commissioning

phase).– ~daily commanding to support ground selection of burst segments as needed.– ~monthly Sensor Diagnostic Tests (bias sweeps) to confirm and optimize instrument biasing.

• Data Management– 12 kbps daily average:

• ~ 5 kbps continuous Survey data (32 S/s E and V; auto- and cross-spectral data products).

• ~ 7 kbps Burst1 and Burst2 data (0.5 and 16 kS/s E, V, and SCM data).• Burst Management

– Higher-rate waveform data (E, V, and SCM) collected continuously and banked into SDRAM and FLASH in seconds to minutes long segments (many days of B1 storage; many hours of B2 storage).

– Each segment tagged with “Burst Quality” computed on-board from DC or AC fields data cues (DC Spin-Fit E; SC Potential; Filter Bank AC E or B).

– B1 playback is through ground selection based on Survey data and other data sources (geophysical indices, etc.); on-board with Burst Quality allows for autonomous selection and playback, as needed (vacations, illness, ennui, etc.).

– B2 survival and playback selection on-board is based on Burst Quality; playback selection includes option for ground selection based on Survey data and other data sources (geophysical indices, etc.).

– B1 and B2 support for time-tagged campaign modes available as well (e.g. BARREL support). • Inter-Instrument Burst Data

– EFW message includes axial sensor status (illuminated/eclipsed), sensor sweep status (static/sweeping), and current burst-valuation algorithm ID and value.

Page 23: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

23 3-4 Sept. 2008 EFW INST+SOC PDR

EFW ConOpsCommand Generation

• EFW-SOC shall generate commands by reference to UTC, as well as MOC data products (predicted ephemerides, etc.) and other data assets (e.g.. Geomagnetic indices).

• EFW commands shall be validated as needed by running command load on EFW TestBed (ETU) and verifying appropriate change of state, data production, and instrument configuration.

• Command validation shall occur prior to transmission of command load from EFW-SOC to RBSP-MOC.

• Verification of current MET↔UTC SCLK Kernel shall occur prior to translation of EFW commands from UTC to MET.

• Command receipt will be verified after transmission using standard MOC data products.

Page 24: 4593-4 Sept. 2008EFW INST+SOC PDR RBSP EFW SOC and ConOps Science Operations Center and Concept of Operations (SOC and ConOps) John Bonnell Space Sciences

24 3-4 Sept. 2008 EFW INST+SOC PDR

• This page intentionally almost blank