4th technical meeting - wp5

53
Project SLOPE WP 5 – Forest information system development Technical Meeting 5 Jul 16

Upload: slope-project

Post on 14-Feb-2017

307 views

Category:

Education


2 download

TRANSCRIPT

Page 1: 4th Technical Meeting - WP5

Project SLOPE

WP 5 – Forest information system development

Technical Meeting 5 Jul 16

Page 2: 4th Technical Meeting - WP5

T5.2- Platform for near real time control of operations

Introduction

TASK 5.2System for near real time control of operations (MHG) achieved by the

implementation of a series of different interfaces to access the FIS and allow a number of different operations.

COMPLETEDDeliverable 5.2 - Submitted

Technical Meeting 5 Jul 16

Page 3: 4th Technical Meeting - WP5

T5.2- Platform for near real time control of operations

Harvesting process

Technical Meeting 5 Jul 16

Page 4: 4th Technical Meeting - WP5

T5.2- Platform for near real time control of operations

Introduction

MHG

3. PROCESSING HEAD SOFTWARE (CNR)

-Real timber products data- Timber products summary- Quality indexes

4. HARVESTING MONITORING - TRE- Field app- Real time tree show- Harvesting report

1. FIS (GRA)-Display single trees and attributes -Select points to set the cable line-Display cutting simulation results -Select single trees to be harvested-Display harvesting status

GPS COM

2. – LOGISTIC AND SUPPLY CHAIN (MHG/ITENE)- Storage areas - Transport tacking

Technical Meeting 5 Jul 16

Page 5: 4th Technical Meeting - WP5

T5.2- Platform for near real time control of operations

Planning information

Tree data recording. Inventory data

Technical Meeting 5 Jul 16

Page 6: 4th Technical Meeting - WP5

T5.2- Platform for near real time control of operations

Planning information

3D trees visualization Single tree selection for harvesting

Technical Meeting 5 Jul 16

Page 7: 4th Technical Meeting - WP5

Field Application (TM) -harvesting plan-:•2D terrain image (UAV available offline)• RFID tagging for trees to be cut• Add additional trees from field at the marking stage •Trees marked with different colours: Selected (to cut), Tagged (with RFID) and others.

T5.2- Platform for near real time control of operations

Planning information

Technical Meeting 5 Jul 16

Page 8: 4th Technical Meeting - WP5

T5.2- Platform for near real time control of operations

Planning information

Review Meeting 5/July/16

Page 9: 4th Technical Meeting - WP5

T5.2- Platform for near real time control of operations

Harvesting Monitoring (trees)

Cutting monitoring (TM app):• Single tree view showing the position on the map of all harvested trees.• Change tree status

Issues and limitations:-The trees cut have not been previously selected

- Solution: View and change status of trees not selected for cutting

-The trees cut are not in the DB- Solution: Add new trees to be cut

Review Meeting 5/July/16

Page 10: 4th Technical Meeting - WP5

T5.2- Platform for near real time control of operations

Harvesting Monitoring (trees)

Cable crane and processor head

To be completed in

task 6

Technical Meeting 5 Jul 16

Page 11: 4th Technical Meeting - WP5

T5.2- Platform for near real time control of operations

Real Time integration

Technical Meeting 5 Jul 16

Page 12: 4th Technical Meeting - WP5

T5.2- Platform for near real time control of operations

Real Time integration

Technical Meeting 5 Jul 16

Page 13: 4th Technical Meeting - WP5

T5.2- Platform for near real time control of operations

Tree data view

Technical Meeting 5 Jul 16

Page 14: 4th Technical Meeting - WP5

T5.2- Platform for near real time control of operations

Real Time integration

Technical Meeting 5 Jul 16

Page 15: 4th Technical Meeting - WP5

T5.2- Platform for near real time control of operations

Real Time integration

Create new timber storageAnd orders

Technical Meeting 5 Jul 16

Page 16: 4th Technical Meeting - WP5

Project SLOPE

Technical Meeting5 Jul 16

T.5.3 – Online purchasing/invoicing of industrial timber and biomass

Trento, July 5th, 2016

Page 17: 4th Technical Meeting - WP5

Overview

Technical Meeting 5 Jul 16

• Status: 90% ready• Length: 20 Months (From M9 to M28)• Involved Partners

• Leader: MHG• Participants: GRAPHITECH, CNR, TRE, ITENE

• Aim: Design, develop and implement an online purchasing/invoicing platform for industrial timber and biomass as a part of FIS

• Output: D.5.03 Platform for purchasing/invoicing

Page 18: 4th Technical Meeting - WP5

Objectives

• Specify and implement sales platform for Slope project• Create communication platform where sellers and buyers

can connect• Integrate market prices to the platform• Implement bidding and group sales functionality• Integrate forest data from the slope central database• Implement management features for the forest data• Deploy sales platform prototype to live server

Technical Meeting 5 Jul 16

Page 19: 4th Technical Meeting - WP5

Work done

• We made some research work about different sales platforms

• First prototype of the sales platform completed• Import forest data from the Slope FIS database and

manage it• Create deals• Group sales functionality • Bidding system• Communication between seller and buyer (via email)

• Sales platform is integrated to Slope user interface (T6.3)

Technical Meeting 5 Jul 16

Page 20: 4th Technical Meeting - WP5

Deliverable overview

Technical Meeting 5 Jul 16

Page 21: 4th Technical Meeting - WP5

Register new user

Technical Meeting 5 Jul 16

Page 22: 4th Technical Meeting - WP5

User estates from slope database

Technical Meeting 5 Jul 16

Page 23: 4th Technical Meeting - WP5

Forest data management

Technical Meeting 5 Jul 16

Page 24: 4th Technical Meeting - WP5

Add new deals for bidding

Technical Meeting 5 Jul 16

Page 25: 4th Technical Meeting - WP5

Active sales deal

Technical Meeting 5 Jul 16

Page 26: 4th Technical Meeting - WP5

Next steps – Final version

• Integrate Italian and Austrian wood market prices• Implement invoicing feature• Small fixes to the deal feature• Automate data transfer from the slope fis web service• User interface fixes• Publish the deliverable prototype

Technical Meeting 5 Jul 16

Page 27: 4th Technical Meeting - WP5

Summary

• First version of prototype is ready• MHG technology stack change affected to the timetable• We start second iteration of development to finalize this deliverable• Italian and Austrian prices need to be converted form that platform

supports• Goal is to finalize this task on September 2016

Technical Meeting 5 Jul 16

Page 28: 4th Technical Meeting - WP5

Technical Meeting 5 Jul 16

Contact info

Veli-Matti Plosila [email protected]

Seppo Huurinainen [email protected]

Thank you for your attention

Page 29: 4th Technical Meeting - WP5

Forest Information System Development

Technical Meeting 4/July/16

T.5.4 – Short-term optimization: operational, ongoing and contingency planning

Trento, July 5th, 2016

Kühmaier Martin, Pichler Gerhard, Kastner Maximilian Institute of Forest EngineeringUniversity of Natural Resources and Life Sciences, Vienna

Page 30: 4th Technical Meeting - WP5

Contents of the presentation

1. Overview

2. Introduction

3. Unexpected events during harvesting operations

4. Working safety risks in the timber supply chain

5. Variables, which are influencing or limiting harvesting operations

Technical Meeting 5/July/16

Page 31: 4th Technical Meeting - WP5

Overview

• Status: ongoing (70%)• Length: 20 Months (From M8 to M27)• Involved Partners

• Leader: BOKU• Participants: CNR, ITENE, MHG, TRE, GT

• Aim: - Daily planning for timber harvesting- Optimization in the supply chain management- Risk management during emergency- Guidelines for short term planning optimization

• Output: D.5.04 (M27)Short-term optimization module of the FIS

Technical Meeting 5/July/16

Page 32: 4th Technical Meeting - WP5

Introduction

• The aim of task 5.4 was to develop a tool for short-term optimization foroperational, ongoing and contingency planning

The FIS module should include following parts:

• Optimization of a short-term harvest schedule (MHG)• Daily planning for harvesting operations (BOKU)• Logistics Optimization concerning the product flow (ITENE, MHG)• Support for ongoing management activities(TRE)• Modelling of contingency plans including risk management (BOKU, MHG)

Development of guidelines and indications for short-term optimization for the daily planning (CNR, BOKU)

Technical Meeting 5/July/16

Page 33: 4th Technical Meeting - WP5

Technical Meeting 5/July/16

Flow charts of harvesting operations

• Evaluation for the current systemand the SLOPE system

• The work flow is displayed in flowcharts

Page 34: 4th Technical Meeting - WP5

Technical Meeting 5/July/16

Unexpected events during harvesting operations

• The influencing events weredisplayed in flow charts

• A list of suggestions for avoidance of these events

Page 35: 4th Technical Meeting - WP5

Technical Meeting 5/July/16

Examples of unexpected events

Unexpected events Avoidance

1 Cable yarder must wait until tree is felled

Better coordination of workflows, training, work experience, shift of workforce

2 Forest worker must wait for carriage

Better coordination of workflows, training, work experience

3 Processor operator must wait for carriage

Better coordination of workflows, training, work experience

4 New software doesn’t work (RFID tags, RFID reader, intelligent carriage, intelligent harvester head, intelligent truck…)

Checking software

5 traceability of the RFID tags after logging is not possible

Subsequent marking with new tags

6 Lost RFID tags during harvesting operations

Subsequent marking with new tags

Page 36: 4th Technical Meeting - WP5

Technical Meeting 5/July/16

Working safety risks in the timber supply chain

Manual fellingFalling objects

Log extractionMachinery hitting

Log landingChain shot

Loading, transport and unloadingLog moving in risk zone

Maintenance of access roadsAccessability

General hazardWeather conditions

Source: Safe Work Australia, 2014 Stampfer, 2015

Page 37: 4th Technical Meeting - WP5

Technical Meeting 5/July/16

Variables, which are influencing or limiting harvesting operations

• Identification of important variables

• Description of variables

• Effect of increase or decrease

• Examples of influence for productivitymodels

Page 38: 4th Technical Meeting - WP5

Technical Meeting 5/July/16

Optimization of logistics

• Optimization of transport distance

• Consideration of truck category

• It is possible to add customers, storages, harvesting plots

• Possibility of scenario analysis

Page 39: 4th Technical Meeting - WP5

Technical Meeting 5/July/16

Outlook• Implementation into SLOPE FIS

• Decision which components to be implemented• Contingency plans• Productivity models• Optimization model

• Cooperation/Solutions from sister project FOCUS• Interface between Woodlandmanager and IPTIM

• Finalization of the deliverable D5.04: September 2016

Page 40: 4th Technical Meeting - WP5

Contact info

Martin Kühmaier: [email protected]

Thank you for your attention

Technical Meeting 5/July/16

Page 41: 4th Technical Meeting - WP5

Project SLOPE

T.5.5 – Mid-long term optimization, strategic and tactical planning

Trento, July 5th, 2016

Huurinainen Seppo, Rasinmäki Jussi, Plosila Veli-Matti

Technical Meeting 5/July/16

Page 42: 4th Technical Meeting - WP5

Contents of the presentation

1. Overview

2. Introduction

3. Iptim software as a Tool

4. Tasks to be completed

Technical Meeting 5/July/16

Page 43: 4th Technical Meeting - WP5

Overview

• Status: 65%• Length: 20 Months (From M8 to M27)• Involved Partners

• Leader: MHG• Participants: GRAPHITECH, CNR, TRE, ITENE

Aim: In the task a module will be developed for the FIS that will support the planning task of optimally allocating harvests to theforest area in 1-10 years timeframe to meet the targets for harvested volume Output: D.5.05 (M28)

- Mid/Long-term optimization module of the FISDelay due to Simosol has been focusing on FOCUS project

Technical Meeting 5/July/16

Page 44: 4th Technical Meeting - WP5

Introduction 1/2

This FIS module should include following parts:

• produce harvesting and sales plans that are realistic and achievable. This is done by supporting easy updating of growth models to track developments in the research in the area, and by simulating at stand level different alternatives for the type, intensity and timing of the management actions that are all viable options for the management of the stand considering the operational constraint in the mountain forests (BOKU).• produce harvesting and sales plans that are optimal within the parameters set by the previous item. Goals can be set to minimize harvesting cost or maximize the net present value of the cash flow generated over the planning horizon; the optimization process will include spatial and temporal clustering functionality, in order toproduce optimal starting point for short-term operational planning; i.e. in order to make utilization of harvesting machinery and workforce as efficient as possible (Task 5.4) these aspects are already taken into account when producing long-term harvest scheduling plans (TRE, CNR).

Technical Meeting 5/July/16

Page 45: 4th Technical Meeting - WP5

Introduction 1/2

This FIS module should include following parts:

• support for monitoring the quality of management plans, based on the accumulated historical time series, by maintaining a data repository over time of the information gathered with sensors during the inventory and harvest operations (GRAPHITECH, FLY, TRE)- IPTIM• support the adaptation of the plans, and re-planning, based on the accumulated supply chain information in the FIS; i.e. for the long-term plans a continuous and adaptive planning approach will be supported (BOKU, CNR).- IPTIM

Technical Meeting 5/July/16

Page 46: 4th Technical Meeting - WP5

IPTIM as a TOOL

Further develop and implement procedures/algorithms developed in the sister project, FOCUS(biomass and industrial timber supply chains – Finland & Belgium pilots)

www.iptim.com

Technical Meeting 5/July/16

Page 47: 4th Technical Meeting - WP5

Modeling – growth & yield‣ A set of model systems for both yield prediction at stand level

and growth predictions at tree level available

‣ Inventory data used to calibrate the model systems

Technical Meeting 5/July/16

Page 48: 4th Technical Meeting - WP5

Produce harvesting and sales plans that are realistic and

achievable (BOKU)

• Topic: produce harvesting and sales plans that are realistic and achievable. This is done by supporting easy updating of growth models to track developments in the research in the area, and by simulating at stand level different alternatives for the type, intensity and timing of the management actions that are all viable options for the management of the stand considering the operational constraint in the mountain forests.

• IPTIM; group of mathematic equations

Technical Meeting 5/July/16

Page 49: 4th Technical Meeting - WP5

Produce harvesting and sales plans that are optimal within

parameters (TRE, CNR)

Topic: produce harvesting and sales plans that are optimal within the parameters set by the previous item. Goals can be set to minimize harvesting cost or maximize the net present value of the cash flow generated over the planning horizon; the optimization process will include spatial and temporal clustering functionality, in order toproduce optimal starting point for short-term operational planning; i.e. in order to make utilization of harvesting machinery and workforce as efficient as possible (Task 5.4) these aspects are already taken into account when producing long-term harvest scheduling plans.- Average prices to be used (Italy, Bolzon etc.)

Technical Meeting 5/July/16

Page 50: 4th Technical Meeting - WP5

Support the adaptation of the plans, and re-planning

(BOKU, CNR)

Topic: support the adaptation of the plans, and re-planning, based on the accumulated supply chain information in the FIS; i.e. for the long-term plans a continuous and adaptive planning approach will be supported- Woodlandmanager + IPTIM- Mobile app for real-time storage management developed and integrated with the FIS

Technical Meeting 5/July/16

Page 51: 4th Technical Meeting - WP5

Data Integration

JSON Data

SLOPE FISWeb Service

SLOPE FIS Database

IPTIM

Woodlandmanager

• Extend SLOPE FIS Web Service when needed

Interface to be completed in September resulting in commercial add-value services for forest owners using WM in Finland

Technical Meeting 5/July/16

Page 52: 4th Technical Meeting - WP5

Results

• Models for mid-long-term harvesting planning (demo site)• Process models

• Indicators for mid-long term planning• Profits• Costs

• Guidelines to optimize planning• Contingency plans

Technical Meeting 5/July/16

Page 53: 4th Technical Meeting - WP5

Contact info

Seppo Huurinainen

[email protected]

Thank you for your attention.

Technical Meeting 5/July/16