GE ABWR & ESBWR Jeff Suggs ESBWR I&C April 17, 2007 Copyright © 2006 by GE Energy / Nuclear

Upload: others

Post on 11-Oct-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

GE ABWR & ESBWRJeff SuggsESBWR I&CApril 17, 2007

Copyright © 2006 by GE Energy / Nuclear

Page 2: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 2

GE EnergyGas Cleaner Coal NuclearHydro

Fuel CellsSolarWind Biomass

Page 3: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 3

Fuel• GNF

Nuclear Power Plants• ABWR• ESBWR• Gen IV

Services• Reactor & Field Services• Performance Services

GE in Nuclear

Page 4: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 4

BWR Activity Today …

Lungmen ABWR Construction

DOE NP-2010 … NuStart & Dominion

ABWRs Being Built in Japan

Lungmen Simulator in San Jose

Page 5: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 5

Oyster Creek

KRBDresden 1

ABWRDresden 2

ESBWRSBWR

BWR Evolution

Page 6: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 6

Containment Evolution

DRY

MARK IIIABWR

SBWRESBWR

MARK I MARK II

Page 7: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 7

Advanced nuclear power … ABWRKey Features

• Mature Design• 1300 MWe Class• Standard / Modular

• Improved safety

• Active design

• Lower O&M burden

Deployment

• NRC Design Certified• Part of the US DOE 2010 Program • Ready to Deploy for 2007 COL

applications

ADS

HPCF

LPCF/RHR

RCIC

LPCF/RHR

HPCFLPCF/RHR

Page 8: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 8

Advanced nuclear power … ESBWRKey Features

• Simplified Design• 1500 MWe Class• Standard / Modular

• Improved safety

• Passive design

• Lower O&M burden

Deployment

• NRC DC submission complete• Part of the US DOE 2010 Program• On plan for 2007 COL applications

Page 9: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 9

Eliminated – only 2 non-safety grade dieselsSafety Grade Diesel Generators (3 each)

Made non-safety grade – optimized for Outage duration

Reactor Building Service Water (Safety Grade)and Plant Service Water (Safety Grade)

Replaced SLCS pumps with accumulatorsStandby Liquid Control System–2 pumps

Non-safety shutdown cooling, combined with cleanup system; Passive Containment Cooling

Residual Heat Removal (3 each) (shutdown cooling & containment cooling)

Replaced with IC heat exchangers (isolation) and CRD makeup (small break makeup)

RCIC (Isolation/Hi-Pressure small break makeup)

LPFL (Low Pressure Core Flooder) (3 each)

Combined all ECCS into one Gravity Driven Cooling System (4 divisions)HPCF (High Pressure Core Flooder) (2 each)

Eliminated (Natural Circulation)Recirculation System + support systems

ESBWRABWR

What’s different about ESBWR

Page 10: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 10

Passive Safety …

Page 11: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 11

Passive Safety Systems …

IC HEAT EXCHANGERCLOSED LOOP WITH Rx

IC POOL (OUTSIDE OF CONTAINMENT)

Isolation Condenser System Passive Containment Cooling

(DRYWELL PRESSURE >WETWELL PRESSURE)

DRYWELL

GDCSPOOL

WETWELL

DRYWELL-TO-WETWELL VENTS

VENT FORNONCONDENSABLES

CONTAINMENTBOUNDARY

Page 12: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 12

Gravity Driven Cooling System …Simple designSimple analyses

Extensive testingLarge safety margins

Gravity driven flow keeps core covered

Page 13: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 13

Reactor Depressurization Valve in the Test Facility

ESBWRNew

Features

PCCS

GDCS

VB

Page 14: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 14

ESBWR 3D Cutaway

Page 15: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 15

GE Environmental & Seismic Qualification

Standard Requirements & Guidelines

- 10 CFR 50.49- Reg. Guide 1.89- Reg. Guide 1.100- IEEE Std 323- IEEE Std 344- NUREG-0588-SRP 3.10-SRP 3.11

Page 16: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 16

GE Environmental & Seismic Qualification

Qualification Basis- Reference Plant (Lungmen)

Evolution of Regulatory GuidancePassive (ESBWR) versus Active (ABWR) Plant

Differences

Page 17: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 17

Passive versus Active PlantEnvironmental Differences – DBA Conditions

- Safe shutdown versus cold shutdown- Containment long term pressure &

temperature- Reactor, Fuel & Control Buildings HVAC

Page 18: 5-ABWR & ESBWR EQ - 041707Title Microsoft PowerPoint - 5-ABWR & ESBWR EQ - 041707 Author rls6766 Created Date 7/13/2007 9:09:21 AM

Copyright © 2006 by GE Energy / Nuclear 18

Final Thoughts … the dawn of a Renaissance?

• Industry trends positive … nuclear energy proven and key part of energy portfolio

• Geopolitical trends, energy policy and environmental needs support nuclear

• New technology investments will drive continued performance improvements

• Next generation reactor designs … address public perception & economics

• GE is investing in our future … People, Processes and Products

• GE is Committed to Nuclear and the ESBWR future