6385 griscom - western right-of-way practices in a new … 1 the utilization of western right-of-way...
TRANSCRIPT
9/13/2011
1
THE UTILIZATION OF WESTERN RIGHT-OF-WAY MANAGEMENT
PRACTICES IN THE DEVELOPMENT OF A NEW CITY IN INDIA
David D. Griscom, BA, MPA
Public Works Director,
Retired
APWA Life Member
APWA Leadership Fellow
INDIA
POPULATION 1.2 BILLION
NOW
60% RURAL, 40% URBAN
30 YEARS
40% RURAL, 60 % URBAN
ISSUES
9/13/2011
2
OBJECTIVES
PRIVATE PLANNED COMMUNITY
AS A MODEL FOR FUTURE URBAN
DEVELOPMENT IN INDIA
TECHNILOGICALLY ADVANCED
ENVIRONMENTALLY SAFE
SUSTAINABLE
SERVING A PLANNED POPULATION
OF 300,000
4.5 Million
9/13/2011
3
9/13/2011
4
9/13/2011
5
9/13/2011
6
ISSUES
9/13/2011
7
DESIGN
CONSTRUCTION
9/13/2011
8
LABOR
9/13/2011
9
INSPECTION/MAINTENANCE
9/13/2011
10
PUBLIC WORKS ROLE
ASHOK BHATAIYA
HEAD OF PUBLIC WORKS
DAVID AMAIRAJ
HEAD OF UTILITIES
SCOT WRIGHTON
CITY MANAGER
9/13/2011
11
RESULTS
Type of Permit: Excavation / Disturbance.
LCL Department:
Contractor's Name:
Authorized Representative: Auth. Representative:
Signature: Signature:
Mobile No. : Mobile No.
Work Order no:
Description of Works:
Start Date: End Date:
Specific Work Location: Street : Width Depth Length
Supporting information (maps, plans etc.) must be attached to application. Applications without necessary supporting documents will not be
considered for approval until documentation is complete.
What methods are proposed for working around existing underground utilities?
No. Item Yes No Remarks
1 "Have all existing utilities (1.Electrical HT/ LTCables. 2.Water Line. 3.Sewer Line. 4.OFC. 5. Over Head Electrical Lines. 6. SWD / CD's
etc.) been identified & removed / isolated / protected?"
2 Where existing services may be interrupted for an excessive period, have provisions for providing alternative services been made?
3 Are the co-ordinates identified at site and marking will be done with lime powder for the proposed excavation, on permit
approval.
Manager - Power
Manager - Distribution & Collection Systems
Manager - Telecommunication
Manager - Roads and Right of Ways
P.T.O.
CITY MANAGEMENT SERVICES
PERMIT CONDITIONS
1 A permit is only valid when signed by Head - Public Works.
2 A valid copy of this permit shall be kept on the work site at all times. Failure to have the permit on site will result in a stop work order.
3 Deviations from the details of work, schedules and locations provided in the permit application must have the prior written approval of Public Works.
4 Work shall not commence before start date on the permit without prior written approval of Public Works.
5 The Contractors Supervisor must be readily available at or near the site at all times during the work.
6 Proper measures for traffic control and pedestrian safety will be implemented prior to the commencement of work and will remain in place until
authorization to remove has been provided by Public Works.
7 No materials may be stored in any location not approved by Public Works. Under no circumstances may materials be stored outside the approved work
area in a manner that would constitute a hazard to the public.
8 Service Disruptions not provided for in the original application will require the prior approval of Public Works.
9 Proper barricading must be provided prior to commencement of work.
10 Contractor will be responsible for complete repair of any damage done to any utility/ property in Lavasa ROW during work execution.
11 Contractor will be responsible for maintenance of work site at all times and will hold harmless CMS Lavasa for work site injuries/ damages.
12 Public Works must approve restoration of site before the Permit is closed. If restoration is not satisfactorily completed, CMS Lavasa may undertake
completion of restoration work at the contractor’s risk and cost.
13 Violations of this Permit may result in penalties including stop work order for any or all held by this applicant as well as fines up to Rs 10,000.00 per day
per violation.
Permit Approved:
"Head Public Works:Date:"
I have read and understood the above mentioned Permit conditions and they will be followed in letter and spirit on site during execution of work.
Authorised Representative:
Contractors Name:
Affix Company Seal:
9/13/2011
12
Permit for Public Area Events
Name of Sponsor:__________________________________________________
Address of Sponsor_________________________________________________
_________________________________________________________________
_________________________________________________________________
Phone Number of Sponsor______________
Local Phone during event ______________
Sponsor or Sponsor’s authorized representative must be on site at all times during event.
Will the event be open to the public or private? Public _____ Private_____
Date(s) and Time(s): Start Date______ End Date ______ Start Time____ End Time ___
Proposed Location of Event: Promenade________ or Other Public Area_______
Number attending_________. Area Needed for Event: ___________. Attached detailed drawing showing proposed
locations of; any exhibits, vendor booths, platforms/stages.
Will electrical power be required? Yes___ No____. If yes, detail those requirements.
_____________________________________________________________________.
Power will be provided by Lavasa at the expense of the Sponsor
Will sanitary facilities be required? Yes _____ No_____
Sanitary Facilities will be provided by Lavasa at the expense of the sponsor.
Drinking water will be provided by Sponsor.
How many parking spaces will be required? _____
Terms and Conditions
1. Application for Event Permit should be submitted at least 1 week in
advance of start of the event.
2. First aid arrangements for all events must be arranged and paid for by
Sponsor
3. For any event with more than 500 attendees, emergency medical staff and
ambulance must be on site at any time the event is ongoing. All costs to be
borne by the sponsor.
4. Fire services and hospital must be informed of event in advance.
5. Sponsor will provide all necessary facilities for performances (stage, sound
systems, lighting, tenting, etc). Noise regulations must be observed such as no
sound systems after 10:00 PM
6. Fireworks are prohibited on the Promenade
7. No vehicles other than bicycles are allowed on the Promenade
8. No animals other than pets are allowed on Promenade. Pet owners must
clean any droppings left by their pets.
9. Event area should be kept free of litter at all times. Clean up after the
event is completed will be by Lavasa at the expense of the Sponsor.
10. Failure to comply with any terms of this Permit may result in a fine of 500
Rs for each violation.
9/13/2011
13
DAVID GRISCOM ITAL YAR
ISRAELI SECURITY CONSULTANT
DAR ____________
ISRAELI SECURITY CONSULTANT