As on 30.04.2008 Original Revised 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Trans. System associated with North-West Trans. Corridor Strengthening Scheme a Agra - Gwalior 2nd S/C (initially to be operated at 400KV) S/C 130 29 101 11 353 314 215 40 Jan'09 WESTERN REGION 2 Sipat - I Trans. System a Sipat - Seoni line-II S/C 354 354 0 0 958 958 958 354 Feb.'07 Apr.'08 Commissioned 4/08 3 a Seoni - Wardha line (to be operated at 400KV) S/C 269 26 243 21 724 610 398 47 Jun'08 Dec.'08 4 Barh Trans. System a Seoni - Bina line (to be operated at 400KV) S/C 293 88 120 29 787 494 446 117 Sep'09 Sep'09 5 a Bina - Gwalior (2nd line) - to be operated at 400KV S/C 235 0 50 0 663 348 128 0 Jul'10 Jul'10 Remarks TL (Nos.) Stubs (Nos.) TE (Nos.) Stringi ng Compl eted (CKm) REPORT INDICATING STATUS OF CONSTRUCTION OF TRANSMISSION LINES (220 kV & ABOVE) VIS-A-VIS PROGRAMME DURING 2008-09 Sl. No. Generating Plant /AssociatedTransmission Scheme No. of Circuit s Total Length (CKm) String. Compl upto March 2008 (CKM) Progra mme for 2008- 09 (CKM) Stringi ng April 2008 onward s (CKm) Target 765 kV Transmission Lines Sipat - II Supplementary Trans. System Western Region Strengthening Scheme-II Trans Lines 1 of 33

Upload: others

Post on 12-Feb-2022

19 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 765 kV Transmission Lines

As on 30.04.2008

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 Trans. System associated withNorth-West Trans. CorridorStrengthening Scheme

a Agra - Gwalior 2nd S/C (initially tobe operated at 400KV)

S/C 130 29 101 11 353 314 215 40 Jan'09

WESTERN REGION

2 Sipat - I Trans. System

a Sipat - Seoni line-II S/C 354 354 0 0 958 958 958 354 Feb.'07 Apr.'08 Commissioned 4/08

3a Seoni - Wardha line (to be

operated at 400KV)S/C 269 26 243 21 724 610 398 47 Jun'08 Dec.'08

4 Barh Trans. Systema Seoni - Bina line (to be operated at

400KV)S/C 293 88 120 29 787 494 446 117 Sep'09 Sep'09

5

a Bina - Gwalior (2nd line) - to beoperated at 400KV

S/C 235 0 50 0 663 348 128 0 Jul'10 Jul'10

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

REPORT INDICATING STATUS OF CONSTRUCTION OF TRANSMISSION LINES (220 kV & ABOVE) VIS-A-VIS PROGRAMME DURING 2008-09

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

765 kV Transmission Lines

Sipat - II Supplementary Trans. System

Western Region Strengthening Scheme-II

Trans Lines 1 of 33

Page 2: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

6 Koteswar Trans. System

a LILO of Tehri - Meerut at TehriPooling Point (to be charged at400 KV)

2xD/C 30 0 5 73 63 26 0 Jun'08 Sep'09

765 kV Total 1311 497 519 61 558

1 Barh Trans. Systema +/- 500 KV Balia - Bhiwadi (2500

MW)Bipole 1564 120 1250 10 2136 1030 751 130 Sep'09 Sep'09

HVDC Total 1564 120 1250 10 130

1

a Barh-Balia (Quad) D/C 490 254 147 46 649 567 510 300 Sep'09 Sep'09

b LILO of Kahalgaon-Patna at Barh D/C 100 50 0 26 135 133 114 76 Sep'09 Mar"09

2 Kahalgaon-II (Phase-II) Trans.a Ranchi-Sipat line D/C 816 706 110 14 1123 1087 1082 720 Oct'07 Jun'08

3a Ranchi-Rourkela D/C 340 0 100 0 478 4 Jun'09 Mar'10b Rourkela - Raigarh D/C 440 0 150 0 586 19 Jun'09 Mar'10c Raigarh - Raipur D/C 450 0 150 0 630 58 Jun'09 Mar'10

4

b Zerda - Kankroli D/C 470 22 448 54 634 371 169 76 Jan'09

NORTHERN REGION

HVDC Transmission Lines

400 kV Transmission Lines

Trans. System associated with Barh Gen. Project (3x660MW)

East-West Trans. Corridor Strengthening

Trans. System associated with North-West Trans.Corridor Strengthening Scheme

Trans Lines 2 of 33

Page 3: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

5 Northern Region SystemStrengthening-I

a Bareilly - Mordadabad S/C 91 91 0 0 252 252 252 91 Mar'07 May.'08 checking in progress

6 System Strengthening Schemein Utharanchal

a LILO of one ckt of Dhauliganga - Bareilly at Pithoragarh (Operated at 220 kV)

D/C 6 0 0 0 10 4 0 Mar'07 Dec,09

7 RAPP 5&6 Trans. System

a RAPP 5&6 - Kota D/C 51 2 0 8 145 70 46 10 Mar.'08 Dec.'08 Forest clearance awaited

b RAPP 5&6 - Kankroli D/C 397 397 0 0 542 542 542 397 Mar.'08 Jun.'08 matching with Gen. Unit

8 Koteshwar Trans. Systema Koteshwar -Tehri Pooling Point D/C 6 0 0 0 11 9 0 0 Jun '08 Sep'09

9 Koldam HEP Trans. Systema Koldam - Nalagarh (Quad)

(Powergrid Portion)D/C 90 13 75 2 119 111 64 15 Sep'08 Jun'09

b Koldam - Ludhiana D/C 306 0 0 0 383 Sep'08 Sep'10

10 Northern Region SystemStrengthening Scheme - V

a Bhiwadi - Agra D/C 364 43 321 0 573 285 171 43 Jun'09

b Bhiwadi - Moga D/C 702 85 583 43 931 306 201 128 Jun'09

c LILO of Hissar - Jaipur at Bhiwadi D/C 156 30 126 24 217 186 81 54 Jun'09

10 Parbati-III Trans. Systema LILO of Parbati -II -

Koldam/Nalagarh at ParbatiD/C 20 0 0 0 Jan'10 Engg.in progress

Trans Lines 3 of 33

Page 4: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

b LILO of Parbati -II - Parbati PoolingPoint at Parbati -III

D/C 7 0 0 0 Jan'10 Engg.in progress

c 400KV D/C Parbati Pooling Point -Amritsar

516 0 75 0 Jan'10 Engg.in progress

11

a Kota - Merta D/C 496 85 411 682 395 277 110 Apr'09

12 System Strengthening in South-Western part of Northern Grid (Part-B) Scheme

a Kankroli - Jodhpur D/C 187 0 150 5 513 231 157 5 Oct'09

13 Northern Region System Strengthening Scheme - VIII

a LILO of 1st ckt. Of Kankroli-Zerda at Bhinmal

D/C 68 0 10 0 179 2 Dec'09

14 Northern Region System Strengthening Scheme - VI

a LILO of Ballabhgarh - Bhiwadi at Gurgaon

D/C 54 0 10 0 82 2 Jul'09 ROW problem

WESTERN REGION15 Sipat - II Trans. System

a Khandwa-Rajgarh (2nd ckt.) S/C 220 220 0 0 220 Aug'07 Apr'08

16 Western Region Strengthening Scheme - I

a Sipat - Raipur D/C 298 280 18 16 410 410 410 296 Nov'07 Jun.'08

17 Sipat - II Supplementary Trans.S ta Wardha - Akola D/C 324 100 224 32 435 422 341 132 Jun'08 Dec.'08

b Akola - Aurangabad D/C 530 8 430 0 663 395 258 8 Jun'08 Dec.'08

System Strengthening in South-Western part of Northern Grid (Part-A) Scheme

Trans Lines 4 of 33

Page 5: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

18 Western Region StrengtheningScheme-II

a Korba (NTPC) – Birsinghpur(MPGENCO)

D/C 454 0 75 0 656 21 Jul'10

b Birsinghpur (MPGENCO) –Damoh

D/C 508 0 100 0 634 139 Jul'10

c Damoh – Bhopal (MPEB) D/C 468 0 75 0 598 60 Jul'10

19 Western Region StrengtheningScheme-VI

1 Pirana-Dehgam D/C 112 0 0 0 Nov"10 Award under Progress

SOUTHERN REGION20 Neyveli TS - II Trans. System

a Neyveli (Expn.) Sw. Yd.- Neyveli(existing) Sw. Yd.

2xS/C 6 3 0 0 17 17 16 3 Dec'07

b Neyveli TS -II - Pugalur D/C 402 310 0 5 576 558 509 315 Dec'07

c Pugalur - Madurai D/C 246 180 0 0 355 355 351 180 Dec'07d Udhamalpet - Arasur D/C 132 0 0 0 189 160 83 Dec'07

e LILO of Neyveli - Sriperumbadurline at puducherry

D/C 26 0 0 0 39 35 19 Dec'07

f LILO of Ramagundam - Khammamat Warangal

D/C 26 0 0 0 42 38 24 Dec'07

21

a Kundankulam (NPC) - Tirunelveli (PG) (Quad Line -I

D/C 160 145 15 0 199 199 199 145 Dec'07

b Kundankulam (NPC) - Tirunelveli (PG) (Quad) line -II

D/C 160 159 0 0 213 213 213 159 Dec'07

c Tirunelveli (PG) - Udumalpet (PG) D/C 528 449 4 1 730 727 722 450 Dec'07

d Tirunelveli (PG) - Edamon (KSEB)Multi -Ckt line

M/C 322 36 200 4 233 176 106 40 Nov'08

Kundankulam - APP Trans. System

Trans Lines 5 of 33

Page 6: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

e LILO of both ckt of Maduri (PG) -Trivendrum (PG) at Tirunelveli

D/C 213 213 0 0 300 300 300 213 Nov'08 Apr'08 Commissioned 4/08

22 Kaiga 3 & 4 Trans. Systema Mysore-Kozhikode line D/C 418 126 156 0 618 312 263 126 Dec.'07 Mar'09

b LILO of existing Kolar-Sriperumbadur at Melakottaiyur

D/C 31 25 0 4 94 94 93 29 Dec.'07 May'08

23 System Strengthening -VII of SR

a LILO of 1 ckt of Madurai (PG) -Trichy (PG) at Karaikudi

D/C 100 0 75 0 126 75 40 July'09

b LILO of 1 ckt of exist. Talguppa(KPTCL) -Neelamangla (KPTCL)at Hassan

D/C 148 18 110 0 208 136 74 18 July'09

24 Trans. system associated withTeesta-V HEP

a Teesta-V - Siliguri (Ckt-II ) S/C 113 112 1 0 112 May'08

25 Eastern Region StrengtheningScheme-I

a Durgapur-Jamshedpur D/C 362 0 240 0 478 302 67 Oct'09

b Jamshedpur - Baripada D/C 270 0 140 0 383 153 Oct'09

c Baripada - Mendhasal D/C 510 0 150 0 732 151 Oct'09

TOTAL (PGCIL) 400 kV 13710 4162 4879 309 4471

Damoder Valley Corporation1 LILO of Durgapur-Jamshedpur

(PG) at Durgapur STPSD/C 372 0 0 0 Aug'09

2 Durgapur STPS - Raghunathpur D/C 138 May'10

LOA placed on 29.4.2008 to Jyoti

Structures

Trans Lines 6 of 33

Page 7: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

3 LILO of Maithon-Ranchi (PG) atRaghunathpur

D/C 7 0 0 May'09

4 Raghunathpur-Ranchi (PG) D/C 301 0 0 May'10

400 kV Total (DVC) 818 0 0 0 0TOTAL (CS) 400 kV 14528 4162 4879 309 4471

400 kV STATE SECTOR :NORTHERN REGION (NR) :RAJASTHAN (RVPN) :

A Associated Transmission Lines

Chhabra TPS (2x250MW)1 Chhabra-Dahra (Kota) D/C D/C 280 0 0 91 375 333 270 91 Sep-082 Dahra(Kota)-Bhilwara S/C S/C 145 0 20 0 400 170 41 0 Sep-08

3 LILO Dholpur-Heerapura at Hindaun D/C

D/C 145 0 0 0 0 Sep-08

4 Chhabra-Hindaun S/C 305 0 305 36 700 625 383 36 Sep-08

Suratgarh STPS (U-6 250 MW)1 Suratgarh STPS -Bikaner S/C S/C 170 0 170 0 510 251 173 0 Oct-08

2 Jaisalmer- Barmer S/C 150 0 0 0 402 79 18 0 Apr-09

3 Jaisalmer- Jodhpur S/C 230 0 0 0 633 155 45 0 Apr-09

4 Rajwest- Jodhpur D/C 440 0 0 0 580 5 0 0 Apr-09

B System Srengthening

Partially completed (400 kV)(CS) :

Trans Lines 7 of 33

Page 8: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

1 Ratangarh-Merta S/C 181 181 0 0 464 464 464 181 Mar-06 Apr-08 Stringing completed/Bays not ready

2 KTPS-Kota(PG) (charged at 220 kV)

D/C 10 10 0 0 10 Mar-08 Jun-08 Line completed and charged at 220 kV

TOTAL (RVPN) 400 kV 2056 191 495 127 318UTTAR PRADESH (UPPCL) :System Srengthening

1 LILO of Anpara-Varanasi at Obra TPS

D/C 21 21 0 0 40 40 40 21 Jun-05 Apr-08 Bays at Obra not ready

TOTAL (UPPCL) 400kV 21 21 0 0 21UTTARANKHAND (PTCUL) :System Srengthening

1 Srinagar-Nehtaur S/C 150 0 0 0 Dec-082 Srinagar-Kashipur S/C 175 0 0 0 Dec-083 Lohri Nagpala-Srinagar S/C 150 0 0 0 Dec-084 Lohri Nagpala-Rishikesh S/C 200 0 0 0 Dec-085 Lohri Nagpala-Pala Maneri S/C 50 0 0 0 Dec-086 Tapovan-Bawla Nand-Prayag S/C 40 0 0 0 Dec-087 Tapovan -Srinagar S/C 100 0 0 0 Dec-088 Tapovan-Vishnu Prayag S/C 50 0 0 0 Dec-089 Kotli Behl-Rishikesh D/C 50 0 0 0 Dec-08

10 Kotli Behl-Kahipur S/C 150 0 0 0 Dec-0811 Kishau Bandh-Rishikesh S/C 150 0 0 0 Dec-0812 Kishau Bandh-Dakpathar S/C 50 0 0 0 Dec-08

TOTAL (PTCUL) 400kV 1315 0 0 0 0

Trans Lines 8 of 33

Page 9: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

JAMMU & KASHMIR (J&K) :Baglihar-I HEP JKPDC (3x150 MW )

1 Kishenpur-Baglihar D/C 136 136 0 0 215 215 215 136 May-07 Apr-08 Stringing completed PLCC/WT Balance

TOTAL (J&K) 400kV 136 136 0 0 136HARYANA (HVPN) :Jhajjar-I (3x500 MW) TPS

1 Jhajjar-Daulatabad D/C 120 0 0 0 0 0 0 0 Mar-102 Jhajjar-Mundka (Delhi) D/C 120 0 0 0 0 0 0 0 Mar-10

Hissar (3x500 MW) TPS1 Hissar - Kirori D/C 0 0 0 0 0 0 0 Mar-102 Hissar - Fatehbad (PGCIL) D/C 0 0 0 0 0 0 0 Mar-10

TOTAL (HVPN) 400 kV 240 0 0 0 0TOTAL (NR) 400 kV 3768 348 495 127 475

WESTERN REGION (WR) :CHHATTISGARH (CSEB) :O.P.Jindal TPP (P) (JPTS)

1 JTPS-Raipur D/C D/C 516 382 2 0 701 699 696 382 Sep-07 Jun-08

1 LILO of Korba-Sipat at Amarkantak

D/C 62 52 10 10 88 88 86 62 Apr-08 Commissioned 4/08

LANCO Amarkantak TPS (P) (2x300 MW )

Trans Lines 9 of 33

Page 10: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

Bhilai TPP (P) (JV- NSPCL)1 NSPCL-Raipur D/C D/C 28 10 18 16 48 48 46 26 Oct.07 May-08 Railway Clearance

awaitedSystem Strengthening

1 Korba (W)-Bhilai (Khedamara) D/C 440 0 0 0 0 0 0 Mar-10 Tendering in progress

2 LILO Korba (West)-Bhilai at Raipur D/C 100 0 0 0 Mar-10 Tendering in progress

TOTAL (CSEB) 400 kV 1146 444 30 26 470GUJARAT (GETCO) :Adani Power Limited (Private)

1 Mundra-Dehgam D/C 842 40 802 0 1179 610 436 50 Jan-09

1 Adani-Hadala D/C 230 0 0 Dec-092 LILO of Adani-Hadala at Versana D/C 230 0 0 Dec-09

1 TPGL-Pirana D/C 220 0 210 0 Mar-08 Mar-09 Survey work completed

System Strengthening1 LILO of one Ckt of Asoj-Amreli at

ChoraniaD/C 39 38 1 0 57 57 55 38 Dec-07 Jun-08 WIP

2 LILO of Asoj-Ukai at Kosamba D/C 60 0 0 0 0 0 0 0 Jun-09 Survey in progress

TOTAL (GETCO& PVT) 400 kV 1621 78 1013 10 88

Adani Power Limited (State) 1000 MW (Bid-1)

Sugen(Akhakol),Torrent Power Limited (Private)

Trans Lines 10 of 33

Page 11: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

MADHYA PRADESH (MPPTCL)System Strengthening

1 LILO of Birsinghpur - Damoh D/C at Damoh

D/C 26 20 6 5 37 37 37 25 Jun-07 May-08 WIP,Matching with Damoh S/S

2 Interconnector of Birsinghpur-Katni-Damoh at Birsinghpur

D/C 2 0 0 0 3 3 2 0 Mar-08 Jun-08 WIP

3 Interconnector of Birsinghpur-Katni-Damoh at Katni

D/C 2 0 2 0 4 4 4 0 Mar-08 Jun-08 WIP

TOTAL( MPPTCL) 400 kV 30 20 8 5 25MAHARASHTRA (MSEB) :

1 Dabhol-Nagothane Ckt.-II S/C 136 58 0 0 337 326 300 58 Feb-06 May-08 ROW Problem

TOTAL( MSEB) 400 kV 136 58 0 0 58TOTAL (WR) 400 kV 2933 600 1051 41 641

SOUTHERN REGION (SR) :

Vijayawada TPS1 LILO of Srisailam-Nunna at VTPS D/C 20 0 20 0 Sep-08 Technical bids opened

System Srengthening

1 LILO of Ramagundam -Ghanapur at Malkaram

D/C 54 0 54 0 76 42 35 Sep-08

2 LILO of Ramagundam -Ghanapur at Gazwel

D/C 21 0 0 0 38 36 30 0 Dec-07 Jun-08

3 LILO of Srisailam-Vijayawada at Narasaraopet

D/C 5 0 0 0 10 0 Dec-07 Mar-09 New site to be finalised for

4 Narasaraopet -Vemagiri D/C 170 0 0 0 293 0 Dec-07 Dec-09 New site to be finalised for Narasaraopet

ANDHRA PRADESH (APTRANSCO) :

Ratnagiri CCPP (Dabhol CCGT ST-II )

Trans Lines 11 of 33

Page 12: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

5 Ramagundam(NTPC)-Ditchpally S/C 171 171 0 0 419 419 419 171 Jun-07 May-08 Ready for commissioning

TOTAL (APTRANSCO) 400 kV 441 171 74 0 171Karnataka(KPTCL)

1 BTPS- Hiriyur D/C 302 302 425 182 54 Dec-082 LILO of RTPS- Guttur at BTPS

KuditiniD/C 14 14 31 26 21 Dec-08

TOTAL (KPTCL) 400 kV 316 0 316 0 0TOTAL (SR) 400 kV 757 171 390 0 171

EASTERN REGION (ER) : 0ORISSA (OPTCL) :System Strengthening

1 Meramundali-Mendhasal (Chandaka)

D/C 200 199 0 0 283 283 283 199 Jun-02 May.08

2 Meramundali-Duburi D/C 192 0 192 0 279 167 115 0 Sep-02 Oct.08 PGCIL will construct

TOTAL (OPTCL) 400 kV 392 199 192 0 199WEST BENGAL (WBSETC) :Sagardigih TPP(2x300 MW)

1 Sagardighi - Parulia (PGCIL) D/C 127 45 54 0 337 324 303 45 Dec-08 Forest clearance awaited

2 LILO of Farakka-Subhashgram at Sagardighi

D/C 13 12 0 0 34 34 34 12 Dec-08 Forest clearance awaited

TOTAL (WBSETC) 400 kV 140 57 54 0 57TOTAL (ER) 400 kV 532 256 246 0 256

TOTAL (State Sector) 400 kV 7549 1204 2182 339 1543TOTAL (All India) 400 kV 22077 5366 7061 648 6014

Ckm

220 kV CENTRAL SECTOR (CS)

Partially Completed (400 kV) (SS) :

Jindal TPC(Thorangallu-Bellary)

Trans Lines 12 of 33

Page 13: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

POWERGRID (PGCIL) :A. International Lines

1 Kabul-Pul-e-Khumri (Afghanistan) D/C 404 268 136 8 613 613 534 276 Oct-08 Severe cold weather Problem

Total ( International Lines) 404 268 136 8 276

B. National LinesSystem Strengthening in Uttarakhand

1 LILO of 01 ckt. Of Tanakpur-Bareilly at Sitarganj

44 7 0 0 70 67 61 7 Jun'08

Western Region Strengthening Scheme - III220KV Vapi (PG) - Kharadpada(DNH) D/C line

34 18 16 6 66 62 60 24 Aug'08

SOUTHERN REGION

220KV Vapi (PG) - MagarwadaD/C line

31 29 2 2 59 59 59 31 Aug'08

220 kV Total 109 54 18 2 62

Trans Lines 13 of 33

Page 14: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

Mejia TPS Unit-6(250 MW)

1 Mejia-Gola - Ramgarh D/C 406 0 401 0 674 452 186 0 Dec.05 Dec.08 Forest proposal sent to GOI on 7.4.08

Chandrapura TPS Extn.(2x250)1 LILO of Kalyaneshwari-CTPS at

Dhanbad2xD/C 8 0 3 0 16 Mar-09

2 Dhanbad-Giridih D/C 86 0 0 0 134 0 0 0 Sep-09 Price bid under evaluation

3 Giridih-Kodarma D/C 212 0 0 0 305 Feb-10 Price bid under evaluation

4 LILO of CTPS-MTPS D/C at Kalyaneshwari & Extn upto Pithakari

2xD/C 187 0 187 0 349 85 36 Nov-08

TOTAL (DVC) 220 kV 899 0 591 0 0

TOTAL (CS) 220 kV 1412 322 745 10 338

Ckm220 kV STATE SECTOR :NORTHERN REGION (NR) :CHANDIGARH :System Strengthening

1 Ganguwal-Mohali (2nd Ckt. Stringing) (Incl of re-alignment)

S/C 72.4 72 0 0 72 Jun-06 Apr-08 Deposit work of PSEB. Re-alingment of Bays in progress

TOTAL (CHND) 220 kV 72.4 72 0 0 72

Partially Completed (220 kV) (CS) :

Existing

DAMODER VALLEY CORPORATION (DVC) :

Trans Lines 14 of 33

Page 15: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

DELHI (DTL) :1 Gazipur-Noida D/C 16 0 0 0 48 38 28 0 Mar-04 Row problem, work

held up

2 LILO of Bawana-Najafgarh at Khanjawla

2XD/C 12 4 0 0 33 33 32 4 Jun-03 ckt 1 of Loop in charged. Bal. work under tendering

3 Papankalan-I- Papankalan-II D/C 11 0 0 0 32 0 0 0 Mar-06 Retendering in progress

4 LILO of Bawana - Narela at Bawana DSIDC

2XD/C 14 13 0 0 50 45 43 13 Dec-05 Rerouting of Loop out required at PL crossing

5 U/G of Maharani Bagh(PG)-Masjid Moth

D/C 19 0 0 0 Mar-08 Mar-09 Bid opened 31.12.07

6 U/G of Maharani Bagh-Electric lane

D/C 22 0 0 0 Mar-08 Mar-10 ICB to be refloated

7 U/G of Maharani Bagh-Trauma Centre/AIIMS

D/C 22 0 0 0 Mar-08 Mar-10 ICB to be refloated

TOTAL (DTL) 220 kV 116 17 0 0 17HIMACHAL PRADESH (HPSEB) :Associated Generating Schemes

1 Kashang - I HEP 2x33 MW 1 Kashang-Bhaba D/C 76 41 0 0 100 99 86 41 Mar-07 Jun-08 Forest Cl obtained

02/082 LILO Kashang-Bhaba at Bhoktoo D/C 63 0 0 0 Jan-08 Dec-09

System Strengthening

1 Nalagarh(Reeru Majra)(PGCIL)-Nalagarh

D/C 12 0 0 0 0 0 0 Mar-07 Mar-10 Delay due to forest case in HC

2 Giri - Moginand (Kala Amb) D/C 30 0 0 0 Mar-08 Mar-11 Delay in land acquisition at

Cable

Cable

Cable

Trans Lines 15 of 33

Page 16: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

3 Khodri-Majri (2nd circuit) S/C on D/C

35 34.2 0 0 34.2 Mar-08 Mar-09 Stringing completed except between locationsT34&T36

4 Kangoo-Rauri S/C 24 0 0 0 0 Jun-09

TOTAL (HPSEB) 220 kV 240 75 0 0 75

HARYANA (HVPN) :220 kV Yamuna Nagar TPS

1 YTPP-Abdullapur D/C 56 28 0 0 93 87 60 28 Mar-08 Jun-082 YTPP-Nilokheri D/C 140 0 0 0 129 129 72 0 Mar-08 Aug-083 Nilokheri-Karnal S/C 20 19 0 0 66 66 66 19 Mar-08 Jun-08

B System Strengthening1 Badshahpur – Rewari (2nd Ckt)

StringingS/C 51 43 0 0 43 Jun-06 Jun-08

2 Badshahpur-IMT Manesar 2nd Ckt Stringing

S/C 12 0 0 0 0 Mar-07 Jun-08

3 LILO of 2nd ckt of Narwana-Fatehabad at Bhuna

D/C 16 0 0 0 27 26 16 0 Dec-07 Jun-08

4 Hissar (Mayyar)-Isharwal D/C 90 22 0 48 151 144 135 70 Apr-08 Jun-08

5 LILO Narwana-Fatehabad & Fatehabad-Sirsa at Fatehabad (PG)

D/C 5 0 0 0 10 10 2 Dec-07 Jun-08

6 Kirori (400 kV)-Hansi D/C 80 0 0 Jun-097 Cheeka-Durala D/C 106 0 106 0 154 154 94 Nov-088 LILO one ckt Shahbad-Pehova at

DuralaD/C 6 0 6 0 12 12 Nov-08

TOTAL (HVPN) 220 kV 582 112 112 48 160

Tower Existing

Tower Existing

Tower Existing

Trans Lines 16 of 33

Page 17: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

PUNJAB (PSEB) :Associated Generating Schemes

220 kVGuru Hargobind TPS - II (2x250 MW)

1 GHTP-Himatpura D/C D/C 70 0 18 0 Dec.07 Sept.082 GNDTP-Muktsar (2nd ckt) S/C on

D/C53 50 0 0 157 156 156 50 May-07 Jun-08 Forest clearence

awaitedSystem Strengthening 0

1 LILO of Patti-Verpal at Tarn-Taran S/C 20 0 0 0 0 Mar-06 Mar-09

2 Ranjit Sagar Dam – Sarna (circuit 4)

D/C 30 30 0 0 30 Jun-05 Jun-08 Stringing completed ,Hill cutting work in progress

3 Khasa – Amritsar (at Balachak (PGCIL))

D/C 44 10 0 10 72 72 63 20 Jun-05 Jun-08

4 LILO of Malerkotla – Lalton Kalan S/C at Pakhowal

D/C 2 0 0 0 5 Mar-06 Dec-08 Matching with Pakhowal S/S

5 LILO of Mohali-I – Dera Bassi at Mohali-II

D/C 1 0 0 0 9 5 Mar-07 Jun-08 WIP

6 LILO of Gobindgarh-I - Gobindgarh-II at Amloh Road

D/C 2 0 0 2 5 5 5 2 Mar-07 May-08 work near completion

7 Humbran–FZR Rd Ludhiana D/C 30 0 0 0 Mar-07 Aug-08 Tower design modification

8 Phagan Majra (400 kV) - F.P.Nabha

D/C 46 2 0 0 108 2 Mar-08 Oct-08 Re-tendering in process

9 Mohali-Dera Bassi (2nd ckt stringing)

S/C on D/C

28 28 0 0 28 Jun-07 May-08

10 LILO of one circuit of GGSSTP – Mohali-I at Kharar

D/C 10 0 0 0 Dec-07 Dec-08

11 Nalagarh-Mohali -I D/C 107 21 0 0 187 95 92 21 Jul-07 Jun-08

12 LILO one ckt of Lalton- Jagron at Ludhiana (PG)

D/C 4 0 0 0 10 10 7 Apr-09

Existing

Existing

Trans Lines 17 of 33

Page 18: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

13 LILO one ckt of Lalton- Dhandarikalan at Ludhiana (PG)

D/C 5 0 0 0 12 1 Apr-09

14 LILO one ckt of Lalton-Sahnewal at Ludhiana (PG)

D/C 3 0 0 0 12 Apr-09 ROW problem

15 Sahnewal- Doraha DC line D/C 12 0 0 0 Jun-09

16 Ludhiana (400kV) - Doraha (220kV)

S/C on D/C

18 0 0 0 Jun-09

17 LILO of one ckt. of Moga- Mukatsar DC at Sadiq

D/C 50 0 50 0 Mar-09

18 Moga (400 KV) - Baghapurana D/C 36 0 36 0 36 Mar-09

19 Mukatsar- Malout SC on DC S/C 32 0 0 0 32 Mar-0920 Focal Point Nabha- Dhuri D/C 50 0 0 0 Jun-0921 Kapurthala-Jalandhar(400 KV ) S/C on

D/C15 0 0 0 Jun-09

22 Patti- Algaon S/C on D/C

20 0 0 0 Jun-09

23 LILO of one ckt. of Moga- Jagraon DC at Ajitwal

D/C 2 0 0 0 Jun-09

24 Botianwala - Mastewala D/C 10 0 0 0 Jun-09

25 LILO of one ckt. of Fateh Garh Churian- Civil Line Amritsar at Majitha

D/C 4.5 0 0 0 Jun-09

26 LILO of one ckt. of Moga (400 KV)-Jagraon DC at Ajitwal

D/C 1 0 0 0 Jun-09

27 Botianwala- Mastewala S/C on D/C

10 0 0 0 Jun-09

Total Punjab 716 141 104 12 153Rajasthan

A Associated Transmission LinesGIRAL LIGNITE (2X125 MW )

1 Giral TPS-Barmer 2nd S/C S/C 32 0 27 0 96 Mar-07 Aug.08

Trans Lines 18 of 33

Page 19: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

2 Dhorimanna-Bhinmal S/C S/C 92 24 0 9 288 242 223 33 Jun-07 Jun.08

3 Giral TPS-Balotra S/C S/C 100 0 100 0 Mar-09

1 Barsinghsar -Khinvsar S/C S/C 100 0 0 31 318 236 155 31 Mar-08 Jun-08

2 Barsinghsar TPS-Phalodi S/C S/C 140 0 70 0 Mar-09 Jun-09

Kota TPP (195 MW)1 LILO Bhilwara-Kankroli at

Kankroli(PG)S/C 9.5 9.5 0 0 16 16 16 9.5 Mar-08 May-08

2 LILO Kota-Bhilwara at Kota (PG) D/C 4 0 4 0 Mar-08 Jun-08

RAPP (2x220 MW)1 Kankroli (PG)-Kankroli S/C 22 0 22 0 0 0 0 0 Apr-08 Apr-09

Chhabra TPS (2x250MW)1 Chhabra TPS-Jhalawar S/C S/C 100 0 100 0 317 4 Sep-082 LILO Bhilwara-Pali at Bhilwara

(400 kV) D/C 10 0 10 0 Sep-08

3 LILO Bhilwara-Bali at Bhilwara (400 kV)

D/C 10 0 10 0 Sep-08

4 Hindaun (400 kV)-Hindaun (220 kV)

D/C 15 0 15 0 28 28 17 0 Sep-08

5 Hindaun (400 kV)-Mandawar D/C 65 0 65 0 Sep-08

6 Chhabra-Baran-Dahra D/C 135 135 0 405 Sep-08

Suratgarh STPS (U-6 250 MW)1 LILO Bikaner-Sridungargarh at

Bikaner (400 kV) D/CD/C 20 0 20 0 Oct-08

2 LILO Bikaner- Nagaur at Bikaner(400 kV) D/C

D/C 20 0 20 0 Oct-08

3 STPS-Bhadra S/C S/C 114 0 114 3 352 342 291 3 Oct-08

Barsinghsar Lignite NLC (2x125 MW)

Trans Lines 19 of 33

Page 20: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

Raj West LTPS (Phase -I)1 Raj West-Barmer D/C 30 0 0 0 51 7 0 0 Jun-092 Raj West-Dhorimanna D/C 90 0 0 0 0 0 Jun-09

B System Strengthening 01 Opening of one ckt of Heerapura-

Bassi line and connecting Sanganer & Phulera

S/C 59 59 0 0 191 191 191 59 Mar-04 May-08 Stringing completed 04/07. PLCC eqpmnt Bal.

2 LILO of Jaipur – Kota at Duni D/C 6 0 0 0 8 8 2 0 Mar-08 Jun-083 Bhiwadi(Khushkhera)-Neemrana S/C 60 26 0 3 184 174 169 29 Mar-08 Jun-08

4 Kankroli (PG)-Debari S/C 70 0 0 0 215 100 2 0 Mar-08 Sep-08

5 LILO one ckt Bassi-Heerapura at Jagatpura

D/C 22 0 22 0 42 Mar-09 Dec-08

6 Giral LTPS- Balotra S/C 100 0 100 0 Mar-097 LILO Heerapura-Kukas at VKIA D/C 2 0 2 0 7 5 0 0 Jul-088 LILO Bhiwali-Neemrana at Khush D/C 8 0 8 0 18 18 14 0 Dec-08

9 LILO Alwar-Bhiwadi at Khushkhi D/C 5 0 5 0 19 10 0 0 Dec-08

TOTAL (RVPN) 220 kV 1441 119 849 46 165UTTAR PRADESH (UPPCL) :

1 Matore(PG)-Nehtaur S/C 73 0 0 0 211 194 141 Dec-07 Jun-082 Nanauta-Muzaffarnagar S/C 65 0 15 0 Apr-08 Mar-09 Work to be started3 Muzaffarnagar-Shamli S/C 65 0 15 0 169 7 Mar-08 Dec-084 LILO of Saharanpur-Shamli at

NanoutaD/C 6 0 0 0 11 7 Apr-08 Mar-09

5 LILO of Moradabad-C.B.Ganj at Rampur

D/C 12 0 0 0 Mar-08 Apr-09 Work to be started

6 Metore(Meerut) (PG)-Gajraula S/C 87 0 37 0 253 212 165 Apr-08 Jun-087 Moradabad-NAPP D/C 4 0 0 0 Mar-08 Mar-098 Loni-Muradnagar(400 kV S/S) D/C 27 0 4 0 112 50 Mar-08 Jun-08

Trans Lines 20 of 33

Page 21: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

9 LILO of Khurja-Muradnagar at Dadri

D/C 23 0 0 0 45 13 Mar-08 Sep-08

10 LILO of Khurja-Muradnagar at Sikandrabad

D/C 38 17 21 0 66 54 43 17 Jun-08 Sep-08

11 LILO of Sarojininagar-Chinhat at Gomtinagar

D/C 6 0 6 0 22 Jun-08 Survey completed

12 Basti-Gonda D/C 103 0 25 0 292 25 Apr-08 Sep-09 Survey completed13 LILO of Orai-Paricha at Jhansi D/C 42 0 21 0 66 43 2 Mar-08 Apr-09

TOTAL ( UPPCL) 220 kV 551 17 144 0 17

Trans Lines 21 of 33

Page 22: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

UTTARAKHAND (PTCUL)

1 Rishikesh-Maneribali Stage-II (3rd ckt)

S/C 110 46 0 0 230 166 165 46 Dec-05 Jun-08 Final Forest Cl awaited

2 LILO of Maneri I-Rishikesh at Maneri II

D/C 4 4 0 0 6 6 6 4 Mar-07 May-08 Stringing completed

System Srengthening1 Kashipur - Barheni D/C 52 0 0 0 84 82 36 Dec-06 Apr-082 Barheni - Pantnagar S/C 35 31 0 0 115 115 113 31 Dec-06 Jun-08

TOTAL (PTCUL) 220 kV 201 81 0 0 81JAMMU & KASHMIR (J&K) :System Strengthening

1 Zainkote-Alusteng-Mirbazar D/C 254 0 0 0 431 218 Mar-10 Tender Doc under preparation

2 Zainkote-Wagoora-Mirbazar D/C 164 0 0 0 292 245 Mar-09 Oct-09 Tech.bid under evaluation

3 Zainkote-Amargarh D/C 85 0 0 0 137 111 Mar-104 LILO of Zainkote – Wagoora at

Budgam D/C 8.6 0 0 0 18 1 Mar-09

5 Barn-Kishenpur D/C 74.8 74.8 0 0 105 105 105 74.8 Mar-08 May-08 Stringing completed

6 Gladni-Udhampur S/C 48 38.5 9.5 0 165 165 163 38.5 Apr-08 Mar-09 Fund allocated7 Stringing of 2nd ckt Thein (RSD)-

HiranagarS/C 40 28 0 2 30 Mar-08 Mar-10 Dispute with Punjab

8 LILO Kishenpur-Pampore atRamban

D/C 4 0 0 0 6 Mar-09 Mar-10

9 Hira Nagar-Bishnah D/C 89 0 0 0 115 Mar-09 Jun-09 Bid opened 11/0710 Bishnah-Barn D/C 75 0 0 0 142 Mar-09 Jun-09 Bid opened 11/07

TOTAL (J&K) 220 kV 842 141 10 2 143TOTAL (NR) 220 kV 4761 775 1219 108 883

Existing

Associated Transmission Schemes Maneri Bhali-II HEP UJVNL (4x76 MW (UK)

Trans Lines 22 of 33

Page 23: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

WESTERN REGION (WR) :CHATTISGARH :

CSEBO.P.Jindal TPP (P) (JPTS)

1 JTPS-Raigarh D/C 108 76 0 3 187 187 177 79 Jun-07 Jun-08

Bhilai TPP (P) (JV- NSPCL)1 NSPCL-Gurur (CSEB) S/C 20 0 20 20 48 48 46 20 Oct.07 Apr-08 Commissioned

2 NSPCL-BSPN MSDS-6 D/C May-08 work completed

3 NSPCL-BSPN MSDS-5 D/C Sep-08

System Strengthening

1 Korba(Darri)-Bishrampur DC 153 38 0 0 450 347 294 38 Mar-08 Mar-09 Work held up due to non-availability of Forest clearance & land for Bishrampur S/S.

2 Kumhari (PGCIL) – Doma S/S D/C 42 0 22 0 76 33 8 0 Mar-08 Sep-08 WIP3 Bhatapara 400 kV

(PGCIL)–Bhatapara (Suhela) S/C 27 0 27 0 47 24 15 0 Dec-07 Jun-08 WIP

4 Raigarh 400 kV (PGCIL) S/S – Raigarh

S/C 21 0 16 0 37 35 28 0 Dec-07 Jun-08 WIP

5 Khedamara- Rajnandgaon D/C 53 0 53 0 43 Dec-08 WIP6 LILO of Korba-Siltara at Mopka D/C 24 0 0 0 46 41 36 0 Apr-08 Jun-08 WIP

TOTAL (CSEB&PVT) 220 kV 448 114 138 23 137

Trans Lines 23 of 33

Page 24: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

GUJARAT :GETCOUtran CCGT 300 MW

1 Utran - Kosamba 2xD/C 2 x D/C

160 0 0 0 Dec-08 Dec-09 Survey work in progress

2 Kosamba-Mobha 2xD/C 2 x D/C

440 0 0 0 Dec-08 Mar-10 Survey work in progress

Surat Lignite Ext. Unit 3 & 4 (2x125 MW )

1 Mangrol - Mobha D/C 218 0 218 0 Oct-08 Foundation work Started

Sugen(Akhakol),Torrent Power Limited (Private)

1 Akhakol-Puna D/C 72 72 0 0 130 130 130 72 Apr-07 May-08 Line backcharged

2 Akhakol-Bhatar D/C 136 136 0 0 232 232 232 136 Apr-07 May-08 Line backcharged

3 Akhakol-Ved D/C 52 48 4 4 93 93 93 52 Apr-07 Jun-08 Line backcharged

4 Akhakhol-Kim D/C 8 8 0 0 17 17 17 8 Apr-07 Apr-08 Commissioned

System Strengthening

1 Bardoli-Chikali D/C 96 96 0 0 152 152 152 96 Dec-07 May-08 Erection of Gantry at both end completed

2 LILO of one Ckt of Anjar - Panadhro at Kukma

D/C 5 4 1 0 12 12 12 4 Mar-08 May-08 Work Completed , Commissioning

3 LILO of Vav-Jagadia on Ckt-1 at Kosamba

D/C 20 0 10 0 27 Mar-08 Mar-09 Survey completed

4 LILO of 2nd ckt of Ukai(T)-Vav at Bardoli

D/C 10 8 0 0 16 16 16 8 Mar-08 Jun-08 WIP

5 LILO of Karamsad - Vartej at Botad

D/C 100 0 0 0 43 Jun-09

6 Raipur - Dudhrej D/C 20 0 20 0 43 25 22 Mar-09

Trans Lines 24 of 33

Page 25: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

7 Adani - Kukma D/C 140 0 0 0 0 0 0 0 Feb-10

8 Adani - Versana D/C 180 0 0 0 0 0 0 0 Jun-099 Versana- Morbi D/C 170 0 0 0 0 0 0 0 Feb-10

10 Mundra (Adani) -Nani khakher D/C 180 0 0 0 0 0 0 0 Jun-09

TOTAL (GETCO&PVT) 220 kV 2007 372 253 4 376GOA :

1 Xeldem-Cuncolim D/C 20 0 0 0 31 0 Jun-07 Feb-10 Linked with Cuncolim Substation S/S

2 LILO of one ckt of Kolhapur - Ponda at Amona

D/C 3 0 3 0 0 Sep-08

TOTAL (GOA) 220 kV 23 0 3 0 0MADHYA PRADESH (MPPTCL) :

1 LILO of Birsinghpur-Satna at Amarkantak

D/C 88 32 48 18 144 144 125 50 Mar-07 Jun-08 WIP

2 LILO of Birsinghpur-Rewa for Sidhi D/C 118 24 58 14 198 198 179 38 Mar-07 Jun-08 WIP

3 LILO Amarkantak-Birsinghpur at Sukha (PG) 2xD/C

D/C 300 0 0 0 531 0 0 Apr-09 Final forest Cl awaited, Survey completed in

1 LILO of both ckts of Bhopal-Itarsi at Itarsi

2xD/C 2 2 0 0 7 7 7 2 Apr-07 Apr-08 Commissioned

1 LILO of Barwaha-Nepanagar (Khandwa) at Omkareshwar

2xD/C 91 80 11 0 108 108 106 80 Apr-07 Jun-08 WIP

Omkareshwar HEP NHDC 8x65MW

Amarkantak TPP Extn. U 5-210 MW

Birsinghpur Extn.St-III *A (Sanjay Gandhi TPS Extn.) U 1-500 MW

Trans Lines 25 of 33

Page 26: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

System Strengthening1 LILO of Gwalior-Malanpur at

Gwalior 400 kV (PG)D/C 17 2 0 4 31 24 18 6 Mar-08 Jun-08 WIP

2 Satna-Chhatarpur S/C on D/C

140 0 40 0 521 340 131 0 Apr-08 Jun-09 WIP

3 Shivpuri-Sabalgarh D/C 200 4.5 190 23.5 312 234 203 28 Apr-08 Nov-08 WIP

4 LILO of 1st Ckt of Itarsi-Bhopal at Mandideep

D/C 12 0 0 0 22 21 18 Mar-08 Sep-08 Fund constraint,WIP

5 LILO of 1st Ckt Damoh-Tikamgarh at Damoh(400 kV)

D/C 2 2 0 0 5 5 5 2 Mar-08 May-08 Stringing completed

6 LILO of 1st Ckt Jabalpur-Itarsi at Piparia

D/C 11 0 10 0 13 13 8 Mar-08 Mar-09 Linked with Piparia S/S

7 Seoni (PG)-Chindwara D/C 140 38 102 2 226 225 218 40 Apr-08 Dec-08 WIP8 Pitampur-Raigarh (2nd) Ckt S/C 69 11 58 19 30 Apr-08 Mar-09 WIP9 LILO of both circuits of Pitampur-

Raigarh D/C at Rajgarh(PG)2xD/C 92 10 82 12 79 78 74 22 Apr-08 Mar-09 WIP

10 Bhopal(400 kV)-Ashta D/C 194 0 0 0 307 292 257 Apr-08 Feb-10 WIP11 LILO of 1st Ckt of Damoh - Bina

D/C at Sagar D/C 15 0 15 0 27 0 0 0 Jun-07 Jun-08 Matching with Damoh

S/S. Critical.12 LILO of 2nd Ckt of Damoh - Bina

D/C at Sagar D/C 10 0 10 0 22 0 0 0 Jun-07 Jun-08 Matching with Damoh

S/S. Critical.13 Sujalpur-Rajgarh D/C 134 0 0 0 245 212 166 0 Jun-0914 Sujalpur-Sujalpur (PGCIL) D/C 10 0 0 0 18 0 0 0 Jun-0915 LILO of Jabalpur-Itarsi(2nd ckt) at

NarsinghpurD/C 3 0 3 10 8 1 May-08

TOTAL (MPPTCL) 220 kV 1648 206 627 92.5 298

Tower Existing

Trans Lines 26 of 33

Page 27: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

MAHARASHTRA (MSETCL) :System Strengthening

1 LILO Tarapur-Borivli at Boisar II D/C 16 7 0 0 15 15 12 7 Mar-07 Jun-08 Permission for Block date awaited from Railway Authorities.

2 Boisar (PG)-Wada S/C on D/C S/C 57 23 0 0 211 173 166 23 Mar-07 Jun-08 ROW problem,Part line (8 Ckm) upto

3 Kolhapur II-Kolhapur-III interconnector

S/C on D/C

18 0 0 0 36 4 Mar-08 Jun-08 ROW problem.Resurvey

4 LILO of Karad – Kolhapur D/C at Wather

D/C 6 0 0 0 Mar-08 Jun-09 Linked with Wather S/S

5 Talegaon 400 kV(PG)S/S – Talegaon 220 kV S/S D/C

D/C 20 0 0 0 Mar-08 Jun-09 Linked with Talegaon S/S

6 LILO of Pusad – Nanded (ckt-1) at Hingoli D/C

D/C 72 0 0 0 Mar-08 Jun-09 Linked with Hingoli S/S

7 LILO of Nasik – Kalwa Ckt 3&4 at Bapgaon

2xD/C 6 0 0 0 Mar-08 Jun-09 Linked with Bapgaon S/S

8 LILO of Padghe – Wada (Ckt-1) at Kudus

D/C 2 0 0 0 Mar-08 Jun-09 Linked with Kudus S/S

9 LILO of Kalwa – Padghe (Ckt-1)at Airoli (Knowledge Park)

D/C 2 0 0 0 Mar-08 Jun-09 Land yet to be acquired for Airoli S/S

10 LILO of Kandalgaon – Chinchwad D/C at Hinjewadi-II

2xD/C 6 0 0 0 Mar-08 Jun-09

11 LILO of Pune Ring Main at Khadakwasala S/S

D/C 24 0 24 0 Mar-09

12 Theur - Magarpatta D/C 24 0 24 0 Mar-09

13 Pune (400kVPG )- Talegaon S/S D/C 20 0 20 0 Mar-09

14 LILO of Pune Ring Main at Talegaon S/S

D/C 10 0 10 0 Mar-09

15 LILO of Karad - Kolhapur at Wathar S/S

D/C 6 0 0 0 Jun-09

16 Paras - Balapur MIDC M/C 24 0 24 0 Mar-0917 Warora - Wani D/C 70 0 0 0 Jun-09

Trans Lines 27 of 33

Page 28: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

18 LILO of Waluj - Jalna at Shendra S/S

D/C 30 0 0 0 Jun-09

19 LILO of Pusad - Nanded II at Hingoli S/S

D/C 44 0 0 0 Jun-09

20 Buttibori (Old) - Buttibori (New) M/C

M/C 4 0 0 0 Jun-09

21 Buttibori (New) - Ambazari M/C 124 0 0 0 Jun-0922 Ambazari - Mankapur M/C 52 0 0 0 Jun-0923 LILO of Padghe - Boisar II at Vasai

S/S D/C 18 0 0 0 Jun-09

24 LILO of Padghe - Kalwa at Bapgaon S/S

D/C 6 0 0 0 Jun-09

TOTAL (MSETCL) 220 kV 661 30 102 0 30TOTAL (WR) 220 kV 4787 722 1123 120 841

SOUTHERN REGION (SR) :

1 Vemagiri-Bhimavaram-Gudivada-Nunna (332ckm) (Bhimavaram- Gudivada portion)

D/C 122 72 0 0 204 192 177 72 Sep-07 Jun-08 Partly Comm.

2 Vijayawada TPS-Tallapally D/C 133 48 85 0 414 331 284 48 Jun-08 Sep-083 Ramagundam- Bellampalli S/C on

D/C S/C 43 0 0 0 139 38 21 Mar-08 Jun-08

4 Boddepallipeta-Tekkali S/C on D/C S/C 44 30 0 0 139 122 121 30 Dec-07 Jun-08

5 Narasaraopet 400kV -Narsaraopet 220kV

D/C 50 0 0 0 Dec-09

6 Narasaraopet 400 kV -Parchur 220 kV

D/C 120 0 0 0 Dec-09

7 Parchur -Podili D/C 152 0 0 0 Dec-098 RTPP-Pulivendala D/C 82 0 0 0 131 May-07 Jun-09 Bid evaluation in 9 Pulivendula-Hindupur D/C 238 0 0 0 372 Dec-07 Jun-09

10 Vetloor- Wanaparthy D/C 40 0 40 0 77 Jun-08 Mar-0911 Kalpa S/S - Ms. Brandix D/C 42 0 42 0 68 31 31 Jun-08 Dec-08

ANDHRA PRADESH (APTRANSCO) :

Trans Lines 28 of 33

Page 29: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

12 Gajwel -Kamareddy S/C on D/C S/C 67 8 59 0 203 53 42 8 Jun-08 Sep-0813 Oglapur 400kV PGCIL-Nagaram D/C 12 0 12 0 Mar-09

14 Nagaram- Durshed D/C 206 0 0 0 Sep-09

TOTAL (APTRANSCO) 220 kV 1351 158 238 0 158KARNATAKA (KPTCL) :Raichur Unit 8 TPS

1 RTPS - Raichur D/C 20 0 0 0 70 58 Dec-07 May-08

System Strengthening 1 Chikkodi-Kudachi D/C 72 0 0 0 120 120 90 0 Sep-06 Dec-08 Work held up on

account of contractor2 LILO of Hoody-Kolar at Hoskote D/C 32 0 32 0 48 22 12 Sep-07 Sep-083 Hiriyur 400kV S/S- Gowribidanur D/C 121 0 0 0 431 370 308 Mar-08 Mar-09 ROW problem at 92

locs.4 Bastipura - Kadakola D/C 54 0 0 0 108 106 92 Mar-08 Mar-09 ROW problem 5 Hiriyur 400kV S/S- Tallak D/C 122 70 52 0 137 128 110 70 Jun-08 Sep-08 ROW problem 6 Tubinakere-Kothipura D/C 137 0 30 0 89 Jun-09

7 Bidadi-Kothipura(Ramanagar) S/S M/C 36 0 36 0 68 68 Jan-09

8 Basthipura-Kushalanagara D/C 154 0 20 0 287 191 120 Jun-09

9 LILO of Mahalingar-Hubli line at D/C 18 0 18 0 37 10 7 Dec-08

Soundatti

10 Guruvanyankere-Puttur D/C 48 15 33 0 135 135 120 15 Jun-08 court case pending

11 Indi- Basavanabagevadi D/C 160 124 36 0 302 258 241 124 Sep-08

12 LILO of Mahalingpur- Kudachi at Athani

D/C 48 0 48 0 95 70 62 Aug-08

13 LILO of SMG- Mysore at Kadavinakote

D/C 32 25 7 0 60 60 58 25 Jun-08

TOTAL (KPTCL) 220 kV 1034 234 312 0 234

KERALA (KSEB) :

Trans Lines 29 of 33

Page 30: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

1 LILO of Kayamkulam-Edaman (ckt-2) at Edappon

D/C 17 0 0 0 35 0 0 0 Mar-08 Mar-09

2 Tap line to Vadakara S/S D/C 2 0 0 0 6 6 6 Mar-08 Jun-083 LILO of New Pallom- Mavelikkara

at PunnapraD/C 37 0 0 0 65 Mar-08 Sep-09

4 LILO both ckts of Kalamassery-Brahmapuram at Pallikkara (Kochi East)

M/C 20 0 0 0 Dec-07 Mar-09

5 Areacode(PGCIL)400kV S/S- Areacode S/S

M/C 1 0 0 0 3 3 1 Dec-07 Jun-08

TOTAL (KSEB) 230 kV 77 0 0 0 0TAMILNADU (TNEB) :Valuthur CCPP Extn.

1 Valuthur - Paramakudi S/C on D/C S/C 50 0 0 0 198 192 80 0 Dec-07 Sep-08

System Strengthening 1 S.P.Koil-Tharamani

(Perambakkam-Tharamani portion)S/C 45 43 0 0 46 46 46 43 Jun-06 Jun-08 court case pending

2 LILO of Neyveli TS-II-Neyveli Zero Unit at Cuddalore

D/C 28 0 0 0 54 54 31 0 Jun-06 Sep-08 Work in Progress

3 Sriperumbudur -Korattur (Changing of conductor)

S/C 20 12 0 0 70 12 Sep-06 Sep-08 Balance work to be taken up

4 Alamathy S/S - Manali D/C 50 44 6 0 91 91 91 44 Jun-07 Jun-08

5 LILO of Pugalur-Checkanooraniat Renganathapuram

D/C 32 32 0 0 56 56 56 32 Jun-07 Apr-08 Commissioned 4/08

6 Alamathy S/S - Avadi (cable) D/C 35 9 0 0 46 46 42 9 Sep-07 Sep-087 Malumichampatty- Common point D/C 81 8 71 0 172 141 12 8 Jun-08 Dec-08

8 Common point - Myvadi S/S S/C on D/C

S/C 17 1 0 0 44 44 9 1 Mar-08 Dec-08

9 Common point -Ponnapuram S/C on D/C

S/C 17 0 17 0 65 48 26 Dec-08

Existing

Trans Lines 30 of 33

Page 31: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

10 Amuthapuram-Chekkanoorani D/C 260 115 145 0 403 403 403 115 Dec-07 Dec-08 Part line charged

11 Kayathar - Checkkanoorani D/C 260 10 50 2 460 452 360 12 Jun-09

12 Arasur 400kV S/S- Arasur 230kV S/S

D/C 13 0 13 0 53 35 22 Jun-08

13 LILO of S P Koil- Tharamani II at Kalivanthapattu 400kV S/S

D/C 14 12 2 0 30 30 28 12 May-08

14 Sriperumbudur 400 kV S/S-Nokia D/C 20 7 13 0 48 44 44 7 Jun-08

TOTAL (TNEB) 230 kV 942 293 317 2 295TOTAL (SR) 220 kV 3404 685 867 2 687

EASTERN REGION (ER) :BIHAR (BSEB) :System Strengthening

1 Begusarai-Purnea D/C 346 0 0 0 564 557 173 0 Sep-03 Jan-10 Fresh work to be started . Tenders awarded .

2 Muzzafarpur-Begusarai D/C 256 256 0 0 396 396 396 256 Dec-03 Jul-09 Charged at 132 kV .Linked with Begusarai S/S

2 Patna-Sipara D/C 10 0 0 0 Jan-10 Linked with Sipara S/S.Work yet to start

TOTAL (BSEB) 220 kV 612 256 0 0 256ORISSA (OPTCL ) :System Strengthening

1 Budhipadar-Bolangir D/C 358 312 46 0 562 562 561 312 Dec-082 Mendhasal-Bidanasi D/C 62 44 18 0 116 115 109 44 May-08 Part line

commissioned3 Duburi-Paradeep D/C 233 226 7 0 414 414 414 226 May-08

Trans Lines 31 of 33

Page 32: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

4 Padmanavpur - Balasore D/C 44 41 0 0 88 87 86 41 May-08 One ckt charged at 132 kV

TOTAL (OPTCL) 220 kV 697 623 71 0 623JHARKHAND (JSEB) :System Strengthening

1 Hatia-Lohardagga-Lather-Daltonganj-Garwa

D/C 430 120 50 0 120 Sep-09

2 PGCIL(Ranchi)-Hatia(Grid) D/C 31 0 10 0 Mar-09

TOTAL (JSEB) 220 kV 461 120 60 0 120WEST BENGAL (WBSETC) :Santaldhi TPP U-5(1x250 MW)

1 Santaldih TPS-Bishnupur D/C 223 192 31 0 347 344 325 192 Oct-08 Forest clearance awaited

System Strengthening1 LILO of Aramgarh-Rishra at Singur D/C 20 0 20 0 Aug-08

2 Jeerat-Rishra D/C 133 0 133 0 Aug-08

TOTAL (WBSETC)220 kV 376 192 184 0 192TOTAL (ER) 220 kV 2146 1191 315 0 1191

Trans Lines 32 of 33

Page 33: 765 kV Transmission Lines

Orig

inal

Rev

ised

1 2 3 4 5 6 7 8 9 10 11 12 13 14

RemarksTL (Nos.)

Stubs (Nos.)

TE (Nos.)

Stringing

Completed

(CKm)

Sl. No.

Generating Plant /AssociatedTransmission Scheme

No. of Circuit

s

Total Length (CKm)

String.Compl upto

March 2008

(CKM)

Programme for

2008-09

(CKM)

Stringing

April 2008

onwards

(CKm)

Target

ASSAM (ASEB) :1 Kathalguri-Tinsukia (2nd Circuit) S/C 50 25 0 0 82 82 82 25 Oct-05 Jul-08 Tender floated

2 BTPS-Agia-Sarusajai (2nd Circuit) S/C 396 0 0 Oct-05 Jul-09 67 ckm completed out of 198.5 Ckm. Balance stringing held up for want of funds.

TOTAL (ASEB) 220 kV 446 25 0 0 25TOTAL (NER) 220 kV 446 25 0 0 25

TOTAL (STATE SECTOR) 220 kV 15544 3398 3524 230 3627TOTAL (ALL INDIA) 220 kV 16956 3720 4269 246 3965

CkmPartially Completed (220 kV) (SS) :

Restringing

NORTH-EASTERN REGION (NER) :

Trans Lines 33 of 33