901 harrison -arc3- 20140801 - 2014-07-17 - for presentation
TRANSCRIPT
ARC #3901 HARRISON | SEATTLE, WASHINGTON
MACFARLANE PARTNERS / ANKROM MOISAN ARCHITECTS, INC.08.01.2014
ANKROM MOISAN ARCHITECTS, INC.ARCHITECTURE INTERIORS URBAN DESIGN BRANDING
ankrommoisan.com
6720 SW Macadam Ave / Suite 100Portland, OR 97219503.245.7100
117 S Main St / Suite 400Seattle, WA 98104206.576.1600
2ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
Site Information:
ADDRESS: 901 Harrison Street, Seattle WA 98109PARCELS: 1986200175, 1986200170LOT AREA: 21,600 sfZONING: SM160 / 85-240URBAN VILLAGE OVERLAY: South Lake Union Urban CenterSTREET CLASSIFICATION: Harrison St - Class II Pedestrian street
Project Goals:
OBJECTIVE #1: INCORPORATE NEW SEATTLE LANDMARK WITH NEW DEVELOPMENT
OBJECTIVE #2: CREATE NEW URBAN HOUSING
OBJECTIVE #3: IMPROVE OUTDOOR PEDESTRIAN AREAS AT GROUND LEVEL
DE
DE
DDDX
TX
TX
TX
ERERRRRAAAAV
EV
EV
EEENNNNN
8T8T8T8T8T8HHHHH
AVAVAVAVAVAVAEEEEEE
NNNN
9T9T9T9TT9T9THHHHHH
AVAVAVAVAVVEEEEEE
NNNNNN
SITE
SSSSSSSSMMMMMMMM 111111111666666660000000///////888888888555555555-------222222222444444000000
DDDDDDDDDDDMMMMMMMMCCCCCCCCCCC 2222224444444000000000/////////22222222299999999000000000----4444444000000000000000000
SSMM 2222222244444444000000000000/////////11111112222222555555555-----4444444440000000000000000000
SSSSSSSSMMMMMMMMM
888888885555555
---22222222244444444
00000000000
SSSSSSMMMMMMM 88888855555555/////////6666666665---1111666666000000
SSSSSSSSMMMMMMMM 8888888555555555
SSSSSSSSSSSSMMMMMMMMM 88888885555555555
NNNNNNNNNCCCCCCCCC33333333 888555555555
CCCCCCCC11111111----
66666666655555555
NNNNNNNNNCCCCCCC333333333 4444000
LLLLLLLL-------33333333
SSSSSSSSMMMMMMMMM////////RRRRRRRRR
55555555555555555555////////88888855555555
SSSSMMMMMMMM 11111222222222555555
SSSSSSSSMMMMMMMM 888888888555555555
Portion of zoning map approved by City Council on May 6, 2013
N
HAHAAHAAAHARRRRRRRRRRRRRISISISSISSSONONNNONON SSSSSTTTT
THHTHTHTTHTHOMOOMOMMMASAASASASASS SSSSSTTTTTT
WE
WE
WE
WE
WE
WES
TSTSTSTSTSTTLALALALALAALA
KE
KE
KE
KE
KE
KE
KE
AAAAAAAVVVVVVEEEEEEEEEEEEE
NNN
AFAFAFAFAAAIRIRRIRII
VI
VI
VVVVEWWEWEWWWWW
AAAAAAAAAAAAAAVVVVVVVAVVVVVVVVVVVVVVEEEEEEEEEE
NNNNNNNNNNN
REREREREEREEPUPUPUPUUUBLBLLBLBLBB ICCCAANANANANAN SSSSSSTTTT
AU
AU
AU
AUU
AU
AU
RO
RO
RO
ROO
RO
RA
RA
RA
RA
RA
RRRRAAAAAV
EV
EV
EV
EV
EV
ENNNNN
AU
RO
RA
AVE
NO
RN
ZONING AND SITE ANALYSIS
Harrison
Thomas
9th Ave
TETETEETTTR
RR
RR
RR
RRRR
YYYY
YYAVAVAVAVVAV
EEENNN
BO
BO
BO
BO
BBR
ER
ER
ER
ER
NNNNAVAVAVAVAVA
EEEENNNNNNN
DEDEDEDEDEDEDDD NNNNNNNNNNN Y Y YY YYY WAWAWWAWAWW YYYYDENNY WAY
TTTTTTTSSSSTTTTSTSSSSSSSSNNNNNNNHHHHHHHHOOOOOOOOOOOOOJOOOOOOOJJJJJJJJJ TTTTTTTNNNNNNHHHHHHJJJJJ NNNNHHHHHH
3ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
1928
1937
LANDMARK BUILDING HISTORIC PHOTOGRAPHS
4ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
Wes
tlake
Ave
9th
AvePROJECT SITE
Alle
y
City Hardware
333 Westlake Ave
325 Westlake Ave 160’ tall futureAmazon offi ce tower
HARRISON STREET LOOKING SOUTH
A
KEYPLAN
A
B
Harrison St.
Thomas St.
9th
Ave
Site
N
Alle
y
9TH AVENUE LOOKING EAST
Har
rison
St.
Thom
as S
t.
PROJECT SITE
B
City Hardware Third and Wall Art Group
Community Mental Health Center The Vude
First Church of Christ Scientist
STREET LEVEL CONTEXT AND ELEVATIONS
5ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
Project Site
Existing Buidling
UNDER CONSTRUCTIONDPD# 3014639
UNDER CONSTRUCTIONDPD# 3014653
VEER LOFTS
N
Open Spaces
SITE PLAN - EXISTING CONDITIONS
6ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
UNDER CONSTRUCTIONDPD# 3014639
UNDER CONSTRUCTIONDPD# 3014653
VEER LOFTS
SITE PLAN - PROPOSED CONDITIONS
N
Landmark Facade
New Tower Base
New Tower
25’-0”
30’-0”
17’-0”
8’-0”
33’-0”
7ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA FLOOR PLANS - EXISTING CONDITIONS
N
1 Existing Landmark building entrances
2
3
4
Existing Landmark building - interior not landmarked
Existing warehouse building
Existing Landmark building mezzanine - interior not landmarked
1
1 2
3
4
EXISTING GROUND FLOOR PLAN1 EXISTING SECOND FLOOR PLAN2
8ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA FLOOR PLANS - PROPOSED CONDITIONS
N
1 New lobby/retail entrance
2
3
4
New retail spaces
New retail mezzanine
Units on second level
1
PROPOSED GROUND FLOOR PLAN1 PROPOSED SECOND FLOOR PLAN2
4
4
3
4
2
2
Proposed retail
Proposed residential and BOH
9ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA LANDSCAPE PLAN - EXISTING CONDITIONS
N
1 Existing concrete sidewalk
2
3
Existing 1’ wide plantings
Existing parking lot
1
2
3 3
10ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA LANDSCAPE PLAN - PROPOSED CONDITIONS
1 3
4
1 New trees
2
3
4
Existing 1’ wide plantings
New plantings
New sidewalk (curb bulb proposed to SDOT, not yet approved)
N
5 8’-0” exterior retail space
2
5
1 3
1
1
1
1 1 1
4
11ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
1
4 33
1
2
Facade to be remainedFacade to be saw cut and reintalled to original locationFacade to be removed
Interiors to be removedoi
2
1
5
5
1
2
3
4
5
6
6
LANDMARK BUILDING - DEMOLITION AND REPLACEMENT
1 Landmark facade and windows to be retained
Upper level facade to be saw cut and reinstalled back to original location as precast
Existing warehouse buildings to be demolished
Facade to be saw cut and reinstalled back to original location as precast
Existing chimney to be removed
Existing windows to be replaced to match historic windows
2
3
4
5
6
12ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
1 Landmark facade and windows to be retained
Upper level facade to be saw cut and reinstalled back to original location as precast
Existing warehouse buildings to be demolished
Facade to be saw cut and reinstalled back to original location as precast
Existing chimney to be removed
Existing windows to be replaced to match historic windows
Remove infill and rebuild window at existing openings
2
3
4
5
11
1
2
3
3
34
5
5 5
5
LANDMARK BUILDING - DEMOLITION AND REPLACEMENT
Saw cut edges on Landmark facade
A - EAST ELEVATION
C - WEST ELEVATION
B - NORTH ELEVATION
D - SOUTH ELEVATION
6
6 6
A
B
C
D
7
7 7 7 7
13ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
North Entry Window Details
Openings at Alley Facade
Remove infill and rebuild window at existing openings at alley
West Entry & Upper Floor Windows
Replace existing windows at upper floor with new windows compatible to original style & mullions
Existing Concrete textureClerestory
Remove existing upper floor facade in pieces & to be reinstalled like precast concrete panels.
Replace existing clerestory at upper floor with new windows compatible to original style & mullions
EXISTING EXTERIOR CONDITIONS
Remove existing signage
14ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
Embracing the Landmark facade
Stepping the roof line
We propose a 3 ft ‘pushback’ on the new facade all the way around the Landmark facade. It creates a building form that embraces and intergrates with the Landmark facade.
The roof line of the new precast facade at podium will be an extension and continuation to the existing stepping roof line of the Landmark facade.
LANDMARK FACADE AND NEW TOWER BASE DESIGN CONCEPTS
15ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
D
C
A
B
Preserved Landmark facade anchors the entire project and creates unique retail space at pedestrian level. Retain and repaint Landmark facade to refl ect historical character.
Existing windows cleaned and reinstalled
Upper facade and clerestory saw cut and reintalled to original location as with precast panels
3’ massing setback around the Landmark volume gives the original building more prominence. Simple residential massing with skin to refl ect South Lake Union’s current and future hi-tech industries
A
B
C
LANDMARK FACADE
D
16ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA NEW TOWER BASE
D
C
A
B
Contemporary precast wall with punched openings used at tower base to honor the Landmark building. Shape, color and texture creates visual continuity with the Landmark facade at ground leve
New punched window openings in new tower base referring to Landmark facade in a non-symmetrical pattern
Open storefront at pedestrian level in new tower base. 8’-0” setback from new sidewalk creates exterior public space for retail and seating
Portion of existing facade to be saw cut and reintalled to original location as with precast panels
A
B
C
D
17ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA LOBBY ENTRANCE
D
C
A
B
Replace existing windows at upper floor with new windows compatible to original style and mullions
Lobby entrance as an extension of the new tower massing is set back from street and Landmark facade
Feature wall at exterior lobby entrance, possibly extending into interior. Design element at entrance and lobby honors the sand & gravel history of the original site
Exterior awning covering exterior public space at new tower base retail areas
A
B
C
D
E 3’ massing setback around the Landmark volume gives the original building more prominence. Simple residential massing with skin to refl ect South Lake Union’s current and future hi-tech industries
E
18ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
LANDMARK BUILDING
Repainted Landmark facade in dark gray color to refl ect historical character. Preserve, clean and reinstall original windows
NEW TOWER BASE
Contemporary response to the Landmark facadePrecast concrete panels with punched openings
1
2
1
MATERIAL CONCEPTS - LANDMARK BUILDING AND NEW TOWER BASE
3
FEATURE WALL
Design element at entrance and lobby honors the sand & gravel history of the original site
2 3
Weathered zinc fl ashing to maintain color consistency
19ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA PROPOSED SECTIONS
L1
L2
L3
L4
L5
L6
L7
PR
OP
ERTY
LIN
E
RETAAIL
UNITTTS
UNITTTS
UNITTTS
UNITTTS
UNITTTS
UNITTTS
HA
RR
ISO
N S
TREE
T
L1
L2
L3
L4
L5
L6
L7
PR
OP
ERTY
LIN
E
RETAIL
UNITS
UNITS
UNITS
UNITS
UNITS
UNITS
ALL
EY
A
B
SECTION SECTIONA B
1 2 P. 21P. 21
30’-0”
25’-0”
20ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
L1
L2
L3
L4
L5
L6
L7
PR
OP
ERTY
LIN
ERETAIL
UNITS
UNITS
UNITS
UNITS
UNITS
UNITS
9TH
AV
ENU
E N
OR
TH
L1
L2
L3
L4
L5
L6
L7
PR
OP
ERTY
LIN
E
LOBBY
UNITS
UNITS
UNITS
UNITS
UNITS
MEZZANINE
9TH
AV
ENU
E N
OR
TH
PROPOSED SECTIONS
DC
SECTION SECTIONC D
3 P. 21
21ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA CONSTRUCTION DETAILS
PARAPET DETAIL @ LANDMARK FACADE
1” = 1’-0”
1 NEW ROOF AND SLAB DETAIL
1” = 1’-0”
3UPPER LANDMARK FACADE @ NEW ROOF AND SLAB
1” = 1’-0”
2
PAVER SYSTEM
RIGID INSULATION
WATERPROOFING
UNIT
NEW WINDOW WALL SYSTEM
NEW CONCRETE SLAB AND STRUCTURE
PATIO
UNIT
EXISTING CONCRETE WALL TO BE SAW CUT, REINSTALLED TO ORIGINAL POSITIONS AND PAINTED DARK GRAY
RIGID INSULATION
WATERPROOFING
NEW CONCRETE ROOF AND STRUCTURE
CEMENT BASED WATERPROOF COATING
INSULATION
NEW WINDOW WALL SYSTEM
NEW MTL FLASHING
GRAVEL
WATERPROOFING
RIGID INSULATION
EXISTING CONCRETE WALL TO CLEANED AND PAINTED DARK GRAY
EXISTING WINDOW AND FRAME
3-8” GROWING MEDIA
WATER RETENTION LAYER
DRAINAGELAYER
22ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA CONSTRUCTION DETAILS
PARAPET @ LANDMARK FACADE
1” = 1’-0”
1 PARAPET @ NEW PRECAST FACADE
1” = 1’-0”
2
1
2
4
3
REINSTALLED SAW CUT LANDMARK FACADE
1” = 1’-0”
4
NEW WINDOW WALL @ SAW CUT LANDMARK FACADE
1” = 1’-0”
3
MTL FLASHING
CEMENT BASEDWATERPROOF COATING
METAL PANEL
EXISTING CONCRETE WALL TO BE CLEANED & PAINTEDDARK GRAY
PAVER SYSTEM
WATERPROOFING
NEW CONCRETE SLAB AND STRUCTURE
NEW WINDOW (SEE PAGE 23)
PRECAST CONCRETE COPING
MTL COPING
6” STUD
METAL PANEL
PRECAST CONCRETE PANEL LAMPBLACK NATURAL FINISH
PAVER SYSTEM
NEW CONRETE SLAB AND STRUCTURE
WATERPROOFING
INSULATION
NEW WINDOW (SEE PAGE 23)
2”
4”2”
4”
EXISTING CONCRETE WALL TO BE SAW CUT, REINSTALLED AND PAINTED DARK GRAY
WATERPROOF MEMBRANE
CEMENT BASED WATERPROOF COATING
SHEATHING
SILICONE AND BACKER ROD
6” STEEL STUD
2” AIR SPACE
GYP BD
6” STEEL STUDS
STEEL COLUMN
NEW WINDOW WALL SYSTEM
SILICONE AND BACKER ROD
EXISTING CONCRETE WALL TO BE SAW CUT, REINSTALLED AND PAINTED DARK GRAY
CEMENT BASED WATERPROOF COATING
23ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA CONSTRUCTION DETAILS
5'-2"
5'
5'-2"
5'
NEW WINDOWS @ LANDMARK FACADE
1/2” = 1’-0”
A WINDOW DETAILS
1” = 1’-0”
A
NEW WINDOWS @ NEW PRECAST FACADE
1/2” = 1’-0”
B WINDOW DETAILS
1” = 1’-0”
B
EXISTING CONCRETE WALL TO BE SAW CUT, REINSTALLED AND PAINTED DARK GRAY
NEW WINDOW
INSULATION
CEMENT BASEDWATERPROOFING
FLASHING BEYOND
INSULATION
CEMENT BASEDWATERPROOFING
(WEATHERED ZINC FINISH)
PRECAST CONCRETEPANEL LAMPBLACK NATURAL FINISH
NEW WINDOW
INSULATION
CEMENT BASED WATERPROOFING
FLASHING BEYOND
INSULATION
CEMENT BASED WATERPROOFING
FLASHING (WEATHERED ZINC FINISH)
24ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA RENDERED PROPOSED TOWER VIEWS
TOWER DESIGN STILL IN PROGRESS AND IS SUBJECT TO CHANGE*
25ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
9TH
AV
ENU
E N
OR
TH
ALL
EY
HA
RR
ISO
N S
TREE
T
HA
RR
ISO
N S
TREE
T
PROPOSED ELEVATIONS
TOWER DESIGN STILL IN PROGRESS AND IS SUBJECT TO CHANGE*
26ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
THANK YOU
28ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
18’ stalls + structures
TYPICAL PARKING LEVEL PLAN
22’ min. drive aisle
22’ min. drive aisle
34’ core + structure
approx. 2’ to 3’ left for
shifting the tower closer
to the alley
18’ stalls + structures
N
96’-0” to
podium
325 Westlake(5) story residence @ 55’
95’-9” to office tower
10’-0”
Over 190’-0” to
office tower
Pro
pe
rty
Lin
e
(5) story office building @ 80’
(2) story retail @ 28’
PROPOSED TOWER SPACING DIAGRAM
28’-0” to
tower
27’-0”
17’-0”
29ARC#3
901 HARRISON
08.01.2014
MACFARLANE PARTNERS, LLC
ANKROM MOISAN ARCHITECTS, INC.
901 HARRISON / SEATTLE, WA
MA
X A
LLO
W
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
LEVEL 1
LEVEL P1
LEVEL P2
LEVEL P3
45'-0
"
PRO
PERT
Y LI
NE
UPP
ER L
EVEL
SET
BAC
K
PRO
PERT
Y LI
NE
UNITS
UNITS
UNITS
UNITS
UNITS
UNITS
UNITS
UNITS
HA
RRIS
ON
ST.
MEZZANINE
13'-0
"10
'-0"
9'-7
"10
'-7"
9'-7
"9'
-7"
11'-0
"9'
-7"
9'-7
"9'
-7"
9'-7
9'-0
"9'
-0"
RETAILLOBBY
20'-0
"
PARKINGPARKKINPPAR
PARKING
PARKING
18'-7
"14
'-0"
UNITS
R13'-0"
35'-0
"
RETAIL
Parking under Landmark Building with no setback below grade:
PARKING AREA: 62,000 sfNUMBER OF LEVELS: 3TOTAL STALLS: 163UNITS: 318RATIO: 0.51
Parking under Landmark Building with 30’ setback below grade:
PARKING AREA: 68,000 sfNUMBER OF LEVELS: 4 TOTAL STALLS: 160 UNITS: 318 RATIO: 0.50
MA
X A
LLO
W
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
LEVEL 1
LEVEL P1
LEVEL P2
LEVEL P3
45'-0
"
PRO
PERT
Y LI
NE
UPP
ER L
EVEL
SET
BAC
K
PRO
PERT
Y LI
NE
UNITS
UNITS
UNITS
UNITS
UNITS
UNITS
UNITS
UNITS
HA
RRIS
ON
ST.
13'-0
"10
'-0"
9'-7
"10
'-7"
9'-7
"9'
-7"
11'-0
"9'
-7"
9'-7
"9'
-7"
9'-7
9'-0
"9'
-0"
RETAIL LOBBY
20'-0
"
PARKINGPARKKINPPAR
PARKING
PARKING
18'-7
"14
'-0"
UNITS
R13'-0"PARKING
35'-0
"
MEZZANINE
RETAIL
8'-6
"
UPUPDNDN
UPUP
UPUP
DNDN
11
AA PP QQ RR SS TT UU VV WW
22
33
44
66
55
ELEV 1V 1ELE ELEV 2V 2ELE ELEV 3V 3ELE
STAIR 1 ELEC/TELEEE ESTAIR 2
STAIR 4
ELEVATOR LOBBY
MECHANICALROOM
STORAGE STORAGE
EXHAUSTXH US
6.0%0%6.0%0%
UPUPDNDN
6.0%0%DNDN
58 STALLS
UPUPDNDN
UPUP
UPUP
DNDN
111
AA PP QQ RR SS TT UU VV WW
22
33
44
66
55
ELEV 1V 1ELE ELEV 2V 2ELE ELEV 3V 3ELE
STAIR 1 ELEC/TELEEE ESTAIR 2
STAIR 4
ELEVATOR LOBBY
MECHANICALROOM
STORAGE STORAGE
EXHAUSTXH US
6.0%0%6.0%0%
UPUPDNDN
6.0%0%DNDN
44 STALLS
6.0%0%
DNDN
WATER TABLE
@ 17’-20’
8’-6” and 1 parking level
below water table
needed if required to set
back 30’ from landmark
and maintain ratio
0’-0” and 0 parking levels
below water table
needed if allowed to build
below grade parking to
property line
30’ setback
AVERAGE FINISH GRADE
@ 55’