A lean and flexible BRT Concept
- the Kampala Case
Eric TrelProject Manager
![Page 2: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/2.jpg)
Why Bus Rapid Transit?
• High-frequent mass transport
• Large buses
• Separate bus lanes
• Fast
• Attractive & safe
• Affordable
• Cost-effective
UATP October 2014 A lean and flexible BRT concept - the Kampala case 2
![Page 3: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/3.jpg)
168 Cities with Bus Rapid Transit
UATP October 2014 A lean and flexible BRT concept - the Kampala case 3
56
4324
3
35
7
Curritiba, 1974Sao Paulo, 1980Santiago, 1991Bogotá, 2000
Istanbul, 2007Lagos, 2008
Johannesburg, 2009Cape Town, 2011
Jakarta, 2004Tehran, 2007
New Delhi, 2008Guangzhou, 2010
![Page 4: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/4.jpg)
Present Situation in Kampala
UATP October 2014 A lean and flexible BRT concept - the Kampala case 4
![Page 5: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/5.jpg)
Main challenge
UATP October 2014 A lean and flexible BRT concept - the Kampala case 5
2022: 5.8million
2012: 3.2 million
Kampala population growth 5.7% per year = 660 per day
Transport needCongestion
Greenhouse Gases
How to keep the city accessible?
![Page 6: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/6.jpg)
UATP October 2014 A lean and flexible BRT concept - the Kampala case 6
0
1,600
3,000
6,000
9,000
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
Parked car Private car Motorcycle 12m bus 18m bus
Passengers per hour per lane
![Page 7: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/7.jpg)
UATP October 2014 A lean and flexible BRT concept - the Kampala case 7
Bogotá
![Page 8: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/8.jpg)
UATP October 2014 A lean and flexible BRT concept - the Kampala case 8
Istanbul
![Page 9: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/9.jpg)
UATP October 2014 A lean and flexible BRT concept - the Kampala case 9
Guangzhou
![Page 10: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/10.jpg)
BRT concept: closed or open?
UATP October 2014 A lean and flexible BRT concept - the Kampala case 10
Open system with direct services
Closed system with trunk line, feeder lines
and interchange stations
![Page 11: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/11.jpg)
BRT concept: closed or open?
UATP October 2014 A lean and flexible BRT concept - the Kampala case 11
Closed Open
Example Bogotá Guangzhou
Network Trunk lines + feeders Direct services
Stations High centre
platforms
Low side
platforms
Fleet Dedicated Standard
Ticket validation On the stations On the station or
when boarding
Other facilities No difference
![Page 12: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/12.jpg)
BRT Concept for Greater Kampala
Infrastructure
• Dedicated bus lanes in the centre of the road
• Stations with side platforms
• Redesign and signalling of all major junctions
• One-way traffic in the city centre
Operation
• Articulated low-floor buses (18m)
• Electronic Ticketing System
• Passenger Information System
• Fleet Management System
UATP October 2014 A lean and flexible BRT concept - the Kampala case 12
![Page 13: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/13.jpg)
BRT Corridor (25km)
UATP October 2014 A lean and flexible BRT concept - the Kampala case 13
BRT 1 Bwaise - Kireka
BRT 2 Kireka - Zana
BRT 3 Bwaise- Zana
Bus Rapid TransitGreater Kampala
City Centre
![Page 14: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/14.jpg)
Challenges
UATP October 2014 A lean and flexible BRT concept - the Kampala case 14
HIGH • Capacity• Speed• Tech
LOW • Subsidy• Land acquisition
and also • Manage traffic
![Page 15: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/15.jpg)
High capacity
18m long articulated low-floor buses
In peak periods: 60 vehicles/hour
UATP October 2014 A lean and flexible BRT concept - the Kampala case 15
![Page 16: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/16.jpg)
High speed
Optimal distance between stations: 600 – 800mOperating speed excl. delays: 20-23 km/h
UATP October 2014 A lean and flexible BRT concept - the Kampala case 16
![Page 17: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/17.jpg)
High tech
UATP October 2014 A lean and flexible BRT concept - the Kampala case 17
ITS Operation
Control Center
Back Office
Passenger Information
Information at stopsInformation on board
CCTV
CCTV at stops
Fleet Management
Vehicle Tracking
GPS GPRS
Electronic Ticketing
Turnstiles at stops
Ticket booths at stops
![Page 18: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/18.jpg)
Station Design
UATP October 2014 A lean and flexible BRT concept - the Kampala case 18
![Page 19: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/19.jpg)
Station Design
UATP October 2014 A lean and flexible BRT concept - the Kampala case 19
Station ShelterExample
![Page 20: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/20.jpg)
Traffic management
• Complete redesign of the right-of-way
• Separate bays for parking, loading & unloading
• Key junctions: traffic lights and separate lane for right-turns
UATP October 2014 A lean and flexible BRT concept - the Kampala case 20
![Page 21: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/21.jpg)
Roundabouts replaced by signalled junctions
UATP October 2014 A lean and flexible BRT concept - the Kampala case 21
Roundabouts are modified and turned into signalled junctions, in order to
• maximise and control the priority given to the BRT,
• avoid a gridlock on the roundabout,
• provide pedestrian crossings.
![Page 22: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/22.jpg)
One-way traffic in the City centre
One-way traffic helps to
• Manage traffic flows at the key junctions
• Calm the traffic in the city centre
• Optimize capacity within limited space
UATP October 2014 A lean and flexible BRT concept - the Kampala case 22
![Page 23: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/23.jpg)
Meetings with affected people and businesses
UATP October 2014 A lean and flexible BRT concept - the Kampala case 23
![Page 24: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/24.jpg)
Organisation
UATP October 2014 A lean and flexible BRT concept - the Kampala case 24
Transport Authority
• Procure & manage BRT infrastructure• Procure & manage BRT operation
• Manage transition of the present operators• Public communication
![Page 25: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/25.jpg)
Perspective for the existing minibus operators
• Growing popula�on → growing market for public transport.
• BRT and minibuses have complementary roles. Minibuses can feeder to the BRT and serve the suburbs.
• Avoid non-productive competition.
• Step-by-step transition and regulation.
UATP October 2014 A lean and flexible BRT concept - the Kampala case 25
![Page 26: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/26.jpg)
Regulating the public transport market
• Move minibus stations to the BRT terminals and the suburbs.
• Introduce transport concessions that offer operators – a stable business
– access to commercial credit
UATP October 2014 A lean and flexible BRT concept - the Kampala case 26
![Page 27: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/27.jpg)
Lessons learned
1. No copy-paste: transport problems are universal, but culture and circumstances differ per country.
2. The business case for operation should drive the main design choices.
3. Main stakeholders drive the consultation process and project planning.
4. Introducing BRT requires redesigning the entire corridor, including traffic lanes, parking, cycling lanes, junctions and signalling.
5. Political will and institutional arrangements are the keys to success.
UATP October 2014 A lean and flexible BRT concept - the Kampala case 27
![Page 28: A lean and flexible BRT concept - the Kampala case](https://reader030.vdocuments.net/reader030/viewer/2022032421/55a709cf1a28ab260b8b46be/html5/thumbnails/28.jpg)
UATP October 2014 A lean and flexible BRT concept - the Kampala case 28