a plan to build an elevator october 15, 2008
DESCRIPTION
A PLAN TO BUILD AN ELEVATOR October 15, 2008. 2006 Long-Range Plan Office-size Elevator New Fireproof Stairs Handicap-Accessible Restrooms Large Multi-purpose Fellowship Hall 2008 Memorial Elevator Office-size Elevator (4’x6’ – six people or wheelchair plus two or three people). - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/1.jpg)
![Page 2: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/2.jpg)
A PLAN TO BUILD AN ELEVATOROctober 15, 2008
• 2006 Long-Range Plan– Office-size Elevator– New Fireproof Stairs– Handicap-Accessible Restrooms– Large Multi-purpose Fellowship Hall
• 2008 Memorial Elevator– Office-size Elevator (4’x6’ – six people or
wheelchair plus two or three people)
![Page 3: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/3.jpg)
FIRST PRELIMINARY PLANJanuary 2005
• LARGE FOOTPRINT
• LONG SETBACK FROM DRIVEWAY
• CASKET-SIZED ELEVATOR
• SIX LARGE HANDICAP RESTROOMS
• NEW FIREPROOF STAIRWELL
• EXPENSIVE
![Page 4: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/4.jpg)
SURVEY OF BUILDING NEEDSAugust 2005
• SMALLER ELEVATOR
• LESS RESTROOMS CAPACITY
• WEATHER PROTECTED ENTRANCE
• FUTURE NEW MULTI-PURPOSE HALL
• FUTURE NEW KITCHEN
• RENOVATE OLD FELLOWSHIP HALL
![Page 5: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/5.jpg)
LONG-RANGE PLANApril 6, 2006
• SMALLER ELEVATOR
• IMPROVED STAIRS
• LESS RESTROOMS CAPACITY
• WEATHER PROTECTED ENTRANCE
• LARGER MULTI-PURPOSE ROOM
• FEWER $$$
![Page 6: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/6.jpg)
FIRST FLOOR
ALL PHASES COMPLETED
![Page 7: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/7.jpg)
![Page 8: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/8.jpg)
![Page 9: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/9.jpg)
![Page 10: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/10.jpg)
![Page 11: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/11.jpg)
![Page 12: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/12.jpg)
A PLAN TO BUILD AN ELEVATOROctober 15, 2008
• 2008 Memorial Elevator– $150,050 + $3,700 = $153,750
• Elevator Fund– About $130,000
• Shortfall (today)– $23,750
• Pledges– $12,200 Need $11,550 more
![Page 13: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/13.jpg)
Additional Options
• Canopy over Handicap Entrance - $2,200• Hardtop Driveway - $3,750• Face brick on East side - $2,000• One handicap restroom - $27,000• Inside double doors - $1,000 per pair
![Page 14: A PLAN TO BUILD AN ELEVATOR October 15, 2008](https://reader035.vdocuments.net/reader035/viewer/2022062310/568160ce550346895dd002f3/html5/thumbnails/14.jpg)
MANAGEMENT
• Elevator Building Committee– Mary Broy Treasurer– Jeff Fanning Associate Project Manager– Rose Staples Assistant Treasurer– Dick Hill Chairman & Project Manager– open Safety and Security Officer