a template for the title sheet is available on the cfl ... · insert name and logo for a/e firm...

1
D E P A R T M E N T O F T R A N S P O R T A T I O N U N I T E D S T A T E S O F A M E R I C A PLANS FOR PROPOSED PROJECT MANAGER APPROVED: DATE: CENTRAL FEDERAL LANDS HIGHWAY DIVISION DENVER, COLORADO U.S. DEPARTMENT OF TRANSPORTATION FEDERAL HIGHWAY ADMINISTRATION FOR PLANS PREPARED BY Insert Name and Logo for A/E Firm here SPECIFICATIONS: "STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-03, U.S. CUSTOMARY UNITS" RECOMMENDED: DIVISION ENGINEER, CENTRAL FEDERAL LANDS HIGHWAY DIVISION DATE: NATIONAL PARK SERVICE Department of the Interior U.S. DEPARTMENT OF THE INTERIOR NATIONAL PARK SERVICE NV PRA-LAME 1(6), 1(7), & 2(1) NORTHSHORE ROAD AND LAKE MEAD BOULEVARD LAKE MEAD NATIONAL RECREATION AREA CLARK COUNTY SCHEDULE A LENGTH 8.29 miles SCHEDULE B LENGTH 8.73 miles SUPERINTENDENT, LAKE MEAD NATIONAL RECREATION AREA NPS PMIS NO.: 54621 CFL PM DESIGN DESIGNATIONS: ADT (2006) ----------- ADT (2026) ----------- DHV ------------------ D -------------------- T -------------------- V -------------------- e(max) --------------- ADT (2006) ----------- ADT (2026) ----------- DHV ------------------ D -------------------- T -------------------- V -------------------- e(max) --------------- ADT (2006) ----------- ADT (2026) ----------- DHV ------------------ D -------------------- T -------------------- V -------------------- e(max) --------------- N G I T E D E E R E T S I G E R S T A L A N E N E I G N E R E E N E I V I L E X M C O F O S S E I O R F N P E R S A M A L P EXAMPLE PE STAMP ~ ~ CFL SAMPLE PLAN SHEET SUNRISE MTN. SH 147 REDSTONE (NO WATER) ECHO BAY L A K E M E D A B O U L V E A R D N O R T H H O R E R O D A S MESQUITE, NV 62.758 mi LAS VEGAS, NV 12 mi from end of project FRENCHMAN MTN. EAST LAS VEGAS LAVA BUTTE BOULDER HWY. SH 582 US 93/ US 95 ALAN BIBLE VISITOR CENTER BOULDER CITY US 95 US 93 PARK HEADQUARTERS E L A K E M A E D D R I V E S H 4 1 6 L A K E S H O R E D R L A K M E A I-40 77.05 mi BAKER, CA 80 mi from end of project HENDERSON,NV CALLVILLE BAY D US 93 HOOVER DAM KINGMAN, AZ 55 mi from end of project OREGON IDAHO UTAH ARIZONA CALIFORNIA ELY RENO CARSON CITY LAS VEGAS WINNEMUCCA KEY MAP OF NEVADA 80 15 80 93 95 50 93 93 93 6 95 TYPE OF CONSTRUCTION: Drainage, pavement rehabilitation, and asphalt surfacing 560 920 150 50% 1% 50 mph 8.0% 1991 2478 372 60% 1% 50 mph 8.0% 1730 2153 323 40/60 1% 50 mph 8.0% U.S. CUSTOMARY DIMENSIONS: Slopes are expressed as RISE:RUN ST A1 REG A12 PROJECT NUMBER PROJECT NAME OVERTON, NV 20 mi from end of project REG STATE PROJECT SHEET NO. TOTAL SHEETS

Upload: others

Post on 20-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: A template for the Title Sheet is available on the CFL ... · Insert Name and Logo for A/E Firm here SPECIFICATIONS: "STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES

DEP

ART

M

ENT

OF TRANSPORT

ATIO

N

UNIT

E

D STATES OF AME

RIC

A

PLANS FOR PROPOSED

PROJECT MANAGER

APPROVED:

DATE:

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

DENVER, COLORADO

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

FOR

PLANS PREPARED BY

Insert Name and Logo for A/E Firm here

SPECIFICATIONS:

"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS

AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-03,

U.S. CUSTOMARY UNITS"

RECOMMENDED:

DIVISION ENGINEER, CENTRAL FEDERAL LANDS HIGHWAY DIVISION

DATE:

NATIONALPARK

SERVICE

Department

of the Interior

U.S. DEPARTMENT OF THE INTERIOR

NATIONAL PARK SERVICE

NV PRA-LAME 1(6), 1(7), & 2(1)

NORTHSHORE ROAD ANDLAKE MEAD BOULEVARD

LAKE MEAD NATIONAL RECREATION AREA

CLARK COUNTY

SCHEDULE A LENGTH 8.29 miles

SCHEDULE B LENGTH 8.73 miles

SUPERINTENDENT, LAKE MEAD NATIONAL RECREATION AREA

NPS PMIS NO.: 54621

CFL PM

DESIGN DESIGNATIONS:

ADT (2006) -----------

ADT (2026) -----------

DHV ------------------

D --------------------

T --------------------

V --------------------

e(max) ---------------

ADT (2006) -----------

ADT (2026) -----------

DHV ------------------

D --------------------

T --------------------

V --------------------

e(max) ---------------

ADT (2006) -----------

ADT (2026) -----------

DHV ------------------

D --------------------

T --------------------

V --------------------

e(max) ---------------

NGI

TE

D

EE

RE

TSI

GE

R

ST

A

LA

NE N

E

IG

NE

RE

EN

EIV IL

EXM

C

OF

OSSE IOR F NP

ER’S

AM

ALP

EXAMPLE

PE STAMP

~

~

CF

L S

AM

PL

E P

LA

N S

HE

ET

SUNRISE MTN.

SH 147

REDSTONE

(NO WATER)

ECHO BAY

L A K E M E DA B

O

U L VE A R D

NORTH

HO R E RO DA

S

MESQUITE, NV

62.758 mi

LAS VEGAS, NV12 mi from end of project

FRENCHMAN MTN.

EAST LAS

VEGASLAVA BUTTE

BO

ULD

ER H

WY

.

SH

582

US 9

3/

US 9

5

ALAN BIBLE

VISITOR CENTER

BOULDER

CITY

US

95 US 93

PARK

HEADQUARTERS

E

LA

KE

M

AE

DDR I

V

E

SH

416

L

AK

ES

HO

RE

D

R

LA K

ME A

I-40

77.05 mi

BAKER, CA

80 mi from

end of project

HENDERSON,NV

CALLVILLE BAY

D

US 93

HOOVER

DAM

KINGMAN, AZ

55 mi from end of

project

OREGON IDAHO

UT

AH

AR

IZO

NA

CA

LIFO

RN

IA

ELY

RENO

CARSON

CITY

LAS

VEGAS

WINNEMUCCA

KEY MAP OF NEVADA

INTERSTATE

80

INTERSTATE

15

INTERSTATE

80

9395

50

93

9393

695

TYPE OF CONSTRUCTION:

Drainage, pavement rehabilitation,

and asphalt surfacing

560

920

150

50%

1%

50 mph

8.0%

1991

2478

372

60%

1%

50 mph

8.0%

1730

2153

323

40/60

1%

50 mph

8.0%

U.S. CUSTOMARY DIMENSIONS:

Slopes are expressed as RISE:RUN

ST A1REG A12PROJECT NUMBER

PROJECT NAME

OVERTON, NV

20 mi from end of project

REG STATE PROJECTSHEET

NO.

TOTAL

SHEETS

Text Box
A template for the Title Sheet is available on the CFL website at http://www.cflhd.gov/resources/design/drawings/template/. It is expected that this template will be revised to incorporate project-specific information.
Text Box
Index to Sheets may be continued onto sheet A2 if necessary.
Text Box
Show approximate project location.
Text Box
Generally describe the type of construction.
Text Box
Show begin & end stations of project on location map, including limits of each bid schedule.
Text Box
Show distances to nearest large destinations.
Text Box
Show the local underground locate service. Phone numbers are available on the web : See http://www.digsafe.com/ or http://www.excavationsafetyonline.com/
Text Box
For A/E projects, show the name of the CFL PM (do not show the CFL lead designer).
Text Box
Refer to the CFL policy on Sealing and Signing of A/E Documents (located on the CFL website: http://www.cflhd.gov/resources/pm/documents/policies/sealing-signing-policy.pdf
Text Box
Show bid schedule project lengths.
Text Box
Show the NPS PMIS number for NPS projects.