(a) unit price coverage. - alletting.dot.state.al.usalletting.dot.state.al.us/changes/all 2020...

10

Upload: others

Post on 16-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: (a) Unit Price Coverage. - alletting.dot.state.al.usalletting.dot.state.al.us/Changes/All 2020 Changes/May 29, 2020... · 5/29/2020  · Highway Construction. The requirements and
Page 2: (a) Unit Price Coverage. - alletting.dot.state.al.usalletting.dot.state.al.us/Changes/All 2020 Changes/May 29, 2020... · 5/29/2020  · Highway Construction. The requirements and
Page 3: (a) Unit Price Coverage. - alletting.dot.state.al.usalletting.dot.state.al.us/Changes/All 2020 Changes/May 29, 2020... · 5/29/2020  · Highway Construction. The requirements and
Page 4: (a) Unit Price Coverage. - alletting.dot.state.al.usalletting.dot.state.al.us/Changes/All 2020 Changes/May 29, 2020... · 5/29/2020  · Highway Construction. The requirements and

S.P. Code

The Following Special Provisions are supplementary requirements and amendments to the Standard Specifications for

Special Provisions

Special Provision Description

Highway Construction. The requirements and amendments given in these Special Provisions take precedence over therequirements given in the Standard Specifications.

PROJECT NO(s). HSIP-0147(503)LEE COUNTY, ALABAMA

Alabama Department of Transportation

005/12 Form FHWA-1273 Required Contract Provisions Federal-Aid Construction Projects18-0090 Title VI Assurance18-0091 Non-Discrimination Statutes and Authorities18-0097 Required Contract Provision for All Federal Aid Projects for EEO18-0107 Liquidated Damages18-0222 Sign Materials18-0313 Load Restrictions for Hauling18-0314 Weight (Mass) Measurements18-0401 Thermally Fused PVC Pipe - Storm Sewers18-0402 Thermally Fused PVC Pipe - Water Line18-0487 Disadvantaged Business Enterprise (DBE)18-0488 Material Remixing Device18-0494 Roadway Signs18-0496 Concrete Joint Fillers18-0548 Traffic Control Devices18-0599 Structural Portland Cement Concrete18-0600 Cement18-0665 Mulching18-0666 Guardrail for Culverts18-0699 Temporary Erosion and Sediment Control18-0747 Grass Pavers18-0748 Cooperation with Utility Companies18-0749 Color Stamped Concrete Pavement18-0865 Delayed Start Work Date18-0871 Illuminated Sign Assembly18-WR0041 Highway Construction Wage Rates for Lee County

REVISED: 5/27/2020

Page 5: (a) Unit Price Coverage. - alletting.dot.state.al.usalletting.dot.state.al.us/Changes/All 2020 Changes/May 29, 2020... · 5/29/2020  · Highway Construction. The requirements and

ALABAMA DEPARTMENT OF TRANSPORTATION DATE: May 26, 2020 Special Provision No. 18-0871

SUBJECT: Illuminated Sign Assembly, Project No. HSIP-0147(503), Lee County.

Alabama Standard Specifications, 2018 Edition, SECTION 730 shall be modified as follows:

SECTION 730 TRAFFIC SIGNALS

730.05 Basis of Payment. (a) Unit Price Coverage.

In Subarticle 730.05(a), Item 730-O shall be replaced with the following:

Item 730-O. Illuminated Sign Assembly will be paid for at the contract unit price which shall be full compensation for furnishing and installing a regulatory or warning sign with accompanying vehicular signal head or embedded flashing LEDs including all attachment hardware, connections, and for all materials, labor, equipment, tools, and incidentals necessary for a complete and operational illuminated sign.

(b) Payment will be made under Item No.

Pay Item 730-O shall be replaced with the following:

730-O Illuminated Sign Assembly Lighting Method, Power Source - per each Lighting Method – Specify “with Flashing Beacon” or “with Embedded LEDs” Power Source – Solar or Utility Powered

Page 6: (a) Unit Price Coverage. - alletting.dot.state.al.usalletting.dot.state.al.us/Changes/All 2020 Changes/May 29, 2020... · 5/29/2020  · Highway Construction. The requirements and
Page 7: (a) Unit Price Coverage. - alletting.dot.state.al.usalletting.dot.state.al.us/Changes/All 2020 Changes/May 29, 2020... · 5/29/2020  · Highway Construction. The requirements and
Page 8: (a) Unit Price Coverage. - alletting.dot.state.al.usalletting.dot.state.al.us/Changes/All 2020 Changes/May 29, 2020... · 5/29/2020  · Highway Construction. The requirements and
Page 9: (a) Unit Price Coverage. - alletting.dot.state.al.usalletting.dot.state.al.us/Changes/All 2020 Changes/May 29, 2020... · 5/29/2020  · Highway Construction. The requirements and
Page 10: (a) Unit Price Coverage. - alletting.dot.state.al.usalletting.dot.state.al.us/Changes/All 2020 Changes/May 29, 2020... · 5/29/2020  · Highway Construction. The requirements and