abb-welcome lift control module m2306 m2307...pos: 10 /b usch-j aeg er (neus truk tur)/modul -strukt...

29
VER:1.3 28.04.2017 ABB-Welcome Lift control module M2306 M2307

Upload: others

Post on 31-Dec-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

VER:1.3 │ │ 28.04.2017

ABB-Welcome

Pos: 2 /DinA4 - Anl eitun gen Online /Inh alt/KNX/Doo rEntry /832 20-AP- xxx/Tit elblat t - 832 20-AP-xxx - ABB @ 1 9\m od_ 132 3249 806 476 _15. docx @ 11 108 4 @ @ 1

Lift control moduleM2306M2307

=== E nde der Liste für Tex tma rke C over == =

Page 2: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

| — 2 —

Pos: 4 /Busc h-Ja ege r (N eust rukt ur)/ Mo dul-St ruktu r/Onli ne-D oku ment ation /Inh altsve rzeich nis ( --> Fü r alle Doku men te <-- )/In haltsve rzeic hnis @ 19\ mod _13 206 490 4438 6_1 5.d ocx @ 109 653 @ @ 1

1 Safety ....................................................................................................... 32 Environment .............................................................................................. 3

2.1 ABB devices ............................................................................. 33 Technical data........................................................................................... 44 Function .................................................................................................... 55 Connection ............................................................................................... 6

5.1 M2306 ...................................................................................... 65.2 M2307 ...................................................................................... 75.3 Lift control relay module address by binary setting ...................... 9

6 Mounting / Installation.............................................................................. 106.1 Requirements for the electrician............................................... 106.2 Mounting ................................................................................. 12

7 User case ............................................................................................... 137.1 High building (no more than 16 floors) with one lift .................... 137.2 High building (more than 16 floors) with one lift ........................ 157.3 High building (more than 16 floors) with two lifts ....................... 177.4 High building (more than 16 floors) with four lifts ...................... 18

8 Operation ................................................................................................ 198.1 User scenario illustration of visitor target floor .......................... 198.2 User Scenario Illustration of resident target floor ...................... 20

9 Configuration through PC software .......................................................... 219.1 Connected to PC ..................................................................... 219.2 Configuration .......................................................................... 22

=== E nde der Liste für Tex tma rke TOC == =

Page 3: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Pos: 6 /Busc h-Ja ege r (N eust rukt ur)/ Mo dul-St ruktu r/Onli ne-D oku ment ation /Übe rschri ften (- -> Für alle D okum ent e < --)/ 1. Eb ene/S - T /Sicher heit @ 18\ mod _13 026 127 917 90_ 15.d ocx @ 103 357 @ 1 @ 1

1 SafetyPos: 7 /Busc h-Ja ege r (N eust rukt ur)/ Mo dul-St ruktu r/Onli ne-D oku ment ation /Sicher heit (-- > Für alle Dok um ente <- -)/Wa rn hinweise /Sicher heit - 23 0 V @ 18\m od_ 130 260 681 675 0_15 .docx @ 1 033 08 @ @ 1

WarningElectric voltage!Dangerous currents flow through the body when coming into direct orindirect contact with live components.This can result in electric shock, burns or even death.■ Disconnect the mains power supply prior to installation and/ordisassembly!■ Permit work on the 110-240 V supply system to be performed only by

specialist staff!

Pos: 10 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n ( --> Fü r alle Doku men te < -- )/1. E bene /U - Z/U mwelt @ 18\ mod _13 026 141 5896 7_1 5.d ocx @ 103 383 @ 1 @ 1

2 EnvironmentPos: 11 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Umw elt ( --> Für all e Doku me nte <-- )/Hinweis e/Hinw eis - U mwelt - Hinweis Elektr oge räte @ 1 8\mo d_1 302 763 973 434 _15. docx @ 10 350 0 @ @ 1

Consider the protection of the environment!Used electric and electronic devices must not be disposed of withhousehold waste.– The device contains valuable raw materials that can be recycled.

Therefore, dispose of the device at the appropriate recyclingfacility.

Pos: 12 /Di nA4 - A nleitu ngen Onlin e/Ueb ersc hrift en/2 ./ABB Gera ete @ 19 \mo d_1 323 162 843 832_ 15. docx @ 11 087 5 @ 2 @ 1

2.1 ABB devicesPos: 13 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Umw elt ( --> Für all e Doku me nte <-- )/Hinweis e/Hinw eis - U mwelt - ABB Elektro ger äte @ 19\ mo d_1 3231 627 458 39_ 15.d ocx @ 110 867 @ @ 1

All packaging materials and devices from ABB bear the markings and test seals forproper disposal. Always dispose of the packaging material and electric devices and theircomponents via an authorized collecting depots or disposal companies.ABB products meet the legal requirements, in particular the laws governing electronicand electrical devices and the REACH ordinance.(EU-Directive 2002/96/EG WEEE and 2002/95/EG RoHS)(EU-REACH ordinance and law for the implementation of the ordinance (EG)No.1907/2006)

Page 4: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

3 Technical dataPos: 14 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Technis che D aten /Dimm er/ Tec hnisch e Dat en - 65 91 U- 101 @ 2 3\mo d_1 333 089 085 280 _15. docx @ 20 703 9 @ @ 1

GeneralSingle-wireclamps

2 x 0.28 mm - 2 x 0.75 mm;

Fine-wire clamps 2 x 0.28 mm - 2 x 0.75 mm;

Bus voltage 20-30 V DC

Size 4 TEProtection IP 20

Operatingtemperature

-25 °C - +55 °C

SizeM2306: 90 mm x 72 mm x 65 mmM2307: 216 mm x 110 mm x 45 mm

Page 5: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Pos: 15 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Steu er mod ule - Onlin e-Dok ume ntati on ( -- > Für alle Dok ume nte <- -)/ +++ ++ ++ +++ ++ S eiten umb ruch + +++ ++ ++ +++ + @ 9\m od_ 126 8898 668 093 _0. docx @ 521 49 @ @ 1

4 FunctionPos: 22 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n ( --> Fü r alle Doku men te < -- )/2. E bene /G - L/L asta rten @ 2 0\m od_1 326 269 704 379 _15. docx @ 13 690 5 @ 2 @ 1

The lift control modules include the M adaptor (M2306) and lift control relay module (M2307). Thesetwo devices together ensure that lift (elevator) only goes to authorized floor(s).

If a resident presses the "unlock" button when receiving a guest's call from the outdoor station, or theauthorized user swipes the registered card or enters correct password, the lift (elevator) willautomatically go down to the floor where the outdoor station is installed. The lift (elevator) will thengo to the dedicated floor where that resident lives. It cannot go to unauthorized floors, even whenother buttons are pressed.

The configuration should be done through the dedicated configuration software by connecting the Madaptor to a computer.

Page 6: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Pos: 30 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n ( --> Fü r alle Doku men te < -- )/1. E bene /A - F/Anschl uss @ 19\ mod _13 0924 827 843 5_1 5.do cx @ 1 074 13 @ 1 @ 1

5 Connection

5.1 M2306Pos: 31 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Anschl uss/Dim me r/Anschl uss - 659 1 U- 101 @ 23 \mo d_1 333 0939 200 08_ 15.d ocx @ 207 132 @ @ 1

Fig. 1

No. Function1 Status

- ON = Connected with the system controller/internal bus- OFF = Not connected with the system controller/internal bus- Blinking = Working with the system controller/internal bus

2 - ON = Power on- OFF = Power off- Blinking = Working

3 Connect with M2307

4 Power supply5 Connect with the system controller/internal bus

Page 7: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

5.2 M2307Pos: 31 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Anschl uss/Dim me r/Anschl uss - 659 1 U- 101 @ 23 \mo d_1 333 0939 200 08_ 15.d ocx @ 207 132 @ @ 1

Fig. 2

No. Function1 Power LED

- ON = Power on- OFF = Power off

2 Setting LED- Blinks when working normally

3 AddressSet the module addressThe address range is 1-16.Only the left 4 bits are used.

4 Power supply

5 Connect with M2306

6 Connect with the lift controller

Page 8: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Pos: 24 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Steu er mod ule - Onlin e-Dok ume ntati on ( -- > Für alle Dok ume nte <- -)/ +++ ++ ++ +++ ++ S eiten umb ruch + +++ ++ ++ +++ + @ 9\m od_ 126 8898 668 093 _0. docx @ 521 49 @ @ 1

Page 9: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

5.3 Lift control relay module address by binary setting

Fig. 3

· Installer needs only read the labeling on the lift control moduleand adjust according to the given position.· Only digits 1-2-3-4 are used.

Page 10: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

6 Mounting/InstallationPos: 34 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Siche rheit (- -> Fü r alle D oku ment e < --) /War nhinweis e/Siche rheit - Nie ders pan nun gs- und 230 V-Leit ung en @ 18\ mod _13 026 178 214 91_1 5.d ocx @ 103 465 @ @ 1

WarningElectric voltage!Dangerous currents flow through the body when coming into direct orindirect contact with live components.This can result in electric shock, burns or even death.■ Disconnect the mains power supply prior to installation and/ordisassembly!■ Permit work on the 110-240 V supply system to be performed only by

specialist staff!

Pos: 35 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Siche rheit (- -> Fü r alle D oku ment e < --) /War nhinweis e/Siche rheit - Vo rgesc halte te Siche run g a bschalt en @ 20\ mo d_1 3264 417 114 67_ 15.d ocx @ 137 043 @ @ 1

WarningElectric voltage!The upstream fuse must be disconnected when working on the lighting

system.

Pos: 36 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Siche rheit (- -> Fü r alle D oku ment e < --) /War nhinweis e/Siche rheit - Fachk enn tnisse @ 18 \mo d_1 302 774 384 017_ 15. docx @ 10 356 4 @ 2 @ 1

6.1 Requirements for the electrician

Warning

Page 11: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Electric voltage!Install the device only if you have the necessary electrical engineeringknowledge and experience.• Incorrect installation endangers your life and that of the user of the

electrical system.• Incorrect installation can cause serious damage to property, such as

a fire.

The minimum necessary expert knowledge and requirements for theinstallation are as follows:

• Apply the "five safety rules" (DIN VDE 0105, EN 50110):1. Disconnect the power;2. Secure against being reconnected;3. Ensure there is no voltage;4. Connect to earth;5. Cover or barricade adjacent live parts.

• Use suitable personal protective clothing.• Use only suitable tools and measuring devices.• Check the type of supply network (TN system, IT system, TT system)

to secure the following power supply conditions (classic connectionto ground, protective earthing, necessary additional measures, etc.).

Page 12: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

6.2 MountingPos: 38 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/M onta ge/ alle Ge rät e/M onta ge - UP-Dos en - DIN 4 907 3-1 ode r g eeign etes A ufput zgeh aeu se - Ohn e Docv aria ble @ 20\ mod _13 257 6603 445 3_1 5.d ocx @ 1365 93 @ @ 1

The device must only be installed on mounting rails according to DIN EN 50022.It is highly recommended that M2306 be installed in the lift motor room on the top flooror the electrical riser, while M2307 should be installed in the lift cabin.

Fig. 4

Fig. 5: Dismantle

Page 13: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

7 User case

7.1 High building (no more than 16 floors) with one lift

One M2306 and one M2307

Pos: 41 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/In bet riebn ahm e/Dim me r/Inb etri ebn ahm e - 659 1 U-1 01 @ 19\ mo d_1 3119 487 810 23_ 15.d ocx @ 108 300 @ 2 22 @ 1

Fig. 6: Topology

Page 14: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Wiring with one M2306 and one M2307

Fig. 7

Page 15: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

7.2 High building (more than 16 floors) with one lift

one M2306 and multi (up to 16) M2307

Fig. 8: Topology

Page 16: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Wiring with one M2306 and multi M2307

Fig. 9

Notes:1.The first mini system controller (M2301) feeds one M2306 and one M2307.

2. An additional M2307 should be locally powered by one mini system controller. Eg. with

(4) M2307 and (1) M2306, 4 mini system controllers are needed.

Page 17: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

7.3 High building (more than 16 floors) with two lifts

one M2306 and multi M2307 support 2 lifts

Fig. 10: Topology

Note: The address code can not be repeated.

Page 18: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

7.4 High building (more than 16 floors) with four lifts

Two M2306 and multi M2307 support 4 lifts

Fig. 11: Topology

Pos: 42 /Busch-Jaeger (Neustruktur)/Modul-Struktur/Online-Dokumentation/Steuermodule - Online-Dokumentation (--> Für alle Dokumente <--)/++++++++++++ Seitenumbruch ++++++++++++ @9\mod_1268898668093_0.docx @ 52149 @ @ 1Note: The address code can not be repeated.

Page 19: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Pos: 43 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n ( --> Fü r alle Doku men te < -- )/1. E bene /A - F/Bedie nun g @ 11\ mod_ 127 918 554 164 9_1 5.doc x @ 8 304 3 @ 1 @ 1

8 OperationPos: 44 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Bedi enun g/Dim me r/Bedie nun g - 659 1 U-1 01 @ 23\ mo d_13 330 912 931 58_ 15.d ocx @ 207 069 @ @ 1

8.1 User scenario illustration of visitor target floor

Fig. 12

Pos: 42 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Steu er mod ule - Onlin e-Dok ume ntati on ( -- > Für alle Dok ume nte <- -)/ +++ ++ ++ +++ ++ S eiten umb ruch + +++ ++ ++ +++ + @ 9\m od_ 126 8898 668 093 _0. docx @ 521 49 @ @ 1

1.Visitor inputscalling code forthe 12th floor.

2. The resident presses the "unlock" buttonat any ABB-Welcome indoor station.

3. The lift will go down to theoutdoor station automaticallywhen visitor enters the lift.

4. Within a set of time(default of 10 minutes),the visitor can onlyactivate the 12th floor.Other floors will not beactivated at the sametime.

After 10 minutes, the visitormust go to the outdoor stationto call the resident again.

5. The visitorreaches the12th floor.

Page 20: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Pos: 43 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n ( --> Fü r alle Doku men te < -- )/1. E bene /A - F/Bedie nun g @ 11\ mod_ 127 918 554 164 9_1 5.doc x @ 8 304 3 @ 1 @ 1Pos: 44 /B usch-J aeg er (Neus truk tur )/M odul -Strukt ur/O nline -Doku me ntatio n/Bedi enun g/Dim me r/Bedie nun g - 659 1 U-1 01 @ 23\ mo d_13 330 912 931 58_ 15.d ocx @ 207 069 @ @ 1

8.2 User Scenario Illustration of resident target floor

Fig. 13

Note: The lift control module will not function if the unlock button is pressed without a callfrom building outdoor station. E.g., unlock when there is a villa/floor outdoor station or gatestation.

1. The resident(living on the12th floor)enters byinputting apassword orswiping withauthorized card.

2. The lift will automaticallygo down to the outdoorstation floor when theresident enters the lift.

3. Within a set time(default of 10minutes), theresident can onlyactivate the 12thfloor. Other floorswill not be activatedat the same time.

After 10 minutes, theresident must go to theoutdoor station to inputpassword or swipe cardagain.

4. The resident reachesthe 12th floor.

Page 21: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

9 Configuration through PC software

9.1 Connected to PC

During configuration, the lift control adaptor can be connected directly to the PC so that the installedsoftware (ABB-Welcome PC Configuration Tool) can be used. Essentially, there is no need for localpower supply during configuration.

Upon completing configuration, click "Send the Configuration" to upload the configured file to thesystem. Refer to instructions below.

Note: Only supports Microsoft Windows

Fig. 14

Page 22: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

9.2 Configuration

Basic Steps

Step 1: Set basic parameters of the apartment using the ABB-Welcome configuration tool.

Fig. 15

No. Function1 Select building number.

2 Select floor number.

3 Select apartment number.

4 Set physical address (e.g., 13 means the IS address set by IS switches)

5 Set user name

6 Set logic address (e.g., 0703 means 7th floor, apartment number 3).7 Add data from one apartment to project.

8 Upload configuration to system

1 2 3 4

5 67 8

Page 23: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Step 2: Select building, M2307 and configure parameters of each relay

Fig. 16

No. Function1 Select building number

2 Select M2307 number

3 Click “Add” to add a new M2307

4 Select ON or OFF for connecting the relay

5 Select NO or NC for output type

6 Set relay operation time (1-3,600 seconds)

7 Show all M2307 parameters

Note: In order to ensure building is configured properly, please finish each step beforestarting installation in a new building.

1 2 3

4 5 6 7

Page 24: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Step 3: Associate outdoor station with M2307

Fig. 17

No. Function1 Building number (same as step2)

2 Select outdoor station number

3 Select Relay No. of M2307

4 Click “Add” to associate outdoor station with relay5 Send all parameters to M2306

6 Input password*. Default password is 123456.*Please write down this password. If password is forgotten, software mustbe reloaded.

1 2 3

4 56

Page 25: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Step 4: Associate indoor station with M2307

Fig. 18

No. Function1 Building number (same as step2)

2 Select indoor station physical address

3 Select relay number of M2307

4 Select outdoor station number (floor number of outdoor station installed)

5 Click “Add” to associate indoor station with relay

6 Send all parameters to M2306

7 Input password. Default password is 123456.

1 2 3

5 6 7

4

Page 26: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Optional steps:Step 5: Export all data from this project or import data for new project

Fig. 19

No. Function1 Export all lift control configuration data to one read-only Excel file. (Export

the lift control configuration of each building for future reference.)

2 Import data for a new project from Excel file

1 2

Page 27: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Step 6: Save as one new project

Fig. 20

No. Function1 Save as one new project: *.xml

1

Page 28: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Step 7: Import existing project data to new outdoor station, guard unit and lift control

Fig. 21

No. Function1 Open one existing project: *.xml

1

Page 29: ABB-Welcome Lift control module M2306 M2307...Pos: 10 /B usch-J aeg er (Neus truk tur)/Modul -Strukt ur/O nline -Doku me ntatio n/Übe rsch rifte n (--> Fü r alle Doku men te

ABB-Welcome

Notice=== E nde der Liste für Tex tma rke Ba ckcove r = ==

We reserve the right to, at any time, make technical changes or changes in the contentof this document without prior notice.The detailed specifications agreed to at the time of ordering applies to all orders. ABBaccepts no responsibility for possible errors or incompleteness in this document. We reserve all rights to this document and the topics and illustrations contained therein.The document and its contents, or excerpts thereof, must not be reproduced,transmitted or reused by third parties without prior written consent by ABB.