ACSS511: Statutory Control 3

Describe the various procedures by which the building control system is administered.

Page 4: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 4

Page 5: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 5

Full Plans procedure

Building Notice procedure

Page 6: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 6

Prepare plans, spec, calcs etc.

Submit application form with supporting info and fee

LA scrutinise proposals Approval or rejection

Page 7: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 7

Site / location plans Detailed plans,

sections Technical details Calculations Drainage info Means of access

Page 8: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 8

Page 9: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 9

Minimum: two copies If Regulatory Reform

(Fire Safety) Order 2005 applies – further copies required.

Page 10: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 10

Payable in two stages

First fee accompanies plan submission

Second fee payable after first site inspection

Page 11: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 11

Scrutinise for compliance with regs

Consult other authorities (e.g. fire)

Prescribed period of 5 weeks, or 2 months with consent of applicant

Page 12: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 12

If plans comply with Building Regs - approval notice issued

If plans don’t comply they may be rejected, and defects specified

Conditional approval may be issued with consent of applicant

Page 13: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 13

Usually resubmitted with amendments

Applicant may refer matter to DCLG for determination

Page 14: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 14

A notice is submitted to LA

Work may commence 48 hours later

Page 15: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 15

Building notice form

Block plan? Insulation details? Hot water system

details?

Page 16: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 16

BN cannot be used if Regulatory Reform (Fire Safety) Order 2005 applies to building in question.

BN is intended for small scale minor works

Page 17: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 17

Single fee payable Same as combined

plan / inspection fee

Page 18: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 18

LA does not approve or reject notice

Further information may be demanded

Page 19: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 19

If FP procedure used – advisable to wait for LA approval notice

However, regardless of which procedure used – work may commence 48 hours after notice is given to LA

Page 20: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 20

Commencement – 2 days Foundation excavated – 1 day Foundation constructed – 1 day DPC – 1 day Oversite preparation – 1 day Drains ready for inspection – 1 day Drains backfilled /ready for test – within 5

days Occupation prior to completion – 5 days Completion of work – within 5 days

Page 21: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 21

Mandatory if Regulatory Reform (Fire Safety) Order 2005 applies to building

In other cases – only if requested

LA not required to issue if BN procedure used

Page 22: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 22

Full Plans◦ Proposals appraised – proceed with

confidence◦ Time taken – up to 2 months

Building Notice◦ Speed and simplicity◦ Risk that work may have to be taken down if

not in compliance

Page 23: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 23

Two possible contraventions:◦ Procedures not followed◦ Work doesn’t comply with

Regs LA’s duty to enforce

Building Regs Usually seek to do it

informally Formal proceedings Fines up to £5000+

Page 24: ACSS511 Statutory Control Lecture 06/03/12

A form of ‘self-certification’ of compliance by firms judged as competent

Installers registered Client does not need

to notify local authority

ACSS511: Statutory Control 24

Page 25: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 25

Provisions introduced by Building Act 1984

Page 26: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 26

Must be approved by Sec of State or designated body: CICAIR

Knowledge base / interview / insurance cover

Page 27: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 27

AI cannot supervise work if they have an interest in it

Page 28: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 28

Agree terms Initial notice LA accept or reject

notice Responsibility

passes to AI Plans certificate Final certificate

Page 29: ACSS511 Statutory Control Lecture 06/03/12

AI has no power to enforce regs

AI may try to resolve situation with developer

If not – notify LA – cancel initial notice

Control function reverts to LA Enforcement proceedings may

commence

ACSS511: Statutory Control 29

Page 30: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 30

Page 31: ACSS511 Statutory Control Lecture 06/03/12

Single design approval for use in multiple locations

ACSS511: Statutory Control 31

Page 32: ACSS511 Statutory Control Lecture 06/03/12

One-to-one relationship with single local authority for pre-submission and plan checking

Site inspections carried out by different LAs

ACSS511: Statutory Control 32

Page 33: ACSS511 Statutory Control Lecture 06/03/12

Nationwide chain of pubs and restaurants About to embark on a large refurbishment

programme Most works involve minor structural

alterations and extensions Consider the relative advantages and

disadvantages of using LABC or Approved Inspector

ACSS511: Statutory Control 33

Page 34: ACSS511 Statutory Control Lecture 06/03/12

Impartial advice Liaison with other council departments Local knowledge Comprehensive, impartial plan checking

service Responsive inspection service Provision of Completion Certificates

ACSS511: Statutory Control 34

Page 35: ACSS511 Statutory Control Lecture 06/03/12

Part of design team. Proactive service – innovative solutions Consultative approach Commercially aware Operate nationally Consistency of advice Backed by insurance Regulated and monitored by CIC Risk-based approach

ACSS511: Statutory Control 35

Page 36: ACSS511 Statutory Control Lecture 06/03/12

ACSS511: Statutory Control 36

Consultation exercise 2012 Download document from

DCLG website Proposals include changes

to:◦ Completion certificates◦ Statutory notifications◦ Enforcement◦ Competent person schemes