Active Corrosion Process. Nisource – COH/CKY. Objectives. Understanding the terminology Active Corrosion & Suspected Areas of “Active Corrosion” Developing the process of Identifying & Managing Suspected Areas and/or “Active Corrosion” - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Active Corrosion  Process

Active Corrosion Active Corrosion ProcessProcess

Nisource – COH/CKYNisource – COH/CKY

Page 2: Active Corrosion  Process

ObjectivesObjectives

Understanding the terminology Understanding the terminology – Active CorrosionActive Corrosion– & Suspected Areas of “Active Corrosion”& Suspected Areas of “Active Corrosion”

Developing the process of Identifying & Developing the process of Identifying & Managing Suspected Areas and/or “Active Managing Suspected Areas and/or “Active Corrosion”Corrosion”

Identifying the Resources and Internal Identifying the Resources and Internal Partners for a Successful ProgramPartners for a Successful Program

Discussion of ImplementationDiscussion of Implementation

Page 3: Active Corrosion  Process

Gas StandardsGas Standards

Policy Number – 653-8Policy Number – 653-8– Effective Date, August 22, 2002Effective Date, August 22, 2002– Definition of Active Corrosion Definition of Active Corrosion

Page 4: Active Corrosion  Process

Gas StandardsGas Standards

Policy Number – 653-8Policy Number – 653-8– Effective Date, August 22, 2002Effective Date, August 22, 2002– Definition of Active Corrosion Definition of Active Corrosion

Two key words, severity & location

Page 5: Active Corrosion  Process

Gas StandardsGas Standards

Policy Number – 653-8Policy Number – 653-8– Effective Date, August 22, 2002Effective Date, August 22, 2002– Definition of Active Corrosion Definition of Active Corrosion

Safety observation for defining Active Corrosion, could reasonably create a condition Detrimental to public safety

Page 6: Active Corrosion  Process

Gas StandardsGas Standards

Policy Number – 653-8Policy Number – 653-8– Effective Date, August 22, 2002Effective Date, August 22, 2002– Definition of Active Corrosion Definition of Active Corrosion

Corrosion Indicator define as -

Page 7: Active Corrosion  Process

Corrosion IndicatorsCorrosion Indicators

Open Leak orderOpen Leak order –

Repair Corrosion LeakRepair Corrosion Leak –

Visual observation of pipe indicating deep pitsVisual observation of pipe indicating deep pits –

Significant CorrosionSignificant Corrosion –

Any anodic corrosion condition determined by Any anodic corrosion condition determined by electrical surveyelectrical survey –

WMS job order with job type “CORR”WMS job order with job type “CORR” –

Page 8: Active Corrosion  Process

Corrosion IndicatorsCorrosion Indicators

Open Leak orderOpen Leak order –

Repair Corrosion LeakRepair Corrosion Leak –

Visual observation of pipe indicating deep pits –Visual observation of pipe indicating deep pits –

Significant Corrosion – Significant Corrosion –

Any anodic corrosion condition determined by Any anodic corrosion condition determined by electrical survey – electrical survey –

WMS job order with job type “CORR”WMS job order with job type “CORR”

Page 9: Active Corrosion  Process

Corrosion IndicatorsCorrosion Indicators

Open Leak order –Open Leak order –

– The process will require the operation centers to determine these locations of Suspected Areas and/or Areas of “Active Corrosion”.

– Communication and Training with Leakage department is required for the personnel to have the complete understanding of sites that meets the criteria or definition.

– Leakage department will be require to review each DPI created for any candidates of Active Corrosion based on the definition, and therefore communicates to the operational center reporting FOL.

– If the FOL is in agreement to the initial assessment, then the segment shall be documented onto the Suspected Area of “Active Corrosion” log book as the first step.

– The item will be discussed on the Semi-annual meeting Decision to be made whether item(s) to be upgrade to “Active

Corrosion” status by a group consensus

Page 10: Active Corrosion  Process

Corrosion IndicatorsCorrosion Indicators

Open Leak orderOpen Leak order –

Repair Corrosion LeakRepair Corrosion Leak –

Visual observation of pipe indicating deep pits –Visual observation of pipe indicating deep pits –

Significant Corrosion – Significant Corrosion –

Any anodic corrosion condition determined by Any anodic corrosion condition determined by electrical survey – electrical survey –

WMS job order with job type “CORR”WMS job order with job type “CORR”

Page 11: Active Corrosion  Process

Repair Corrosion LeaksRepair Corrosion Leaks– The process will require the operation centers to determine the

locations of Suspected Areas and/or Areas of “Active Corrosion”– All executed DPI’s shall be review by the designated operations

center FOL to determine any areas of candidates for Suspected Areas of “Active Corrosion” based on the definition

– Any DPI’s field involvement due to possible generalized corrosion with the operation’s center FOL shall be evaluated for a possible candidates for Areas of “Active Corrosion”

– All candidates shall be placed onto the Suspected Areas of “Active Corrosion” log as a first step

– Evaluation shall be given on a semi-annual bases Decision to be made whether item(s) to be upgrade to “Active

Corrosion” status by a group consensus

Corrosion IndicatorsCorrosion Indicators

Page 12: Active Corrosion  Process

Corrosion IndicatorsCorrosion Indicators

Open Leak orderOpen Leak order –

Repair Corrosion LeakRepair Corrosion Leak –

Visual observation of pipe indicating deep pitsVisual observation of pipe indicating deep pits – –

Significant Corrosion – Significant Corrosion –

Any anodic corrosion condition determined by Any anodic corrosion condition determined by electrical survey – electrical survey –

WMS job order with job type “CORR”WMS job order with job type “CORR”

Page 13: Active Corrosion  Process

Corrosion IndicatorsCorrosion Indicators

Visual observation of pipe indicating deep pitsVisual observation of pipe indicating deep pits – –– The process will require the operation centers and joint effort of the

Corrosion department to determine the locations of Suspected Areas and/or Areas of “Active Corrosion”

– Any excavation and pipe line exposure with indications of sever corrosion due to deep pits, should involve the Operational Center reporting FOL and the area’s Corrosion Technician for proper measurements and classification

– Most systems with a visual observation of deep pits that have been determine to be Generalized corrosion shall be evaluated for Areas of “Active Corrosion”

– All candidates shall be placed onto the Suspected Areas of “Active Corrosion” log book as the first step

– Evaluation given on a Semi-Annual bases Decision to be made whether item(s) to be upgrade to “Active

Corrosion” status by a group consensus

Page 14: Active Corrosion  Process

Corrosion IndicatorsCorrosion Indicators

Open Leak orderOpen Leak order –

Repair Corrosion LeakRepair Corrosion Leak –

Visual observation of pipe indicating deep pits –Visual observation of pipe indicating deep pits –

Significant Corrosion – Significant Corrosion –

Any anodic corrosion condition determined by Any anodic corrosion condition determined by electrical survey – electrical survey –

WMS job order with job type “CORR”WMS job order with job type “CORR”

Page 15: Active Corrosion  Process

Corrosion IndicatorsCorrosion Indicators Significant Corrosion –Significant Corrosion –

– The process will require the operation centers and joint effort of the Corrosion department to determine these locations.

Page 16: Active Corrosion  Process

Corrosion IndicatorsCorrosion Indicators Significant Corrosion –Significant Corrosion –

– Corrosion Department Shall compile any “Corr” orders, such as leaks on coated

pipe, Leak on CP, Investigate DPI or Generalized corrosion and etc., for any candidates of Areas of “Active Corrosion”; bring all material to the semi-annual review meeting

– Decision to be made whether item(s) to be upgrade to “Active Corrosion” status by a group consensus

Page 17: Active Corrosion  Process

Corrosion IndicatorsCorrosion Indicators Significant Corrosion –Significant Corrosion –

– Operations Designated FOL, shall compile any areas that have a history of

significant corrosion that may not be classified as Generalized Corrosion, such as several DPI’s with Localized Corrosion in a specific locations for candidates of Areas of “Active Corrosion”

– Any Areas with a repeat of Class 1 or 2+– Any Areas with more than three main line corrosion leaks

(localize) recorded for the last 9 years– Any Areas with past history of Generalized Corrosion, with

pending or completed DPI’s in the same general area– If by historical review of data appear to meet the criteria of Areas of

“Active Corrosion”, then the segments shall be placed in “Suspected Area of “Active Corrosion Log” and review at the Semi-Annual meeting

– Decision to be made whether item(s) to be upgrade to “Active Corrosion” status by a group consensus

– Note: Rolling measurement used for an area of 500 feet in either Note: Rolling measurement used for an area of 500 feet in either direction to define the investigative term “Area”direction to define the investigative term “Area”

Page 18: Active Corrosion  Process

Corrosion IndicatorsCorrosion Indicators

Open Leak orderOpen Leak order –

Repair Corrosion LeakRepair Corrosion Leak –

Visual observation of pipe indicating deep pits –Visual observation of pipe indicating deep pits –

Significant Corrosion – Significant Corrosion –

Any anodic corrosion condition determined by Any anodic corrosion condition determined by electrical survey – electrical survey –

WMS job order with job type “CORR”WMS job order with job type “CORR”

Page 19: Active Corrosion  Process

Any anodic corrosion condition determined by electrical survey –Any anodic corrosion condition determined by electrical survey –– Electrical Survey shall be conducted by the Corrosion DepartmentElectrical Survey shall be conducted by the Corrosion Department

Based on anomaly identification for mitigation of bare or coated pipelines, Based on anomaly identification for mitigation of bare or coated pipelines, requested by the Engineering departmentrequested by the Engineering department

– Corrosion Department shall evaluate the data and determine anodic Corrosion Department shall evaluate the data and determine anodic areasareas

Any anodic areas will be evaluated based on the definition of Areas of Any anodic areas will be evaluated based on the definition of Areas of “Active Corrosion” for any possible potential corrosive areas that meet the “Active Corrosion” for any possible potential corrosive areas that meet the criteriacriteria

Corrosion Technician shall collect and provide data; place information Corrosion Technician shall collect and provide data; place information onto the proper formonto the proper form

– Any areas that meet the criteria shall be placed in to the Suspected Any areas that meet the criteria shall be placed in to the Suspected Areas of “Active Corrosion” Log book for the next Semi-Annual review Areas of “Active Corrosion” Log book for the next Semi-Annual review meetingmeeting

Decision to be made whether item(s) to be upgrade to “Active Corrosion” status by a group consensus

Corrosion IndicatorsCorrosion Indicators

Page 20: Active Corrosion  Process

Corrosion IndicatorsCorrosion Indicators

Open Leak orderOpen Leak order –

Repair Corrosion LeakRepair Corrosion Leak –

Visual observation of pipe indicating deep pits –Visual observation of pipe indicating deep pits –

Significant Corrosion – Significant Corrosion –

Any anodic corrosion condition determined by Any anodic corrosion condition determined by electrical survey –electrical survey –

WMS job order with job type “CORR”WMS job order with job type “CORR”

Page 21: Active Corrosion  Process

WMS job order with job type “CORR”WMS job order with job type “CORR”– All WMS generated orders with the job type “CORR” that are All WMS generated orders with the job type “CORR” that are

associated with a completed DPI order, shall be evaluated for any associated with a completed DPI order, shall be evaluated for any Areas of “Active Corrosion” by the responsible Corrosion TechnicianAreas of “Active Corrosion” by the responsible Corrosion Technician

Generalized CorrosionGeneralized Corrosion Leaks on CP systemLeaks on CP system Cleared DPI “investigate”Cleared DPI “investigate” Etc..Etc..

– The Corrosion Technician shall evaluate the information and data that The Corrosion Technician shall evaluate the information and data that is available or any information obtain in the field to determine, if any is available or any information obtain in the field to determine, if any areas meets the criteria of “Active Corrosion”areas meets the criteria of “Active Corrosion”

– Any Candidates shall be placed on the Suspected Area of “Active Any Candidates shall be placed on the Suspected Area of “Active Corrosion” Log and evaluated at the next Semi-Annual meetingCorrosion” Log and evaluated at the next Semi-Annual meeting

Decision to be made whether item(s) to be upgrade to “Active Corrosion” status by a group consensus

Corrosion IndicatorsCorrosion Indicators

Page 22: Active Corrosion  Process

Commitment to SafetyCommitment to Safety

At all times during the investigation or prior of the At all times during the investigation or prior of the investigation, Departmental leadership shall have investigation, Departmental leadership shall have an obligation of responsibility to public safetyan obligation of responsibility to public safety– Any time the pipeline appears to be un-safe or the Any time the pipeline appears to be un-safe or the

situation appears un-stable, then the operations situation appears un-stable, then the operations leadership team shall act accordingly of a correct course leadership team shall act accordingly of a correct course of action “promptly” of action “promptly”

– The indicators or Areas of “Active Corrosion” process The indicators or Areas of “Active Corrosion” process does not postpone any necessary actions to be taken, if does not postpone any necessary actions to be taken, if needed “promptly”needed “promptly”

– This shall be taken into consideration for all casesThis shall be taken into consideration for all cases– Operation’s leadership staff will be held accountable for Operation’s leadership staff will be held accountable for

this assessmentthis assessment

Page 23: Active Corrosion  Process

Gas StandardsGas Standards

Policy Number – 653-8Policy Number – 653-8– Effective Date, August 22, 2002Effective Date, August 22, 2002– Investigation of Suspected Areas of “Active Investigation of Suspected Areas of “Active

Corrosion” Corrosion” Perform this Task @ Semi-Annual Meeting

Page 24: Active Corrosion  Process

Semi-Annual MeetingsSemi-Annual Meetings

Objectives Objectives – Discuss candidates for Suspected Areas and Discuss candidates for Suspected Areas and

Areas of “Active Corrosion”Areas of “Active Corrosion”– Review present entries on the Suspected Areas Review present entries on the Suspected Areas

of Active Corrosion log to determined, if any of Active Corrosion log to determined, if any necessary action is needed, such as necessary action is needed, such as upgrade to Active Corrosion status, upgrade to Active Corrosion status, increase leakage survey frequency, increase leakage survey frequency, maintain item in Suspected Areas of “Active maintain item in Suspected Areas of “Active

Corrosion” Status Corrosion” Status or remove item from the Suspected Areas of “Active or remove item from the Suspected Areas of “Active

Corrosion” statusCorrosion” status

Page 25: Active Corrosion  Process

Semi-Annual MeetingsSemi-Annual Meetings

Objectives, cont…… Objectives, cont…… – Review past and any present Active Corrosion Review past and any present Active Corrosion

logslogs Determine a course of action, or has the present Determine a course of action, or has the present

course of action been follow through, such as course of action been follow through, such as – ReplacementReplacement– RetirementRetirement– Cathodically protect the segmentCathodically protect the segment

– To get all departments involved for decision To get all departments involved for decision makingmaking

– Assure all Corrosion Indicators are consideredAssure all Corrosion Indicators are considered

Page 26: Active Corrosion  Process

Semi-Annual MeetingsSemi-Annual Meetings

Departments to be involvedDepartments to be involved– Field OperationsField Operations

Designated LeaderDesignated Leader If available, Operation’s center leadershipIf available, Operation’s center leadership

– EngineeringEngineering Technician & EngineerTechnician & Engineer If available, Senior EngineerIf available, Senior Engineer

– CorrosionCorrosion TechniciansTechnicians If available, Corrosion FLL & Corrosion SpecialistIf available, Corrosion FLL & Corrosion Specialist

Page 27: Active Corrosion  Process

Semi-Annual MeetingsSemi-Annual Meetings

Resources –Resources –– Any Corrosion Indicator Data Sheet Annual Summary Sheets – Any Corrosion Indicator Data Sheet Annual Summary Sheets –

Form C 1282-14 – Gas Standards – 653-8 Exhibit AForm C 1282-14 – Gas Standards – 653-8 Exhibit A– All DPI’s, Corr orders, Electrical Survey sheets, any Main Exposure All DPI’s, Corr orders, Electrical Survey sheets, any Main Exposure

sheets obtainedsheets obtained WMS based orWMS based or Local Filing SystemLocal Filing System

– Any GIS systemsAny GIS systems Color coded patterns placed on maps indicating leakage historyColor coded patterns placed on maps indicating leakage history

– Any Adhoc reports based on historical review based on system Any Adhoc reports based on historical review based on system numbers, Street, City or town locations, or map numbersnumbers, Street, City or town locations, or map numbers

– On going filing system, keep for purpose of Areas of “Active On going filing system, keep for purpose of Areas of “Active Corrosion” semi-annual meetingsCorrosion” semi-annual meetings

Page 28: Active Corrosion  Process

Semi-Annual MeetingsSemi-Annual Meetings

RT’s shall be createdRT’s shall be created– Designated for each operation centerDesignated for each operation center

TCC to primary locations of Active Corrosion Log storage locationsTCC to primary locations of Active Corrosion Log storage locations Comments of RT will indicate location of Log books and the designated Comments of RT will indicate location of Log books and the designated

FOL to maintain the booksFOL to maintain the books

– Responsible Corrosion TechnicianResponsible Corrosion Technician Shall be assigned to RT as the responsible supervisorShall be assigned to RT as the responsible supervisor

– FrequencyFrequency Anniversary set for every 6 months not to exceed 9 monthsAnniversary set for every 6 months not to exceed 9 months Must complete two meetings per calendar yearMust complete two meetings per calendar year

– All RT’s will generate a “2797” job typeAll RT’s will generate a “2797” job type Job order shall be executed after the end of each meeting with the Job order shall be executed after the end of each meeting with the

remarks –remarks –– Attendance (Who & what department)Attendance (Who & what department)– New items added or old items removed to the Areas of “Active Corrosion” New items added or old items removed to the Areas of “Active Corrosion”

log sheetlog sheet– Brief summary of any meeting discussionBrief summary of any meeting discussion

Page 29: Active Corrosion  Process

Semi-Annual MeetingsSemi-Annual Meetings

– Master log sheet of RT’s shall be kept with System Ops and Master log sheet of RT’s shall be kept with System Ops and communicated to all other departments with the set target dates communicated to all other departments with the set target dates with locations specificwith locations specific

– Ultimately, System Ops/Corrosion Technician responsibility to send Ultimately, System Ops/Corrosion Technician responsibility to send invitations for all Semi Annual meetings to the department invitations for all Semi Annual meetings to the department representatives involvedrepresentatives involved

– All involved departments shall be responsible to attend and provide All involved departments shall be responsible to attend and provide inputinput

All documentation brought to the Semi-Annual meeting All documentation brought to the Semi-Annual meeting shall be kept on a designated filling location for future shall be kept on a designated filling location for future review and monitoringreview and monitoring– Designated FOL shall maintain the recordsDesignated FOL shall maintain the records

Page 30: Active Corrosion  Process

Internal AuditsInternal Audits

Representative of the auditing group shall Representative of the auditing group shall be given the “Semi-Annual Meeting - RT be given the “Semi-Annual Meeting - RT master list” to evaluate the quality master list” to evaluate the quality assurance of the process be carried out for assurance of the process be carried out for each individual area each individual area – By information provided on the RTBy information provided on the RT

The auditor will know, The auditor will know, – the designated Leader to maintain the bookthe designated Leader to maintain the book– the location of the bookthe location of the book– the dates of when the information was reviewedthe dates of when the information was reviewed– A summary of information from the last Semi-Annual A summary of information from the last Semi-Annual

meetingmeeting

Page 31: Active Corrosion  Process

Suspected Areas of “Active Suspected Areas of “Active Corrosion” Corrosion”

Exhibit B of COH Exhibit B of COH Gas Standards – Gas Standards – 653-8653-8

Form C-1282-15Form C-1282-15 Form shall be Form shall be

updated for any updated for any candidates of Areas candidates of Areas of “Active of “Active Corrosion”, Corrosion”, categorize as categorize as Investigation of Investigation of Suspected Areas of Suspected Areas of “Active Corrosion”“Active Corrosion”

Group shall review Group shall review form semi-annuallyform semi-annually

New form created on New form created on a yearly basesa yearly bases

Page 32: Active Corrosion  Process

Areas of “Active Corrosion”Areas of “Active Corrosion” Exhibit C of COH Gas Exhibit C of COH Gas

Standards – 653-8Standards – 653-8 Form C-1282-16Form C-1282-16 SME group from the SME group from the

semi-annual meeting semi-annual meeting shall come to a shall come to a consensus before consensus before entering any data into entering any data into formform

Must be evaluated Must be evaluated each Semi-Annual each Semi-Annual meetingmeeting

Corrective action must Corrective action must be carried out promptly be carried out promptly

Three methodsThree methods– CP appliedCP applied– ReplacementReplacement– RetirementRetirement

Page 33: Active Corrosion  Process

In-ConclusionIn-Conclusion

Active Corrosion is an ODOT mandateActive Corrosion is an ODOT mandate

We need to work together in maintaining and We need to work together in maintaining and following through with the process to stay in following through with the process to stay in compliance, this is not a one person or a compliance, this is not a one person or a one department operation but a joint effort.one department operation but a joint effort.