Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity Report WG A3.24 AR 2014 Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal Arc Testing Convener: Nenad Uzelac (USA) Secretary: Mietek Glinkowski (USA) Year of Kick-off: 2009 Number of Members: 20 Regular Members: 19 Corresponding Members: 1 Retiring Members: No retiring members New Members: Proposed for approval by SC A3 No new members A3-14(AG01)023-IWD

Upload: thuong

Post on 24-Feb-2016

41 views

Category:

Documents


0 download

DESCRIPTION

A3-14(AG01)023-IWD . WG A3.24 Tools for Simulating Internal Arc Testing Convener : Nenad Uzelac (USA) Secretary: Mietek Glinkowski (USA) Year of Kick-off: 2009. Activity Report 2014. Number of Members: 20 Regular Members: 19 Corresponding Members: 1. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Activity Report   2014

Study Committee A3 HIGH VOLTAGE EQUIPMENT

Working Group Activity Report WG A3.24 AR 2014 Page No.: 1

Activity Report 2014

WG A3.24 Tools for Simulating Internal Arc TestingConvener: Nenad Uzelac (USA)Secretary: Mietek Glinkowski (USA)

Year of Kick-off: 2009

Number of Members: 20

Regular Members: 19

Corresponding Members: 1

Retiring Members: No retiring members

New Members:Proposed for approval by SC A3

No new members

A3-14(AG01)023-IWD

Page 2: Activity Report   2014

Study Committee A3 HIGH VOLTAGE EQUIPMENT

Working Group Activity Report WG A3.24 AR 2014 Page No.: 2

Technical activities & discussion items

Meetings:• First meeting in Delft, Holland (March 2009)

• 10th meeting in San Sebastian, Spain (January 2013)

• 11th (and Last) held in Stockholm, Sweden (June 2013)

• Attendance: 60% on average.

• Used Skype effectively.

Page 3: Activity Report   2014

Study Committee A3 HIGH VOLTAGE EQUIPMENT

WG A3.24 AR 2014

Progress of work:• Completed short Tutorial (1 hour)

• Completed REV 11 of the technical brochure

• Submitted TB to Technical Committee

Working Group Activity Report Page No.: 3

Technical activities & discussion items (cont)

130 pages

7 ANNEXES 60 pages

Page 4: Activity Report   2014

Study Committee A3 HIGH VOLTAGE EQUIPMENT

Working Group Activity Report WG A3.24 AR 2014 Page No.: 4

Next StepsPublication on behalf of the WG (Title, way of publication, stage of preparation, approximate date of final version

1. Electra Paper – Q2, 2014

2. Poster for CIGRE Paris: Q3 2014

3. IEEE paper

4. Tutorials - 20141. Xian Jiaotong University2. ????

Page 5: Activity Report   2014

Study Committee A3 HIGH VOLTAGE EQUIPMENT

WG A3.24 AR 2013

Membershipwith approval of the last SC meeting

Working Group Activity Report Page No.: 5

Last Name First Name Country Company StatusDel Rio Luis Spain Ormazabal R

Douchin Jerome France Schneider R

Dullni Edgar Germany ABB R

Feitoza Costa Sergio Brazil Cognitor R

Fjeld Elin Norway Telemark University R

Glinkowski Mietek USA ABB R (secretary)

Kim Hong-Kyu Korea KERI R

Kriegel Martin Switzerland ABB R (Past Convener)

Kweon Ki-Yeoung Korea HYOSUNG Corporation Retired

Lopez-Roldan Jose Australia Powerlink R

Pater Ryszard Canada Hydro-Québec R

Pietsch Gerhard Germany RWTH Aachen R

Reiher Thomas Germany Siemens R

Robin-Jouan Phillipe France Areva Retired

Schoonenberg Gerard Netherlands Eaton R

Singh Shailendra Germany Schneider R

Smeets Rene Netherlands KEMA R

Uchii Toshiyuki (Toshi) Japan Toshiba R

Uzelac Nenad USA G&W R (Convener)

Van der Sluis Lou Netherlands TU Delft C

Vinson Paul France Areva R

Yoshida Daisuke Japan Mitsubishi Electric Corporation R