AESTHETIC SHELL FOR REGENERATIVE ENERGY
The almost 100 meter long sculptural shell conjures
up numerous associations: from whales or waves
through to polished boulders. The power plant
replaces a building from the 1950s and currently
supplies around 4,000 households with a capacity
of around 14 gigawatt hours per year.
In a competition, the building client, Allgäuer Über-
landwerk (AÜW) Kempten, requested a building
design to harmonize with the protected group of
buildings opposite, comprising the former Rosenau
spinning works and weaving works. The result is a
multiple award-winning structure: It won the Ger-
man Architecture Prize 2011, the German Concrete
Architecture Prize 2010, the German Industrial
Building Prize 2010 and made it into the final selec-
tion for the International Liechtenstein Prize for
Sustainable Construction in the Alps 2010.
The concept devised by the Becker Architekten
architecture office planned to link up the two end
points - the power house (with generators and
Keselstraße hydroelectric
power station, Kempten
Allplan Engineering in practice
The new run-of-the-river power plant on the Iller river at Kempten impresses the viewer with its
dynamic, elegant form.
2
EinlaufOberwasser
AuslaufUnterwasser
Tor
4,38
40
0607
01
02
03
04
05
1112
13
14
15
16
21
17
19
180810 09
2524
2322
21
20
Auflagerlasten siehestatische Berechnung
1
4
5
7
8
Fuge
Fuge
15
16
17
18
25.1
27
29
30
31
32
Abschnitt V1; Pos. D5.1Abschnitt IV; Pos. D4
Abschnitt II; Pos. D2
Abschnitt I; Pos. D1
Abschnitt III; Pos. D3
Abschnitt V2; Pos. D5.2
Abschnitt VI; Pos. D6
Positionsplan Dachkonstruktion M=1:100
28
26
25.2
25.423
22.2
21.2
22.121.1 20
19
13
12
Fuge
1114
9
6
2
0
10
3.23.1
25.3
24
Fuge
Fuge
Detail LagerausbildungPosition
4, 7, 12, 16, 19, 20, 21.1, 21.2, 23, 24, 26, 29, 30, 31 und 32M=1:10
Detail LagerausbildungPosition 28M=1:10
Detail LagerausbildungPosition
0, 6, 9, 11, 14 und 17M=1:10
Konstruktionsgruppe Bauen Kempten AG Ingenieurbüro für Bauwesen
Bauherr:
Tragwerksplanung:
Bauvorhaben:
Plandarstellung:
Datum
Maßstab:
bea.: gez.: gepr.: Plangröße: Plan Nr.:
Proj. Nr.:Senger
1:100Möller Möller 1,00m²
07601
Allgäuer ÜberlandwerkGmbH KemptenIllerstraße 1887435 Kempten
Prüfingenieur:
Planung Hochbau:
Planung Tiefbau:
Becker ArchitektenArchitekturbüroBeethofenstraße 787435 KemptenTel.: 0831/5122000Fax.: 0831/5122001
RMD Consult GmbHWasserbau und EnergieBlutenbergstraße 2080636 MünchenTel.: 089/99222402Fax.: 089/99222409
Neubau IllerKraftwerkAÜW Keselstraße
Positionsplan Dachkonstruktion Wasserkraftwerk
05.07.07
Zu diesem Plan gehörende Pläne:
Plan Nr.
Index Datum
Datum Prüf.Ing.
gez. gepr. Änderung
Bauherr Architekt Baufirma
a
b
c
d
e
Werkpläne des Architekten
P1001
Pos. Plan :
Legende
21.01.2008 Senger 10 und 13 Festpunkte
14.11.07 3x
3xP1001a 21.01.08 1V (PDF) 1V (PDF) 1V (PDF)
LGA KemptenLandesgewerbeanstalt Bayern Zweigstelle KemptenStiftsplatz 187439 KemptenTel.: 0831/ 521480Fax.: 0831/5214820
Senger04.08.2008
Bahnhofplatz 1 87435 Kempten Tel. 0831 521560 Fax 5215660
an neue Geometrie des Architekten angepasst
3x 1V (PDF) 1V (PDF) 1V (PDF)P1001b 06.08.08
RMDConsult
1V (PDF)
1V (PDF)
Senger08.10.2008 Vom Prüfer freigegeben (ohne Eintrag)
P1001c 08.10.08 1xPDF 1xPDF 3x + 1xPDF 1x + 1xPDF
P1001c
H/B = 841.0 / 1189.0 (1.00m²) Allplan 2006
transformer) and the flow restrictor weir (with
trash rack cleaning system) via a continuous
building shell. Approximately half-way along, this
shell passes through the historic steel trussed arch
of the cable bridge. Despite the overall size, the
architects wanted to create a highly differentiated,
organic form that on the one hand blends in with
its environment, but on the other is perceived as an
independent building thanks to its design.
When the structural engineers from Konstrukti-
onsgruppe Bauen AG, Kempten became involved
in the project, a decision had not yet been made
regarding the materials. Ultimately, a concrete
structure was chosen to enable the organic form
enclosing the plant to be realized. The civil enginee-
rs first used hand drawings to help determine the
points at which the structure can be supported
by the existing technical installations. The shell
was divided into six sections, first to provide the
expansion joints required by the thermal conditions
and second because the roof supports needed to
be permanently fixed at some points, and movable
at others.
In the next step, the engineers developed a rib
structure for the concrete construction. It had to fit
in with the overall image, but it was also necessary
to be able to split it into six segments. Models of the
concrete shell were then created with a high level
of geometric detail in Allplan Engineering to serve
as the basis for reinforcement and shell design. The
result is a monolithic concrete roof structure of fre-
ely curved rib arches, curved walls and arched roof
surfaces. The large free span of the rib arches is
9.3 meters, the concrete areas are between 20 and
25 centimeters thick.
The hydroelectric power plant on the Iller is a buil-
ding that aesthetically enriches its environment,
rather than detracting from it. Among other things,
it therefore plays a role in generating support for
electricity supplied via regenerative energy. The
Iller power station is part of the “hydropower world“
accessible to the public via an unbroken foot and
cycle path along the river. This path runs directly
between the old spinning works and the new power
station and passes the impressive, high interiors
with their concrete ribs. It‘s a view that makes you
feel as though you are inside a modern cathedral.
PROJECT INFORMATION OVERVIEW
> Building typology: Hydroelectric power station
> Software used: Allplan Engineering
PROJECT DATA
> Structural engineering design:
Konstruktionsgruppe Bauen AG, Kempten
> Earthworks structural design: RMD Consult,
Munich
> Architecture: Becker Architekten, Kempten
> Client: Allgäuer Überlandwerk AÜW Kempten
> Construction start date: November 2007
> Completion: July 2010
> Cubature: 3,865 m³
> Usable area: 590 m²
3
Konstruktionsgruppe Bauen AG, Kempten covers
the whole range of project planning from bridge
construction and civil engineering, structural design
and structural inspection through to building
management for both new constructions and
building in the existing assets. Expert opinions and
building inspections in bridge construction and
structural engineering round out the services
offered by Konstruktionsgruppe Bauen AG.
In the area of structural design for structural
engineering and industrial construction, Konstruk-
tionsgruppe Bauen deals with all questions relating
to structural analysis, construction and building
management with the aim of creating economically
feasible solutions with a high planning quality.
“The organically shaped shell of the
hydroelectric power plant was created
with a very high level of detail with
Allplan Engineering and provided the
optimum basis for shell and reinforce-
ment plans.“
Andreas Möller
Konstruktionsgruppe Bauen
ALLPLAN is a leading European vendor of open
Building Information Modeling (BIM) solutions. For
over 50 years, the company has been supporting
the construction industry with its pioneering
software portfolio, and has been decisively driving
the digitalization of the construction industry
forward: innovative, tailored to the clients’ needs –
and with the best “Made in Germany” quality.
ABOUT THE COMPANY
© 2018 Allplan GmbH, Munich, Germany; © Title and plan back page: Konstruktionsgruppe Bauen AG, photo: Eva Bartussek; photo back page: Brigida González
ALLPLAN UK Ltd
5 Charter Point Way
Ashby Park
Ashby de la Zouch
LE651NF
Tel:+44 01530 560126
allplan.com