agnesnycz presentation small

142

Upload: agnieszka-nycz

Post on 07-Apr-2016

222 views

Category:

Documents


1 download

DESCRIPTION

 

TRANSCRIPT

  • AGNIESZKA NYCZWWW.AGNESNYCZ.COM

  • THE PROFESSIONAL EXPERIENCE

    APRIL-JULY 2014

    4U ENGEENERING CONSULTANTS ARCHITECTS, ENGINEERS + PLANNERS/DUBAI:

    1.SHOWROOM/ UMM SUQEIM DUBAI: concept+3dmodel + architectural, technical drawings;

    PREPARATION FOR THE DUBAI MUNICIPALITY SUBMISSION PROCESS;

    2. G+M MALL WEST ZONE MALL L- architectural, technical drawings;

    3. AL JADDAF HOTEL- architectural, technical drawings;

    4.PRIVATE VILLA PROJECT/DUBAI:3dmodel + architectural, technical drawings;

    5. PRIVATE VILLA PROJECT/DUBAI /AL BARSHA SOUTH: concept+ 3dmodel + architectural, technical drawings;

    JANUARY-APRIL 2014

    A.UAE/DEWAN AL AMARA ARCHITECTS AND ENGINEERS/DUBAI:

    1.Raha Beach hotel in Abu Dhabi(analyses ,presentation)-scale of the project: city hotel;

    2.Modon Project Villas Prototype in Modon(3d modeling)-scale of the o project:one family building;

    3.Green Community Townhouses in Dubai-(3d modeling)-scale of the project:one family building;

    4.Green Community Villa in Dubai(3d modelling and renderings)-scale of the project:one family building;

    5.Residential Tower on Plot C18, Sector W1 at Corniche in Abu Dhabi -Link International Tower ( analyses,renderings, 3d modeling,

    rendering postproduction, presentation- competition)-scale of the project: high-rise tower;

    6.Samarra University in Iraq( 2d autocad technical plans drawings)scale of the project -university;

    7.Hilton Hotel in Dubai( 3d Modelling, rendering postproduction)-scale of the project:city hotel;

    8.4* Apartment Hotel (Marriott hotel) at Dammam(elevations drawings, renderings postproduction) )-scale of the project:city hotel,

  • 9.Dar Al Wasl Road Extention in Dubai-masterplan (analyses, presentation), scale of the project-masterplan;

    11.Umm Nahad Development in Dubai(3d modeling) , scale of the project-masterplan;

    12.modern villa concept at World Island in Dubai ( conceptual technical drawings , 3d modeling, renderings, presentation)-scale of the

    project:one family building;

    13.villa concept in Dubai ( conceptual technical drawings , 3d modeling, renderings, presentation)-scale of the project-one family building

    JANUARY 2013-MAY 2013

    ATELIERS JEAN NOUVEL/PARIS/France

    KLAUS RINKE MUSEUM PROJECT -3dmodels + architectural, technical drawings;

    PHILIPPE RAHM ARCHITECTES/PARIS/France

    TAICHUNG GATEWAY INTERNATIONAL ECO PARK-3dmodels + architectural, technical drawings;

    FROM 2007

    FREELANCE EXPERIENCE :

    1.FUJARAH/DUBAI-concept+3dmodel + architectural, technical drawings;

    2.UK-BASED COMPANY- SPA PROJECT/CRACOW- NEIGHBOURHOOD/SOUTH OF POLAND- concept+3dmodel + architectural,

    technical drawings;

    3.USA- TRUSTIN RESEARCH SERVICE- graphic identification of the company (logo, business cards etc. consultant post);

    4.INTERNET COLLABORATIONS/ORDERS-GRAPHIC IDENTIFICATION WORKS-DIFFERENT SCALES AND TYPES

  • a

  • GROUND FLOOR minus one LEVEL

    OBSERVATION DECK

    SKYBAR

    RESTAURANT

    OFFICES

    EXHIBITION SPACE

    WORKSHOPS

    CONFERENCE

    LIBRARY

    MEZANINE ANDOBSERVATION DECK ON THE ROOF

    ENTRANCE LOBBY

    STORAGE AND PARKINGSTORAGE AND PARKING

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    DRAWINGsPROJECT-PRELIMINARY DESIGN

    MUsEE KLAUs RINKEPROJECT

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z E X I s T I N G s TAT E P H O T O s

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z E X I s T I N G s TAT E P H O T O s

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z K L A U s R I N K E W O R K s T H AT W I L L B E I N P L A C E D I N T H E N E W E X H I B I T I O N s PA C E I N T H E R E V I TA L I s E D C A s T L E

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    DRAWINGsPROJECT-PRELIMINARY DESIGN

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    Visitors Access and Parking

    The access to the Rinke Museum should

    not interfere with the private character of

    the New Schloss. Nowadays, ten resi-

    dences can be found in the new castle

    precinct with approximately 30 inhabitants.

    Therefore, a driveway along the north

    defense wall will be realized to avoid the

    new castle and give access directly to the

    old Castle. At the end of the driveway, will

    be found a small parking for approximately

    50 to 60 parking spaces with the possibi-

    lity for a tourist bus to realize a U turn and

    drive back. An additional parking providing

    for up to 200 to 300 parking places will be

    found earlier along the existing road before

    Neuhaus.

    s I T U AT I O N

    sITESITuATION

    N AT U R A L P R O T E C T I O N A R E A

    T O P O G R A P H Y

    s I T E A E R I A L V I E W

    DONAU

    Main Parking60 Pl.Small Parking

    21 Pl.

    Access roadto be created

    Museum access

    Private Schloss Entrance

    Potential artdelivery access

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Site Plan

    DateEchelle: 1/2000Preliminary Design

    M U s E U M A C C E s s

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    The Tower

    GH 2 EXPO

    NEW BUILDINGS FOOTPRINT SURFACE

    The Pavillion

    TUNNEL 2

    TUNNEL 1

    The New Gallery

    TUNNEL 3

    vertical circulationstructure in CAFE

    BRIDGE N1BRIDGE N2BRIDGE N3

    TUNNEL N0BRIDGE N4

    GH1 CAFE

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Roof Plan - General Plan

    DateEchelle: 1/400Preliminary Design

    N E W B U I L D I N G s

    PROjECT sCHEMENEw buILDINGS

    N E W B U I L D I N G s F O O T P R I N T

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    400

    401

    402

    403

    404

    405

    406

    407

    408

    409

    410

    411

    412

    413

    414

    415

    416

    417

    418

    419

    420

    421

    422

    423

    424

    425

    426

    427

    428

    429

    430

    431

    433

    434

    435

    436

    437

    432

    438

    439

    440

    441

    442

    443

    444

    445

    446

    413.10 413.00 413.00

    411.65

    410.40410.85410.90

    411.10410.95

    411.35

    409.00

    406.70

    413.10

    404.20

    401.70

    412.15

    407.00

    405.00

    404.00

    400.00

    419.82

    416.60

    427.27 427.17

    431.30

    427.74

    431.40

    439.35439.35

    445.50

    427.58

    432.50

    424.50

    439.35

    448.20

    430.5430.60431.30

    428.52

    424.30

    423.26

    424.10

    425.90

    415.36

    434.20

    460

    400

    401

    402

    403

    404

    405

    406

    407

    408

    409

    410

    411

    412

    413

    414

    415

    416

    417

    418

    419

    420

    421

    422

    423

    424

    425

    426

    427

    428

    429

    430

    431

    433

    434

    435

    436

    437

    432

    438

    439

    440

    441

    442

    443

    444

    445

    446

    447

    448

    450

    451

    452

    453

    454

    449

    455

    1m1m

    456

    457

    458

    459

    425.40

    408.00

    421.80

    413.40413.90

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE GENERAL SOUTH AND NORTH ELEVATIONS

    DateEchelle: 1/1000Preliminary Design

    PROjECTMuSEuM ENTRANCE

    N O R T H P R E C I N C T W A L L

    M U s E U M E N T R A N C E

    D O O R D E TA I L- D R A W I N G F R O M 1 9 5 8 N O R T H P R E C I N T W A L L Z O O M O N T H E D O O R

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE GENERAL SOUTH AND NORTH ELEVATIONS

    DateEchelle: 1/1000Preliminary Design

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    COUPE D_D

    413.50

    422.00422.25

    429.60

    430.60431.30

    427.48

    448.20

    423.76423.10422.80

    DONAU

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE GENERAL SECTION

    DateEchelle: 1/400Preliminary Design

    N E W G A L L E R Y

    GALLERY sCHEMECONTExT PLANS AND SECTIONS

    T H E M U s E U M O V E R LO O K I N G T H E D A N U B E R I V E R

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE New Buildings -General Plan

    DateEchelle: 1/333Preliminary Design-New Gallery

    413.10

    410.90

    419.82

    416.60

    427.27 427.17427.74

    431.40

    439.35439.35

    445.50

    427.58

    432.50

    424.50

    439.35

    430.60431.30

    428.52

    424.30

    423.26

    424.10

    425.90

    415.36

    425.40

    421.80

    413.40413.90

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE New Gallery - Facade

    DateEchelle: 1/333Preliminary Design-New Gallery

    413.50

    422.00422.25

    429.60

    430.60431.30

    427.48

    448.20

    423.76423.10422.80

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE SECTION CC

    DateEchelle: 1/200Preliminary Design-New Gallery

    439.35

    431.54

    435.80

    424.30

    427.10

    423.58

    427.20

    416.60

    428.65

    431.88

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE SECTION BB

    DateEchelle: 1/200Preliminary Design-New Gallery

    N E W G A L L E R Y B _ B s E C T I O N

    N E W G A L L E R Y

    GALLERY sCHEMECONTExT PLANS AND SECTIONS

    N E W G A L L E R Y A E R I A L V I E W

    N E W G A L L E R Y G E N E R A L F A C A D EN E W G A L L E R Y C _ C s E C T I O N

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    10

    81.

    55.

    51

    0.5 0.59

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE CC SECTION ZOOM

    DateEchelle: 1/100Preliminary Design-New Gallery N E W G A L L E R Y

    GALLERY sCHEMEbuILDING PLANS AND SECTIONS

    E X H I B I T I O N C O N F I G U R AT I O N P O s s I B I L I T Y

    C O N C E R T C O N F I G U R AT I O N P O s s I B I L I T Y

    N E W G A L L E R Y C _ C C R O s s s E C T I O N

    PA I N T I N G s C O N F I G U R AT I O N P O s s I B I L I T Y

    C O N C E R T C O N F I G U R AT I O N P O s s I B I L I T Y

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE New Buildings -General Plan

    DateEchelle: 1/333Preliminary Design-Green Houses

    424.40

    427.74

    431.40

    439.35

    425.40

    422.50

    418.36

    424.66424.16

    425.30

    424.30

    427.10

    431.88

    435.50 435.80

    439.35

    431.42 431.54431.40

    428.10427.65

    428.20

    425.45

    439.35

    445.50

    430.60431.30

    422.25

    421.50

    420.15419.80

    427.58

    432.50

    423.26

    428.52

    424.50

    421.50

    427.03

    424.40

    431.54

    427.17

    429.60

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Green Houses - General Section

    DateEchelle: 1/333Preliminary Design-Green Houses

    568

    1132

    564

    7611200

    1200

    761

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE GH CAFE PLAN

    DateEchelle: 1/150Preliminary Design-Green Houses

    1650

    1650

    682

    682

    693

    1132

    440

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE GH EXPO PLAN

    DateEchelle: 1/150Preliminary Design-Green Houses

    G R E E N H O U s E s

    GREEN HOUsEs sCHEMECONTExT PLANS AND SECTIONS

    N E W G A L L E R Y F A C A D E

    G R E E N H O U s E s A E R I A L V I E W

    G R E E N H O U s E s G E N E R A L F A C A D E

    N E W G A L L E R Y A E R I A L V I E W

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    439.35

    431.54

    435.80

    424.30

    427.10

    423.58

    427.20

    416.60

    428.65

    431.88

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE SECTION BB

    DateEchelle: 1/200Preliminary Design-New Gallery

    421.80

    425.06

    425.30

    418.80

    417.80

    419.20

    424.40

    427.74

    431.40

    424.43

    427.40

    424.60

    419.82

    425.90

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE SECTION CC

    DateEchelle: 1/200Preliminary Design-New Gallery

    425.30

    425.30424.80

    422.20421.36

    422.50

    421.36

    420.30422.50425.40

    425.30

    418.36

    417.12

    420.20

    425.30

    414.20

    417.12

    415.10

    419.20

    417.92419.32

    419.12

    419.82

    415.36

    417.44421.50

    420.18

    419.00421.08

    423.78

    417.80

    424.43423.50

    424.15

    416.90

    414.40 413.95

    422.15

    423.05

    413.40

    420.95

    421.85

    413.15

    420.45

    420.20

    420.15

    420.15

    427.17

    427.27

    427.17

    427.27

    425.30

    425.80421.80

    421.73

    423.10

    428.12

    429.60

    430.35

    428.06

    427.77

    427.82

    427.18425.30

    427.77428.67

    425.70

    423.90

    428.22

    430.40

    431.30431.10

    423.95 428.52

    428.42

    423.60

    428.70428.10

    429.60

    423.56

    427.67

    429.10

    427.50

    422.80

    428.65

    427.06

    420.20

    428.40

    426.21

    419.40

    426.80

    426.04

    418.80

    426.30

    424.90

    423.00

    426.26

    421.10

    418.76

    424.50

    417.80

    425.06

    424.66

    425.90

    423.10

    424.23

    424.22

    424.44

    425.30

    419.82420.02

    425.30

    423.93

    424.90

    424.60423.80

    423.73

    420.48

    421.08

    422.50

    420.32

    425.76430.90

    427.77

    428.27

    427.82

    427.32

    427.67

    430.90430.60

    422.45

    430.50

    424.45

    428.40430.40

    428.31431.30

    424.30

    423.80

    420.30

    427.57

    427.47

    422.50

    419.26

    414.60

    416.60

    424.76

    424.40

    423.31

    424.24

    425.20

    425.14

    425.30

    425.45

    425.45

    442.30

    424.14

    427.55

    427.30

    427.21426.40

    432.50

    427.70

    423.96

    423.60

    423.85

    423.45

    423.70

    422.95

    422.50

    422.15421.50

    420.65

    421.10

    421.45

    422.05

    428.82 427.70

    423.40

    423.50

    428.02

    428.22

    427.80

    426.96

    424.40

    428.21424.16

    426.19

    01

    02

    KELLER

    GROUNDFLOOR LEVEL 425.16

    419.82

    416.60

    KELLER

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Ground Floor - General Plan

    DateEchelle: 1/400Preliminary Design

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Level 01 - General Plan

    DateEchelle: 1/400Preliminary Design

    K E R N B U R G

    KERN BURGPLANS AND DETAILS

    1 s T F LO O R P L A N

    A - A C R O s s s E C T I O N

    B - B C R O s s s E C T I O N

    G R O U N D F LO O R P L A N

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    431.40

    431.42 431.54

    431.88

    431.40

    431.50

    431.40

    431.42 431.54

    431.88

    431.40

    431.50

    L02-R1 L02-R2L02-R3

    S 02

    01

    03

    02

    02 03

    03

    05

    06

    02 01

    04

    05 04

    02

    03 01

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Level 02 - General Plan

    DateEchelle: 1/400Preliminary Design

    435.85

    435.40

    439.35

    439.35

    439.35

    439.35435.80

    435.80

    435.50

    435.55

    L03-R1L03-R2 01

    03

    02

    03

    02

    01

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Level 03 - General Plan

    DateEchelle: 1/400Preliminary Design

    K E R N B U R G

    KERN BURGPLANS AND DETAILS

    2 N D F LO O R P L A N

    3 N D F LO O R P L A N

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    427.74

    431.40

    439.35

    425.40

    422.50

    418.36

    424.24 424.30

    439.35439.35

    445.50

    430.60431.30

    422.25

    421.50

    420.15419.80

    427.58

    432.50

    423.26

    428.52

    424.50

    421.50

    427.03

    424.40

    418.76

    421.10

    424.10

    419.82

    425.90

    427.27 427.17

    419.82

    416.60

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Tower,Tunnels,Bridges -General Scheme

    DateEchelle: 1/333Preliminary Design-Tower,Bridges and Tunnels-connections

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Kern Burg Connection with New Structure-Section

    DateEchelle: 1/333Preliminary Design-Tower,Bridges and Tunnels-connections

    New building entities

    Green houses

    Entrance Caf Exhibition spaces for

    sculptures

    The New Gallery

    Principal exhibition space with down views

    on the Donau- Concerts can take place in

    the gallery itself (should provide space for

    about 200pers.)

    The Old Castle

    Exhibition space Temporary exhibition

    (Essentially restoration, not necessarily

    open in winter)

    T O W E R , T U N N E L s A N D B R I D G E s

    TOWER,TUNNELs AND BRIDGEs sCHEME

    CONTExT PLAN AND SECTION

    T O W E R . T U N N E L s A N D B R I D G E s A E R I A L V I E W

    T O W E R . T U N N E L s A N D B R I D G E s G E N E R A L F A C A D EK E R N B U R G A N D N E W s T R U C T U R E C O N N E C T I O N

    K E R N B U R G A N D N E W s T R U C T U R E C O N N E C T I O N

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    GROUNDFLOOR

    1st LEVEL

    2nd LEVEL

    3nd LEVEL

    PA V I L L I O N

    PAVILLIONCONTExT PLANS AND SECTIONS

  • 0 1 / 0 2 / 1 3 8 3 4 M U S E E K L A U S R I N K E l i N Z

    The Tower

    GH 2 EXPO

    NEW BUILDINGS FOOTPRINT SURFACE

    The Pavillion

    TUNNEL 2

    TUNNEL 1

    The New Gallery

    TUNNEL 3

    vertical circulationstructure in CAFE

    BRIDGE N1BRIDGE N2BRIDGE N3

    TUNNEL N0BRIDGE N4

    GH1 CAFE

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Roof Plan - General Plan

    DateEchelle: 1/400Preliminary Design

    415.63

    417.80

    423.50

    416.90

    413

    417

    416

    415

    414

    413

    412

    404.20 405.65

    410.60

    414.80

    415.01

    418.80

    415.10

    415.30

    407.86

    407.02

    415.63

    417.20

    417.80

    419

    413.95

    414.40

    423.50

    422.23

    423.40

    423.90

    422.80

    421.73

    422.40

    413

    413.10 410.90

    420.30

    423.17424.30

    419.40

    415.05

    414.60

    415

    416.28

    410.40

    406.30407.60

    410.38

    406.86

    406.40

    407.00

    405.50404.35

    401.20

    420.48

    401.25

    400.80

    401.80

    401.34

    399.84

    413.25

    413.35

    416

    417

    418

    419

    420

    421

    422

    421.87

    416.60

    423

    411.90

    416.90413.40

    413.50

    408.60 400.40

    410.80

    411.80 410.20

    413.11

    412.60

    411.75

    413.80

    413

    412.15

    417.46

    405.90405.50

    414

    413

    410

    411

    412

    413

    414

    415

    414

    413

    412

    411

    410

    409

    408

    407

    417

    416

    415

    414

    413

    412

    411

    412

    411

    410

    409

    408

    407

    406

    405

    404

    403

    402

    401

    1

    419.82

    416.60

    KELLER

    01

    02

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Basement -2 - General Plan

    DateEchelle: 1/400Preliminary Design

    425.30

    425.30424.80

    422.20421.36

    422.50

    421.36

    420.30422.50425.40

    425.30

    418.36

    417.12

    420.20

    425.30

    414.20

    417.12

    415.10

    419.20

    417.92419.32

    419.12

    419.82

    415.36

    417.44421.50

    420.18

    419.00421.08

    423.78

    417.80

    424.43423.50

    424.15

    416.90

    414.40 413.95

    422.15

    423.05

    413.40

    420.95

    421.85

    413.15

    420.45

    420.20

    420.15

    420.15

    427.17

    427.27

    427.17

    427.27

    425.30

    425.80421.80

    421.73

    423.10

    428.12

    429.60

    430.35

    428.06

    427.77

    427.82

    427.18425.30

    427.77428.67

    425.70

    423.90

    428.22

    430.40

    431.30431.10

    423.95 428.52

    428.42

    423.60

    428.70428.10

    429.60

    423.56

    427.67

    429.10

    427.50

    422.80

    428.65

    427.06

    420.20

    428.40

    426.21

    419.40

    426.80

    426.04

    418.80

    426.30

    424.90

    423.00

    426.26

    421.10

    418.76

    424.50

    417.80

    425.06

    424.66

    425.90

    423.10

    424.23

    424.22

    424.44

    425.30

    419.82420.02

    425.30

    423.93

    424.90

    424.60423.80

    423.73

    420.48

    421.08

    422.50

    420.32

    425.76430.90

    427.77

    428.27

    427.82

    427.32

    427.67

    430.90430.60

    422.45

    430.50

    424.45

    428.40430.40

    428.31431.30

    424.30

    423.80

    420.30

    427.57

    427.47

    422.50

    419.26

    414.60

    416.60

    424.76

    424.40

    423.31

    424.24

    425.20

    425.14

    425.30

    425.45

    425.45

    442.30

    424.14

    427.55

    427.30

    427.21426.40

    432.50

    427.70

    423.96

    423.60

    423.85

    423.45

    423.70

    422.95

    422.50

    422.15421.50

    420.65

    421.10

    421.45

    422.05

    428.82 427.70

    423.40

    423.50

    428.02

    428.22

    427.80

    426.96

    424.40

    428.21424.16

    426.19

    01

    02

    KELLER

    GROUNDFLOOR LEVEL 425.16

    419.82

    416.60

    KELLER

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Ground Floor - General Plan

    DateEchelle: 1/400Preliminary Design

    427.80

    427.58

    427.40

    424.30

    428.70428.20

    427.74

    427.10

    428.10

    L01-R1 L01-R2 L01-R3L01-R4

    01

    03 02

    04

    01

    S1 03

    04

    05

    02

    03

    02

    07

    06 05

    01

    04

    01

    03

    02

    03 01

    02

    427.

    07

    427.

    07

    427.

    03

    424.

    47

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Level 01 - General Plan

    DateEchelle: 1/400Preliminary Design

    431.40

    431.42 431.54

    431.88

    431.40

    431.50

    431.40

    431.42 431.54

    431.88

    431.40

    431.50

    L02-R1 L02-R2L02-R3

    S 02

    01

    03

    02

    02 03

    03

    05

    06

    02 01

    04

    05 04

    02

    03 01

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Level 02 - General Plan

    DateEchelle: 1/400Preliminary Design

    435.85

    435.40

    439.35

    439.35

    439.35

    439.35435.80

    435.80

    435.50

    435.55

    L03-R1L03-R2 01

    03

    02

    03

    02

    01

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Level 03 - General Plan

    DateEchelle: 1/400Preliminary Design

    407.02

    415.63

    417.80

    423.50

    416.90

    413

    417

    416

    415

    414

    413

    412

    404.20 405.65

    410.60

    414.80

    415.01

    418.80

    415.10

    415.30

    407.86

    407.02

    415.63

    417.20

    417.80

    419

    413.95

    414.40

    423.50

    422.23

    423.40

    423.90

    422.80

    421.73

    422.40

    413

    413.10 410.90

    420.30

    423.17424.30

    419.40

    415.05

    414.60

    415

    416.28

    410.40

    406.30407.60

    411.84

    410.38

    406.86

    406.40

    407.00

    404.35

    401.20

    420.48

    401.25

    400.80

    401.80

    401.34

    399.84

    413.25

    413.35

    416

    417

    418

    419

    420

    421

    422

    421.87

    416.60

    423

    411.90

    416.90413.40

    413.50

    408.60 400.40

    410.80

    411.80 410.20

    413.11

    412.60

    411.75

    413.80

    413

    412.15

    417.46

    405.90405.50

    414

    413

    410

    411

    412

    413

    414

    415

    414

    413

    412

    411

    410

    409

    408

    417

    416

    415

    414

    413

    412

    411

    412

    411

    410

    409

    408

    407

    406

    405

    404

    403

    402

    401

    A

    1

    413.95

    414.40

    413

    413.10

    413.25

    413.35

    413.40

    413.50

    400.40

    410.80

    411.80 410.20

    413.11

    412.60

    411.75

    413.80

    412.15

    419.82

    416.60

    KELLER

    417.12

    417.82

    417.26

    Ateliers Jean Nouvel834 MUSEE KLAUS RINKE Basement -1 - General Plan

    DateEchelle: 1/400Preliminary Design

    1st LEVEL

    2nd LEVEL

    3nd LEVEL

    GROUNDFLOOR

    BASEMEMENT -1

    BASEMENT -2

    PA V I L L I O N

    PAVILLIONbuILDING PLANS AND SECTIONS

  • TA IC H U NG G AT E WAY I N -T E R N AT ION A L E CO PA R C

    TA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C

    PHILIPPE RAHM ARCHITECTESTA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C

  • TA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C I N T E R N AT ION A L COm PE T I T ION 1 s T PR I z E P R O J E C T B A C K G R O U N D E X P L A N AT I O N

  • TA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C I N T E R N AT ION A L COm PE T I T ION 1 s T PR I z E P R O J E C T B A C K G R O U N D E X P L A N AT I O N

  • TA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C I N T E R N AT ION A L COm PE T I T ION 1 s T PR I z E P R O J E C T B A C K G R O U N D E X P L A N AT I O N

  • TA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C I N T E R N AT ION A L COm PE T I T ION 1 s T PR I z E P R O J E C T B A C K G R O U N D E X P L A N AT I O N

  • TA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C I N T E R N AT ION A L COm PE T I T ION 1 s T PR I z E P R O J E C T P L A N S D R A W I N G S

  • TA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C I N T E R N AT ION A L COm PE T I T ION 1 s T PR I z E

    p v pa n e l s r o o f p r o j e c t

  • TA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C I N T E R N AT ION A L COm PE T I T ION 1 s T PR I z E P v PA N E L S R O O f P R O J E C T- D E N S I T Y S P R E A D I N T H E v E R T I C A L A N D H O R I Z O N TA L D I R E C T I O N

  • TA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C I N T E R N AT ION A L COm PE T I T ION 1 s T PR I z EP v PA N E L S R O O f P R O J E C T- D E N S I T Y S P R E A D I N T H E v E R T I C A L A N D H O R I Z O N TA L D I R E C T I O N

  • TA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C I N T E R N AT ION A L COm PE T I T ION 1 s T PR I z E P v PA N E L S R O O f P R O J E C T

    h o r m o n o r i u m p r o j e c tP L A N S A N D S E C T I O N S

  • TA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C I N T E R N AT ION A L COm PE T I T ION 1 s T PR I z E P L A N S

  • TA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C I N T E R N AT ION A L COm PE T I T ION 1 s T PR I z E P L A N S

  • TA IC H U NG G AT E WAY I N T E R N AT ION A L E CO PA R C I N T E R N AT ION A L COm PE T I T ION 1 s T PR I z E S E C T I O N S A N D D E TA I L S

  • DEWAN ARCHITECTS & ENGINEERS

    DEWAN ARCHITECTS & ENGINEERS

    OVER 28 YEARS OF COMMITMENT TO

    EXCELLENCE IN DESIGN AND THE BUILT ENVIRONMENT

    Leading the Evolution of Middle East's Booming Architectural and Engineering

    Design Sector for Almost Three Decades

  • VILLA MODERN STYLE COMPLETE CONCEPT DESIGN

    DUBAI / UAE

  • DEWAN AL AMARA / A.NYCZ-PROJECTS

    R E N D E R I N G - E X T E R I O R

  • DEWAN AL AMARA / A.NYCZ-PROJECTS

    v O l u m E S K E T C H E S

  • DEWAN AL AMARA / A.NYCZ-PROJECTS

    R E N D E R I N G I N T E R I O R - S TA I R C A S E W I T H S K Y l I G H T

  • DEWAN AL AMARA / A.NYCZ-PROJECTS

    R E N D E R I N G I N T E R I O R - S TA I R C A S E W I T H S K Y l I G H T

  • DEWAN AL AMARA / A.NYCZ-PROJECTS

    S I T E P l A N

  • DEWAN AL AMARA / A.NYCZ-PROJECTS

    G R O u N D f lO O R A N D 1 S T f lO O R P l A N

  • DEWAN AL AMARA / A.NYCZ-PROJECTS

    G R O u N D f lO O R A N D 1 S T f lO O R P l A N W I T H D I m E N S I O N S

  • VILLA LOCAL STYLEMODEL AND

    RENDERINGSDUBAI

  • DEWAN AL AMARA / A.NYCZ-PROJECTS

    R E N D E R I N G

  • rendering And AnALYSeSLink internAtionAL tower CoM-

    PetitionABU-DHABI/UAE

  • DEWAN AL AMARA / A.NYCZ-PROJECTS

    rendering-Link internAtionAL tower - Abu dhAbi

  • DEWAN AL AMARA / A.NYCZ-PROJECTS

    AnALYSiS-Link internAtionAL tower - Abu dhAbi

    Link International TowerAbu Dhabi, UAE

    01

    VIEW ANALYSE

    SITE ANALYSIS AND NEW VOLUME

    SITE ANALYSIS AND NEW VOLUME

    VERTICAL LOUVERS AND SHADOW SCHEME DEVELOPMENT ODF THE IDEA AND SKETCHES

    BUILDING LOCATION ON THE ABU DHABI MAP

  • hiLton hoteLDUBAI/UAE

  • SHOWROOM/DUBAI

  • CONCEPT 3a

  • CONCEPT 3b

  • VILLA PROJECT AL BARSHA/DUBAI

  • WEST ZONE MALL /DUBAI

  • FREELANCE WORKS

  • VILLA PROJECT-COLLABORATION WITH ARCHITECTURE OFFICE/DUBAI

  • VILLA PROJECT-COLLABORATION WITH INTERIOR DESIGN OFFICE

  • GR

    OU

    ND

    FLO

    OR

    PLA

    N 4

    20M

    SQ

  • FIR

    ST F

    LOO

    R P

    LAN

    480

    MSQ

  • RESTAURANT CONCEPT/FUJARAH

  • concept designRestAURAnt concept-FUJAiRAH/UAe

    c o n c e p t

  • concept designRestAURAnt concept-FUJAiRAH/UAe

    c o n c e p t

  • ABSHERON OFFICE DIFC/DUBAI

  • NAKHEEL MALL AL HOKAIR OFFICE/DUBAI

  • CAFE INTERIOR DESIGN/DUBAI

  • FLOOR-PLAN

    CAFE SPACE...

    OPEN,CUSTOMER FRIENDLY ZONE DEFINIED BY MODERN, SMART AND TRANSFORMABLEFURNISHING SYSTEM OF BOXES,NATURALHIGH QUALITY FINISHINGMATERIALS,STRUCTURAL AND SUSPENDED LAMPS SYSTEM BUILDING INDUSTRIAL CLIMATEAS A COFFEE LAB-FACTORY...

    BAR"Rolling blocs" cascade, open bar concept as an exposition in the cafe space

    MAIN COUNTER-on the counter:cashier place,1big coffee mashine,2 coffee roasters,double knock-box,1big coffee mashine,double sink,3grinders,2blenders,2milkshakes-under the counter:bar fridge,ice-maker,dishwasher for glasses,double layer pizza oven,-over the counter and cashier place:suspended box with menu cards on the hangers

    SECONDARY COUNTER(custom self service):1coffee mashines,1grinder

    GLASS VITRINEmain facade of the local- no framed glass with the logo

    DISPLAYING WALL-brick wall with cascade of wooden shelves for displaying products-black board with menu

    MAIN ENTRANCEno framed glass door with the logo on it

    FLOORindustrial, concrete plate with the cafe's signage/R=1mCEILINGcomposition of metal structure (lamps as metal frames/3D triangles-1.2/1.2/1.2m with lighteningelements)

    TABLES

    Using the smart,modular system of "Rolling blocs"- different and transformableconfiguration of boxes can create regular lower tables and higher bar desks giving the free and elastic zone

    SIGNAGE/LOGO

    BAR TABLE ON THE DOOR

    PLACE FORCOFFEE ROASTERProbatone

    COFFE BEANSDISPLAY

    COFFE BEANSDISPLAY

    CAKE DISPLAYFRIDGE

    PLACE FORCOFFEE ROASTERProbatone

    PLACE FOR COFFEE ROASTERProbatone

    FLOOR PLAN

  • SECTION1

    SECTION 1

    SECTION 2

  • SECTION2

    SECTION 2

  • ANOTHER CONCEPT

  • MICRO RESTAURANT CONCEPT-MADINAT JUMEIRAH/DUBAI

  • ROYAL FAMILY PALACE COURTYARDS CONCEPTS/DUBAI

  • FALCONERY FESTIVAL TENT SOLUTION FOR EVENT COMPANY/DUBAI

  • FALCONERY FESTIVAL TENT SOLUTION/DUBAI

  • FURNITURE SHOWROOM-INTERIOR DESIGN CONCEPT/POLAND

  • BRANDING DESIGN

  • PERSONAL BUSINESS CARDS DESIGN

  • NFC MEDIC BRANDING DESIGN /DUBAI

  • LOGO DESIGNS

  • GULF JOINERY BRANDING DESIGN CONCEPT/DUBAI

  • PERSONAL BUSINESS CARDS DESIGN

  • PERSONAL BUSINESS CARDS DESIGN

  • PERSONAL BUSINESS CARDS DESIGN

  • PERSONAL BUSINESS CARDS DESIGN

  • Obraz.pdfObraz0001 (2).pdfObraz0003.pdf