air presentation at silicon south west

Upload: david-tester

Post on 10-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 Air presentation at Silicon South West

    1/22

    In Need of AirLessons from Air Semiconductor, 2005 to 2010

    David TesterFounder, Air

  • 8/8/2019 Air presentation at Silicon South West

    2/22

    Air Founder Blog In Need of Air: http://blog.ex -air.co.uk/Air Website: http://www.ex-air.co.uk/air_website/index.html

    Air History: http://www.crunchbase.com/company/air-semiconductor/

    Email: [email protected] Tel: +44 7958 052933

    In Need of AirLessons from Air Semiconductor, 2005 to 2010

    Ten Lessons from Air(with more lessons Im happy to share privately)

    Lesson #1 Figure out the Big Vision and then just get started!#2 Include additional launch market in the go -to-market strategy#3 Take the time to build a strong team quality people are essential#4 Get an early adopter architecture license customer

    #5 Just accept it will take 4 years to create initial (system level) product#6 Spend every $1 as if its the last $1 and get used to that experience#7 Be sure some early customers can be referenced by investors#8 Stealth Mode is a myth your investor pitch will go to competitors#9 Your founder peers will share their experiences with you, so just ask#10 You will quickly get used to the start-up fear, uncertainty and chaos!

  • 8/8/2019 Air presentation at Silicon South West

    3/22

    Sell Tescos car park to Sainsburys

    1 _.@ DEF 3

    Special offers at

    Sainsburys today!

    Press # for directions

    Car park

    Location targeted advertising is only possible withAlways -ON positioning in mobile phones

  • 8/8/2019 Air presentation at Silicon South West

    4/22

    Minimum standbycurrent:

    2.1 mA

    Average current*:

    7.3 mA

    Nokia 6233

    Minimum standbycurrent:

    2.4 mA

    Average current*:

    7.8 mA

    Motorola RAZR V3i

    Minimum standbycurrent:

    3.6 mA

    Average current*:

    8.3 mA

    Samsung E900

    Minimum standbycurrent:

    2.6 mA

    Average current*:

    9.4 mA

    SEMC K610im

    Minimum standbycurrent:

    4.0 mA

    Average current*:

    8.3 mA

    LG KG800 Chocolate

    Minimum standbycurrent:

    3.1 mA

    Average current*:

    9.9 mA

    BenQ-Siemens SL91

    * Current draw based on average use assuming battery recharge once every 4 days

    Always-ON GPSThe Key to Proactive Location Based Services

    How often does phone battery needs to be recharged if GPS active?GPS must be limited to 1-2mA (or 10% of phone power)

    Consumers need almost-instant response; push-to-fix delay of 1 secondMust maintain awareness of location since GPS does not work indoors !

  • 8/8/2019 Air presentation at Silicon South West

    5/22

  • 8/8/2019 Air presentation at Silicon South West

    6/22

    Initial Market: Digital Camera Market and Geotagging

    9 M22 M

    38 M62 M

    146 M 150 M155 M 160 M

    164 M

    2008 2009 2010 2011 2012

    GPS enabled DSC's DSC shipments

    GPS modules developed by DSC partners

  • 8/8/2019 Air presentation at Silicon South West

    7/22

    GPS 101Receive Power is -130dBm to - 160dBm 20dB to 50dB below the Thermal Noise Floor!

    Regional geo-stationary augmentation satellites

    WAAS Wide Area Augmentation System USA

    EGNOS European Geostationary Navigation Overlay

    System Europe

    Earth radius6,378 km

    1 9 , 1 0 0

    k m

    2 0 , 2 0 0 k m

    23,222 km

    Galileo

    GPS Orbit 11 hours 58 minutes13,900 km/h

    GLONASS

    Moon

    Approx. 400,000 km

    3 5 , 7 8 6 k m

    Geo-stationary

    GPS 6 orbital planes; 55to equator

    Galileo 3 orbital planes; 56to equator

    GLONASS 3 orbital planes; 65to equator

  • 8/8/2019 Air presentation at Silicon South West

    8/22

    Hugh ThomasCEO

    Steve GrahamCo-Founder & VP Marketing

    Staff

    Employee #1 (20 years experience)Employee #2 (20 years experience)

    ContractContract #1 (15 years experience)Contract #2 (15 years experience)

    Staff

    Employee #3 (20 years experience)Employee #1 (20 years experience)

    Staff

    Employee #4 (10 years experience)Employee #5 (15 years experience)Employee #6 (15 years experience)

    ContractContract #3 (20 years experience)Contract #4 (20 years experience)Contract #5 (20 years experience)2x Synopsys IC layout contractors

    Staff

    Employee #7 (20 years experience)Employee #8 (15 years experience)

    ContractContract #8 (20 years experience)Contract #9 (15 years experience)

    RFIC Design System Design ASIC Design Software Design

    ex-CEO Andromedia (acquired Macromedia 99)ex-CEO Frictionless Commerce (acquired S AP 06)

    Hank IzumiVP Sales Asia

    ex-CEO PortalPlayer (NASDAQ: PLAY)ex-CEO S3 (NASDAQ: SIII)

    Kent Godfrey

    Michael Gera

    David Tester

    Board of Directors

    Gary JohnsonPond Ventures

    Independent

    Pond Ventures

    ex-CEO TapRootHugh ThomasSupport Staff

    1x General Admin1x Finance ManagerCTO

    CEO

    Andy HeatonVP Operations

    David TesterFounder & CTO

    The Air Team

  • 8/8/2019 Air presentation at Silicon South West

    9/22

    Initial Idea (in 2005) to Prototype Silicon (in 2009)

    Red Herring 100 Europe 2008April 08

    $1.75M Series-A TermsheetApril 06

    Prof Izzet Kale joins Technical Advisory BoardOctober 08

    Demonstrate GPS technologyJuly 08

    Recruit external CEOMay 08

    Exit stealth modeAnnounce 1 st productJanuary 08

    Gary Johnson joins Board of Directors2x NASDAQ CEO (PortalPlayer & S3)May 07

    A1225 RFIC (v1)April 07

    A1250 single die GPS receiverJanuary 09

    A1225 RFIC (v2)February 08

    J F M A M J J A S O N D

    J F M A M J J A S O N D

    J F M A M J J A S O N D

    J F M A M J J A S O N D

    2006 2007J F M A M J J A S O N D

    J F M A M J J A S O N D

    J F M A M J J A S O N D

    J F M A M J J A S O N D

    2008 2009

    Air Inc + Ltd incorporatedMay 06

    Development starts!June 06

    Engage with TSMC for siliconSept 06

    IET Start-Up of the Year 2008November '08

    Electra Start-Up of the Year 2008November 08

    RFIC + FGPA platformMay 08

    Air tracks GPS satellites with RFICMarch 08

    Air tracks GPS satellites with RFIC + FPGAJune 08

    Tracking DSPArchitecture

    Acquisition DSPArchitecture

    Air first PVT, confirms lab in SwindonJune 08

    Acquisition DSPImplementation

    Tracking DSPArchitecture

    Tracking DSPImplementation

    J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

    Radio ICImplementation

    PVT &Kalman Filter

    Tracking DSP

    Implementation

    Radio ICImplementation

    A1250IC design

    Dual-Mode GPSsystem design

    Dual-Mode GPSsoftware design

    A1250 silicon evaluation

    SPECIFICATIONCOMPLIANT

    GPS RECEIVER

    Sell Air Patent Portfolio to u-bloxFebruary 10

    J F

    J F

    J F

    First VC MeetingFebruary 06

    $1.25M Series-A1 TermsheetSeptember 06

    $3.8M Series-A2 TermsheetNovember 07

    $1M Bridge FinanceSeptember 08

    $1M Bridge FinanceFebruary 09

    $1M Bridge FinanceJune 09

  • 8/8/2019 Air presentation at Silicon South West

    10/22

    air wave 1 system development platformand prototype sample silicon module

  • 8/8/2019 Air presentation at Silicon South West

    11/22

    Air Technical Demonstration Platform in Japan

  • 8/8/2019 Air presentation at Silicon South West

    12/22

  • 8/8/2019 Air presentation at Silicon South West

    13/22

    GPS with air wave 1 silicon

  • 8/8/2019 Air presentation at Silicon South West

    14/22

    Prototype Product Performance

    Plot shows 20m (x axis) by 20m (z axis)Positions grouped into 20cm x 20cm binsStationary receiver over 12 hour period

    Push-to-Fix TTF @ -130dBm: 2.5sPush-to-Fix TTF @ -150dBm: 2.5s(Future push-to-fix TTF could be

  • 8/8/2019 Air presentation at Silicon South West

    15/22

  • 8/8/2019 Air presentation at Silicon South West

    16/22

    Air Prototype SOC GPS Receiver PerformanceLowest Power, Lowest Die Area GPS Radio (2.1mm 2 10.7mW)

  • 8/8/2019 Air presentation at Silicon South West

    17/22

    $0

    $1

    $2

    $3

    $4

    $5

    $6

    $7

    $8

    $9

    $10

    $11

    $0

    $50

    $100

    $150

    $200

    $250

    $300

    $350

    $400

    $450

    $500

    $550

    $600

    J u n

    J u

    l

    A u g

    S e p

    O c

    t

    N o v

    D e c

    J a n

    F e

    b M a r

    A p r

    M a y

    J u n

    J u

    l

    A u g

    S e p

    O c

    t

    N o v

    D e c

    J a n

    F e

    b M a r

    A p r

    M a y

    J u n

    J u

    l

    A u g

    S e p

    O c

    t

    N o v

    D e c

    J a n

    F e

    b M a r

    A p r

    M a y

    J u n

    J u

    l

    A u g

    S e p

    Monthly Burn $K Total Burn $M

    Air Operating Costs - 2005 to 2010

    M o n

    t h l y B u r n

    ( $ K )

    T o

    t a l B u r n

    ( $ M )

    2006 20082007 2009

  • 8/8/2019 Air presentation at Silicon South West

    18/22

    Proactive

    VC Introductions

    Unsolicited enquiries

    Customer Status: 174 Active Customer LeadsMarkets:Camera, Cellphone, Laptop PC, Netbook, Digital Watch, Asset Tracking

    37 active leads generated proactively by AirIncluding: Ability; Apple; Canon; Casio; DoCoMo; Foxconn; Fujifilm; LG; NEC; Nikon;Nokia; Olympus; Panasonic; Pentax; Ricoh; Samsung Electronics; Samsung Techwin;Sanyo Digital Imaging; Sony Ericsson; Softbank; Sony

    20 active leads from VC introductionsIncluding: Google; Motorola; O2; Spreadtrum; Swatch; Vodafone

    117 unsolicited enquiries resulting from PR activityIncluding: Mediatek; Microsoft; RIM; Altek; Fujitsu; Hitachi; HTC; Mitac; Compal

  • 8/8/2019 Air presentation at Silicon South West

    19/22

    CSR / SiRF follow Air Semiconductor Always -ON

  • 8/8/2019 Air presentation at Silicon South West

    20/22

  • 8/8/2019 Air presentation at Silicon South West

    21/22

    Air Founder Blog In Need of Air: http://blog.ex -air.co.uk/Air Website: http://www.ex-air.co.uk/air_website/index.html

    Air History: http://www.crunchbase.com/company/air-semiconductor/

    Email: [email protected] Tel: +44 7958 052933

    In Need of AirLessons from Air Semiconductor, 2005 to 2010

    Ten Lessons from Air(with more lessons Im happy to share privately)

    Lesson #1 Figure out the Big Vision and then just get started!#2 Include additional launch market in the go -to-market strategy#3 Take the time to build a strong team quality people are essential#4 Get an early adopter architecture license customer

    #5 Just accept it will take 4 years to create initial (system level) product#6 Spend every $1 as if its the last $1 and get used to that experience#7 Be sure some early customers can be referenced by investors#8 Stealth Mode is a myth your investor pitch will go to competitors#9 Your founder peers will share their experiences with you, so just ask#10 You will quickly get used to the start-up fear, uncertainty and chaos!

  • 8/8/2019 Air presentation at Silicon South West

    22/22