allens parade street - waverley council€¦ · concept only p:\p3792 waverley 40km per hour zone 1...
TRANSCRIPT
N
o. 35
N
o. 33
N
o. 37
N
o. 39
N
o. 41
N
o. 43
N
o. 45
N
o. 47
B
otany
S
treet
25km/h
25km/h
A
llens
P
arade
Plain Concrete Ramps and WingsLight Colour or White SurfaceTreatment
'Terracotta' Colour SurfaceTreatment or Similar
Maintain Existing Parkingand No Stopping Zone
100mm Concrete FlatTop Road Hump
N
o. 31
N
o. 29
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 1)
BOTANY STREET & ALLENS PARADEBONDI JUNCTION
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
1
12.09.2019
CONCEPT DESIGN002 K.W 22.10.2019
25km/h
N
o. 14
N
o. 12
N
o. 10
N
o. 6
N
o. 15-19
N
o. 7
B
otany
S
treet
Lla
ndaff S
treet
25km/h Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
'Terracotta' Colour SurfaceTreatment or Similar
100mm ConcreteFlat Top Road Hump
Maintain ExistingKerbside Parking and
No Stopping
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 2)
BOTANY STREET & LLANDAFF STREETBONDI JUNCTION
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
2
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 8
8
No. 8
6
No. 8
4
No. 9
0
No. 9
2
No. 9
4
No. 9
6
No. 9
8
No. 9
9
No. 9
7
No. 9
1
No. 8
9
No. 8
7
No. 8
5
R
uthven
Street
25km/h
25km/h
Maintain ExistingKerbside Parking
'Terracotta' Colour SurfaceTreatment or Similar
Plain Concrete Ramps and WingsLight Colour or White SurfaceTreatment
Maintain ExistingKerbside Parking
100mm Concrete FlatTop Road Hump
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 11)
RUTHVEN STREET (No. 90)QUEENS PARK
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
3
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 4
7
No. 4
9
No. 5
1
No. 5
3
No. 5
0
No. 4
8
No. 4
6
No. 4
4
No. 4
2
Bourke
Street
B
ourke Lane
25km/h
25km/h
Maintain ExistingKerbside Parking
and Cycle Lane
'Terracotta' Colour SurfaceTreatment or Similar
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
Maintain ExistingKerbside Parkingand Cycle Lane
75mm Concrete FlatTop Road Hump
Maintain ExistingNo Stopping
No. 5
5
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 15)
BOURKE STREET & BOURKE LANEQUEENS PARK
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
4
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 1
7
No. 1
2
No. 1
0
No. 8
No. 6
No. 1
4
No. 1
9
No. 1
5
No. 1
3
No. 1
1
No. 9
No. 7
No. 2
1
B
ourke
S
treet
25km/h
25km/h75mm Concrete Flat
Top Road Hump
Maintain Existing KerbsideParking and Cycle Lane
Maintain Existing KerbsideParking and Cycle Lane
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
'Terracotta' Colour SurfaceTreatment or Similar
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 16)
BOURKE STREET (No. 10)QUEENS PARK
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
5
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 7
6
No. 7
4
Queens P
ark
No. 7
8
Q
ueens
Park
Road
Bourke S
treet
KEEP
LEFT
KEEPLEFT
Maintain DrivewayAccesses
Re-align Cycle LaneGreen Surface Treatment
Tie in With ExistingCycle Lane
Re-Align Cycle LaneGreen Surface Treatment
New ConcretePedestrian Refuge
Retain ExistingKerb Ramps
Remove Approximately TwoParking Spaces
Tie-in with ExistingCycle Lane
Concrete KerbBlisters
Tie-in with ExistingCycle Lane
Remove TwoParking Spaces
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNPEDESTRIAN REFUGE (SITE 21)
QUEENS PARK ROAD & BOURKE STREETQUEENS PARK
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
6
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 16
No. 18
No. 20
No. 22
No. 24
No. 14
No. 12
No. 26
No. 1
3
No. 1
1
No. 9
No. 5
No. 2
3
25
km/
h
25
km/
h
Vic
toria
Str
eet
Edm
und S
treet
Plain Concrete Ramps and WingsLight Colour or White SurfaceTreatment
100mm Concrete FlatTop Road Hump
Maintain Existing KerbsideParking and Cycle Lane
Maintain Existing KerbsideParking and Cycle Lane
'Terracotta' Colour SurfaceTreatment or Similar
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 22)
VICTORIA STREET & EDMUND STREETQUEENS PARK
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
7
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 47 &
49
No. 51
York
Road
25km/h
25km/h
Maintain ExistingKerbside Parking
'Terracotta' Colour SurfaceTreatment or Similar
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
Maintain ExistingKerbside Parking
100mm Concrete FlatTop Road Hump
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 25)
YORK ROAD (No. 47 & 49)QUEENS PARK
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
8
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 3
4
No. 3
6
No. 3
3
No. 2
9
B
ennett
S
treet
25km/h
25km/h
Maintain ExistingKerbside Parking
75mm Concrete FlatTop Road Hump
Plain Concrete Ramps and Wings LightColour or White Surface Treatment
'Terracotta' Colour SurfaceTreatment or Similar
Maintain ExistingKerbside Parking
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 27)
BENNETT STREET (No. 34)BONDI
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
9
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 2
3
No. 2
1
No. 1
7
No. 1
9
No. 2
2
No. 2
0
No. 1
8
No. 1
6
No. 1
2
No. 2
4D
udley
Street
25km/h
25km/h
Maintain ExistingKerbside Parking
Maintain ExistingKerbside Parking
Maintain Driveway Access
'Terracotta' Colour SurfaceTreatment or Similar
Maintain Driveway Access
No. 2
6
No. 2
5
75mm Concrete FlatTop Road Hump
Plain Concrete Ramps and Wings LightColour or White Surface Treatment
No. 1
4
No. 2
7
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 30)
DUDLEY STREET (No. 21)TAMARAMA
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 G.Y
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y G.Y T.W0 2 41:200
6 8 10Scale @ A3
10
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 2
90
No. 2
88
No. 2
92
No. 2
94
B
irrell
S
treet
O
cean S
treet
150mmSemi-mountable
Median Island
Maintain ExistingKerbside Parkingand No Stopping
Re-alignedKerb Ramp
Maintain ExistingKerbside Parkingand No Stopping
Opening forPedestrian Access
KEEPLEFT
KEEPLEFT
Existing Kerb Ramp
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNPEDESTRIAN REFUGE (SITE 32)
OCEAN STREET & BIRRELL STREETBONDI
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 G.Y
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y G.Y T.W0 2 41:200
6 8 10Scale @ A3
11
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 9
4
No. 9
6
No. 9
8
No. 9
2
No. 9
0
No. 8
9
No. 9
1
No. 9
3
No. 9
5
O
cean
Street
25km/h
25km/h
Maintain ExistingKerbside Parking
Maintain ExistingKerbside Parking
100mm Concrete FlatTop Road Hump
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
'Terracotta' Colour SurfaceTreatment or Similar
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 33)
OCEAN STREET (No. 94)BONDI
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
12
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 2
62-2
64
N
o. 264A
Waverle
y P
ark
P
ark
P
arade
Birrell
Str
eet
100mm Raised ConcreteFlat Top Road Hump
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
Two Parking SpacesRemoved
25km/h
25km/h
Concrete Kerb Blisters
'Terracotta' Colour SurfaceTreatment or Similar
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNRAISED ENTRY THRESHOLD (SITE 35)
PARK PARADE & BIRRELL STREETBONDI
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y G.Y S.B0 2 41:200
6 8 10Scale @ A3
13
12.09.2019
CONCEPT DESIGN002 G.YCONCEPT DESIGN002 22.10.2019
No. 2
2
No. 2
1
No. 2
0
No. 1
9
No. 1
8
No. 1
7
Waverle
y P
ark
P
ark
P
arade
25km/h
25km/h
100mm Raised Concrete FlatTop Road Hump
Plain Concrete Ramps and Wings LightColour or White Surface Treatment
Maintain ExistingKerbside Parking
Timber Log Barrieror Similar
'Terracotta' Colour SurfaceTreatment or Similar
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 36)
PARK PARADE (No. 19)BONDI
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
14
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 6
No. 1
0
No. 1
2
No. 1
4
No. 1
3
No. 9
No. 7
No. 1
1
25km/h
25km/h
S
andridge
S
treet
Maintain Existing KerbsideParking
Maintain ExistingKerbside Parking
'Terracotta' Colour SurfaceTreatment or Similar
Maintain Driveway Access
75mm Concrete Flat Top Road Hump
Plain Concrete Ramps and Wings LightColour or White Surface Treatment
W
ilga
Str
eet
KEEPLEFT
KEEPLEFT
Concrete Median Island
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 38)
SANDRIDGE STREET & WILGA STREETBONDI
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y G.Y S.B0 2 41:200
6 8 10Scale @ A3
15
12.09.2019
002 CONCEPT DESIGN G.YCONCEPT DESIGN002 22.10.2019
No. 7
3
No. 7
1
No. 6
9
No. 6
7
No. 6
5
No. 6
3
No. 5
0
No. 5
2
No. 5
4
No. 5
6
No. 5
8
No. 6
0
No. 6
2
W
atson
Street
25km/h
25km/h
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
'Terracotta' Colour SurfaceTreatment or Similar
Maintain ExistingKerbside Parking
75mm Concrete FlatTop Road Hump
Maintain ExistingKerbside Parking
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 39)
WATSON STREET (No. 67)BONDI
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
16
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 1
6
No. 1
4
No. 1
8
No. 2
0
No. 2
2
No. 9
No. 7
No. 5
No. 3
B
row
n
S
treet
25km/h
25km/h
100mm Concrete FlatTop Road Hump Maintain Driveway Access
Maintain ExistingKerbside Parking
'Terracotta' Colour SurfaceTreatment or Similar
Maintain ExistingKerbside Parking
Maintain Driveway Access
Maintain Driveway AccessMaintain Driveway Access
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 41)
BROWN STREET (No. 18)BRONTE
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
17
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 2
09
No. 2
11
No. 2
07
No. 2
05
Birrell
Street
D
ickson S
treet
25km/h
25km/h
100mm ConcreteFlat Top Road Hump
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
'Terracotta' Colour SurfaceTreatment or Similar
Maintain Existing No StoppingMaintain ExistingNo Stopping
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNRAISED ENTRY THRESHOLD (SITE 42)DICKSON STREET & BIRRELL STREET
BRONTE
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
18
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
N
o
. 1
0
N
o
. 1
2
No. 1
1
No. 9
No. 7
No. 5
No. 3
N
o
. 8
D
ickson
S
treet
25km/h
25km/h
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
Maintain ExistingKerbside Parking
100mm Concrete FlatTop Road Hump
'Terracotta' Colour SurfaceTreatment or Similar
Maintain ExistingKerbside Parking
N
o
. 1
4
N
o
. 1
6
R
ead
S
treet
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 43)
DICKSON STREET & READ STREETBRONTE
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
19
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 4
7
No. 4
5
No. 4
3
No. 4
1
No. 4
9
No. 5
1
No. 6
8
No. 6
6
No. 6
4
No. 6
2
No. 6
0
No. 5
8
No. 7
0
25
km/
h
25
km/
h
H
ew
lett
Street
Maintain ExistingKerbside Parking
75mm Concrete FlatTop Road Hump
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
Maintain ExistingKerbside Parking
'Terracotta' Colour SurfaceTreatment or Similar
Maintain DrivewayAccesses
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
28
CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 47)
HEWLETT STREET (No. 60)BRONTE
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 3
7
No. 3
5
No. 3
3
No. 3
1
No. 3
4
No. 3
6
No. 3
8
No. 2
37
Langlee
A
venue
25km/h
25km/h
'Terracotta' Colour SurfaceTreatment or Similar
100mm Concrete FlatTop Road Hump
Maintain ExistingKerbside Parking
Maintain ExistingKerbside Parking
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
Maintain Driveway Accesses
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
29
CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 49)
LANGLEE AVENUE (No. 35)WAVERLEY
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
25
km/
h
25km/h
M
u
r
r
a
y
S
tr
e
e
t
N
o
. 2
3
N
o
. 2
5
N
o
. 2
7
N
o
. 2
7
A
N
o
. 2
9
N
o
. 2
0
N
o
. 2
6
N
o
. 1
6
75mm ConcreteFlat Top Road
Hump
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
Maintain DrivewayAccess
Maintain Kerbside Parking
Existing Kerb Blisters
Maintain KerbsideParking
'Terracotta' ColourSurface Treatmentor Similar
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
30
CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 50)
MURRAY STREET (No. 26)BRONTE
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
25km/h
25
km/h
M
u
r
r
a
y
N
o
. 3
0
N
o
. 2
6
N
o
. 3
5
A
N
o
. 3
7
N
o
. 3
9
N
o
. 2
8
N
o
. 3
9
S
tr
e
e
t
75mm Concrete FlatTop Road Hump
MaintainKerbsideParking
Maintain DrivewayAccesses
Plain Concrete Ramps and WingsLight Colour or White SurfaceTreatment
Maintain KerbsideParking
MaintainDrivewayAccesses
Existing Kerb Blisters
'Terracotta' ColourSurface Treatment or
Similar
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
31
CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 51)
MURRAY STREET (No. 30)BRONTE
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
25
km/h
25km
/h
T
a
m
a
r
a
m
a
M
a
r
i
n
e
D
r
i
v
e
Maintain Existing No Stopping
Maintain Existing No Stopping
Existing Light Pole
75mm Concrete Flat TopRoad Hump
'Terracotta' Colour SurfaceTreatment or Similar
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
No. 1
9
No. 2
5
No. 2
3
No. 2
1
Tam
aram
a B
each
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
32
CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 53)
TAMARAMA MARINE DRIVE (SOUTH OF BEACH)TAMARAMA
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
25
km/
h
Vic
toria
Str
eet
Maintain ExistingKerbside Parking
100mm Concrete FlatTop Road Hump
Plain Concrete Ramps and WingsLight Colour or White SurfaceTreatment
No. 46N
o. 42
No. 44
No. 50
No. 52
No. 48
No. 54
No. 56
No. 45
MaintainExisting
KerbsideParking
and CycleLane
'Terracotta' Colour SurfaceTreatment or Similar
Maintain Driveway Accesses
25
km/
h
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
33
CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 54)
VICTORIA STREET (No. 44)WAVERLEY
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
N
o
. 4
6
0
N
o
. 4
6
2
N
o
. 4
5
8
N
o
. 4
5
6
N
o
. 4
5
4
N
o
. 4
5
2
N
o
. 4
5
0
N
o
. 4
6
4
B
r
o
n
te
R
o
a
d
25
km/h
25km/h
N
o
. 3
8
7
N
o
. 3
8
9
N
o
. 3
9
1
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
Maintain ExistingKerbside Parking
'Terracotta' Colour SurfaceTreatment or Similar
100mm Concrete FlatTop Road Hump
Maintain DrivewayAccesses
Maintain ExistingKerbside Parking
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
34
CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 58)
BRONTE ROAD (No. 458)BRONTE
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
N
o
.
4
9
8
N
o
.
4
9
6
N
o
.
4
9
4
N
o
.
4
9
2
N
o
.
4
3
5
N
o
.
4
3
3
B
r
o
n
t
e
R
o
a
d
25km
/h
25km/h
100mm Concrete FlatTop Road Hump
N
o
.
4
9
0
N
o
.
4
8
8
N
o
.
4
3
1
N
o
.
4
2
9
'Terracotta' Colour SurfaceTreatment or Similar
Maintain ExistingKerbside Parking
Maintain ExistingKerbside Parking
Plain ConcreteRamps and WingsLight Colour or WhiteSurface Treatment
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
35
CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 59)
BRONTE ROAD (No. 492)BRONTE
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 3
2
No. 3
4
No. 3
6
No. 2
7
No. 2
5
No. 2
3
No. 1
9
E
vans
S
treet
Brae S
treet
25km/h
25km/h
100mm Concrete FlatTop Road Hump
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
Maintain ExistingKerbside Parking
'Terracotta' Colour SurfaceTreatment or Similar
MaintainDrivewayAccesses
Maintain ExistingKerbside Parking
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
36
CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 61)EVANS STREET & BRAE STREET
BRONTE
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 1
No.1
4
No.1
6
No. 5
No. 7
No.3
No. 4
Lugar
S
treet
B
rae S
treet
25km/h
Maintain ExistingKerbside Parking
100mm Concrete FlatTop Road Hump
Plain Concrete Ramps and WingsLight Colour or White Surface Treatment
Maintain ExistingKerbside Parking
New Signpost
'Terracotta' Colour SurfaceTreatment or Similar
Maintain DrivewayAccessess
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
37
CONCEPT DESIGNFLAT TOP ROAD HUMP (SITE 63)LUGAR STREET & BRAE STREET
BRONTE
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 1
42
No. 1
38
N
o. 136
N
o. 134
N
o. 132
N
o. 130
No. 3
1
No. 143
No. 141
No. 139
No. 3
4
No. 3
6
No. 3
2
M
acpherson
Street
25
km/
h
25
km/
h
ExistingPedestrianCrossingLocation
Retain Existing Kerb Blistersand Traffic Islands
75mm Concrete RaisedPedestrian Crossing
Retain Existing BusStop and Cycle Lane
Retain Existing KerbRamps
S
t T
hom
as
S
treet
Paint Bike SymbolBefore the Ramp
25
km/
h
25
km/
h
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
38
CONCEPT DESIGNRAISED PEDESTRIAN CROSSING (SITE 65)
MACPHERSON STREET & ST THOMAS STREETBRONTE
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
N
o. 499
N
o. 2-14
No. 502
No. 504A
P
acific
S
treet
B
r
o
n
t
e
R
o
a
d
New KerbBlisterNew Concrete
Median Splitter Island
Maintain ExistingKerbside Parking
KEEPLEFT
KEEP LEFT
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W S.B0 2 41:200
6 8 10Scale @ A3
39
CONCEPT DESIGNMEDIAN ISLAND (SITE 68)
PACIFIC STREET & BRONTE ROADBRONTE
12.09.2019
CONCEPT DESIGN002 G.YCONCEPT DESIGN002 22.10.2019
No. 4
6
No. 4
8
No. 5
0
No. 5
2
No. 7
3
No. 7
1
No. 6
9
No. 6
7
No. 6
5
No. 6
3
No. 6
1
S
t T
hom
as
Street
Plain ConcreteMedian Splitter Island
500mm Wide
Paint New Linemarking
Paint New Linemarking
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
40
CONCEPT DESIGNMEDIAN ISLAND (SITE 69)
ST THOMAS STREET (No. 48)BRONTE
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 4
7
No. 4
5
No. 2
No. 4
No. 2
& 2
A
Birrell
Street
St Jam
es R
oad
25
km/
h
25
km/
h
25
km/
h
25
km/
h
100mm Concrete RaisedPedestrian Crossing
Retain ExistingTraffic Islands
Existing PedestrianCrossing Location N
o. 8
Retain Existing KerbRamps
No. 6
Retain Existing Linemarking
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
41
CONCEPT DESIGNRAISED PEDESTRIAN CROSSING (SITE 84)
BIRRELL STREET & ST JAMES ROADQUEENS PARK
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 7
1
No. 140
No. 142
No. 144
No. 146
No. 148
N
o. 59
No. 63
N
o. 65
N
o. 67
N
o. 69
N
o. 71
N
o. 73
N
o. 75
N
o. 77
Birrell
Str
eet
25
km/
h
25
km/
h
25
km/
h
25
km/
h
Retain ExistingTraffic Islands
75mm Concrete RaisedPedestrian Crossing
Retain ExistingCycle Lanes
Relocate Traffic IslandsAdjust Linemarking
Re-alignSouthern Kerb
Ramp
Existing PedestrianCrossing Location
Retain Existing TrafficIsland
Retain ExistingKerb Ramp
Paint BikeSymbolAfter theRamp
RetainExistingKerbBlisters
Paint Bike SymbolAfter the Ramp
Paint Bike SymbolBefore the Ramp
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
42
CONCEPT DESIGNRAISED PEDESTRIAN CROSSING (SITE 85)
BIRRELL STREET & BRISBANE STREETQUEENS PARK
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 5
W
averle
y C
olle
ge
Waverle
y P
ark
Birrell
Str
eet
Henrietta S
treet
25
km/
h
25
km/
h
25
km/
h
25
km/
h
75mm Concrete RaisedPedestrian Crossing
Existing PedestrianCrossing Location
Retain ExistingKerb Blisters
Retain ExistingTraffic Islands
Retain ExistingKerb Ramps
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
43
CONCEPT DESIGNRAISED PEDESTRIAN CROSSING (SITE 87)BIRRELL STREET & HENRIETTA STREET
WAVERLEY
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W
No. 5
9
No. 6
1
No. 6
5
No. 6
9
No. 6
7
No. 5
4
No. 4
8
No. 4
2-4
4
M
acpherson
Street
25
km/
h
25
km/
h
25
km/
h
25
km/
h
Existing PedestrianCrossing Location
Retain Existing Kerb Blistersand Traffic Islands
75mm Concrete RaisedPedestrian Crossing
Retain ExistingKerb Ramps
Lugar S
treet
Design
Date
CONCEPT ONLY
Drawn Checked
p:\p3792 w
averley 40km
per hour zone 1 speed review
\technical w
ork\cad\consultation concept plans\concept plan\p3792.002d w
averley speed review
_consultation concept plans.dw
g
Sheet Number IssueProject Number
REVISIONS
DrawnRevisions/Descriptions
DateIssue
Project
Title
Gold CoastSuite 26, 58 Riverwalk Avenue, Robina QLD 4226.P: (07) 5562-5377W: www.bitziosconsulting.com.auBrisbaneLevel 2, 428 Upper Edward Street, Spring Hill 4000.P: (07) 3831-4442E: [email protected] 203, 3 Gladstone Street, Newtown NSW 2042.P: (02) 9557 6202 002
22.10.2019
CONCEPT DESIGN001 K.W
P3792
P3792 WAVERLEY 40KM/H SPEED REVIEWZONE 1
G.Y K.W T.W0 2 41:200
6 8 10Scale @ A3
44
CONCEPT DESIGNRAISED PEDESTRIAN CROSSING (SITE 89)MACPHERSON STREET & LUGAR STREET
BRONTE
12.09.2019
CONCEPT DESIGN002 22.10.2019K.W