TOWN OF SHELBURNE
REGULAR COUNCIL MEETING
October 21,2013
AGENDA
7:00 p.m. Communitv Excellence Award Presentations
Council Meetinq
1. Callto Order
2. Approval ofAgenda
3. Disclosure of Pecuniary lnterest
4. Minutes of Previous Meetings - October 7,2013
5. Question Period
6. Deleqations
7. Bv-Laws. Correspondence & New Business
1. By-law #58-2013 is ready for Council's consideration being a by-law to authorize theTown of Shelburne to enter into a memorandum of understanding with the County ofDufferin for loose leaf collection services.
Discussion regarding large brush pick-up service offered by the County of Dufferin.
Report from the CAO/Clerk dated October 16,2013 regarding extension of contractservices with OCWA.
Report from the Director of Public Works dated October 17,2013 regarding front endloader rental for winter operations.
3.
4.
5.
7. Discussion regarding the naming of the new soccer field at Greenwood Park.
8. Minutes from the Shelburne Police Services Board meeting held September 17,2013.
9. Minutes from the Centre Dufferin Recreation Complex Board meeting held September11,2013.
10. Request from the Royal Canadian Legion Branch 220 dated October 17 , 2013 to have apoppy flag on the Town's flag pole from October 25 to November 11th.
Ël#tffiLetter from Larry Soper d4eq qcþþel1pgyl.HqlCedar Street -
14. Letterfrom Leah Cross dated October 11,2013 regarding the Simon/Franklyn StreetPark.
15. Letter from Rick Groves dated October 17 , 2013 regarding illuminated signs.
lnformation is collected under the authority of The Municipal Freedom of Information and Protection of Privacy Act. The agenda is a public documentand forms part of the permanent public record. Questions about the collection of personal information should be directed to the Clerk at 51 9-925-2600.
TOWN OF SHELBURNE
REGULAR COUNCIL MEETING
October 21,2013
AGENDA
16. Letterfrom MPAC dated October 11,2013 regarding 2014 Enumeration, Ward/PollRevision Process.
17. Letter from the Canadian Union of Postal Workers dated October 14,2013 regarding thepreservation of postal services.
18. AMO Watchfile dated October 10 & 17 ,2013.
ffiffiffiffiffiffiffiffiffi
9. Approval of Bills & Accounts
Payables listing for October 21,2013
10. New Business
ll. Countv Business
12. Confirmatorv Bv-Law
By-law #59-2013 is ready for Council's consideration being a By-law to confirm certainproceedings of the Council of the Corporation of the Town of Shelburne for its RegularCouncil meeting held October 21,2013.
13. Adiournment
lnformation is collected under the authority of The Municipal Freedom of Information and Protection of Privacy Act. The agenda is a public documentand forms part of the permanent public record. Questions about the collection of personal information should be directed to the Clerk at 51 9-925-2600.
AUTOFORM CONTRACTING LONDON LTD. INVOIGE2093 Jetstream RoadLondon, ontarlo Ns\t 4M7
lnvoice No.: 472a
Date: Oct01,2O13
Ship Date:
Page: 1
Re: Order No.
Sold to: Ship to:Tol'VN OF SHELBURNE OLÐ VILLAGE LANE /VARIOUS REPAIRS
203 irAtN ST EAST SHELBURNE
SHELBT}RNE, ONTARIO LON fSO 1i-'172
Businæ l{o: 135 504 991 RP0001
q<
TOWhAPProvaltAcci' No'
i Acct- No'
Acct. No'
Cheque I'
DatePai(
AUTOFORM CON
SQM
LM
SQM
SQM
ûF Sl{EtIrffi). .éê
l.*..4
ìACT]NG LOND(
160.53
13.25
24.30
54.78
vÐtÞæ.0¿ /54
-¡l
Éa¡!-J¡'''
{ LTD. HST: #1
.CONCRETE SIDEIA/ALK Ð(CAVATE &INSTALL - INCLUDES RESTORATION -OLDV]LLAGE L.ANEREMOVE & REPLACE CURB & GUTTER- INCLUDES RESTORATION - OLDVILLAGE LANEINSTALL 50 MM ASPHALT BLVD &GRANULAR BASE * EXCAVATIONREMOVE & REPLACE S]DEWALK @vARrous LocATtoNS (9)
NOTE: PLEASE SIGN AND RETURN BYFAù( OR EMAIL YOUR CONFIRMATIONOF OUR SITE MEASUREMENTS.
PLEASE CONTACT US IMMEDIATELY IFTHERE ARE ANY DISCREPANCIESWITH OUR QUANTITIES OR PRICES SOTHAT WE CAN TAKE THE NECESSARYSTEPS TO RESOLVEANY ISSUES STHATTHERE
äMENroFfrcNAruRE:POSITION:
IS NO DELAY INTHIS INVOICE IN FULL.
Subtotal:
H - HST l37oHST
15 504 991
H
H
H
H
118.49
147.25
52.80
187.65
19,021.20
1,951.06
1,283.04
10,279.47
32,53/..77
4,229.53
Shipped By:
Comment:
Sold By:
Tracking Number:
Terms: Net 30 Days 36.764.3C
GOI|IRAC!û{GLOilDor tm.2oæJe¡srRenM Roeo
LONDON, ONTARþ }I.5I' 4M7
CONTACT:OFHCEFÆCMOBILE:
ÐatidBæk¡and519467:1979519457-7990s1$62f-S136
TO Corporation d the Torn of Sh&¡meATT: Emiþ [¡dtelrsrscdt tryheeHor¡
DATE: AI{S*É nzttgPROJECT: Otd Vifiage Rtt/ariot¡s Reçnirs
NoTE: wananty period - 1 year workmanshþ & matøials onJy, .o(cludng tfùÌd parry oamages- For.2 ¡lear maintenancê, ¡ridudir€ damage by orhers,add 10% to abo'e pfi:es' Quotetl pices are vano ror io"ys ttor aosra,. npprcaue taxes to be added to ¡nìro¡cê.
|åä"#:i"ffi,S:*ïAmt*fl#t1,T#[ffi;.t#ffiffi,-r12%perannum. Ar¡torormwirnorasr.êtoaþâywhen
l ffiiffio1i'HJt#,]änï ffääîlåHgît#r,ffi31':d"* ûn''sh ary qrerhe producúto opsDspecncaríon'3- Trâffic control and concrele tesüru ¡v or.*--:-* -i:-$ffi1!'Ë'ä#ä¡iË1ä"¡i';äffi*;*;t sio¿ä;.f-".r,""¿+;J.".,*;;;;;: _.-_..._ _ .":_.
tr%ffi ffiffiffi ffimi?#;ffi jggrgrï:lÍgrrFirgt+,bac*o*n0;siteresl*:f n.ryo¡nsplacecak'hbåãnramestosndeirrocáe¿¡nconcrereâr.thethne"rp*,¡ru.'c-Jilä*ffif"1ilï,i'à,1ffi1""triì;mfm$ä
. l5-ffiËüi'ï;|#esenÊrârconbacro'. enrvp*or"iri*Ë;";Ëäid""ilËffi;äliäililä"i:ål'0,**",*randmeshare
6' Sidewalls - Repahs ard a¡stom work are not ir¡cfr¡ded.in pr'æÈrg. îhe geileral coñtsactof ¡s^ respornible for the fdlanring - dispoa€l d o(caì¡ated
$ffirf.ffitr#å[iffi3å¡¿qu*a't*'"iñt¡'iàr'=*iîäîää;;äËöäliä,il""J,i*"¡ñu¡.ri,e.*. ñ",y..-'' 7' TIE folkwing requhe ¡rdivifual pri*g ån¿ are not ¡nur¡eo - coror¡¡Ed oon@e, sæcrbrssr¡ng, sedanh,, caÍkir€ and stains,' 8. Payment to be bæed T *td.m"ouçl1*s or *nip¡e"à ,"ø[ ;,
"oettuÁiJilil-** ou*.9' t fnt€r co'q,ete placenæ'* raee æ * Horæm¡er tJ- nea"o oot oäe ¡z.ssÁh'ffiq m, öowd,,g fs Éo6t protêcr¡on (geore¡<tile or prasth) tr,50/ln m'sg m' bubHe tarps irlstaled $2.lxvlln rn sq m. ¡rrrormr v¡ü 'h;Fû
d;ärg' ;î¡*_ïd,,q_sÌ,rro ru wËh o avo¡o rrese addfrionar coeb-HffiHaTffi-* mthêperrorÍancêtianvcmseæp*ea*iÑãÃliårroü- Theg€nerarcorüactorassumesftlrresponsibrilyfc
#iffi-"Iåü:: pnces are tor prcducüon work orty' shodseqi'ts' hanÉfqmed secdons, r€pa¡rs ar,d eÐstom woùk anê nd ¡ncru&$ in
Ïo schedule tt¡e abwe project, please sþn belorv ano relum to Ar¡üdorm by fax (51g457-7gg0)
-2þO
rTEH Oneìtub*izatirm QUAITTITY I,NIT PFUCE SUB.TOTALI Ëxcarde tnstd nst ørrcrete s¡cla¡A<-f ZSmm thidrress
-- lnch¡des Re$odion rr¡iür topço¡l rø *dãnO ¡n¡Uanoter'
irg-- lncludes Restoration of Asphâlt tf ùfecessarv: 0-5m max.
148 sg.rn $118.49sq-m
2 rîmgf ano Hepart;orrcr$eS¡deuralk in Vadous l¡cdions- ¡nchtdos Restordion wíth.hecoü ard sod and.lnÌlial ruder-
mg-- înc¡uOes Restoration ofAsphatt if Necessan¡: 0.Sm max-
52.2 sq-m $187.65[sq-m
3 Kemare and Rêplaae Concre*e GuÈ in Varircus Locations: lndudes Res*o¡ation cf AÉphalt if Necessar¡6 0.5m rnax'l2linm $147-2í/linm
er4a +
Seconded by:
BE lT RESOLVED THAT Gouncil receives the report from the Director of puuic worksdated september 5, ?9rl regarding sidewark r.$ir, ,"*nJ*aion and rearþnment aspresented and circulated;
ANB FURTHER THAT Council awards the projec{ to Autoform contracting for thequoted pnce of $28, 861 .87 plus applícable taxbs- ' ' vv' rtr qv(" 'v rv' r'r rç
TOWN OF SHELBURNE
COUNGIL RËSOLUTIOII
No- lA
ftu-/
Reguested Vote to be recorded I lYes llNo
Councillor lñfalter BenotûoGouncillorÀJ- CaveyCounciltor Randy GhambersCouncillor Geotr DunlopGouncillorTom FganD_eputy-Ailayor Ken Benn ingtoniltayor Ed Crewson
NaytII¡TItIITITTI
Yea
TIIIIITTtItItI
@DIRECTOR OF PUBLIC WORKS
REPTRT
Page I of2
TO:FROM:CC¡RE:
Mernbers of CourrcilScott J.Wheeldon. C.E.T. Director of public Workslohn Telfer, C,AAIOerk, Carol Sweeney, Treasurer
ANALYSIS:As approved in the 2013 Budget. A request for quotes was sent to severat localcontractors for sidewalk reconstruction/repair, the request included a detaileddescription location and type of work. The majonW of the work is for repair andreconstruction, a small percenbge of the work is to repair around sanitary andstorm manholes and catch basins, Unfortunately we only had one contractor bid,but their quote is under our budgeted amounÇ their unit prices are below whatwe used for our budget estimate. This contractor compleied the work for Janeand Marie Street under contract for the GeneralContractor, their workmanshipwas good.
The I quote received is as follows:
Autoform Contracting London Ltd. g28,B6t.g7 plus HST
The quote was reviewed to ensure all terms and conditions were met and thatno errors occurred, none were noted.
@DIRECTOR OF PUBLIC
REPTRT
Page2 of?
FI ]IATICTAL / STAFFI N€ I M PLIC,ATIOIIS :
l*lyOø in 2013 approved budget. The work will be billed to Road Construction,Sanitary and Stsrm lewer. The request for quotes provides provisional ¡iemscosts, which cannot be determined until work is in progress.
'They would only be
approved if reouired
RECOMMENDATION:THAT council awards the sidewalk reconstruction/repair projectto AutoformÇ9.$rgcting concrete.for a price as quoted of $2g,861.g7 prús appricable taxes;AND THAT any provisional items be approved as requireà.
Respectfu I ly submitted,
9.ff p.'?l/,'.,//ô,.
Directo¡. of Public Works
POLICIES AFFECTIIIG PROFOSAL:Town of Shelburne Procurement
SHETBURNE PUBLIC WORKSSIDEWATK AND CURB REPAIRS 2013
LoeatÍonSize Type of uork
l.elrgütfml Wfo'th
square
metefs
New Sidewalk3æ1304.
1308Olde Village Court North Side
60 1.5 90.onew sidewalk
Olde Village Court North Side 10 2 20.o new sidewalkOlde Village Court WestSide 6 6 36.O tum around pad
Total SquareMeters: 146.0
Rernove and Repair
249 Victoria Street East Side4.57 1.5 6.9
remove & replacesidewalk
308 William Street West Side1.5 1.5 23
r€move & replacesidewalk
329 Owen Sound Street East Side4 1.5 6.O
remove & replacesidewalk
3Ml3r2 Owen Sound Street West Side4.9 1.5 7.4
remove & replacesidewalk
248 Owen Sound Street West Side2.8 1.5 4.2
remove & replacesidewalk
220 Owen Sound Street WestSide4.6 1.5 6.9
remove & replacesidewalk
sr6lszo Owen Sound Street West Side6.1 1.5 9.2
remove & replacesídewalk
Second Avenue W€st atOwen Sound Street Sor¡thS¡d€
15 1.5 2.3
remove & replacesidewalk
Main Street West atJohnStreet (Manhole) North S¡de
1.5 1.5 2.3
remove & replacesidewalk
James Street at FoodlandParking Lot West Side
3.3 1.5 5.O
remove & replacesidewalk
Total SquareMeters:
Total SquareMeters: 52.2
Curb replacement
Various locationsTotal lineal curb
replacement t2remove andreplace curb
PLEASE PROVIDE PRICE
FOR-locates
-removal and disposal of sidewalk anddebris
-all safety and traffic control are the responsibility of thecontractor
-suppl% prepare base and place concretesidewalk-reinstatement of sod and asphalt as required within 5 businessdays-proof of insurance and WSIB clearancecert¡ficate
NOTES:-sídewalk to be 1.5m wide and unlessotherwise stated-requires L50mm of granular Acompacted-topsoilto be l00mm deep-continual communication betweentown and contractor-all work to be completed prior toOctober 3t,2OL3
HcorfiRAcnrc LoilDoflLTD.
ææJCTSTRE¡MROADLONDON,ONTAR0 N5V4¡/F
0EdæþnCONTACT:OFFICE:FAXMOB]LE:
Danid Buckland519-457-7979519-457-799051.+521-913ô
TO: Gorporaü¡n dthe Torn d Shdbume
ATT: Erniþ lltatthqüs/Sooü Wheeldon
DATE: August2220i3
PROJECT: Old Milag€ RdA/adq¡s Repairs
1.2_
3.4.
5.
7-8.9.
NorE: wananty period - I vear workmanship E malerials orily, exd,rring third party damages..Ig_? ry3, T"¡ntenance, ¡ndud¡ng damage by others,add l0% to abor¡e prices' Quoted prices are'vatio øri oays trom oosing. Appñcable raxes ro be added to invo¡ce-
;#ä[Tîffi,i:åt;äf"ät* fi"":åffiX#ilrffi" ,i;]ffiffi#: th ! 12o/o per ann '. *""*'¡r nor asree ro a "pay when
ô*iffi1i"îrP#'"Xilãffi tr$äî:;*iåiffiifffig'fffT o'sh and cure rhe produc{ ro opsD spec¡ncarions.Traffic coñbol and cor¡cret€ testirìg by ones. .------ -- ----
.
ffi*:lläXï:: prices are-røprøuaionwork onlv- short sedions, hân+frmed seerions, repairs and custom work are not induded in
c.r-nb work rmacrrinabrer - Generar contractor ¡s responsibrê for the foilowing: <risposar d o<,cooute'aãliranüãõ catctr gas¡ aojr¡stme,rsïJåätl, 'ø,,ro",¡-ng",
¡åùãilü"#:1ffü:rifillriiügl¿*:;*,i*1î-.'*if"nplace catch basin franes to srade if located in conoa" "ìir,"
rir" ø po*nõ. 'cãä iä.îË øo.o ro gra<te in ãiphan or the foroìring yeâr areÏä :ffitil'is,$e seneral Gontractor- ¡lr rypÀ J"ãüoks, inrãåããäÉääläincrroø in prtia. Reinforcins steet and mesh aesidevualks - Repairs ãnd cr¡stom work àre not included ¡n prlc¡ng-..The generd confacttr ¡s respons¡ble fof the fdlo,iring - dbposâl d exca\¡ated
Tålifl¡tffif i#îffiiflåfråno¿it¡onars¡ða,'àärnlcì''rËäîrä;"J$'iõÃóî'iåäi,il,¡"J.îL"S'#*ono,. ou*yThê folld'ÙÐ require indivirJual pridng ånd are not ¡nouoø -
"oh,,"o coûrcrde, sanduasring, searanrs, caurk¡ng and stdns.Pavmenrto be bæed on rdd measuremenrs ccomgaeo r*i ;lrpprËil;iffiìi]ä*
Winær cqlcrele placemer{ rates as d Noræmber id_ r*aä "*oa" $2.98/kl m/sq ¡n colffm rc trrel m.rær¡Âñ ,àer
u' 'nruq ', h,bù[éã,pu ¡*iä"¿ sz.oornn ^,sq
,. -À,iãä ,u r,*","
",*;d"Ë ööir:i,rñrriffiJiffiîtr#R*: *
ffi:mffiip on the pertormance ti ""v "ãîåä
pace¿ anei r,¡oË¡ù¡er rírr. ir," çno"r conrâcrr asswn€s ftdl resporsib*ry ror
To schedule the abore prciect please sign belor and retum to At¡toform by fax (51g.457-7gg0)QUOTATION AGCEPTEDAS STATED .
---'
lTET' OneMobilizatûon SUAIÛTITY T'NIT PRTCE SU&TOTALI Exs¿vae, tn$dl risil concrete sídeuallr_125mm thickness
- lndudes Restordion with topso¡l an¿ soOãA'hithlwater_ir¡g-- incltdes Restoration dAçhalt if ì,lecessary; 0-5nr max.
146 sq.m $118.49/sq-m
$187.65þ.m2 Rgryg ard Repair Goncrete SkJevralL ¡n Var¡ousGi¡oÃ
- hdu@s Restoration with topsoil and sod an¿ ¡nitia¡ w*er_irB.- ÏncluOes Restoration of Asphalt if Necessarv: O.Sm rnar
52.2 sq-m
3 ñerÍrove ano ¡tepace Uoncr€te Gurlc in Various Locations= lncÌudes Restoration of Asphatt if Necessary; 0.Sr¡r rnax
12lin.m $147.25llin.m
Ed Crewson < [email protected] >
Friday, October L8,2013 3:L7 PM'Jennifer Willoughby'FW: Shelburne North - Existing Cedar Street (French paving)
From: Mark DeSouza [mai]to:[email protected]: Thursday, October 17, 2013 9:50 PMTo: Mayor Ed CrewsonCc: John Telfer; Steve Wever; Nick Karakis; Shaun Foster; Bobby PillÍterri; PatIzo; Aldo Spizzirri; Ron McMillan; ChrisLangley; Sam CelioSubjecft Fw: Shelburne North - Existing Cedar Street (Trench Paving)
Mayor Crewson,
Thank you for the call this morning to bring the above noted matter to my attention.
As we proceed with our overall site servicing efforts on our Shelburne North Development we have been facedwith a few challenges given the wet rainy season this Spring/Summer and unexpected site conditions.
Nevertheless) we have made great progress and strides to our overall schedule and would like to thank both theTown, Staff and local residents for their patience and understanding during this time.
Weather permitting our servicing contractor is aiming to have our Ph. lA together with Cedar Street paved Oct.24thas noted below.
Should things change in that regard I will be sure to notifu both yourself and the Town with the revised date andtime.
Again,I would like to thank you for your continued support, cooperation and guidance and we move forwardwith our development.
Respectflrlly yours,
MDSMark DeSouzaVANDYK group of companies
X'rom: Pat Izzo <Plzzo@cdcconhactingDate: Thu, tr7 Oct 2013 15:00:27 +0000To: Mark De [email protected]ìCc: Aldo Spizzirri<[email protected]; Bobby Pillitteri<[email protected]: Shelbume North - Existing Cedar Street (Trench Paving)
Mark,
Jennifer Willoughby_,
From:Sent:To:Subject:
The trench restoration paving willtake place in conjunction with the base asphalt paving within the new subdivision. Weare tentatively scheduled for October 24th for paving to commence.
Regards,
Pat lzzoPrqþdüianagerCDC Corrtracting
10 Brdwick Drive, Unit 1, Cutcwd Ontario, L4K-2T3mobile 416-989-1U3offne90673843ßert.231fax9Alß8-2412en aíl : pizzñ edccontrac{in g. cafil
är, -"rru*" has been scanned for viruses anddangerous content by VPNetworks MailScanner, and isbelieved to be clean.
This message has been scanned for viruses anddangerous content by VPNetworks MailScanner. and isbelieved to be clean.
It/?L/2Ðr1 ËON 111 23 FAX 519 9¿r 1802 rwP AthÈr¡nth & EAËt Gùry *-- ?oWlI ÊHELBURNE EIo0r/001
8,EN fr,fZEßOI4 Ðlreaor of Publlelt/otlaPUAUC WOKKS -TELEPHONE: (Í19) 941.t065FAX: (5¡9)eó1.1802ena I I : bryze bo I @ na rw n t h.c ail ea ty. ca
SASÅN M. STONE, Cr{.o¡clc¡f-Ttøtu¡e¡TELEPFIONE; (5 t9) 94 t-1007
FÆ(: (5rÐ94¡-ltû2emai l: satgn@npra nilreaçtgøry,ca
G@ti'tY57{0tt ó1.¡ LINE, AMAß.ÀNIII, OIY'TÂRIOL9lYtlM6
October 1,7,2013
Ontario Power Authority120 Adelaide Street WestSuite: 1600Toronto, OntarioMsH ITI
Dear Sir/lvfadam: Re: A-sraqth Resolution r€: Dufferin Wind FIT Conrraßt
Flease be advised at the regular meeting of Council held October 16, ?013, thefollowing resolution was set forth.
Resolution
Resslved that ÏVhereas Dufferin Wind Power has indicated that they will not be able tomeet their stårt up date under their FIT contrÐcqNow Therefore, the Township of Amaranth af,e opposed to any extension being grantedto Dufferin Wind by the Ontario Energy Board, the Minisær of Energr, and the Mínistçrof the Environrnent, as well as the Premier. Carried.
Yours truly
SN{S:odSusan M. Stone, A.M.C.T.CAO/Clerk-TreasurerTownshþ of Amarsnth
åi** Energy Bd. / Dufferin rüind Power Ins. / Minister of EnergyMinister of the Environnrent / Premier of OnJario / Dufferin Area Municipalities
ffiOntado
LEGISLATfVEASSEMBLY
Sylvia Jonesn MPPDufferin-Caledon
244 Broadway 12596 Regional Road 500rangeville, 0nhrio Bolton,OnþrioLgW 1K5
Tel. (519) 941-7751 Tet. (905) 9s1-93s2Fax (51 9) 941 -3246 Fax (S5) 9Sl -t 807
.t_800_265{603
E-maiL sylvia. [email protected]
L7E 1T6
0c1 11 1s13
TOV{N OF SHÉLBURNÊ
October 17,2013
Mayor Ed Crewson and CouncilTown of Shelbume203}l[a¡n Street EShelburne, ON L9V 3K7
Dear Mayor Crewson and Council:
I wanted to make you aware of a statement made by my colleague Ted Arnott, MPP Wellington-Halton Hills in the Ontario Legislature on Oct 8,2013.
He called for the reconstitution of the Connecting Link program, I am awate that you weredirectly affected by the cancellation of this program.
Enclosed is a copy of Mr. Arnott's statement.
*"ttDufferin-Caledon
ÊECENÉD
Encl:
Ted Arnott, MPPWellington-Halton Hills
Text of Mr. Arnott's statement in the ontario Legislature,October 8,2013
Mr. Speaker:
The cancellation of the Ministry of Transportation's Connecting Link program is a disgracefulabrogation of responsibility on the part of the Liberal Government.
Earlier this year, in spite of a commitment to all municipalities, the spirit of which was intended toassure them that no significant decisions affecting the budgets of municipalities would be taken by theProvincial Government without consultation,
The Provincial Government arbitrarily and suddenly cancelled the Connecting Link program, whicli I
believe has existed since 1927, when George Howard Ferguson was Premier of Ontario.
Since before the Depression, since before the Second World War, since before any Member of tl,scurrent Legislature was even born, the Connecting Link program has been a joint partnershipbetween local and provincial Government.
::
Recognizing that provincialtraffic on provincial highways travels through built up areas in smallercommunities, the Connecting Link program has paid for up to g0 percent of the cost of necessaryroad and bridge repairs through these "connecting links."
I first raised this in the House on May 28, and have heard from the Township of Centre Wellingtor.,and the Town of Halton Hills. Both of them are rightly pushing back on this massive download ctcosts.
As a former Minister of Transportation, the Premier should know how important this program hqsbeen through the years and that it's still relevant today.
i
I call upon the Government to either reconstitute the Connecting Link program as it has existed forgenerations, or help to fund each and every one of the Connecting Link municipal infrastructureprojects we need in Wellington-Halton Hills.