2 3 4 5 cpdlc expected stakeholders 6 cpdlc integration team (cit) government/industry/union team...

Post on 22-Dec-2015

217 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

2

3

4

5

CPDLC Expected Stakeholders

6

CPDLC Integration Team (CIT)

• Government/Industry/Union Team Providing Coordinated Management and Oversight of the Project• Integrated Schedule• Risk Management• Action Item Tracking• Problem Tracking and Resolution

• CIT Meets Monthly

• Agenda• Restricted to CPDLC Build I

7

• American Airlines• Allied Pilots Association

• Rockwell Collins

• ARINC

• FAA• Free Flight Program Office (AOZ)

• En Route Systems (AUA-200)

• Miami ARTCC (ZMA)

• W. J. Hughes Technical Center (ACB-510, AOS-310)

• National Air Traffic Controllers Association (NATCA)

• Flight Standards (AFS-400)

• Aircraft Certification (AIR-130)

• Air Traffic Procedures (ATP-410)

• Delta Air Lines• Air Line Pilots Association

• Teledyne Controls

CPDLC Integration Team (CIT)

8

• Miami ARTCC

• Airspace: 1,300,000 sq. kilometers

• Ranking: 7th busiest US ARTCC (out of 20)

• Annual Operations: 2 million+

• Record Day Operations: 8,245 (3/23/02)

9

• Miami ARTCC

• Flight Strips per Year: 9 million+• Long Range Radar: 8• Discrete Frequencies: 101

10

CPDLC Build 1 Schedule

11

9 VDL-2 Ground Stations from

Northern Florida to the Caribbean

12

20 CPDLC Certified B757/767s By End Of 2002

13

CMU-900

Message RouterATS End System

•CPDLC•CM

Message CommunicationDisplay Unit - MCDU

Shared Functionality• CPDLC Message Display• Downlink Composition• ACARS• FMS• Advisories

VHF-920

14

4 CPDLC Certified B767-400s by Spring 2003

15

• Multiple Interface Control Display Unit - MICDU• Communications Management Unit - CMU• Sextant VHF Data Radio - VDR

16

Service Certification Suite (SCS)

Service Certification Suite Allows Miami Technicians to Perform End-to-end Testing and Certification of the CPDLC System. The SCS Sends and Receives Signals From ARINC’s VDL-2 Station Located a Few Miles Away at Miami International Airport

17

FAA Menu Build Work Station

Allows the Air Traffic supervisorsto compose free text messages for assignment to individual Sectors

18

Data Link Application ProcessorsContext Management Processors

• DLAP

•CPDLC system application software

•Interfaces with FAA Host computer system

•Database management

•Data recording

•Menu build

•User Interface

• CMA

•ICAO-9705 CM logon service

•Allows CPDLC-equipped aircraft to logon to CM server

•Address data retrieved by DLAP

19

FAA Technical Center Testing

83,344 Total Testing Labor Hours for

CPDLC Build I Prior to Delivery to Miami

20

21

FAA Convair 580 Test Bed

• ATN/AOA Testing• 1st Test Flight January 2002

• 5,000 Messages Exchanged

• 80 Hours of Testing

22

FAA B727 Test Bed

• CPDLC Testing• 1st Test Flight - March 2002

• 1,000+ Messages Exchanged

• 45 Hours of Testing

23

Airways Facilities Technician Training

• 6-day Training Course• Software Troubleshooting• Hardware Remove & Replace

24

FAA Air Traffic Controller Training

• 4-day training program• Classroom/lecture• Computer Based Instruction• ATC Radar Training Lab (DYSIM)

25

CPDLC Build 1 Message Set

• Transfer of Communication• Initial Contact• Altimeter Setting• Menu Text

26

First CPDLC Message

27

For Further Information About Our Program, Please Contact:

Timothy R. HancockTimothy.hancock@faa.gov

FAA Free Flight Program Office

28

29

top related