8_3_1c
Post on 12-Apr-2016
218 Views
Preview:
DESCRIPTION
TRANSCRIPT
Toledo Refinery
Site Technical Practices EP 8-3-1C
Packaged Watertube Boilers Inspection Checklist (Future Release)
August 2007 Revision 0.0
Page 1 of 1
Maintained by E2G – Shaker Heights, OH
PROJECT
PROJECT NO.
INQUIRY NO.
LOCATION
UNIT
EQUIPMENT ID
JOB NO.
DOCUMENT NO.
DATA ISSUED FOR
IN-HOUSE REVIEW
TOLEDO REFINERY APPROVAL
QUOTATION
PURCHASE
CONSTRUCTION
THIS SHEET IS A RECORD OF EACH ISSUE OR REVISION TO THE SUBJECT DATA. EACH TIME THE DATA IS CHANGED ONLY THE NEW OR REVISED DATA SHEETS NEED TO BE ISSUED. THE EXACT SHEETS CHANGED AND THE NATURE OF THE CHANGE SHOULD BE NOTED UNDER REMARKS. THESE REMARKS ARE NOT A PART OF THE DATA. THE REVISED DATA SHEET(S) BECOME PART OF THE ORIGINAL DATA AND SHALL BE COMPLIED WITH IN THEIR ENTIRETY.
ALL DATA SHEETS ATTACHED
REVISED DATA SHEET(S) ONLY ATTACHED
REV. DATE BY CHECK APPROVALS REMARKS
SECTION PROJECT TOLEDO REFINERY
top related