GETINSA – PAYMA, S.L.in association with
Segmental Consulting & Infrastructure Advisory (P) Ltd
KIRATPUR NER CHOWK EXPRESSWAY LIMITED (KNCEL)
Four Laning of Kiratpur-Ner Chowk Section of NH-21 From Km.73+200 to Km. 186+500 in state of
Punjab and Himachal Pradesh.
Independent Engineer
“Executive Summary”
(Monthly Progress Report No.: 53)
February’ 2017
Page 0
1.1 Summary of Current Month’s Progress
February, 2017
Total length of project is 84.38 km from 73+200 to 186+500 with total construction cost 1818.47 Cr and total project cast set forth in financial package as per clause 12.21 of schedule G is 2291 Cr. Appointed Date was 14/11/2012 and scheduled date of completion of construction is 12/11/2016 (with 1095 days construction period) however 15 months extension of Time has been recommended to the Authority and anticipated date of completion of the project is 5th February 2018,The case of EOT is under consideration of Authority.
Cumulative physical progress 66.61% and financial progress 74.20% has been achieved as mentioned in MPR submitted by Concessionaire for the month of February-2017 however IE assessment of physical progress as scrutinized the MPR and found that 66.61% ( including 9.08% Design& material procurements for Road, Tunnel works ). Total expenditure till date is 1682.46 Cr, including withdrawal from the escrow account. Total progress of DBM layer is 30.71 km two lane with 10 km pending across the entire stretch.
Major land acquisition of entire stretches has been completed, as on 28 Feb, 2017 95% land is free from hindrances made available to the Concessionaire. Concessionaire is required to speed-up the physical progress as substantial works are balance in hindrance free working front.
Current Issues & Recommended Actions by IE:
1. Slow Progress of Structures: The progress of structures (especially, major bridges, minor bridges, flyovers) is slow and need to be expedited by providing additional resources, so that 38 nos of bridges completed by June-2017 as committed by the Concessionaire during the progress review meeting at NHAI H.Q. Out of 04 nos of underpasses not even single underpass started so far. 11 nos of bridges has completed out of 43 bridges so far.
Recommendation: Concessionaire should improve the progress of structures by providing more resources especially between Km 14 to Km 22. Three critical Major Bridges at Km 23+100,26+100 &130+172 require to expedite in view of balance construction period ,Concessionaire is required to expedite all the structure works i.e. bridges,culverts,RS/RCC retaining walls where works in under progress .
2. Road works especially in section-1 laying of DBM is very slow due to frequent break down of machineries/HMP and other works affected due to shortage of cash flow in spite of hindrance free work front available. In Section-2, laying of DBM works could not take up till date in spite of available work front for laying of bituminous layers.Recommendation: Concessionaire is required to expedite the progress of bituminous works in all three section in order to complete the targeted progress of 40 Km by march-2017 however only 15.35 Km DBM has been completed till date.
3. Tunnel Works, There is scope of further improvement in tunnel works still it is slow pace as per the targeted progress in all five tunnels. Recommendation: The man power and resources found inadequate in Tunnel 2, 3 &5 and frequent breakdown of shotcrete machine & other machineries which required to be provided, standby machineries in these tunnels to be deployed for uninterrupted progress during day/night shift. Adequate
Page 1
planning is required for all Tunnels to complete the excavation works between June to August 2017 as committed by Concessionaire.
Change of Scope (COS): Notice of Change of Scope for Bridges requested by Concessionaire after examined by I.E. submitted to Authority and is under consideration of NHAI HQ. The COS for additional box culverts/Pipe culverts has been approved by Authority.COS for PUP at chainage 140+000 under VIP reference of Honorable minister of Health & Family Welfare Shri J. P. Nadda has been submitted of amounting Rs 7.58 crores to Authority and is under consideration.COS for additional two lane of Sundernagar bypass block cost of 59.23 crores submitted to the Authority however detailed cost yet to be submitted by Concessionaire.Block cost for additional service road 3.75m wide in Naulakha-Dadour section has been submitted by Concessionaire but in this section, minimum 5.50m wide service road required so that revised block cost is to be submitted by Concessionaire.
Recommendation: Concessionaire is required to submit detailed COS for service road in Naulakha-Dadour section and additional two lane in sunder nagar bypass area.
1.2 Critical Issues & Action Log
1.2.1 Pending Issues & Action Log
Sr. No
.
IssueDescription
Type
Ongoing/ New Issue/
Resolved
Concerned
Authority
Chainage(s) affected due to
the issue
Length affected (km)
Action (s) taken till now
Action(s) suggested by the IE
Expected date/Actual
Date for resolving
issue
1 Diversion forest Land
Clearance Resolved MoEF73.200 to
82.000 -
Forest Clearance obtained
-22-10-2013
2 Diversion forest Land
Clearance Resolve
d MoEF
08.700 to 26.500/126.500
to 152.100 -
Forest Clearance obtained
-20-06-2013
3 Diversion forest Land
Clearance Resolve
dMoEF
151.100 to 189.000
-Forest Clearance
obtained-
23-08-2013
4 Environment Clearance
Clearance Resolved MoEF73.200 to 134.500
-Environment
Clearance obtained
-21-03-2013
5 Environment Clearance
Clearance Resolved MoEF134.500 to
186.500 -
Environment Clearance obtaine
d-
21-03-2013
6
Sunder Nagar
Bypass (3.34 Ha)
Clearance Resolved MoEF/
NHAI
167+150 to 172+950
-Environment
Clearance obtained
Tree cutting to
be expedited
31.03.2017
Page 2
1.2.2 Obligation as per Contract Critical obligations and constraints of concessionaire as per contract
Concessionaire is required to expedite the utility shifting work for estimates already approved in coordination with concerned department, demarcation of ROW is required to ascertain the availability of encumbrance free land in Sundernagar bypass area, Also center line marking and inventory survey are required
Critical obligations of authority as per contract
Authority requested to clear the pending utilities shifting of HT Towers of PSTCL at Km 10+700 and HPSEPL HT Towers No 16, 17&47. AD Hydro HT Tower at Km 157+348.
Authority is requested to assist the Concessionaire in Tree cutting, removal of utilities, structures in Sunder Nagar bypass area.
Estimates for utilities shifting in SunderNagar bypass area is yet to be submitted by concerned department to the Authority.
Critical pending obligations of IE as per contract
No pending obligation.
1.3 Project Overview1.3.1 Salient Features of Project
Project Name Four laning of Kiratpur to Ner Chowk Section of NH-21 From Km73.200 to Km186.500 in the State of Punjab/Himachal Pradesh to be Executed as BOT(Toll) on DBFOT Pattern Under NHDP Phase-III.
NH No. (New/ Old) 21
Scheme/Phase NHDP Phase-III
Mode of the Execution (BOT Toll/BOT Annuity/EPC/HAM/Item Rate/Others)
BOT(Toll) on DBFOT Pattern under NHDP-III
No. of Lanes/Configuration Four Lane with divided carriage way Flexible Pavement and 5 nos of Bi-directional Two lane Tunnels with Rigid Pavement
Length of the Project (in Km) 84.38 Km.
Total Project Cost (in Cr) INR 2291 Cr. (Constructions Cost-1818.47 Cr. As per CA)
No. of Bypasses (Name of Town, Length) 2 Nos ( Sunder Nagar Bypass- 5.80 Km & Nerchowk bypass-4.20KM) and 43 KM Re-alignment
No. of Major Bridges (Number and Location) Major Bridges -24 Nos
Page 3
Minor Bridges- 18 Nos
No. of Toll Plazas (Number and Location) 02 Nos ( Km 8+500 & Km 151+537)
No. Of Culverts 269 Nos
No. of Fly Overs/Under Passes (Number and Location)
Fly Over- 01 No ( Km 142+680)
Under Passes (PUP/CUP)-04 Nos
Ch.-21+800, Ch.22+200,Ch. 25+600,Ch.133+735
No Of Tunnel (No and Location)
Tunnel-05 Nos
Tunnel T1- 1800 m long with Escape Tunnel-1802 m long
Tunnel T2 490 m
Tunnel T3 550 m
Tunnel T4 1265 m
Tunnel T5 740 m
DPR Consultant Name M/S Voyants Solution Pvt. Ltd and M/S ICT Pvt.Ltd
Lead & Consortium Members of Banks Indian Bank
Concessionaire Name (SPV & Parent Company) M/S Kiratpur-Nerchowk Expressway Pvt.Ltd (KNCEL)
Date of Award (LOA Date) 16th March,2012
Appointed Date 14th November,2012
Concession Period 28 Years
Construction Period (in Days) 1095 Days
O&M Period (in Days) 90 Days
Scheduled Date of Completion 12th November,2016
Independent Engineer
Getinsa-Payma,S.L (Spain)
In association with
Segmental Consulting & Infrastructure Advisory Pvt.Ltd.(India)
IE Agreement Date 13th September,2012
IE Mobilization Date 16th October,2012
1.3.2 Project Milestone
ProjectMilestone
Description(Days fromAppointed
Date)
Planned ActualDelay
(No. of months)
CurrentPhysical Status
Physical Status
Progress (%)Scheduled Date
PhysicalProgress
(%)Revised Date
Milestone I (180 days from Appointed
10% 13-05-2014 10% 30-04-2014 - Achieved on 167th day from appointed date, i.e.
Page 4
Date)
30.04.2014. [The same has been concurred by NHAI vide letter no. 11009/6/KNCEL/2013/PIU-SML/620 dated 24-07-2014 and IE vide letter no. SCIA/001/14-15/TL/NHAI-00404 dated 26-06-2014.]
Milestone II (450 days from
Appointed Date)
35% 07-02-2015 35% 06-02.2015 -
Achieved on 450th day from appointed date i.e. 06.02.2015. The same has been intimated to I.E. vide letter no ITNL-KNCEL/PRJ/ TECH/ICO-581/2015/1127, dated 05.02.2015. The same has been concurred by IE vide letter no. SCIA/ 001/15-16/TL/NHAI-00688 dated 07-04-2015.
Milestone III(750th days
from Appointed Date)
70% 03-12-2015 - - -
Amendments in milestone III has been requested for 15 months. Which falls on 04.03.2017
Milestone IV(1095th days
from Appointed Date)
100% 12-11-2016 - - -EOT for 15 months of the project completion date
falls on 5-02-2018
ScheduledCompletion
12th
November,2016- - -
Anticipated date 5th
February 2018
Page 5
1.3.3 Location Map
Page 6
1.3.4 Key Plan
Page 7
Page 8
1.4 Physical progress
Sr. No Component Weightag
e (%)Physical Progress
During Current Month (%)
Physical Progress Cumulative Upto
Current Month (%)1 Road Works 27.26% 0.41% 15.94%2 Structures 35.24% 0.08% 29.47%3 Tunnels 28.50% 0.26% 13.21%4 Other Works 9.00% 0.14% 7.99%
Physical Progress 100.00% 0.89% 66.61%
Page 9
1.4.1 Detailed Scope of Work & Physical Progress by Component
Sr. No
Component
Cost Weighta
ge in Project
(%)
Item DescriptionTotal Scop
eUnit
Cost Weightag
e in components (%)
Planned in scope (As per scope of
work)
Progress Till Date
Physical Progress
till Current
Month (%)
Value of Physical Progress
(%)a b c d e f g h i j k=g x j
1 Road Works 27.26%
C&G 312 Ha 0.09% 267 281.85 90.34 0.08%Earth Work 150.8
2km
10.00% 115 124.23 82.37 8.24%GSB 151.3
5km
1.08% 63.5 55.22 36.48 0.39%WMM 151.3
5km
1.12% 42 43.3 28.61 0.32%DBM 151.3
5km
4.00% 23.5 30.71 20.29 0.81%BC 159.1
4km
2.00% 0.00 0.00%Design and material procurement for Highway works
1 Job 8.97% 0.75 0.68 68.00 6.10%
2 Structures 35.24%
Major Bridge 25 NosFoundation 264 Nos 8.50% 222 226 85.61 7.28%
Sub Structure 264 Nos 3.50% 206 203 76.89 2.69%Super Structure -
Design of structures,
Fabrication & Casting of girders
1 Job
4.75% 0.83 0.9 85.00 4.04%
Super Structure erection
217 Nos0.75% 56 60 27.65 0.21%
Minor Bridge 17 NosFoundation 84 Nos 3.50% 80 72 85.71 3.00%
Page 10
Sub Structure 84 Nos 1.40% 80 69 82.14 1.15%Superstructure -
Design of structures,
Fabrication & Casting of girders
1 Job
2.30% 0.86 0.9 90.00 2.07%
Super Structure erection
52 Nos0.30% 46 35 67.31 0.20%
Fly Over 1 Nos 0.15% 0.00 0.00%PUP/VUP 4 Nos 0.15% 0.00 0.00%Slab and Box Culvert
269 Nos5.00% 216 220 81.78 4.09%
Slope Protection/Retaining Wall
18000 Rmt
4.94% 17200 17265 95.92 4.74%
3 Tunnel 28.50%
Portal Development
10 Nos4.00% 10 8.9 89.00 3.56%
Heading 6675 Rmt 11.47% 3250 3544 53.09 6.09%Benching 4875 Rmt 2.28% 1700 864 17.72 0.40%Kerb Concrete 6675 Rmt 1.35% 1000 900 13.48 0.18%Overt Lining 6675 Rmt 4.48% 0.00 0.00%Rigid Pavement 6675 Rmt 0.63% 0.00 0.00%Drainage Works 6675 Rmt 0.15% 0.00 0.00%Lighting 6675 Rmt 0.15% 0.00 0.00%Ventilation slab 1800 Rmt 0.13% 0.00 0.00%Finishing Works 6675 Rmt 0.19% 0.00 0.00%Building Works 2 Nos 0.17% 0.00 0.00%Design and Material Procurement
1 Job 3.50% 0.81 0.85 85.00 2.98%
4 Other 9.00% Protective Works 1 Nos 7.75% 0.85 0.94 94.00 7.29%
Page 11
Works
Miscellaneous Works, Road Marking, Toll Plaza, Crash Barrier, Guard Rails, Lighting etc.
1 Job 1.25% 0.5 0.56 56.00 0.70%
Physical Progress 100.00% 66.61%
Page 12
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 1 2 3 4 4 1
Types of Structures
Types of Structures
Number of Structures 1 2 3 4 4 1
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 2
Types of Structures
Types of Structures
Number of Structures 2
Status of Structures
LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 0+100 0+200
1.5.1 Strip Plan (Details)LHS-Service Road Const.
Box
Culv
ert
Box
Culv
ert
Pipe
Cul
vert
RHS
1
Bypass
LHS 1
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Major Bridge (72 m)
0+900 1+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
0+300 0+400 0+500 0+600 0+700 0+800
1+800 1+900 2+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road Workfront
1+200 1+300 1+400 1+500 1+600 1+700
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 1+100
RHS-Service Road Const.Bypass
LHS
Pipe
Cul
vert
RHS
Page 13
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 5 6 7
Types of Structures
Types of Structures
Number of Structures 5 6 7
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 8 9
Types of Structures
Types of Structures
Number of Structures 8 9
Status of Structures
2+500 2+600 2+700 2+800 2+900 3+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 2+100 2+200 2+300 2+400
LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 3+100 3+200
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
LHS-Service Road Const.
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Bypass
LHS
Box
Culv
ert
Box
Culv
ert
RHS
3+900 4+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
3+300 3+400 3+500 3+600 3+700 3+800
Page 14
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
Types of Structures
Types of Structures
Number of Structures
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 10 1
Types of Structures
Types of Structures
Number of Structures 10 1
Status of Structures
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 4+100 4+200 4+300 4+400
RHS
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
4+500 4+600 4+700 4+800 4+900 5+000
Slab
Cul
vert
RHS
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Box
Culv
ert
5+600 5+700 5+800 5+900 6+000
RHS-
MCW
W
orkf
ront
Chainage 5+100 5+200 5+300 5+400 5+500
Page 15
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 2
Types of Structures
Types of Structures
Number of Structures 2
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 3 4 11
Types of Structures
Types of Structures
Number of Structures 3 4 11Status of Structures
LHS-Service Road Const.LHS-Service Road Workfront
7+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
6+400 6+500 6+600 6+700 6+800 6+900
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 6+100 6+200 6+300
7+500 7+600 7+700 7+800 7+900 8+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 7+100 7+200 7+300 7+400
LHS 1
Minor Bridge (28.35)
Slab
Cul
vert
RHS
1
Slab
Cul
vert
Slab
Cul
vert
Box
Culv
ert
RHS
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Page 16
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 12 3
Types of Structures
Types of Structures
Number of Structures 12 3
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 4 5 6 7 8 9
Types of Structures
Types of Structures
Number of Structures 4 5 6 7 8 9
Status of Structures
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 8+100
RHS-Service Road Const.Bypass
LHS
Box
Culv
ert
Pipe
Cul
vert
RHS
8+800 8+900 9+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road Workfront
8+200 8+300 8+400 8+500 8+600 8+700
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
9+500 9+600 9+700 9+800 9+900 10+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 9+100 9+200 9+300 9+400
RHS Pi
pe C
ulve
rt
Pipe
Cul
vert
Pipe
Cul
vert
Pipe
Cul
vert
Pipe
Cul
vert
Pipe
Cul
vert
Page 17
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 10 11 12 13 14 15 16
Types of Structures
Types of Structures
Number of Structures 10 11 12 13 14 15 16
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 17 18 19 20 21 17
Types of Structures
Types of Structures
Number of Structures 17 18 19 20 21 17
Status of Structures
10+500 10+600 10+700 10+800 10+900 11+000
LHS-
MCW
W
orkf
ront
Chainage 10+100 10+200 10+300 10+400
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
Pipe
Cul
vert
RHS
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
Pipe
Cul
vert
Pipe
Cul
vert
Pipe
Cul
vert
Pipe
Cul
vert
Pipe
Cul
vert
Pipe
Cul
vert
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
11+500 11+600 11+700 11+800 11+900 12+000
LHS-
MCW
W
orkf
ront
Chainage 11+100 11+200 11+300 11+400
RHS Pi
pe C
ulve
rt
Pipe
Cul
vert
Pipe
Cul
vert
Pipe
Cul
vert
Pipe
Cul
vert
Box
Culv
ert
Page 18
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 22 23 24 25 26 14
Types of Structures
Types of Structures
Number of Structures 22 23 24 25 26 14
Status of Structures
LHS
RHS
LHS
RHS
LHS
RHS
LHS-
MCW
W
orkf
ront
Chainage 12+100 12+200 12+300 12+400
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
Tunnel T1 Ch. 12+732 to 14+568 (1836m)
LHS
Tunnel T1 Ch. 12+732 to 14+568 (1836m)
Pipe
Cul
vert
Pipe
Cul
vert
Pipe
Cul
vert
Pipe
Cul
vert
Pipe
Cul
vert
Box
Culv
ert
RHS
Tunnel
RHS-
MCW
W
orkf
ront
RHS-
MCW
Tunnel T1 Ch. 12+732 to 14+568 (1836m)
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
12+500 12+600 12+700 12+800 12+900 13+000
Invert Lining (Rigid Pavement)
E&M & Other Misc. Works
Escape Tunnel T1 12+750 to 14+552 (0+051 to 1+853) (1802m)
Tunnel Escape Tunnel T1 12+750 to 14+552 (0+051 to 1+853) (1802m)Underground Excavation Heading
Kerb Lining
Final Lining
Heading including Primary Lining
Benching including Primary Lining (Two Lane Tunnel)
Kerb Lining (Two Lane Tunnel)
Final Lining
Ventilation Slab
Invert Lining (Rigid Pavement)
E&M & Other Misc. Works
Page 19
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
Types of Structures
Types of Structures
Number of StructuresStatus of Structures
LHS
RHS
LHS
RHS
LHS
RHS
LHS-Service Road Const.LHS-Service Road Workfront
13+700 13+800 13+900 14+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
Tunnel T1 Ch. 12+732 to 14+568 (1836m)
LHS-
MCW
Tunnel T1 Ch. 12+732 to 14+568 (1836m)
LHS-
MCW
W
orkf
ront
Chainage 13+100 13+200 13+300 13+400 13+500 13+600
E&M & Other Misc. Works
Escape Tunnel T1 12+750 to 14+552 (0+051 to 1+853) (1802m)
Tunnel Escape Tunnel T1 12+750 to 14+552 (0+051 to 1+853) (1802m)Underground Excavation Heading
Kerb Lining (Two Lane Tunnel)
Heading including Primary Lining
Benching including Primary Lining (Two Lane Tunnel)
Kerb Lining (Two Lane Tunnel)
Final Lining
Ventilation Slab
Invert Lining (Rigid Pavement)
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Tunnel T1 Ch. 12+732 to 14+568 (1836m)
RHS
Tunnel
Final Lining
Invert Lining (Rigid Pavement)
E&M & Other Misc. Works
Page 20
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
Types of Structures
Types of Structures
Number of StructuresStatus of Structures
LHS
RHS
LHS
RHS
LHS
RHS
14+600 14+700 14+800 14+900 15+000
RHS-
MCW
W
orkf
ront
LHS-Service Road Workfront
LHS-
MCW
Tunnel T1 Ch. 12+732 to 14+568 (1836m)
LHS-
MCW
W
orkf
ront
Chainage 14+100 14+200 14+300 14+400 14+500
LHS-Service Road Const.
Heading including Primary Lining
Benching including Primary Lining (Two Lane Tunnel)
Kerb Lining (Two Lane Tunnel)
Final Lining
Ventilation Slab
Invert Lining (Rigid Pavement)
E&M & Other Misc. Works
2 2
Min
or
Brid
ge (1
3) Major Bridge (360m)
RHS
Major Bridge (330m)
2 2
RHS-
MCW
Tunnel T1 Ch. 12+732 to 14+568 (1836m)
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Tunnel T1 Ch. 12+732 to 14+568 (1836m)
Tunnel
Invert Lining (Rigid Pavement)
E&M & Other Misc. Works
Escape Tunnel T1 12+750 to 14+552 (0+051 to 1+853) (1802m)
Tunnel Escape Tunnel T1 12+750 to 14+552 (0+051 to 1+853) (1802m)Underground Excavation Heading
Kerb Lining
Final Lining
Page 21
Page 22
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 15
Types of Structures
Types of Structures
Number of Structures 15
Status of Structures
LHS
RHS
LHS
RHS
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 16 27 17 28
Types of Structures
Types of Structures
Number of Structures 16 27 17 28
Status of Structures
LHS
RHS
LHS
RHS
LHS-
MCW
W
orkf
ront
Chainage 15+100 15+200 15+300 15+400
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
Tunnel T2 15+783 to 16+ 277 (494m)
LHS
Tunnel T2 15+783 to 16+ 277 (494m)
2 3
Major Bridge (360m)
Box
Culv
ert
Major Bridge (90m)
RHS Major Bridge (330m)
2
RHS-
MCW
W
orkf
ront
RHS-
MCW
Tunnel T2 15+783 to 16+ 277 (494m)
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
15+500 15+600 15+700 15+800 15+900 16+000
LHS-
MCW
Tunnel T2 15+783 to 16+ 277 (494m)
LHS-
MCW
W
orkf
ront
Chainage 16+100 16+200 16+300
Invert Lining (Rigid Pavement)
E&M & Other Misc. Works
LHS-Service Road Const.LHS-Service Road Workfront
3
Tunnel
Heading including Primary Lining
Benching including Primary Lining (Two Lane Tunnel)
Kerb Lining (Two Lane Tunnel)
Final Lining
Pipe
Cul
vert
Box
Culv
ert
Pipe
Cul
vert
RHS
4
Tunnel
Bypass
LHS
Tunnel T2 15+783 to 16+ 277 (494m)
4
Box
Culv
ert
Major Bridge (90)
17+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
Tunnel T2 15+783 to 16+ 277 (494m)
RHS-Service Road WorkfrontRHS-Service Road Const.
16+400 16+500 16+600 16+700 16+800 16+900
Heading including Primary Lining
Benching including Primary Lining (Two Lane Tunnel)
Kerb Lining (Two Lane Tunnel)
Final Lining
Invert Lining (Rigid Pavement)
Page 23
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 18
Types of Structures
Types of Structures
Number of Structures 18
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 14 30 19 20 21
Types of Structures
Types of Structures
Number of Structures 14 30 19 20 21
Status of Structures
17+500 17+600 17+700 17+800 17+900 18+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 17+100 17+200 17+300 17+400
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
5 6
Major Bridge (390m) Major Bridge (136m)
Box
Culv
ert
RHS
5 6
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS 3
Pipe
Cul
vert
Minor Bridge (40m)
18+600 18+700 18+800 18+900 19+000
RHS-
MCW
W
orkf
ront
Chainage 18+100 18+200 18+300 18+400 18+500
Pipe
Cul
vert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
3
Page 24
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 22 23 24 25 26 31
Types of Structures
Types of Structures
Number of Structures 22 23 24 25 26 31
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 27 28 32 29 33
Types of Structures
Types of Structures
Number of Structures 27 28 32 29 33
Status of Structures
19+500 19+600 19+700 19+800 19+900 20+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 19+100 19+200 19+300 19+400
RHS
7 4
LHS-Service Road Const.
7 4
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Major Bridge (94m)
Box
Culv
ert
Box
Culv
ert
Pipe
Cul
vert
Minor Bridge (15m)
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
20+900 21+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
20+300 20+400 20+500 20+600 20+700 20+800
LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 20+100 20+200
Pipe
Cul
vert
RHS
5 8
Bypass
LHS 5 8
Box
Culv
ert
Box
Culv
ert
Pipe
Cul
vert
Minor Bridge (45 m)
Box
Culv
ert
Major Bridge (170 mtr)
Page 25
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 30 31 1
Types of Structures
Types of Structures
Number of Structures 30 31 1
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 2 34 32 33 35 36
Types of Structures
Types of Structures
Number of Structures 2 34 32 33 35 36
Status of Structures
LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 21+100 21+200
LHS-Service Road Const.
PUP
RHS
9
LHS-Service Road Const.
Bypass
LHS 9
Box
Culv
ert
Major Bridge (81.05)
Box
Culv
ert
21+900 22+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
21+300 21+400 21+500 21+600 21+700 21+800
22+900 23+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
22+300 22+400 22+500 22+600 22+700 22+800
LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 22+100 22+200
RHS
10
Bypass
LHS 10
PUP
Pipe
Cul
vert
Box
Culv
ert
Box
Culv
ert
Pipe
Cul
vert
Pipe
Cul
vert
Major Bridge (464m)
Page 26
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 37 34
Types of Structures
Types of Structures
Number of Structures 37 34
Status of Structures
LHS
RHS
LHS
RHS
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 38 35 36 37
Types of Structures
Types of Structures
Number of Structures 38 35 36 37
Status of Structures
LHS
RHS
LHS
RHS
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
Tunnel T3 23+548 to 24+102 (554m)
RHS-
MCW
W
orkf
ront
RHS-
MCW
Tunnel T3 23+548 to 24+102 (554m)
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
23+500 23+600 23+700 23+800 23+900 24+000
LHS-
MCW
W
orkf
ront
Chainage 23+100 23+200 23+300 23+400
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
Tunnel T3 23+548 to 24+102 (554m)
Heading including Primary Lining
Benching including Primary Lining (Two Lane Tunnel)
Kerb Lining (Two Lane Tunnel)
Final Lining
Invert Lining (Rigid Pavement)
E&M & Other Misc. Works
LHS
Tunnel T3 23+548 to 24+102 (554m)
10
Major Bridge (464m)
Pipe
Cul
vert
Box
Culv
ert
RHS
10
Tunnel
RHS-
MCW
W
orkf
ront
RHS-
MCW
Tunnel T3 23+548 to 24+102 (554m)
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
24+500 24+600 24+700 24+800 24+900 25+000
LHS-
MCW
W
orkf
ront
Chainage 24+100 24+200 24+300 24+400
Tunnel
Min
or B
ridge
(25m
)
Heading including Primary Lining
Benching including Primary Lining (Two Lane Tunnel)
Kerb Lining (Two Lane Tunnel)
Final Lining
Invert Lining (Rigid Pavement)
E&M & Other Misc. Works
Minor Bridge (25m)
Box
Culv
ert
RHS
6 11 7
LHS
Tunnel T3 23+548 to 24+102 (554m)
6 11 7
Minor Bridge (60 m)
Pipe
Cul
vert
Box
Culv
ert
Major Bridge (120m)
Box
Culv
ert
Page 27
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 39 38 39 3
Types of Structures
Types of Structures
Number of Structures 39 38 3
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
Types of Structures
Types of Structures
Number of StructuresStatus of Structures
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
25+500 25+600 25+700 25+800 25+900 26+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 25+100 25+200 25+300 25+400
LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 26+100 26+200
RHS
8 12
LHS-Service Road Const.
8 12
Min
or
Brid
ge
Pipe
Cul
vert
Box
Culv
ert
Box
Culv
ert
PUP Major Bridge (375m)
Bypass
LHS 12
Maj
or
Brid
ge
(375
m)
RHS
12
26+900 126+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
26+300 26+400 26+500 26+600 26+700 26+800
Page 28
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 40 41
Types of Structures
Types of Structures
Number of Structures 40 41
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 42 43 44 45 46 47 48
Types of Structures
Types of Structures
Number of Structures 42 43 44 45 46 47 48
Status of Structures
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 126+100 126+200 126+300 126+400
Box
Culv
ert
Box
Culv
ert
RHS
LHS-Service Road Const.
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
126+500 126+600 126+700 126+800 126+900 127+000
127+900 128+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
127+300 127+400 127+500 127+600 127+700 127+800
LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 127+100 127+200
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
Bypass
LHS
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Page 29
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 49 50 51 52 53 54 55 56 57
Types of Structures
Types of Structures
Number of Structures 49 50 51 52 53 54 55 56 57
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 58 59 60
Types of Structures
Types of Structures
Number of Structures 58 59 60
Status of Structures
LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 128+100 128+200
LHS-Service Road Const.
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
Bypass
LHS
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
128+900 129+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
128+300 128+400 128+500 128+600 128+700 128+800
129+600 129+700 129+800 129+900 130+000
RHS-
MCW
W
orkf
ront
Chainage 129+100 129+200 129+300 129+400 129+500
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
RHS
13
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS 13
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Major Bridge (632)
Page 30
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 61
Types of Structures
Types of Structures
Number of Structures 61
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 62 62
Types of Structures
Types of Structures
Number of Structures 62 62
Status of Structures
LHS-
MCW
W
orkf
ront
Chainage 130+100 130+200 130+300 130+400
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
13
Major Bridge (632)
Box
Culv
ert
RHS
13
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
130+500 130+600 130+700 130+800 130+900 131+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
131+500 131+600 131+700 131+800 131+900 132+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 131+100 131+200 131+300 131+400
14
Major Bridge (63.20)
Box
Culv
ert
Box
Culv
ert
RHS
14
Page 31
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 64 40 65 66 41
Types of Structures
Types of Structures
Number of Structures 64 40 65 65 41
Status of Structures 40 41
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 4 67
Types of Structures
Types of Structures
Number of Structures 4 67
Status of Structures
132+500 132+600 132+700 132+800 132+900 133+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 132+100 132+200 132+300 132+400
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Box
Culv
ert
Pipe
Cul
vert
Box
Culv
ert
Box
Culv
ert
Pipe
Cul
vert
RHS
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS 15
133+600 133+700 133+800 133+900 134+000
RHS-
MCW
W
orkf
ront
Chainage 133+100 133+200 133+300 133+400 133+500
9
Major Bridge (63.20 m) PU
P
Min
or
Brid
ge
Box
Culv
ert
RHS
15 9
Page 32
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 42
Types of Structures
Types of Structures
Number of Structures 42
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 68 69
Types of Structures
Types of Structures
Number of Structures 68 69
Status of Structures
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 134+100 134+200 134+300 134+400
Pipe
Cul
vert
RHS
LHS-Service Road Const.LHS-Service Road Workfront
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
134+500 134+600 134+700 134+800 134+900 135+000
136+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
135+400 135+500 135+600 135+700 135+800 135+900
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 135+100 135+200 135+300
LHS 16 10
Major Bridge (153.80 m)
Box
Culv
ert
Box
Culv
ert
Minor Bridge (31.25)
RHS
16 10
Page 33
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 70 71 72 73 43
Types of Structures
Types of Structures
Number of Structures 70 71 72 73 43
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 74 75 76 77 78
Types of Structures
Types of Structures
Number of Structures 74 75 76 77 78
Status of Structures
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 136+100 136+200 136+300 136+400
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Pipe
Cul
vert
RHS
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
136+500 136+600 136+700 136+800 136+900 137+000
137+600 137+700 137+800 137+900 138+000
RHS-
MCW
W
orkf
ront
Chainage 137+100 137+200 137+300 137+400 137+500
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Box
Culv
ert
Page 34
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 79 80 81 44 82
Types of Structures
Types of Structures
Number of Structures 79 80 81 44 82
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 45 83
Types of Structures
Types of Structures
Number of Structures 45 83
Status of Structures
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 138+100
RHS-Service Road Const.Bypass
LHS 11 12
Box
Culv
ert
Box
Culv
ert
Min
or
Brid
ge
Box
Culv
ert
Pipe
Cul
vert
138+800 138+900 139+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road Workfront
138+200 138+300 138+400 138+500 138+600 138+700
139+500 139+600 139+700 139+800 139+900 140+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 139+100 139+200 139+300 139+400
Box
Culv
ert
Minor Bridge
(31.26 m)
RHS
11 12
Box
Culv
ert
Box
Culv
ert
RHS
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Page 35
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 46 84
Types of Structures
Types of Structures
Number of Structures 46 84
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 85
Types of Structures
Types of Structures
Number of Structures 85
Status of Structures
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 140+100 140+200 140+300
LHS-Service Road Const.LHS-Service Road Workfront
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 141+100
LHS
Pipe
Cul
vert
Box
Culv
ert
RHS
141+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
140+400 140+500 140+600 140+700 140+800 140+900
RHS-Service Road Const.Bypass
LHS 17
Major Bridge (120 m)
Box
Culv
ert
RHS
17
141+800 141+900 142+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road Workfront
141+200 141+300 141+400 141+500 141+600 141+700
Page 36
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 86 87 88 89
Types of Structures
Types of Structures
Number of Structures 86 87 88 89
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 90
Types of Structures
Types of Structures
Number of Structures 90
Status of Structures
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
142+500 142+600 142+700 142+800 142+900 143+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 142+100 142+200 142+300 142+400
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 143+100 143+100 143+200
RHS
1
LHS-Service Road Const.LHS-Service Road Workfront
1
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
GSI (
41.3
8)
Box
Culv
ert
LHS 18
Box
Culv
ert
Major Bridge (102.55 m)
RHS
18
144+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
143+300 143+400 143+500 143+600 143+700 143+800
Page 37
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 5
Types of Structures
Types of Structures
Number of StructuresStatus of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 91 92 93 94 95 96 97
Types of Structures
Types of Structures
Number of Structures 91 92 93 94 95 96 97
Status of Structures
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
144+500 144+600 144+700 144+800 144+900 145+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 144+100 144+200 144+300 144+400
145+500 145+600 145+700 145+800 145+900 146+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 145+100 145+200 145+300 145+400
13
Min
or
Brid
ge
Slab
Cul
vert
RHS
13
Box
Culv
ert
RHS Bo
x Cu
lver
t
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Page 38
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 98 99 100
101
97
Types of Structures
Types of Structures
Number of Structures 98 99 ## ## 97
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 102
103
104
Types of Structures
Types of Structures
Number of Structures ## ## ##
Status of Structures
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
146+500 146+600 146+700 146+800 146+900 147+000
LHS-
MCW
W
orkf
ront
Chainage 146+100 146+200 146+300 146+400
LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 147+100 147+200
Pipe
Cul
vert
RHS
14
LHS-Service Road Const.
14
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Minor Bridge (51.25 m)
Box
Culv
ert
Bypass
LHS
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
147+900 148+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
147+300 147+400 147+500 147+600 147+700 147+800
Page 39
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 47 48 105
Types of Structures
Types of Structures
Number of Structures 47 48 ##
Status of Structures
LHS
RHS
LHS
RHS
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 15
Types of Structures
Types of Structures
Number of Structures 15
Status of Structures
LHS
RHS
LHS
RHS
148+600 148+700 148+800 148+900 149+000
RHS-
MCW
W
orkf
ront Chainage 148+100 148+200 148+300 148+400 148+500
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
Tunnel T4 148+468 to 149+767 (1299m) with 30m cut & cover
LHS-
MCW
W
orkf
ront
Final Lining
Invert Lining (Rigid Pavement)
E&M & Other Misc. Works
LHS-Service Road Const.
RHS
Tunnel
Heading including Primary Lining Cut & CoverBenching including Primary Lining (Two Lane Tunnel)
Kerb Lining (Two Lane Tunnel)
RHS-
MCW
Tunnel T4 148+468 to 149+767 (1299m) with 30m cut & cover
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Tunnel T4 148+468 to 149+767 (1299m) with 30m cut & coverPi
pe C
ulve
rt
Pipe
Cul
vert
Box
Culv
ert
RHS-
MCW
Tunnel T4 148+468 to 149+767 (1299m) with 30m cut & cover
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Tunnel T4 148+468 to 149+767 (1299m) with 30m cut & cover
149+600 149+700 149+800 149+900 150+000
RHS-
MCW
W
orkf
ront
LHS-Service Road Workfront
LHS-
MCW
Tunnel T4 148+468 to 149+767 (1299m) with 30m cut & cover
LHS-
MCW
W
orkf
ront
Chainage 149+100 149+200 149+300 149+400 149+500
Final Lining
Invert Lining (Rigid Pavement)
E&M & Other Misc. Works
Min
or B
ridge
(31.
25 m
)
RHS
Tunnel
Heading including Primary Lining
Benching including Primary Lining (Two Lane Tunnel)
Kerb Lining (Two Lane Tunnel)
Page 40
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 49 50 51 52 106
107
Types of Structures
Types of Structures
Number of Structures 49 50 51 52 ## ##
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 108
Types of Structures
Types of Structures
Number of Structures ##
Status of Structures
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 150+100 150+200 150+300
LHS-Service Road Const.LHS-Service Road Workfront
Pipe
Cul
vert
Box
Culv
ert
Box
Culv
ert
RHS
15
LHS 15
Min
or
Brid
ge
Pipe
Cul
vert
Pipe
Cul
vert
Pipe
Cul
vert
151+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
150+400 150+500 150+600 150+700 150+800 150+900
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
151+500 151+600 151+700 151+800 151+900 152+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 151+100 151+200 151+300 151+400
Box
Culv
ert
RHS
Page 41
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 52 109
110
53 111
112
113
Types of Structures
Types of Structures
Number of Structures 52 ## ## 53 ## ## ##
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
1114
115
116
Types of Structures
Types of Structures
Number of Structures ## ## ##
Status of Structures
152+500 152+600 152+700 152+800 152+900 153+000
LHS-
MCW
W
orkf
ront
Chainage 152+100 152+200 152+300 152+400
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
19 20
19 20
Major Bridge (165 m)
Pipe
Cul
vert
Box
Culv
ert
Box
Culv
ert
Pipe
Cul
vert
Major Bridge (73.35)
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
153+600 153+700 153+800 153+900 154+000
RHS-
MCW
W
orkf
ront
Chainage 153+100 153+200 153+300 153+400 153+500
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
RHS
16
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS 16
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Min
or
Brid
ge
(16.
05 m
) Page 42
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
Types of Structures
Types of Structures
Number of StructuresStatus of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
Types of Structures
Types of Structures
Number of StructuresStatus of Structures
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 0+100 0+200 0+300
ACC Link Road Two Lane from 0+000 to 2+000 (154+000)
LHS-Service Road Const.LHS-Service Road Workfront
LHS 21
Major Bridge (260m)
RHS
21
1+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
0+400 0+500 0+600 0+700 0+800 0+900
1+800 1+900 2+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road Workfront
1+200 1+300 1+400 1+500 1+600 1+700
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 1+100
RHS-Service Road Const.Bypass
LHS 21
Major Bridge (260m)
RHS
21
Page 43
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 117
118
54 55
Types of Structures
Types of Structures
Number of Structures ## ## 54 55
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 119
120
121
Types of Structures
Types of Structures
Number of Structures ## ## ##
Status of Structures
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 154+100 154+200 154+300 154+400
Box
Culv
ert
Box
Culv
ert
Pipe
Cul
vert
Pipe
Cul
vert
RHS
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
154+500 154+600 154+700 154+800 154+900 155+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
155+500 155+600 155+700 155+800 155+900 156+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 155+100 155+200 155+300 155+400
22
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Major Bridge (132.75 m)
RHS
22
Page 44
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 122
123
124
Types of Structures
Types of Structures
Number of Structures ## ## ##
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 125
56 126
Types of Structures
Types of Structures
Number of Structures ## 56 ##
Status of Structures
LHS
RHS
LHS
RHS
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 156+100 156+200 156+300 156+400
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
156+500 156+600 156+700 156+800 156+900 157+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
Tunnel T5 157+658 to 158+402 (744m)
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
157+500 157+600 157+700 157+800 157+900 158+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
Tunnel T5 157+658 to 158+402 (744m)
LHS-
MCW
W
orkf
ront
Chainage 157+100 157+200 157+300 157+400
Invert Lining (Rigid Pavement)
Tunnel Tunnel T5 157+658 to 158+402 (744m)Heading including Primary Lining
Benching including Primary Lining (Two Lane Tunnel)
Kerb Lining (Two Lane Tunnel)
Final Lining
LHS 23
Box
Culv
ert
Pipe
Cul
vert
Box
Culv
ert
Major Bridge (83.35 m)
RHS
23
Page 45
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 127
Types of Structures
Types of Structures
Number of Structures ##
Status of Structures
LHS
RHS
LHS
RHS
LHS-Service Road Const.
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 128
129
130
131
132
133
134
135
Types of Structures
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Types of Structures Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Number of Structures ## ## ## ## ## ## ## ##
Status of Structures
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
Tunnel T5 157+658 to 158+402 (744m)
RHS-
MCW
W
orkf
ront
RHS-
MCW
Tunnel T5 157+658 to 158+402 (744m)
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
158+500 158+600 158+700 158+800 158+900 159+000
LHS-
MCW
W
orkf
ront
Chainage 158+100 158+200 158+300 158+400
LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 159+100 159+200 159+300 159+400
Heading including Primary Lining
Benching including Primary Lining (Two Lane Tunnel)
Kerb Lining (Two Lane Tunnel)
Final Lining
Invert Lining (Rigid Pavement)
E&M & Other Misc. Works
LHS
Tunnel T5 157+658 to 158+402 (744m)
24
Box
Culv
ert
Major Bridge (75.20 M)
RHS
24
Tunnel
24
Maj
or
Brid
ge
(75.
20 M
)
Box
Culv
ert
RHS
24
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
159+500 159+600 159+700 159+800 159+900 160+000
Page 46
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 136
137
138
139
4140
141
142
143
144
Types of Structures
Types of Structures
Number of Structures ## ## ## ## ## ## ## ## ##
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 145
146
147
148
149
150
151
152
153
Types of Structures
Types of Structures
Number of Structures ## ## ## ## ## ## ## ## ##
Status of Structures
160+800 160+900 161+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road Workfront
160+200 160+300 160+400 160+500 160+600 160+700
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 160+100
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS-Service Road Const.Bypass
LHS
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Box
Culv
ert
161+600 161+700 161+800 161+900 162+000
RHS-
MCW
W
orkf
ront
Chainage 161+100 161+200 161+300 161+400 161+500
Box
Culv
ert
Box
Culv
ert
RHS Bo
x Cu
lver
t
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Page 47
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 154
155
156
157
158
159
160
161
162
Types of Structures
Types of Structures
Number of Structures ## ## ## ## ## ## ## ## ##
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 163
164
165
166
167
168
169
Types of Structures
Types of Structures
Number of Structures ## ## ## ## ## ## ##
Status of Structures
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 162+100 162+200 162+300
LHS-Service Road Const.LHS-Service Road Workfront
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
LHS
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
163+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
162+400 162+500 162+600 162+700 162+800 162+900
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
163+500 163+600 163+700 163+800 163+900 164+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 163+100 163+200 163+300 163+400
Box
Culv
ert
RHS Bo
x Cu
lver
t
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Page 48
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 170
171
172
Types of Structures
Types of Structures
Number of Structures ## ## ##
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 173
174
175
176
177
Types of Structures
Types of Structures
Number of Structures ## ## ## ## ##
Status of Structures
LHS-
MCW
W
orkf
ront
Chainage 164+100 164+200 164+300 164+400
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
164+500 164+600 164+700 164+800 164+900 165+000
165+800 165+900 166+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road Workfront
165+200 165+300 165+400 165+500 165+600 165+700
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 165+100
Box
Culv
ert
Box
Culv
ert
RHS
RHS-Service Road Const.Bypass
LHS
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Page 49
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 178
179
180
181
Types of Structures
Types of Structures
Number of Structures ## ## ## ##
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
Types of Structures
Types of Structures
Number of StructuresStatus of Structures
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 166+100 166+200 166+300
LHS-Service Road Const.LHS-Service Road Workfront
LHS
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
167+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
166+400 166+500 166+600 166+700 166+800 166+900
167+600 167+700 167+800 167+900 168+000
RHS-
MCW
W
orkf
ront
Chainage 167+100 167+200 167+300 167+400 167+500
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
RHS
Page 50
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
Types of Structures
Types of Structures
Number of StructuresStatus of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
Types of Structures
Types of Structures
Number of StructuresStatus of Structures
168+500 168+600 168+700 168+800 168+900 169+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 168+100 168+200 168+300 168+400
LHS-
MCW
W
orkf
ront
Chainage 169+100 169+200 169+300 169+400
RHS
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
RHS
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
169+500 169+600 169+700 169+800 169+900 170+000
Page 51
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
Types of Structures
Types of Structures
Number of StructuresStatus of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
Types of Structures
Types of Structures
Number of StructuresStatus of Structures
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
RHS
170+600 170+700 170+800 170+900 171+000
RHS-
MCW
W
orkf
ront
Chainage 170+100 170+200 170+300 170+400 170+500
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
RHS
171+600 171+700 171+800 171+900 172+000
RHS-
MCW
W
orkf
ront
Chainage 171+100 171+200 171+300 171+400 171+500
Page 52
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
Types of Structures
Types of Structures
Number of StructuresStatus of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 182
183
Types of Structures
Types of Structures
Number of Structures ## ##
Status of Structures
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
172+500 172+600 172+700 172+800 172+900 173+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 172+100 172+200 172+300 172+400
173+500 173+600 173+700 173+800 173+900 174+000
LHS-
MCW
W
orkf
ront
Chainage 173+100 173+200 173+300 173+400
RHS
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
Box
Culv
ert
Box
Culv
ert
RHS
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Page 53
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 184
185
Types of Structures
Types of Structures
Number of Structures ## ##
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 186
187
188
Types of Structures
Types of Structures
Number of Structures ## ## ##
Status of Structures
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 174+100 174+200 174+300
LHS-Service Road Const.LHS-Service Road Workfront
LHS
Box
Culv
ert
Box
Culv
ert
RHS
175+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
174+400 174+500 174+600 174+700 174+800 174+900
175+800 175+900 176+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road Workfront
175+200 175+300 175+400 175+500 175+600 175+700
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 175+100
RHS-Service Road Const.Bypass
LHS
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
Page 54
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 189
190
Types of Structures
Types of Structures
Number of Structures ## ##
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 191
192
Types of Structures
Types of Structures
Number of Structures ## ##
Status of Structures
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 176+100 176+200 176+300 176+400
Box
Culv
ert
Box
Culv
ert
RHS
LHS-Service Road Const.
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
176+500 176+600 176+700 176+800 176+900 177+000
177+900 178+000
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
177+300 177+400 177+500 177+600 177+700 177+800
LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 177+100 177+200
Bypass
LHS 25
Box
Culv
ert
Box
Culv
ert
Maj
or
Brid
ge
(105
.30
m)
RHS
25
Page 55
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 193
194
Types of Structures
Types of Structures
Number of Structures ## ##
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 195
196
197
198
Types of Structures
Types of Structures
Number of Structures ## ## ## ##
Status of Structures
178+500 178+600 178+700 178+800 178+900 179+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 178+100 178+200 178+300 178+400
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
26
Major Bridge
Box
Culv
ert
Box
Culv
ert
RHS
26
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
17
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS 17
Min
or
Brid
ge
(20.
84 m
)
179+600 179+700 179+800 179+900 180+000
RHS-
MCW
W
orkf
ront
Chainage 179+100 179+200 179+300 179+400 179+500
Page 56
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 199
200
201
202
203
204
Types of Structures
Types of Structures
Number of Structures ## ## ## ## ## ##
Status of Structures
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures 205 1 206
207
208
Types of Structures
Types of Structures
Number of Structures ## 1 ## ## ##
Status of Structures
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
180+500 180+600 180+700 180+800 180+900 181+000
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Chainage 180+100 180+200 180+300 180+400
181+500 181+600 181+700 181+800 181+900 182+000
LHS-
MCW
W
orkf
ront
Chainage 181+100 181+200 181+300 181+400
RHS
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
Pipe
Cul
vert
Box
Culv
ert
Box
Culv
ert
Box
Culv
ert
RHS
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Bypass
LHS
Page 57
BCDBMWMMGSBSub-GradeC&GOther HindrncesClearance PendingLA PendingWorkfront Available
Workfront AvailableLA PendingClearance PendingOther HindrncesC&GSub-GradeGSBWMMDBMBC
Status of Structures
Number of Structures
Types of Structures
Types of Structures
Number of StructuresStatus of Structures
LHS-Service Road Const.LHS-Service Road Workfront
LHS-
MCW
LHS-
MCW
W
orkf
ront
Bypass
LHS
RHS
RHS-
MCW
W
orkf
ront
RHS-
MCW
RHS-Service Road WorkfrontRHS-Service Road Const.
Chainage 182+100 182+200
Page 58
1.5.1 Strip Plan (Details) Highway
Page 59
Item Description Unit Total Scope Progress till Date
C&G Ha 312 281.85
Earth Work Km 150.82 124.23
GSB Km 151.35 55.52
WMM Km 151.35 43.30
DBM Km 151.35 30.71
BC Km 159.14 NIL
Major Bridge Nos. 25
Foundation Nos. 264 226
Sub Structure Nos. 264 203
Super structure erection Nos. 217 60
Minor Bridge Nos. 17
Foundation Nos. 84 72
Sub Structure Nos. 84 69
Super structure erection Nos. 52 35
Fly Over Nos. 1 Nil
PUP/VUP Nos. 4 Nil
Slab and Box culvert Nos. 269 220
Slope protection /Retaining wall
Nos. 18000 17265
Portal Development Nos. 10 8.9
Heading Rmt 6675 3544
Benching Rmt 4875 864
Kerb Concrete Rmt 6675 900
Overt lining Rmt 6675 Nil
Rigid Pavement Rmt 6675 Nil
Drainage works Rmt 6675 Nil
Lighting Rmt 6675 Nil
Ventilation slab Rmt 1800 Nil
Finishing works Rmt 6675 Nil
Building works Nos. 2 Nil
Page 60
Design and Material procurement
Job 1 0.85
1.5.2 Strip Plan (Summary)
1. Work front Unavailable & Reason for Unavailability
2. Length Completed by Layer (MCW)3. Length Completed by Layer (Service
Road)
Length(km)
% Total Pending Length
Length(km)
% Total Length
Length(km)
% Total Length
Total Length 84.38 Total Length 151 Total Length NA
Total Work frontUnavailable
4.39 5.20%Total LengthCompleted(Till DBM)
30. 18.78%Total LengthCompleted(Till DBM)
0 0%
Pending Land Acq. 0 0% BC 0 0% BC 0 0%
Pending Clearances 0 0% DBM 30.71 20.33% DBM 0 0%
Encumbrances 4.39 5.20% WMM 43.30 28.67% WMM 0 0%
GSB 55.22 36.57% GSB 0 0%
Sub-Grade 65.270 43.22% Sub-Grade 0 0%
C&G(Ha) 281.85 90.34% C&G 0 0%
1.6 Land Acquisition and Clearances 1.6.1 LA Summary
DescriptionTotal
Required (ha)
Total in possession at
start (ha)
Total to beacquired (Ha)
TotalAcquired (Ha
Total to be acquired (ha)
Existing ROW 63.00 63.00 Nil Nil Nil
Pvt. Land To be Acquired 169.116 15.75 153.366 145.866 7.50
Public Land To be Transferred 119.884 0.00 119.884 119.884 Nil
Grand Total 352 78.75 273.25 262.417.50
(Approx.)
.
Page 61
1.6.2 LA Detail by CALA
CALA
Total Land left to be Acquired
(Ha)
3H Pending
(ha)
3H Done (ha)
3G Pending
(ha)
3G Done (ha)
3G Pending
(ha)
3D Done (ha)
3A Pending
(Ha)
3A Done (ha)
Amount Awarded (Crore Rs.)
Amount Deposited (Crore Rs.)
Amount Disbursed by CALA (Crore Rs.)
Pending Amount (Crore Rs.)
1 1.61 - - - 19.39 - - 1.61 - 636773259.00 636773259.0 636773259.0 -
2 183.04 - - 4.28 243.49 182.60 - - 182.60 7655165123.00 5549655728.00 5778567931.00 1856248304.00
Grand Total
184.64 - - 4.28 163.00 182.60 - 1.61 182.60 8291938382.00 6186428987.00 6415341190.00 1856248304.00
Note-The above LA details is being produced on the basis of information provided by Concessionaire & Authority. It is requested to Authority to verify the details of pending amount.
1.6.3 Clearances Summary
Environment Clearance
Proposal Description Status Length Impacted Current Issues/Comments
Environment Clearance Obtained Nil Completed Obtained on 21-03-2013
Environment Clearance Obtained Nil Completed Obtained on 21-03-2013
Page 62
1.6.4 Status of Utility ShiftingStatus of Utility Estimate approval
Division wise particulars of Utility Shifting Estimates (Water Supply)
Sr. No.
Name of Work
Location
Department
DivisionSub
DivisionEstimate Amount
Approved Amount
(Inclusive of Departmental Charges)
Supervision Charges/
Departmental Charges
Approved Amount
(Exclusive of Departmental Charges)
Approval letter No. (RO)Approva
l Date (RO)
Status Remarks
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1
Shifting of Water Pipe Line along
proposed 4 Lane
0+000 to
08+650WSS
Anandpur Sahib
Kiratpur Sahib
Rs. 44,140,930
Rs. 31,302,383
Rs. 2,817,214Rs.
28,485,169
NHAI/RO/CHD/11011/PD-SHM/NH-21/KIR-N.CHK/
US/14
23-07-14
Approved Work in Progress
2
Shifting of Water Pipe Line along
proposed 4 Lane
172+600 to
178+000 ,
178+000 to
179+700 &
177+050 to
182+100
IPH Baggi Baggi I & IIRs.
40,658,600Rs.
37,716,790Rs. 3,394,511
Rs. 34,322,279
NHAI/RO/CHD/11011/PD-SHM/NH-21/KIR-N.CHK/
US/35
28-01-15
Approved Work in Progress
3
Shifting of Water Pipe Line along
proposed 4 Lane
151+000 to
163+000 &
163+350 to
176+200
IPHSunder Nagar
Sunder Nagar & Kanaid
Rs. 42,136,724
Rs. 24,902,417
Rs. 2,241,218Rs.
22,661,199NHAI/RO-Jammu/
2010/11050/K-N/29326-12-
13Approved Work in Progress
Page 63
4
Shifting of Water Pipe Line along
proposed 4 Lane
08+800 to
23+500
IPH
Bilaspur Swarghat Rs. 680,560 Rs. 581,674 Rs. 52,351 Rs. 529,323NHAI/RO-Jammu/
2010/11050/K-N/28723-12-
13Approved
work not started, Concessionaire is required to start
the shifting of water pipe line on
urgent basis
130+500 to
137+500
Ghumarwin
JhandutaRs.
3,981,900Rs. 3,601,565 Rs. 324,141 Rs. 3,277,424
NHAI/RO-Jammu/2010/11050/K-N/289
23-12-13
Approved Work Completed
JhandutaRs.
2,093,510- - -
Yet to be Approved
Additional Work under Progress
Ghumarwin
Rs. 16,202,300
_ - -NHAI/RO/CHD/11011/PD-
MANDI/NH-21/US/1327-05-
16Approved
No Bill Proposed yet
138+000 to
153+500
Bilaspur KandrourRs.
17,741,750Rs.
14,957,201Rs. 1,346,148
Rs. 13,611,053
NHAI/RO-Jammu/2010/11050/K-N/284
23-12-13
Approved Work in Progress
5Acc Link
roadIPH Bilaspur Bilaspur
Rs. 10,431,700
Yet to be Approved
R.O. Shimla
6
Shifting of Water Pipe
Line in Sundernaga
r Bypass
- I&PH - - - - - - - - -Estimate yet to be submitted by I&PH
7
Shifting of Electrical
Tower within
proposed ROW
EstimateApproved
AD Hydro Pvt. Ltd
Work to be started
Estimate approved shifting of tower is to be done by AD
Hydro Pvt. Ltd.
1.7 Change of ScopeS No. Proposal Details Date of first Current Status COS Expected/ Actual Date of
Page 64
submission to IE Amount (Rs) Approval
1. Major Bridge @ Ch. 0+450 08-09-2015 Principally Approved 14,64,42,399 28-04-2016
2. Major Bridge @ Ch. 23+070 08-09-2015 Principally Approved 27,20,03,104 28-04-2016
3. Major Bridge @ Ch. 26+184 08-09-2015 Principally Approved 17,86,13,658 28-04-2016
4. Major Bridge @ Ch. 178+013 08-09-2015 Principally Approved 5,14,47,500 28-04-2016
5. Additional Culverts 08-09-2015 Approved 25,17,41,709 13-12-2016
6. Naulakha Dadour ( Service Road) 23-09-2014 Block cost Submitted 16,66,16,863Detailed cost to be
submitted by Concessionaire.
7. Sunder Nagar Bypass 19-07-2014 Block Cost Submitted 65,91,56,391Detailed cost to be
submitted by Concessionaire.
1.8 Mobilization of Resources
S/no
Equipment Name
Make Model Age of Equipment
Planned/ Required Quantity
Actual Quantity
Deployed During
the Month
Reason(s) for
Under/Over Mobilization
Expected Delay due to
Under- Mobilization
(Months)
RemarksEquipment Description
Equipment Capacity
1 Air Compressor IR-400 & 600 Ingersoll-rand 13
2 Bar Bending M/c Spaream SBM 42 Spartan 6
3 Bar Cutting M/c Spaream SBM 42 Spartan 29
4 Diesel vibrator 5 HP Greaves 65 Dewatering pump 3 HP Kirlosker 126 Dewatering pump 5 HP Kirlosker 127 Electrical Vibrator 5 HP greaves 48 Poker Vibrator Smart 65 Atlas Copco 13
Page 65
9 Submersible Pump 7.5 HP Kirlosker 110 Submersible Pump 2 HP Kirlosker 211 Welding Rectifier 400 Amp Adore 4612 Welding Rectifier 350 Amp Lincoln 1
13 Welding Transformers 400 AMP Adore 14
14 Shuttering Viberator 1 K.W. Atlas Copco 32
15 Shuttering Viberator Needle 4.7 KVA Atlas Copco 8
16 Plate Compactor 4.4 kw Atlas Copco 4
17 Frequency Converter 4.7 KVA Atlas Copco 8
18 Solex Pump Geo Constec 619 Motor Bike 100 CC TVS-Suzuki 4
20 Hyd Jake 600T&700T 50T & 30T Kanwar 2
21 High Pressure Car Washer Model Elgi 1
22Breaker TE 1000-AVR 230-V(2065553)
HILTI Hilti 7
23 Submersible Non-Clog Sludge pump 10 HP Mody 7
24 Vibratory Rammer Walker Neuson 325 Batching Plant 30 Cum/Hrs Schwing Stetter 1326 Batching Plant 18 Cum/Hrs Schwing Stetter 127 Mini batching plant RM 800 Universal 228 Cement Silo 100 T Schwing Stetter 2
29 Cement Feeding Pump N/A Schwing Stetter 2
30 Crusher-3 Stage 200 TPH Metso 131 GSB Crusher 60 TPH Indigenious 132 Wet Mix Plant 200 MTPH Maxmec 133 Concrete Pump SP-1400 Schwing Stetter 334 Boom Placer 36 mtr Putzmeister 235 Transit Mixer 6 CUM Schwing Stetter 3936 Ambulance Force 2
Page 66
37 Self-Loading Mixer 2 CUM Ajax Fiori 1
38 Tipper 06 CUM 09 CUM Ashok Leyland 26
39 Tipper 14 CUM Tata/Mahindra/ Leyland 49
40 Trailer 40 Ft Ashoka Leyland 341 Trailer 24 Ft Tata/AMW 342 Trailer 32 Ft Tata/AMW 143 Trailer 27 Ft Tata/AMW 044 Wheel loader 1.7 CUM Hindustan/Tata 3
45 Dozer CAT D5G & BEML BD 80 Catterpillar/BEML 4
46 Hydraulic Excavator 01 CUM CAT/Tata/Hyundai/ JCB/Volvo 34
47 Hydraulic Excavator with breaker 01 CUM Hyundai/JCB/Doosan 15
48 Mini Tandom Roller 3 T Greaves 149 Mobile Crane 14 T Indofarm/Escort 250 Mobile Crane 12 T Indofarm/Escort 251 Hyd Crane 16T Escort 552 Mobile Crane 40 & 23 T ACE 353 Crane 75 T P&H 454 Tower Crane 2.5 T ACE 355 Motor grader 12/14 Ft Catterpillar/BEML 3
56 Pneumatic tyred roller 14 T HAMM 1
57 Soil compactor 10 T Greaves/Escort/Atlas 6
58 Skid Steer Loader (Bobcat) .46 Cum Terex 1
59 Vibratory Tandem Roller N/A Escort 4
60 Backhoe Loader .75 CUM CAT/JCB/ACE/ Mahindra 13
61 Power generator 7.5 KVA & 10 Kirlosker/Sudhir 962 Power generator 30 KVA Kirlosker/Sudhir 663 Power generator 40 KVA Kirlosker/Sudhir 964 Power generator 62.5 KVA Sudhir 7
65 Power generator 125 KVA & 250 Greaves/Sudhir 23
Page 67
KVA66 Power generator GWY 500 Greaves/Sudhir/CAT 567 Tower Light 5 KVA Chicago Pneumatic 668 Welding DG Set 400 Amps Adore 969 Weigh Bridge 80 MT Precision 170 Weigh Bridge 60 MT Weing control System 471 Weigh Bridge 100 MT Eagle 2
72 Tractor with (Trolly and Tanker) 3000 Ltrs Mahindra/Sonalika/
HMT 19
73 Water Tanker 10000/8000 Ltrs Tata 7
74 Diesel Tanker 12000 Ltr Tata 5
75 Shotcrete Machine(Sika Aliva) PM-500 Putzmeister 4
76 Shotrete Machine(Normet) 7110/8100 Normet/ Schwing
stetter 2
77 Grouting Pump Mai 400 Atlas Copco/ Rocktec 1878 ROC LM 100 Atlas Copco 479 Rocket Boomer L2D/E2D/XE3C Atlas Copco/ Sandvik 880 SCISSOR LIFT JCB 1
81 Ventilation ducting 1800 MM Dia & 45 KW 8
Note: IE has provided the above details as per the information given by Concessionaire, missing information as per table yet to be provided by Concessionaire.
1.9 Financial Progress Details
1.9.1 Pen Picture-EscrowTPC (Cr)
Cumulative inflow to Escrow till previous month (Cr)
Cumulative outflow from Escrow till previous month (Cr)
Inflow to Escrow during the month (Cr)
Outflow from Escrow during the month (Cr)
2,291 1711.9 1682.46 1.5 17.5
1.9.2 Escrow details
TPC (Cr) Cumulative exp. Escrow Plan till Escrow Plan till Escrow Plan till Escrow Actual Escrow Actual till Escrow
Page 68
till date (Cr)date- Debt (BOT)
(Cr)date- Equity
(BOT) (Cr)date- VGF (BOT)
(Cr)till date- Debt
(BOT) (Cr)date- Equity (BOT)
(Cr)
Actual tilldate- VGF(BOT) (Cr)
2,291 1699.96 1,555.62 500.81 134.57 1087.8 469 0
Page 69
Page 70
1.10 Monitoring of Operations & Maintenance Obligations1.10.1 Maintenance Status during Construction Phase
Expected Contents & Structure
Submission of maintenance estimate from km 73+200 to km 186+500 for an amount of Rs. 19.06 Crore based on SOR of PWD(HP) were submitted to PD NHAI vide letter no. ITNL-KNCEL/PRJ/TECH/ODO-589/2012/005, dated 01.11.2012.
Video recording of existing pavement condition of highway NH – 21 km 73+200 to km 186+500 was submitted to PD NHAI vide letter no ITNL-KNCEL/PRJ/TECH/CLO-579/2013/395, dated 23.11.2013.
For the maintenance of existing road, Concessionaire has submitted an estimate of Rs. 15.45 crores vide letter no. ITNL-KNCEL/PRJ/TECH/CLO-579/2013/390 dated 29.11.2013. Thereafter, Independent Engineer verified an amount of 10.88 crores vide letter no. SCIA/001/13-14/TL/NHAI-00221 dated 05.12.2013 and subsequently, NHAI sanctioned an amount of 6.52 crores vide letter no. 11009/5/2013/K-N/PIU-SML/06 dated 01.04.2014.Now except 26 Km matching with existing highway and balance 90 Km handed over to PWD.
Maintenance of existing road is still in consideration as and when required.
Status of traffic worthiness and safety of project highway
The existing road along project highway from Km 8+00 to 12+700, 173 to 178 required to be regular maintenance to make the road in traffic worthy condition.
Status of necessary repair and maintenance works
Concessionaire has been started the maintenance works of existing road between Km 8+00 to 12+700. During the end of this month Concessionaire has not been completely repaired the above stretch Between KM158+850 to KM 159+840 & Km 165+050 to 166+680 regular maintenance is required.
Compliance of other maintenance obligations as per contract.
The existing road has to be maintained for traffic worthiness and safety measures in accordance to clause 12.2 of C.A to avoid inconvenience to traffic users.
1.10.2 Maintenance Status during operations & Maintenance Phase (If Applicable) Not Applicable
1.11 Pen Picture on safety features Details to be provided after assessment of the site requirement vis-à-vis provisions in the Concession Agreement:
Location of Black Spots
Suggested Remedial Measures within provisions of Concession
Agreement
Additional Remedial Measures
(If any)
Financial implications of additional Remedial Measures
for Authority (Cr.)
NA NA NA NA
Page 71
1.12 Annex 1: Detailed list of Physical Components as per Schedule G
Component Physical Item
Road works including culverts,minor bridges, underpasses,overpasses, approaches to
ROB/RUB/ Major Bridges/ Structures(but excluding service roads)
A- Widening and strengthening of existing road
(1) Earthwork up to top of the sub-grade ( Scope-51.450 Km)
(2) Granular work (sub- base, base, shoulders)
(a) GSB( Scope-51.450 Km)
(b) WMM( Scope-50.450 Km)
(3) Shoulders( Scope-51.450 Km)
(4) Bituminous work
(a) DBM( Scope-50.450 Km)
(b) BC( Scope-50.700 Km)
(5) Rigid Pavement (1.00 Km)
Concrete work
(6) Widening and repair of culverts Nil
(7) Widening and repair of minor bridges at Km 0+450 RHS
B- New realignment/bypass
(1) Earthwork up to top of the sub-grade (Scope 99.370 Km)
(2) Granular work (sub- base, base, shoulders)
(a) GSB ( Scope 99.895 Km )
(b) WMM (Scope 99.895 Km)
(3) Shoulders Scope (99.895 Km)
(4) Bituminous work
(a) DBM (Scope 99.895 Km)
(b) BC (Scope 108.44 Km)
(5) Rigid Pavement
Concrete work (Scope 1.00Km)
C- New culverts, minor bridges, underpasses, overpasses on existing road, realignments, bypasses:
(1) Culverts 269 Nos
(2) Minor bridges 17 Nos
(a) Foundation 84
(b) Sub-structure 84
(c) Super-structure (including crash barriers etc. complete) 52
(3) Cattle/Pedestrian underpasses NA
(a) Foundation
(b) Sub-structure
(c) Super-structure (including crash barriers etc. complete)
(4) Pedestrian overpasses 04 Nos
(a) Foundation
Page 72
(b) Sub-structure
(c) Super-structure (including crash barriers etc. complete)
(5) Grade separated structures 01 No
(a) Underpasses
(i) Foundation
(ii) Sub-structure
(iii) Super-structure (including crash barriers etc.
Overpass NA
Foundation
(ii) Sub-structure
(iii) Super-structure (including crash barriers etc. complete)
(d) Foot over Bridge
Major Bridge works and ROB/RUB Structures (elevated sections,
reinforced earth)
A- Widening and repairs of Major Bridges NA
(1) Foundation
(a) Open Foundation
(b) Pile Foundation/Well Foundation
(2) Sub-structure
(3) Super-structure (including crash barriers etc. complete)
B- Widening and repair of NA
(a) ROB
(1) Foundation
(2) Sub-structure
(3) Super-structure (including crash barriers etc. complete)
(b) RUB
(1) Foundation
(2) Sub-structure
(3) Super-structure (including crash barriers etc. complete)
C- New Major Bridges
(1) Foundation 264 Nos
(a) Open Foundation
(b) Pile Foundation/Well Foundation
(2) Sub-structure 264 Nos
(3) Super-structure (including crash barriers etc. complete) 217 Nos
D- New rail-road bridges
(a) ROB N/A
(1) Foundation
(2) Sub-structure
(1) Super-structure (including crash barriers etc. complete)
(b) RUB N/A
(1) Foundation
Page 73
(2) Sub-structure
(3) Super-structure (including crash barriers etc. complete)
(1) Foundation
(2) Sub-structure
Super-structure (including crash barriers etc. complete
(4) Reinforced Earth Wall (includes Approaches of ROB, Underpasses, Overpasses, Flyover etc.
Other Works
(i) Service roads/ Slip Roads Nil
(ii) Toll Plaza 02 Nos at Km 8+500 &Km 151+537
(iii) Road side drains
(iv) Road signs, markings, km stones, safety devices,
(a)Road signs, markings, km stones,
(b) Concrete Crash Barrier/ W-Beam Crash Barrier in Road work
(v) Project facilities
(a) Bus bays Scope- 50 Nos
(b) Truck lay-byes Scope-03 Nos
(c) Rest areas To be decided
(vi) Repairs to bridges/structures
(vii) Road side plantation
(viii) Protection works
(a) Boulder Pitching on slopes Nil
(b) Gravity/Retaining wall 18 Km (Variable as per site Condition)
(ix) Tunnel 05 Nos
(a) Excavation ( Scope 6675 Meter)(b) Construction of support system including rock bolting, lining etc. 6675 meter(c) On complete completion of tunnel (Final Lining ) 6675 meter
(d) Rigid Pavement (Scope 6675 Meter)