dest opening oct 2010 ecg tc

Post on 04-Jul-2015

257 Views

Category:

Travel

2 Downloads

Preview:

Click to see full reader

DESCRIPTION

The Downeast Sunrise Trail officially opened September 2010. This slidehow was presented to the ECGA Trails Council meeting OCT 2010 in Durham, NC to support the final designation of the this trail -- now the longest rail-trail in New England and the longest off-road section of the East Coast Greenway.

TRANSCRIPT

Downeast Sunrise Trail

Maine’s most spectacular section of the East Coast GreenwayMaine’s most spectacular section of the East Coast GreenwayMaine’s most spectacular section of the East Coast Greenway

DURHAM, NC OCTOBER, 2010

Construction ActivityConstruction ActivityDennysville photos, but saw concurrent activity in Dennysville photos, but saw concurrent activity in all areas. A lot is going on.all areas. A lot is going on.

BridgesBridges

Bridge work and Bridge work and finish details are finish details are

particularly nice and particularly nice and add to the add to the

attractiveness of the attractiveness of the trail.trail.

Water DrainageWater DrainageDay after heavy rains & trail was dry. Very nice Day after heavy rains & trail was dry. Very nice and robust water structures.and robust water structures.

DEST OFFICIAL OPENINGDEST OFFICIAL OPENING21 September 201021 September 2010

Tireless AdvocateTireless Advocate 2000 20102000 2010

Downeast Sunrise TrailDowneast Sunrise TrailMaine’s most spectacular section of the East Coast Maine’s most spectacular section of the East Coast

GreenwayGreenway

Trail SurfaceTrail SurfaceAcceptable for Recreational Bicyclists?Acceptable for Recreational Bicyclists?

top related