06/01/14

2,200,000.00€

21/10/12

Vigo-España

EQUIPMENT

CLIENT:

SITE:

AMOUNT:

START DATE CAMPAIGN:

END DATE CAMPAIGN:

OPERATIONAL DAYS:

SCOPE OF WORKS:

Geophysicalsurveyusingthefollowingequipment:

-BathymetryMultibea-Sidescansonar.-Sub-bottomprofiler.Pinger.-Seismichighandlowresolution.-Magnetometryhighresolution.

Geotechnicalsurvey:

2boreholeusingdrillrigandcontinoussamplingupto30mbsf.

2CPTUindown-the-holeupto30mbsf.

DredgingInternational

ControlyProspeccionesIGEOTESTS.LhasbeencontractedbyDREDGINGINTERNATIONALtocarryoutageotechnicalsurveyinKuwaitforthenewrefineryproject.ThesitelocationisproposedatthewestsideoftheAl-ZourPowerPlantandthesouthwestendoftheTexacoOilFacilities.InthesouthwefindtheAlKhiranPearlCity.Toallowconstructionoftheplant,atotalof70millionm_ofsandneedstobedredgedandreclaimed.ForthisasandsearchcampaignhasbeensetupaspartofaSIB.ThiscomprisesseabedsurficialboreholesexecutedwithaSeabedMinidrill.

•1sondeotestificaciónhasta15m(instalaciondepiezom.yarqueta)•3sondeosatestificaciónhasta5m

MINIDRILL MDS-6000Dimensions: 7510x2400x2350 (l x w x h)Surface weight: 5600 kgSampler Diameter (mm): 120 int./146 ext .Sampler length (m): 6,0 mMax. water depth: 300 mThrust capacity: 35 kNElectrical power: 15kw/400VRefrigeration pump 60l/min - 50 barDrilling tool:bit widia

Totalde27presiómetrosentierra

Campañageotécnicamarinaconsistenteenlarealizaciónde:

SEA WAVETYPE: offshore tug / supply shipSIZE: 61 x 12 mDRAUGHT: 4,90 m

•8sondeosdestructivosc/presiómetroc/1,5m(endossondeoscaladode5m)hastacota-30m.Totalde108presiómetrosenmar

*Sondeosdestructivosconregistrodeparámetros*Detectarinstalacionesenterradas*30mldetuberiapiezométricay2arquetas.

30/08/2013

10Days

24/09/2013

Thetotalgeotechnicalsurveyswasperformedin30dayswiththePrepaparationphase,Mobilizationphase,Surveyperformacephaseoffshore(geotechnical)anddataprocesingphaseandtheinterpretationandreportingphase.

MARINE SPREADS

AlZour-Kuwait

217,000.00€

KNPC New Refinery Project Al Zour