news from tbts

Post on 13-Jan-2016

19 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

News from TBTS. CLIC RF Structure Development Mtg , Alexey Dubrovskiy and CTF team. RF measurements. Diode power measurement. Drive beam. PETS 12GHz. PETS output. Loop output. CLIC RF Structure Development Mtg Alexey Dubrovskiy and CTF team. ACS input. ACS output. Probe beam. - PowerPoint PPT Presentation

TRANSCRIPT

News from TBTSCLIC RF Structure Development Mtg,

Alexey Dubrovskiy and CTF team

RF measurements

PETS 12GHz

ACS: 12WDSDVG1.8

- RF Diode & IQ measurements

Drive beam

Probe beam

PETS output

ACS input

Loop output

ACS output

2

06.07.11

CLI

C R

F Str

uct

ure

Develo

pm

ent

Mtg

Ale

xey D

ubro

vsk

iy a

nd C

TF

team

The expected attenuation is 77% => <15% RF measurement inconsistency

Diode power measurement

RF measurements and Acceleration

PETS 12GHz

ACS: 12WDSDVG1.8

- RF Diode & IQ measurements

Drive beam

Probe beam

PETS output

ACS input

Loop output

ACS output

All Diode and PETS and Loop output IQ signals are consistent with acceleration.

Estimated Acceleration from Diodes

Estimated Acceleration from IQs

3

06.07.11

CLI

C R

F Str

uct

ure

Develo

pm

ent

Mtg

Ale

xey D

ubro

vsk

iy a

nd C

TF

team

Illustration of BDs

4

06.07.11

CLI

C R

F Str

uct

ure

Develo

pm

ent

Mtg

Ale

xey D

ubro

vsk

iy a

nd C

TF

team

PETS extracted PETS reflected

Attenuated forward Attenuated reflected

ACS forward ACS reflected

ACS transmittedDrive beam current

BD without reflection

BD in the waveguide

No BD

PETS loop conditioning

5

06.07.11

CLI

C R

F Str

uct

ure

Develo

pm

ent

Mtg

Ale

xey D

ubro

vsk

iy a

nd C

TF

team

PETS output peak power PETS Vacuum level

Pulse length at 75% of pp

Pulse length at 90% of pp

Number of BD

Accumulated BDR

* BD detection is based on the reflected power

PETS attenuator conditioning

6

06.07.11

CLI

C R

F Str

uct

ure

Develo

pm

ent

Mtg

Ale

xey D

ubro

vsk

iy a

nd C

TF

team

PETS output peak power Expected attenuated power

Pulse length at 75% of pp

Pulse length at 90% of pp

Number of BD

Accumulated BDR

* BD detection is based on the missing energy

PETS2ACS waveguide conditioning

7

06.07.11

CLI

C R

F Str

uct

ure

Develo

pm

ent

Mtg

Ale

xey D

ubro

vsk

iy a

nd C

TF

team

PETS output peak power

Pulse length at 75% of pp

Pulse length at 90% of pp

Number of BD

Accumulated BDR

* BD detection is based on the missing energy

Illustration of BDs

8

06.07.11

CLI

C R

F Str

uct

ure

Develo

pm

ent

Mtg

Ale

xey D

ubro

vsk

iy a

nd C

TF

team

PETS extracted PETS reflected

Attenuated forward Attenuated reflected

ACS forward power ACS reflected

ACS transmitted ACS Forward Phase

BDs in the recirculation loop

High reflection from the ACS. Is it a BD in the ACS?

No BDs in the waveguide

ACS conditioning

9

06.07.11

CLI

C R

F Str

uct

ure

Develo

pm

ent

Mtg

Ale

xey D

ubro

vsk

iy a

nd C

TF

team

Forward peak power Pulse length at 75% of pp

Number of BD

Accumulated BDR

* BD detection is based on the missing energy, pulses with upstream BDs are excluded

Number of BD

Accumulated BDR

* BD detection is based on the missing energy

ACS BD vs Acceleration

10

06.07.11

CLI

C R

F Str

uct

ure

Develo

pm

ent

Mtg

Ale

xey D

ubro

vsk

iy a

nd C

TF

team

Forward peak power

Accumulated BDR

* BD detection is based on the missing energy, pulses with upstream BDs are excluded

Measured acceleration

96 MV/m105 MV/m

113 MV/m 120 MV/m 127 MV/m 133 MV/m

ACS BDR vs Acceleration

11

06.07.11

CLI

C R

F Str

uct

ure

Develo

pm

ent

Mtg

Ale

xey D

ubro

vsk

iy a

nd C

TF

team

BDR vs Acceleration

The latest news from the last night

12

06.07.11

CLI

C R

F Str

uct

ure

Develo

pm

ent

Mtg

Ale

xey D

ubro

vsk

iy a

nd C

TF

team

Successful run over the night with the stable beam conditions

Conclusions

13

06.07.11

CLI

C R

F Str

uct

ure

Develo

pm

ent

Mtg

Ale

xey D

ubro

vsk

iy a

nd C

TF

team

• The RF measurement has been improved, but not finished yet • The major number of BDs appear nearby the variable attenuator• The BDR in the ACS is in the order of 10-3 at 100MV/m• The TBTS night operation has been successfully established• The future operation will continue the RF system conditioning and DBR measurement.

top related