seminars in professional practice, fall 2006€¦ · web view1 hrs cutting buckram and sewing bias...

Post on 28-Oct-2019

4 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Seminars in Professional Practice, Spring 2010Topics in Masks and Armor

Portfolio Project Sheet

Name: __Kaitlin Fara_____________________________________________________

Project: __Simple Mask____________________________________________________

Hourly breakdown of labor:[ex.: “30 min research/planning, 30 min pattern drafting, 5 hour construction]

.5 hrs Setting up to sculpt matrix2 hrs Sculpting Matrix.5 hrs Applying 1st Layer of fabric mache5min Applying 1st Layer of plain sculpt or coat.5 hrs Applying 2nd Layer of fabric mache5min Applying 2nd Layer of plain sculpt or coat.5 hrs Applying 3rd Layer of fabric mache5min Applying 3rd Layer of plain sculpt or coat.5 hrs Applying 4th Layer of fabric mache5min Applying 4th Layer of plain sculpt or coat(4 hrs Drying -.5 hrs between each coat).5 hrs Painting 2 layers of base coat1 hrs cutting buckram and sewing bias on7 hrs applying wire, bells, and fabric to buckram pieces1 hr Sewing on 1st row of buckram pieces, removing shank from button decoration, and

gluing on trim2 hrs Hand sewing remaining buckram pieces to mask and attaching ribbon1 hr Applying button and painting scrollwork

Total 17hrs 20min (w/out dry time); 21hrs 20min (w/dry time)

Products used:Aluminum FoilStyrofoam HeadAir Dry ClayMuslinSculpt or Coat

Quilting FabricAcrylic PaintJingle BellsPuff Paint

Patcher Sewing Machine18 Gauge WireRibbon

Research citations, if any:

Please attach copies of any notes, drawings, mathematical formulae, etc. used in the process of completing this project.

top related