Synchro Phasor Monitoring System

Ray Doyle

Generator Forum 15th May

Presentation Content

• Update on status of SPM system

• Use of SPM system during North-South Separation

• Use of system during Storm Darwin

• Use of SPM to observe generator behaviour during

Testing

• Recent Power System Events of Concern

SPM System Status Update

• 19 PMU’s now operational – 14 in Ireland

– 4 in Northern Island (Coolkeeragh * 2, Moyle & Castlereagh House)

– 1 in UK on East West Interconnector

– Additional Units planned for NI

• Additional recorders installed in Ireland with PMU

capability will be connected to the SPM system as

bandwidth required to stream data becomes available

• Real Time Phasor Data now available to NCC and will be

available to CHCC in near future

System Frequency Measurements

Frequency Spectrum Analyser

Generator Stability Status

Control Centre Frequency Oscillation Monitoring Display

Oscillation Magnitude (MW) & Frequency

North-South system Separation 28th Nov 2013

Forced Outage of Louth-Tandragee 275 kV Interconnector

49.9

49.92

49.94

49.96

49.98

50

50.02

50.04

50.06

50.08

28

-11

-13

08

:40

:00

28

-11

-13

08

:41

:00

28

-11

-13

08

:42

:00

28

-11

-13

08

:43

:00

28

-11

-13

08

:44

:00

28

-11

-13

08

:45

:00

28

-11

-13

08

:46

:00

28

-11

-13

08

:47

:00

28

-11

-13

08

:48

:00

28

-11

-13

08

:49

:00

28

-11

-13

08

:50

:00

28

-11

-13

08

:51

:00

28

-11

-13

08

:52

:00

28

-11

-13

08

:53

:00

28

-11

-13

08

:54

:00

28

-11

-13

08

:55

:00

28

-11

-13

08

:56

:00

28

-11

-13

08

:57

:00

28

-11

-13

08

:58

:00

28

-11

-13

08

:59

:00

28

-11

-13

09

:00

:00

28

-11

-13

09

:01

:00

28

-11

-13

09

:02

:00

28

-11

-13

09

:03

:00

28

-11

-13

09

:04

:00

28

-11

-13

09

:05

:00

28

-11

-13

09

:06

:00

28

-11

-13

09

:07

:00

28

-11

-13

09

:08

:00

28

-11

-13

09

:09

:00

28

-11

-13

09

:10

:00

Fre

qu

en

cy (

Hz)

System Frequencies pre/post System Separation

South

North

Moment of Separation

North-South Re-Synchronisation 30th Nov 2013

49.94

49.95

49.96

49.97

49.98

49.99

50

50.01

50.02

50.03

50.04

50.05

30

-11

-13

08

:30

:00

30

-11

-13

08

:31

:00

30

-11

-13

08

:32

:00

30

-11

-13

08

:33

:00

30

-11

-13

08

:34

:00

30

-11

-13

08

:35

:00

30

-11

-13

08

:36

:00

30

-11

-13

08

:37

:00

30

-11

-13

08

:38

:00

30

-11

-13

08

:39

:00

30

-11

-13

08

:40

:00

30

-11

-13

08

:41

:00

30

-11

-13

08

:42

:00

30

-11

-13

08

:43

:00

30

-11

-13

08

:44

:00

30

-11

-13

08

:45

:00

30

-11

-13

08

:46

:00

30

-11

-13

08

:47

:00

30

-11

-13

08

:48

:00

30

-11

-13

08

:49

:00

30

-11

-13

08

:50

:00

30

-11

-13

08

:51

:00

30

-11

-13

08

:52

:00

30

-11

-13

08

:53

:00

30

-11

-13

08

:54

:00

30

-11

-13

08

:55

:00

30

-11

-13

08

:56

:00

30

-11

-13

08

:57

:00

30

-11

-13

08

:58

:00

30

-11

-13

08

:59

:00

30

-11

-13

09

:00

:00

Fre

qu

en

cy (

Hz)

System Frequencies during System Re-synchronisation

South

North

Matching of System Frequencies Moment of Re-Synchronisation

North-South Re-Synchronisation 30th Nov 2013

-300

-250

-200

-150

-100

-50

0

50

Ph

ase

An

gle

(d

egr

ee

s)

Voltage Phase Angles during System Re-synchronisation

South

North

Matching of System Angles Moment of Re-Synchronisation

The Synchro-phasor Monitoring System

Provides Control Centre With

• Immediate Identification of System Splits – Information of the state of each sub system

– Means to direct efforts when re-synchronising two parts of the system

• Generator MW & MVAr output

• Bus Voltages / Frequencies / Phase angles

• Oscillation magnitudes and frequencies

• Indication of Faults, Fault Types and Durations

• Partial Backup for Scada/EMS failure

Use of Phasor Monitoring system

during Storm Darwin 12th February

• 67 faults on 110 kV System from 11:36 to 16:21 – Seven 110 kV load stations disconnected

– Three 110 kV wind farms disconnected

• Eight lines forced out of service at end of storm

• All generators rode through all faults

Voltage Dips Across the Network

11:30 to 15:30

Impact at various networks nodes

available to operators seconds after fault

Line Trip, Auto-Reclose & Trip 1 Ph to E fault, line structure okay, attempt restoration

1 s per division

Line Trip, Auto-Reclose & Trip Ph to Ph fault , possible structural damage, no restoration attempt

~ 0.5s per division

Fault evolving from 1 to 2 to 3 phase (suggest structure failure thus no attempt to restore)

Use of Phasor Monitoring system

during Storm Darwin 12th February

• SPM system can provide detailed fault

information to control centre in real time

• This supplements existing information such as

Protection relay signals

• New information is graphical thus faster and

easier to interpret – In many instances can reduce decision making time

Use of SPM to observe generator

behaviour during Testing

• The SPM now allows observation of generator testing in

real time – Any issues the machine is causing for the system or other generators can be observed

• Should allow for more secure operation of the system

when tests with significant impact potential are being

carried out

• Allows decisions to be made on continuing with test

programme or pausing to investigate issues

Example of Setpoint Step Change to AVR

238.9

kV L-L

-24.6

MVAr

17:19 17:18 17:17 17:13 17:12 17:11

12/03/2014 17:20:00Measured Voltage and Reactive Power

237.8

238.0

238.2

238.4

238.6

238.8

239.0

239.2

-44.0

-41.1

-38.3

-35.4

-32.6

-29.7

-26.9

-24.0

Reaction of Generator MVAr output to Disturbance

introduced by Transformer Switching

234.2

kV L-L

-74.7

MVAr

20:44 20:43 20:42 20:38 20:37 20:36

12/03/2014 20:45:00Measured Voltage and Reactive Power

222.0

224.0

226.0

228.0

230.0

232.0

234.0

236.0

-90.0

-77.1

-64.3

-51.4

-38.6

-25.7

-12.9

0.0

Reaction of Generator MW Output Disturbance

introduced by Transformer Switching

E.Freq;Hz

50.010

Hz

E.3P;MW

429.2

MW

20:40:06 20:40:04

12/03/2014 20:40:07Local Frequency and Real Power

49.960

49.970

49.980

49.990

50.000

50.010

50.020

50.030

380.0

397.1

414.3

431.4

448.6

465.7

482.9

500.0

Recent Incidents

• Two Major Incidents currently under Investigation

– 22nd April Under-frequency Load Shedding

following generator trip

– 27th April Major System Oscillation following

generator trip

System Frequency 22 April 2014 17:31 to 17:46

• 370 MW Gen Trip

• 180 MW load disconnected approx

• Frequency sub 49.9 Hz ~ 9 min

Comparison Event

• 357 MW Trip 27 May 2013

• Frequency recovered to 49.9 Hz ~ 9 seconds post Nadir

System Frequency 27 April 2014 21:40

• 370 MW Trip 27 April 2014

• Severe Oscillation in generator outputs around Nadir

20s per division

Frequency & Voltage Oscillations

Looking Ahead

• Trend is to have fewer conventional units

committed than in the past

• No Margin for underperformance of any unit – In terms of reserve provision, stability, fault ride through, voltage support

• EirGrid & Generators to Collaborate on – More robust testing of machine capability and dynamic performance

– Enhanced Performance Monitoring

– Linking payments to actual performance with the potential for declaring

services unavailable following evidence of under performance

– Incentives to deliver the required performance

Thanks for your Attention

Questions

top related