trans mountain pipeline: not worth the risk · presentation to ministerial panel august 16, 2016...

Post on 17-Aug-2020

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

NOT WORTH THE RISK

City of Vancouver

Presentation to Ministerial

Panel

August 16, 2016

TRANS MOUNTAIN PIPELINE:

We have taken an evidence-based approach to assessing TMEP

3

M/V Marathassa Fuel Spill

> 2,800 L released

CLIMATE LEADERSHIP 4

The risk of an oil spill from TMEP-related tankers could

be devastating

The NEB process and Kinder Morgan’s

deeply flawed methodologies

have produced a biased and unreliable report.

One tanker will transit Vancouver waters

at every daytime high-tide.

RISK = LIKELIHOOD x CONSEQUENCES

5

Worst-case scenario:

16 million litres of oil in local waters

(1/5 of volume in a project-related tanker)

Map by Living Oceans Society

6

TMP & NEB failed to properly assess the risk of oil

spills.

7

Stearman Beach, West Vancouver Sargeant Bay, Sunshine Coast

Lighthouse Park, West Vancouver

What’s at risk?

Public health

Metro Vancouver evidence showed up

to 1 million people may be

potentially exposed to unsafe

levels of benzene.

100,000+ sea and shorebirds could die

Harbour seals and salmon could be decimated

The endangered southern resident killer whale

population would be at risk of extinction

8

What’s at Risk?

Ocean-dependent economy

Potential losses =

$201 - 687 million in GDP

9

What’s at Risk?

Our Economy

How could a pipeline possibly

fit with Canada’s future low

carbon economy and Vancouver’s

Renewable City?

10

11

Minister Catherine McKenna at COP21 in Paris, December 2015

TMEP is incompatible with

Canada’s and the international

community’s climate

commitments.

TMEP-related downstream GHG emissions

(not considered by the NEB and CEAA GHG

Methodology) are estimated to be 10x higher

than upstream emissions.

12

There is no real economic need for the pipeline.

13

The NEB process was

flawed and led to an

unlawful and invalid

NEB recommendation.

14

• No oral cross examination

• No way to adequately test

TMP’s evidence

• An inadequate information-

request process

• Lack of proper public

consultation and engagement

There’s no social license for TMEP

15

This is a question

of democracy.

With so much

at stake, and

no benefit to a

future low-carbon

Canada, this

pipeline is

NOT WORTH THE RISK.

16

top related