NOT WORTH THE RISK
City of Vancouver
Presentation to Ministerial
Panel
August 16, 2016
TRANS MOUNTAIN PIPELINE:
We have taken an evidence-based approach to assessing TMEP
3
M/V Marathassa Fuel Spill
> 2,800 L released
CLIMATE LEADERSHIP 4
The risk of an oil spill from TMEP-related tankers could
be devastating
The NEB process and Kinder Morgan’s
deeply flawed methodologies
have produced a biased and unreliable report.
One tanker will transit Vancouver waters
at every daytime high-tide.
RISK = LIKELIHOOD x CONSEQUENCES
5
Worst-case scenario:
16 million litres of oil in local waters
(1/5 of volume in a project-related tanker)
Map by Living Oceans Society
6
TMP & NEB failed to properly assess the risk of oil
spills.
7
Stearman Beach, West Vancouver Sargeant Bay, Sunshine Coast
Lighthouse Park, West Vancouver
What’s at risk?
Public health
Metro Vancouver evidence showed up
to 1 million people may be
potentially exposed to unsafe
levels of benzene.
100,000+ sea and shorebirds could die
Harbour seals and salmon could be decimated
The endangered southern resident killer whale
population would be at risk of extinction
8
What’s at Risk?
Ocean-dependent economy
Potential losses =
$201 - 687 million in GDP
9
What’s at Risk?
Our Economy
How could a pipeline possibly
fit with Canada’s future low
carbon economy and Vancouver’s
Renewable City?
10
11
Minister Catherine McKenna at COP21 in Paris, December 2015
TMEP is incompatible with
Canada’s and the international
community’s climate
commitments.
TMEP-related downstream GHG emissions
(not considered by the NEB and CEAA GHG
Methodology) are estimated to be 10x higher
than upstream emissions.
12
There is no real economic need for the pipeline.
13
The NEB process was
flawed and led to an
unlawful and invalid
NEB recommendation.
14
• No oral cross examination
• No way to adequately test
TMP’s evidence
• An inadequate information-
request process
• Lack of proper public
consultation and engagement
There’s no social license for TMEP
15
This is a question
of democracy.
With so much
at stake, and
no benefit to a
future low-carbon
Canada, this
pipeline is
NOT WORTH THE RISK.