NOTE: Construction methods are always improving. Please ensure you
have the most up-to-date installation instructions by visiting: trex.comHave Questions?
1–800–BUY–TREX
NOTES: » Adjust drill power to lowest setting that will drive screw. DO NOT OVER TORQUE 316 STAINLESS STEEL STAINLESS FASTENERS. » NEVER use impact tools on 316 Stainless Steel Fasteners.» Be careful inserting rods through intermediate vertical supports. Lay pieces on a flat, solid surface and insert as
straight as possible to prevent scratching.» When marking lines on bottom rail, do not make a mark wider than 1" or it will be visible after installation.
F
G
E
H
L
N
O
I I
D
C
QP
K
MMB
A
N
J
TOOLS NEEDED
A. TrexSignaturetoprailandcrownedcover -6'(actuallength73-1/2"[1867mm]) -8'(actuallength97-1/2"[2477mm])B. TrexSignaturebottomrailandflatcover -6'Rail(actuallength71-1/2"[181.6cm]) -6'Cover(actuallength70"[177.8cm]) -8'Rail(actuallength95-1/2"[242.6cm]) -8'Cover(actuallength94"[238.8cm])C. TrexSignatureupperrailbracketandcoverD. TrexSignaturelowerrailbracketandcoverE. Anti-rattlestripF. RodG. EndverticalsupportH. Intermediateverticalsupport*I. TrexSignaturepostcaporpostsleevecap**J. TemplateK. TrexdeckingL. HZspacerM.TrexSignaturepostskirtorpostsleeveskirt**
N. TrexSignaturepost* (2"or2.5"dependingonapplication) -36"(actuallength37"[94.0cm]) -42"(actuallength43"[109.2cm]) orTrex4"x4"postsleeve* -36"(actuallength39"[99.1cm]) -42"(actuallength45"[114.3cm])O. Code-approvedwoodrimjoist2"x8" (5.1cmx20.3cm)orlargerP. Code-approvedwoodjoist2"x8" (5.1cmx20.3cm)orlargerQ.TrexFasciaR.Footblock(notshownabove)-requiredforallspans
greaterthan6'* 1 for 6' span/2 for 8' span** Item not included in Trex Signature Railing kits. Both 4" x
4" (10.2 cm x 10.2 cm) and 6" x 6" (15.2 cm x 15.2 cm) post sleeves are designed to fit over 4" x 4" pressure-treated post.
*** For 8' Rail Sections only - RODRAILSTIFFENER (included with kit), not shown above.
Non-ferrousmetal cutting blade
1/4”(6.4 mm)
7/64”(2.8 mm)
or similar sized metal punch
#2 SquareBit
SAFETY Whenworkingonanyconstructionproject,youshouldwearprotectiveclothingandsafetyequipment.Wearsafetyglasses,gloves,adustmaskandlongsleeves,particularlywhencuttinginconfinedspaces.Trexdeckingandrailingsareheavierandmoreflexiblethanwood.Go to www.trex.com for Safety Data Sheets (SDS).
PARTS
TREX SIGNATURE® ROD RAILInstallation Instructions
TRR-0219
2
NOTE: Construction methods are always improving. Please ensure you
have the most up-to-date installation instructions by visiting: trex.comHave Questions?
1–800–BUY–TREX
Attach Brackets Using Trex Signature PostsTIP:Useaclamptohelpholdbracketsinplacewhilefasteningwithscrews.
1.Measure1-3/8"(3.5cm)fromtopofpostbaseplateor1-7/8"(4.8cm)fromdeckingsurface.Markwithlightline.
2. Measureupfrompostbaseplate33-7/16"(84.9cm)for36"(92cm)railheightor39-7/16"(100.2cm)for42"(107cm)railheight.Markwithlightline.
NOTE: If measuring from decking surface, measure up 33-15/16" (86.2 cm) for 36" (92 cm) rail height or 39-15/16" (101.4 cm) for 42" (107 cm) rail height.
3. Centerlowerbracketonpostabovethemarkedlineandattachusingtwoself-tappingscrews(provided).
4. Centerupperbracketonpostabovemarkedlineandattachusing(3)self-tappingscrews(provided).
NOTE: Upper bracket is not required on crossover post configuration.
Attach Brackets Using Pressure-Treated Postsand Post SleevesTIP:Useaclamptohelpholdbracketsinplacewhilefasteningwithscrews.
1.Measure1-7/8"(4.8cm)upfromdecksurfacetobottomofbracket.Slideskirtuptoallowforpropermeasurement.Markwithlightline.
2. Measureupfromdeckingsurface33-15/16"(862cm)for36"(92cm)railheightor39-15/16"(101.4cm)for42"(107cm)railheight.Markwithlightline.
NOTE: Push skirt back down onto surface of decking BEFORE ATTACHING BRACKETS.
3. Centerlowerbracketonpostabovethemarkedlineandattachusingtwo2"(51mm)woodscrews(provided).
4.Centerupperbracketonpostabovemarkedlineandattachusingthree2"(51cm)woodscrews(provided).
1-3/8"(3.5 cm)1-3/8"
(3.5 cm)2-1/2"Post
2-1/2"Post
1
1
4
2
1
3
2
33-7/16"(84.9 cm)
or39-7/16"
(100.2 cm)
33-7/16"(84.9 cm)
or39-7/16"
(100.2 cm)
22
33-15/16"(86.2 cm)
or39-15/16"(101.4 cm)
33-15/16"(86.2 cm)
or39-15/16"(101.4 cm)
1
4
2
1-7/8"(4.8 cm)
1-7/8"(4.8 cm)
1
1
3
2
» NOTE THAT TOP AND BOTTOM RAILS ARE DIFFERENT LENGTHS, TO ACCOMMODATE THE INSTALLATION OF CROSSOVER POST APPLICATIONS.
5.Prepareasolidworksurfacearea(plywood,decksurface,etc.).
How to Measure Bottom and Top Railings(When Required)6. For Full Span Post to Post Applications -onlytop
railwillneedtobecut.7. For Full Span Crossover to Crossover post
Applications -norailshavetobecut,HOWEVERthelocationoftheHZTemplateonthetoprailwillneedtobeadjustedin3/4"oneachsideoftoprailtoallowforproperplacementofverticalsupports.
HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD
3
TRR-0219
NOTE: Construction methods are always improving. Please ensure you
have the most up-to-date installation instructions by visiting: trex.comHave Questions?
1–800–BUY–TREX
8. Positionbottomandtoprailsbetweenposts andalignwithbottombracket.Markbottomrail andtoprailateachend.
Cutting Railings and Covers
9. Cuteachendofbottomandtoprail1/4"(0.6cm)shorterthanmarkoneachendtoallowforfitintobottomrailbrackets.Ifinstallingcrossoverrailing,add3/4"toeachsideoftoprail.Ifusingswivelbrackets,measuredistancebetweenbracketsandcutrailingstothisdistance.
10.Markandcutbottomrailcover1-1/2"(3.8cm)shorterthanbottomrail.
11. Markandcuttoprailcoversamelengthastoprailforalltoprailconfigurations.
Locating Vertical Holes on Bottom and Top Rails
12.PlaceHZtemplateatendoftopandbottomrails.Pre-drillpilotholes(usinga7/64"bitorsmallpunch)atlocations.
NOTES:» Template is labeled for the type of bracket used.» Pilot holes will be drilled out larger in a later step.» For Compound Swivel Brackets, set the rail in the
bracket and mark 3.75" from the post.
6' Rail Spans or Shorter
13a.Measurethedistancebetweentheverticalendholesonboth top and bottom rails.Markthecenter.
IMPORTANT: DO NOTmarkthelineacrosstheentirewidthofthebottomrail,asitwillbevisibleafterinstall.Maximumrecommendedlinewidthis1".
Over 6' Rail Spans
13b.Measurethedistancebetweentheverticalendholesonboth top and bottom rails.Dividethedistanceintothirdsandmaketwomarksontopandbottomrails.
NOTE: Maximum unsupported rod span is 32.25".
8
Top rail
Bottom rail
9
1/4"(0.6 cm)
1/4"(0.6 cm)
1/4"(0.6 cm)
1/4"(0.6 cm)
KEYMarkCut
KEY
Bottom rail
1-1/2"(3.8 cm)
1-1/2"(3.8 cm)
10 Bottom rail
Bottom rail cover
11
12
12
13b
13a
TRR-0219
4
NOTE: Construction methods are always improving. Please ensure you
have the most up-to-date installation instructions by visiting: trex.comHave Questions?
1–800–BUY–TREX
Locating and Drilling Midspan Holes
14. UsingtheslotontheHZtemplate,locatemarkedlineanddrilltwo7/64"pilotholes(ormarkwithapunch).
NOTE: Pilot holes will be drilled out larger in next step.
15. Usingpilotholes(ormarks),drill1/4"holesforallverticalsupportsinbothtopandbottomrails.
NOTE: Clean any burrs from edges of holes to ensure good fit on both sides. Cutting Rods to Length (When Required)
16. Measurethedistancebetweentheend(outer)holes(X")ontoporbottomrailandadd3/8"tothismeasurement.
NOTE: If installed at exact spans, rods do not have to be cut.
17. Cutrodstothelengthmeasuredinpreviousstep.
Vertical and Rod Assembly 18. Insertanti-rattle
stripsintotheverticalsupports.
NOTE: There are two anti-rattle strips for each support and they can only be inserted in one side.
19. AttachoneendverticalandallintermediateverticalstobottomrailusingHZspacerandscrewsprovided.
20.Slideallrodsthroughintermediatesupportsandintoendverticalsupport.
NOTE: When inserting rods through intermediate supports, keep rods straight to avoid scratching.
21. SlideendverticalontorodsandattachtobottomrailusingHZspacerandscrewsprovided.
14
21
15
X" + 3/8"
X" + 3/8"
16
X" + 3/8"17
18
19
1
1
2
20
211
11
2
HOW TO INSTALL HORIZONTAL ROD RAILING/CONTINUED TREX SIGNATURE STANDARD
5
TRR-0219
NOTE: Construction methods are always improving. Please ensure you
have the most up-to-date installation instructions by visiting: trex.comHave Questions?
1–800–BUY–TREX
Installing Top and Bottom Rails
22.Usingamallet,installbottomrailcoveronto bottomrail.
23.InstalltoprailtoallverticalandendsupportsusingHZspacerandscrewsprovided.
24.Dropassembledrodrailpanelintobrackets.
25.Attachbottomrailtotobottombracketsbyusingoneself-tappingscrew(provided)foreachbracket.
26.Attachtoprailtotopbracketsbyusingtwoself-tappingscrews(provided)foreachbracket.
NOTE: Pre-drilling is required (7/64" [0.28 cm] drill bit) for attachment of railing to bracket.
Inserting Rod Rail Stiffener - For Rail Sections over 6'
27.Attachtape(qty6provided)toalternatingsidesoftherodstiffenerasshown.
28.Placerodstiffenerinsiderailchannel.
29.Usingamallet,installtoprailcover.
Attachment of Bracket Covers, Skirts, and Caps
30 Attachcorrespondingbracketcoversoveropeningintopandbottomrails.
31. AttachprovidedpostskirttobottomofpostswhenusingTrexSignatureposts.
1
31 Signaturepost
2
2
130
22
231
1
12
24
2
25
17/64"
(.28 cm)7/64"
(.28 cm)
2
26
17/64"(.28 cm)
7/64"(.28 cm)
27Rod sti�ener
28 Rod sti�ener
29
TRR-0219
6
NOTE: Construction methods are always improving. Please ensure you
have the most up-to-date installation instructions by visiting: trex.comHave Questions?
1–800–BUY–TREX
HOW TO INSTALL HORIZONTAL ROD RAILING/CONTINUED TREX SIGNATURE STANDARD
32.AttachpostcapstoTrex®Signature™posts.(Useofrubber malletmayberequiredforsecureattachment.)
33.AttachpostcapstopostsleevesusingexternalgradePVCconstructionadhesive.
1
32
Signaturepost
2 Postsleeve
33
3
1
1. Make sure 53" (135.6 cm) posts are used for all stair posts.
2. IfTrexSignaturestairpostsareused,installatnoseofstairtreaddirectlyunderrequiredblocking.Refer to Trex Signature Instructions for detailed post installation.
3. Ifpressure-treatedpost/postsleevesareused,postsaretobeinstalledtotheinsideofthelaststairstringer.(Railsmustbeoverdeckingsurface.)RefertoTrexSignatureInstructionsfordetailedpostinstallation.
INSTALLING STANDARD STAIR POSTS, OR PRESSURE-TREATED POST, POST SLEEVES AND SKIRTS TREX SIGNATURE STANDARD
2
3
HOW TO INSTALL TREX SIGNATURE STAIR POSTS AND STAIR RAILINGTREX SIGNATURE STANDARD
HOW TO INSTALL FOOT BLOCKS - HORIZONTAL ROD RAILINGTREX SIGNATURE STANDARD
Non-ferrousmetal cutting blade
5/16”(7.9 mm)drill bit for stairs 7/64”
(2.8 mm)or similar sized
metal punch
#2 SquareBit
8 Irwin Quick Clamps (or similar)
Attachment of Foot Block (Required ONLY for All Clear Span Applications Over 6' [1.83 m] )
1.Toensurecorrectlocation,placefootblockundercenterofbottomrail.Marktoprovideplacementloca-tionofbase.
2.Placebase(smallersidefacingdown)ondeckingsurface.Attachbaseoffootblockusingonescrewatananglethroughbaseandintodecking.
NOTE: Pre-drilling is recommended (1/8" [0.32 cm] drill bit) for attachment of base.
3.Afterattached,usearubbermalletalongwithscrappieceofwoodtotapfootblockuntilitlocksintoplace.
1
3
2
1
2
1
7
TRR-0219
NOTE: Construction methods are always improving. Please ensure you
have the most up-to-date installation instructions by visiting: trex.comHave Questions?
1–800–BUY–TREX
HOW TO INSTALL HORIZONTAL ROD RAILING/CONTINUED TREX SIGNATURE STANDARD
1. Placea1"deckboardonthenoseofthestairtread,thenlaythebottomstairrailontopofthedeckboard.Usethelowerandupperstairposttosetthesizeofthelowerstairrail.OnUPPER STAIR POST,markfromundersideofbottomrail.ON LOWER STAIR POST,markfromtopsideofbottomrail.
2. Cuteachendofthebottomstairrailandbottomrailcover1/4"(0.6cm)shorterthanthemarkoneachendtoallowforfitintobottomstairrailbrackets.
NOTE: Railing does not need to be cut at angle. Brackets are designed to allow for railing to be installed with standard straight cut.
3. Withdeckboardstillonnoseofstairtread,placebracketsonendofbottomstairrail(donotattachbracketstorail)andmarkpostsforbracketlocations.
Installing Lower Stair Brackets
4. Centerlowerstairbracketonpostabovethemarkedlineandattachusingtwoself-tappingscrews(provided).Insomecasesitmaybedifficulttoattachthestairbracketonthelowerstairpost.Recommendusinga90°drilladapterorloosentheposttogetaccesstothelowerbracketscrewholes.
HOW TO INSTALL STAIR ROD RAILINGTREX SIGNATURE STANDARD
NOTES: » All Trex Signature fixed stair brackets ONLY work with stair slopes of 32°-37°.» Illustrations shown are representations when using Trex Signature post, but same rules apply if using
pressure-treated posts and post sleeves.
AA.BottomStairBracketandCover–LowerRailBB.TopStairBracketandCover–LowerRailCC.FastenerPackDD.BottomStairBracketandCover–Upper
RailEE.TopStairBracketandCover–UpperRail
DD
CC
AA
EE
BB
BRACKET HARDWARE – STAIR APPLICATIONS TREX SIGNATURE STANDARD
1" (2.5 cm)
1
2
1/4"(0.6 cm)
1/4"(0.6 cm)
1/4"(0.6 cm)
1/4"(0.6 cm)
KEYMarkCut
KEY
Bottom stair rail
1" (2.5 cm)
3
4 Bottom stair bracket –
bottom rail
Top stair bracket –
bottom rail
1
1
2
TRR-0219
8
NOTE: Construction methods are always improving. Please ensure you
have the most up-to-date installation instructions by visiting: trex.comHave Questions?
1–800–BUY–TREX
HOW TO INSTALL STAIR ROD RAILING/CONTINUED TREX SIGNATURE STANDARD
Installing Upper Stair Brackets
5. OnLowerPost–Fromtopoflowerbracket,measureupandmarkwithlightline(33-1/4"for36"rail;39-1/4"for42"rail).OnUpperPost–Fromtopoflower(upper)bracket,measureupandmarkwithlightline(33-1/8"for36"rail;39-1/8"for42"rail).
6. Centerupperstairbracketsonposts belowthemarkedlinesandattachusingtwoself-tappingscrews(provided).
7. Setbottomstair railintobottom stairrailbrackets.
How to Mark, Cut and Place Top Stair Railing
8. Positiontoprailtosideofpost.Marktopstairrailateachlocationstated.OnUPPER STAIR POST,markfromundersideofbottomrail.OnLOWER STAIR POST,markfromtopsideofbottomrail.
9.Cuteachendoftopstairrailandtoprailcover 1/4"(0.6cm)shorterthanmarktoallowforfitinto topstairrailbracket.
NOTE: Railing does not need to be cut at angle. Brackets are designed to allow for railing to be installed with standard straight cut.
10.Settopstairrailintotopstairrailbrackets.
7
2
8
9
1/4"(0.6 cm)
1/4"(0.6 cm) 1/4"
(0.6 cm)1/4"
(0.6 cm)
KEYMarkCut
KEY
Top stair rail
10
33-1/4" (84.5 cm)33-1/4"
(84.5 cm)
5
33-1/8" (84.1 cm)33-1/8"
(84.1 cm)
Lowerpost
Upperpost
6
Lower stair bracket –
top rail
Upper stair bracket –
top rail1 1
2
9
TRR-0219
NOTE: Construction methods are always improving. Please ensure you
have the most up-to-date installation instructions by visiting: trex.comHave Questions?
1–800–BUY–TREX
HOW TO INSTALL STAIR ROD RAILING/CONTINUED TREX SIGNATURE STANDARD
11
Measuring and Cutting Rods
11.Usingthelongedgeofthestairtemplate,markthelocationoftheendverticalsontheupperandlowerrails.
NOTE: Mark should only be 1" max length or it will be visible after installation of vertical.
12.Measureandmarkthemid-line(6'sections)ofthetwoendmarksofthetopandbottomrail.Takethatmeasurementandadd3/8"forrodlengthinnextstep.
NOTE: For 8' sections divide the distance into thirds and make two marks for the two verticals.
13. Cutrodstothelengthmeasuredinpreviousstep.
IMPORTANT: DO NOT CUT RODS AT RAIL ANGLE; MAKE 90˚ CUTS ONLY!
Measuring and Cutting Verticals
14.Clampfirstvertical(lowerpartofstairs)inplace,usingwidthofstairtemplatetoposition.
15.Clampmiddlevertical(s)inplace.
16.Slidearodintotopandbottomofallverticals.Ensurethatdistanceoftoprodtotoprailandbottomrodtobottomrailareequal.
12
X" + 3/8"
X" + 3/8"
X" + 3/8"
13
14
15
16
TRR-0219
10
NOTE: Construction methods are always improving. Please ensure you
have the most up-to-date installation instructions by visiting: trex.comHave Questions?
1–800–BUY–TREX
HOW TO INSTALL STAIR ROD RAILING/CONTINUED TREX SIGNATURE STANDARD
17.Clamptopvertical(upperpartofstairs)inplace,usingwidthofstairtemplatetoposition.
18.Markanglecutsattopandbottomonallverticals
19.Afterremovingrodsandverticals,makeanglecutsontopandbottomofverticalsfollowingmarksfrompreviousstep.
Vertical and Rod Assembly 20.Insertanti-rattle
stripsintotheverticalsupports.
NOTE: There are two anti-rattle strips for each support and can only be inserted in one side.
21. UsingtheslotontheHZtemplate,locatemarkedlineanddrilltwo7/64"pilotholesateachmark(ormarkwithapunch).
NOTE: Pilot holes will be drilled out larger in next step.
22.Usingpilotholes(ormarks),drill5/16"holesforallverticalsupportsinbothtopandbottomrails.
17
18
19
20
21
21
22
11
TRR-0219
NOTE: Construction methods are always improving. Please ensure you
have the most up-to-date installation instructions by visiting: trex.comHave Questions?
1–800–BUY–TREX
HOW TO INSTALL STAIR ROD RAILING/CONTINUED TREX SIGNATURE STANDARD
Installing Top and Bottom Rails
23.InstalllowestendverticalandallintermediateverticalstobottomrailusingSTWedgeSpacerandscrewsprovided.
24.Sliderodsintolowerendandallintermediateverticals.
NOTE: When Inserting rods Into intermediate supports, keep rods straight to avoid scratching.
25.SlideupperendverticalontorodsandattachtobottomrailusingSTWedgeSpacerandscrewsprovided.
26.Usingamallet,installbottomrailcoveronto bottomrail.
27. InstalltoprailtoallverticalandendsupportsusingSTWedgeSpacerandscrewsprovided.
Final Installation
28.Dropassembledstairrodrailpanelintobrackets.
1 1
23
1
2
11
1
252
26
24
1
27
2
1
1
1
28
12
TRR-0219
NOTE: Construction methods are always improving. Please ensure you
have the most up-to-date installation instructions by visiting: trex.comHave Questions?
1–800–BUY–TREX
HOW TO INSTALL STAIR ROD RAILING/CONTINUED TREX SIGNATURE STANDARD
29.Attachbottomstairrailtobottomstairbracketusingtwoself-tappingscrews(provided)oneachsideofbracket.
30.Attachtopstairrailtotopstairbracket(alltypes)usingtwoself-tappingscrews(provided)oneachsideofstairbracket.
Attachment of Bracket Covers, Skirts, and Caps
31. Usingamallet,installtoprailcover.
32.Attachcorrespondingbracketcoversoveropeninginupperandbottomrails.
33.AttachprovidedpostskirttobottomofpostswhenusingTrexSignatureposts.
34.AttachpostcapstoTrexSignatureposts.(Useofrubber malletmayberequiredforsecureattachment.)
35.AttachpostcapstopostsleevesusingexternalgradePVCconstructionadhesive.
31
34
SignaturePost
2 2
35
Postsleeve
3
1
30
1
2
32
1
33 SignaturePost
2
29
2