annexure ii arr formats tariff filing forms ...15 ntpc kayamkulam 65 - - - - - - - 16 ntpc er 43 33...
TRANSCRIPT
ANNEXURE II
ARR FORMATS
TARIFF FILING FORMS (DISTRIBUTION)
Form 1
Name of the Company / Licensee TANGEDCO
Rs Crs
Sl.
No.
ParticularsReference
to Form
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
FY 2013-14
(Actuals)
FY 2014-15
(Actuals)
FY 2015-16
(Actuals)
FY 2016-17
(Projected)
FY 2017-18
(Projected)
FY 2018-19
(Projected)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
1 Power Purchase Cost 7 18,558.62 20,204.38 24,391.98 24,586.56 24,212.27 24,681.20 27,760.97 31,255.73
2Generation cost (Transfer from
Generation)9 9,313.27 10,258.50 12,769.94 16,230.90 16,311.95 17,921.75 15,834.65 17,594.04
3 Return on Equity 10 260.62 471.02 600.44 582.32 582.32 582.32 609.62 609.62
4 Interest on Loan Capital 11 C 1,239.38 2,136.60 3,351.30 3,995.12 4,383.58 3,807.19 3,345.74 3,945.15
5 Depreciation 15 B 265.10 294.39 327.15 525.28 670.46 203.77 483.53 645.79
6 Interest on Working Capital 16 - - - 189.53 178.74 238.13 235.23 351.19
7 Operation and Maintenance Expenses 18 D 3,626.33 3,523.79 3,970.93 4,565.07 4,844.82 5,234.90 5,534.33 5,850.89
8 Other Debits 19 36.52 10.14 21.70 25.98 13.19 13.19 13.19 13.19
9 Prior Period Credits / Charges 20 583.84 1,695.93 (284.26) (89.24) (1,526.91) - - -
10 Extra Ordinary Items 2.22 0.13 0.08 -
11Less Cap of Cost of Generation during
Trial Stage- - (1,042.80) (17.76)
- - - -
12 Total Revenue Requirment 33,885.91 38,594.89 44,106.47 50,593.78 49,670.44 52,682.46 53,817.27 60,265.60
Less: (i) Revenue at Existing tariff
(including Subsidy)25 19,598.11 24,673.79 29,245.23 34,124.86 40,076.78 44,694.85 49,827.13 54,469.20
(ii) Non-tariff revenue 21 553.00 935.80 822.16 852.97 780.86 780.86 952.65 971.70
(iii) Other income 22 144.13 196.41 229.61 302.23 322.02 434.73 586.89 704.27
(iii) Other Govt Subsidy (FRP
bond take over)1,000.00 1,000.00 2,000.00 2,343.49 -
13Balance ARR proposed to be met
with new tariff13,590.67 12,788.89 13,809.47 14,313.73 7,490.78 4,772.01 107.12 4,120.43
Summary of Aggregate Revenue Requirement
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 2
No. of consumers Sales in MU No of consumers Sales in MU No. of consumers Sales in MU No. of consumers Sales in MU
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
I HIGH TENSION
a Registered factories,Textiles,Tea Estate,Software Industries etc. IA 5,095 9,605 5,437 7,542 5,396 9,674 5,323 11,299
b Railway Traction IB 22 708 23 711 24 766 27 824
cGovt. Educational Institutions,Govt. Hospitals, Water supply
etc.IIA 629 1,251 670 973 698 1,111 720 1,268
d Private Eductional Institutions, Cinema Theaters & Studios IIB 228 227 224 224 236 280 248 309
e Actual places of public worship, Mutts and Religious Instn. IIC 7 28 - - - - - -
fCommercial and all categories not covered in other HT
categoriesIII 1,468 1,833 1,593 1,554 1,595 1,505 1,650 1,650
g Lift Irrigation and Co-operative Soc.for Agriculture IV 11 6 9 5 9 6 9 7
h HT Temporary Supply for construction & other purpose V - - 22 165 96 294 93 71
i Supply to Pondicherry plus wheeling charges 3 400 2 381 3 237 3 356
j Supply to Other States - - - - - - -
Total HT 7,463 14,057 7,980 11,554 8,057 13,873 8,073 15,783
II LOW TENSION
a Domestic , Hand Loom etc. IA 15,670,594 17,507 16,750,854 17,834 17,520,043 20,201 18,843,735 21,990
b Huts in Village panchayats, TAHDCO etc. IB* 1,456,215 395 1,420,037 425 1,182,835 460 1,144,787 428
c LT Bulk supply for railwaty, defence colonies etc. IC 1,051 21 1,113 25 892 11 838 11
d Public Lighting and Public Water Supply & Sewerage IIA 490,321 1,700 563,425 1,468 631,867 1,917 654,131 2,110
eGovernment and aided Educational Instn., Government
Hospitals etc.IIB (1) 66,756 574 68,982 499 82,272 345 74,222 178
f Private Educational Instn., IIB (2) 23,609 247 47,127 192 22,492 229 18,032 247
g Actual place of public worship, Mutts and Religious Institutions IIC 136,456 101 138,157 95 139,748 105 144,800 116
h Cottage and Tiny Industries IIIA (1) 61,573 562 68,094 463 88,203 406 124,636 196
i Powerloom etc. IIIA (2) 127,825 782 128,464 719 130,318 801 140,857 926
j Industries not covered under L.T.Tariff IIIA(1), IIIA(2) incl. IT IIIB 372,646 3,953 384,726 3,880 372,460 4,761 318,291 5,872
k Agriculture and Govt.seed farm etc. IV* 2,021,359 10,118 2,035,638 11,248 2,047,181 12,295 2,046,317 12,399
lCommercial and all categories not covered in other LT
categoriesV 2,980,814 4,296 3,250,570 4,691 3,287,073 5,393 2,793,649 6,227
m Temp.supply other than Domestic and Lavish illuminations VI 15,236 25 19,241 36 50,374 71 157,058 142
Total LT 23,424,455 40,281 24,876,428 41,574 25,555,758 46,993 26,461,353 50,842
Grand Total 23,431,918 54,338 24,884,408 53,128 25,563,815 60,866 26,469,426 66,625
FY 2014-15 (Actuals)
Statement showing Consumer Category-wise demand/ Sales projection
Name of the Company / Licensee
FY 2011-12 (Actuals) FY 2012-13 (Actuals) FY 2013-14 (Actuals)
Sl. No. Category of Consumer Tariff
TANGEDCO
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
(1) (2)
I HIGH TENSION
a Registered factories,Textiles,Tea Estate,Software Industries etc. IA
b Railway Traction IB
cGovt. Educational Institutions,Govt. Hospitals, Water supply
etc.IIA
d Private Eductional Institutions, Cinema Theaters & Studios IIB
e Actual places of public worship, Mutts and Religious Instn. IIC
fCommercial and all categories not covered in other HT
categoriesIII
g Lift Irrigation and Co-operative Soc.for Agriculture IV
h HT Temporary Supply for construction & other purpose V
i Supply to Pondicherry plus wheeling charges
j Supply to Other States
Total HT
II LOW TENSION
a Domestic , Hand Loom etc. IA
b Huts in Village panchayats, TAHDCO etc. IB*
c LT Bulk supply for railwaty, defence colonies etc. IC
d Public Lighting and Public Water Supply & Sewerage IIA
eGovernment and aided Educational Instn., Government
Hospitals etc.IIB (1)
f Private Educational Instn., IIB (2)
g Actual place of public worship, Mutts and Religious Institutions IIC
h Cottage and Tiny Industries IIIA (1)
i Powerloom etc. IIIA (2)
j Industries not covered under L.T.Tariff IIIA(1), IIIA(2) incl. IT IIIB
k Agriculture and Govt.seed farm etc. IV*
lCommercial and all categories not covered in other LT
categoriesV
m Temp.supply other than Domestic and Lavish illuminations VI
Total LT
Grand Total
Statement showing Consumer Category-wise demand/ Sales projection
Name of the Company / Licensee
Sl. No. Category of Consumer Tariff
TANGEDCO
Form 2
No.of consumers Sales in MU No. of consumers Sales in MU No. of consumers Sales in MU No. of consumers Sales in MU
(11) (12) (13) (14) (15) (16) (17) (18)
5,389 11,572.67 5,497 12,730 5,607 15,232 5,719 17,331
27 834 28 880 29 938 30 1,009
757 1,351.01 772 1,502 787 1,602 803 1,726
261 324.73 266 351 271 365 276 387
- -
1,687 1,880.62 1,721 2,160 1,755 2,667 1,790 3,231
9 6 9 7 9 8 9 8
105 170 107 179 109 187 111 207
3 188 3 188 3 188 3 188
- - - - - - -
8,238 16,328 8,403 17,996 8,570 21,187 8,741 24,087
18,993,402 23,489 19,183,336 25,368 19,318,000 26,367 19,704,360 27,422
1,137,086 440 1,159,828 449 1,183,025 458 1,206,686 467
748 11 763 11 778 11 794 12
675,172 2,232 688,675 2,567 702,449 2,873 716,498 3,215
74,162 144 75,645 149 77,158 155 78,701 162
17,211 252 17,555 270 17,906 289 18,264 309
143,362 123 146,229 131 149,154 140 152,137 150
140,628 219 143,441 244 146,310 261 149,236 284
138,317 968 141,083 1,036 143,905 1,139 146,783 1,248
314,615 6,256 320,907 7,335 327,325 8,581 333,872 9,491
2,060,445 11,542 2,101,654 11,928 2,143,687 12,544 2,186,561 13,276
2,779,909 6,462 2,835,507 7,190 2,892,217 8,808 2,950,061 10,182
178,431 164 182,000 197 185,640 247 189,353 309
26,653,488 52,301 26,996,623 56,876 27,287,554 61,873 27,833,306 66,526
26,661,726 68,629 27,005,026 74,872 27,296,124 83,060 27,842,047 90,613
FY 2016-17 (Projected) FY 2017-18 (Projected) FY 2018-19 (Projected)FY 2015-16 (Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 3
TANGEDCO
S.No. Details UnitFY 2011-12
(Actuals)
FY 2012-13
(Actuals)
FY 2013-14
(Actuals)
FY 2014-15
(Actuals)
FY 2015-16
(Actuals)
FY 2016-17
(Projected)
FY 2017-18
(Projected)
FY 2018-19
(Projected)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
1 Total Demand as projected in Form 2 in MU 54,338 53,128 60,866 66,625 68,629 74,872 83,060 90,613
2 ABT UI Power (529) 231 - - -
3 T & D Loss percentage in % 21.62% 20.95% 21.52% 22.02% 20.13% 20.44% 19.00% 18.70%
4 T & D Loss in MU 14,992 14,080 16,686 18,812 17,297 19,235 19,483 20,842
5Total Energy required to meet the
demandin MU 69,330 67,208 77,552 85,437 85,926 94,107 102,543 111,455
6Energy available in own Generating
Stationsin MU 25,494 23,099 28,828 32,054 31,838 34,926 36,922 39,345
7Energy available from other sources
(NCES, CPP, Co-Gen.)in MU 7,655 6,385 14,481 14,645 3,496 9,478 9,472 9,897
8Energy from must run stations (Nuclear
Stations)in MU 2,775 3,036 3,375 5,311 5,006 8,917 12,137 12,857
9Balance proposed to be purchased on
Merit Order ranking from CGS, IPPs, etc.in MU 33,406 34,688 30,868 33,426 45,585 40,786 44,012 49,356
Name of the Company / Licensee
Statement showing the Total Energy input Requirement
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 6
NAME OF THE COMPANY TANGEDCO
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
II Purchase under merit order
ranking
A Central Generating Stations
1 Neyveli TS-I 155 333 286 251 218 239 359 366
2 Neyveli TS-II Stage I 79 109 110 111 201 212 239 244
3 Neyveli TS-II Stage II 118 109 94 95 - - - -
4 Neyveli TS-I Expansion 212 219 189 225 218 228 233 237
5 Neyveli Expansion Unit I - - -
6 Neyveli Expansion Unit II - - - - 65 280 286 291
7 NLC TNEB Tuticorin unit I - - -
8 NTPL JV with NLC - - - - 213 396 404 412
Total NLCs 565 769 679 681 914 1,356 1,520 1,551
9 Ramagundam I&II 217 250 253 232 234 241 246 250
10 Ramagundam III 88 110 99 88 92 96 87 89
11 Simhadri Stage II -Unit III 115 191 273 254 239 241 270 275
12 Simhadri Stage II -Unit IV - - -
13 NTPC_TNEB JV Vallur Unit 1 126 625
18 NTPC_TNEB JV Vallur Unit 2
19 NTPC_TNEB JV Vallur Unit 3
14 Talcher 284 283 288 294 283 297 302 309
15 NTPC Kayamkulam 65 - - - - - - -
16 NTPC ER 43 33 23 20 22 26 27 27
17 NTECL
21 Infirm Power from Kudankulam
22 Kudgi TPS Stage -I
23 Kudgi TPS Stage -II
Total NTPC 813 993 1,561 1,583 1,760 2,164 2,341 2,388
FY 2014-15
(Actuals)
STATEMENT SHOWING FIXED COSTS CGS AND IPPs
695
FY 2015-16
(Actuals)
Rs Crs
889 1,264 1,410 1,438
ProjectedSl.No Source
FY 2011-12
(Actuals)
FY 2013-14
(Actuals)
FY 2012-13
(Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 6
NAME OF THE COMPANY TANGEDCO
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
FY 2014-15
(Actuals)
STATEMENT SHOWING FIXED COSTS CGS AND IPPs
FY 2015-16
(Actuals)
Rs Crs
ProjectedSl.No Source
FY 2011-12
(Actuals)
FY 2013-14
(Actuals)
FY 2012-13
(Actuals)
IPPs
GMR 159 167 161 73 - - - -
Samalpatti 116 109 80 82 67 67 67 67
Madurai 125 110 88 95 76 76 76 76
PPN 286 292 223 215 259 259 259 259
ST-CMS 315 364 425 343 236 236 236 236
ABAN 107 118 88 66 64 64 64 64
Penna 56 58 55 41 16 16 16 16
Total IPP 1,162 1,216 1,120 915 718 718 718 718
28 Short Term Traders
29 Local CPPs -STOA - - -
Grand Total 2,540 2,977 3,360 3,179 3,392 4,238 4,579 4,657
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 4
MUs
Sl.No Name of the Station
Total allotted
capacity (in
MW)
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
FY 2013-14
(Actuals)
FY 2014-15
(Actuals)
FY 2015-16
(Actuals)
FY 2016-17
(Projected)
FY 2017-18
(Projected)
FY 2018-19
(Projected)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
I NLC Stations
1 Neyveli TS-I 475 3,146 3,189 3,271 2,851 2,487 2,675 3,942 3,942
2 Neyveli TS-II Stage I 193 1,264 1,310 1,443 1,328 3,157 3,260 3,596 3,596
3 Neyveli TS-II Stage II 288 1,903 1,981 1,956 1,948 - - - -
4 Neyveli TS-I Expansion 226 1,526 1,629 1,584 1,672 1,629 1,675 1,675 1,675
5 Neyveli Expansion Unit I 115 - - - - -
6 Neyveli Expansion Unit II 115 - 307 1,302 1,302 1,302
7 NLC TNEB Tuticorin unit I 194 - - - - -
8 NTPL JV with NLC 194 - 1,299 2,375 2,375 2,375
Total NLCs 1,800 7,839 8,109 8,254 7,799 8,879 11,287 12,890 12,890
II NTPC Stations
1 Ramagundam I&II 548 4,106 4,149 4,005 3,876 4,020 4,050 4,050 4,050
2 Ramagundam III 137 1,048 981 1,054 949 1,069 1,095 967 967
3 Simhadri Stage II -Unit III 112 570 1,079 1,572 1,428 1,544 1,525 1,674 1,674
4 Simhadri Stage II -Unit IV 112 - - -
5 NTPC_TNEB JV Vallur Unit 1 358 - 488 2,558 - 5,162 7,193 7,867 7,867
6 NTPC_TNEB JV Vallur Unit 2 358 -
7 NTPC_TNEB JV Vallur Unit 3 341 -
6 Talcher 498 3,622 3,405 3,475 3,760 3,713 3,810 3,925 3,925
7 NTPC Kayamkulam 205 - -
8 NTPC ER 465 319 267 239 285 325 325 325
9 NTECL - 3,850
12 Kudgi TPS Stage -I - -
13 Kudgi TPS Stage -II -
Total NTPC 2,465 10,016 10,421 12,931 14,102 15,793 17,998 18,808 18,808
STATEMENT SHOWING ENERGY AVAILABILITY from EXTERNAL SOURCES
Name of the Company / Licensee TANGEDCO
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
MUs
Sl.No Name of the Station
Total allotted
capacity (in
MW)
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
FY 2013-14
(Actuals)
FY 2014-15
(Actuals)
FY 2015-16
(Actuals)
FY 2016-17
(Projected)
FY 2017-18
(Projected)
FY 2018-19
(Projected)
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
STATEMENT SHOWING ENERGY AVAILABILITY from EXTERNAL SOURCES
Name of the Company / Licensee TANGEDCO
III Nuclear Stations
1 Madras APS 332 1,604 1,774 1,332 1,672 2,091 2,371 2,472 2,480
2 Kaiga APS 234 1,171 1,261 1,581 1,568 1,869 1,825 1,654 1,654
3 Kudankulam Unit I 463 462 2,071 1,047 3,777 3,777 3,777
4 Kudankulam Unit II 463 - - - 944 3,777 3,777
5 PFBR Kalppakam 167 - - - - 458 1,170
Total Nuclear Stations 1,659 2,775 3,036 3,375 5,311 5,006 8,917 12,137 12,857
IV IPPs
1 GMR 196 858 610 804 576 - - - -
2 Samalpatti 106 292 329 299 223 36 - - -
3 Madurai 106 282 357 345 243 40 - - -
4 PPN 331 1,491 1,785 1,427 1,143 159 159 159 159
5 ST-CMS 250 1,688 1,665 1,721 1,678 1,385 1,105 1,105 1,105
6 ABAN 113 760 850 699 561 620 793 793 793
7 Penna 53 360 375 363 378 179 370 370 370
Total IPP 1,155 5,731 5,972 5,658 4,802 2,419 2,427 2,428 2,427
V Windmill 7,337 5,711 7,474 5,110 3,963 2,873 6,944 6,150 6,347
VI Co-generation 440 1,285 1,428 803 1,508 509 970 970 970
VII Biomass 11 73 11 20 18 21 20 20 20
VIII Captive generation 32 575 595 2,383 2,972 24 39 39 35
IX Solar 11 45 20 25 69 1,506 2,294 2,525
X Co-Gen in Co-op Sugar Mills 10 - - - - -
XI UI Power 717 82 (418) (529) (231) - - -
XII Traders-MTOA - 3,465 6,233 14,126 - 1,840 -
XIII Traders-LTOA - - - 8,823 8,044 15,230
XIV Local CPPs -STOA 4,456 2,203 3,526 6,790 4,542 251 - -
XV CPP_Traders - - - - -
XVI Power Exchanges 2,769 387 58 - - -
XVII Trading Bilateral 6,900 6,935 828
XVIII ABT PGCIL -
Grand Total 19,364 43,835 44,109 48,724 53,381 54,087 59,181 65,620 72,110
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
NAME OF THE COMPANY
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
Central Generating Stations
Neyveli TS-I 3,146 1.65 521 155 675.76 2.15 3,189 2.24 713 333 1,046.54 3.28
Neyveli TS-II Stage I 1,264 1.94 245 79 324.21 2.57 1,310 1.97 258 109 366.91 2.80
Neyveli TS-II Stage II 1,903 1.94 369 118 487.59 2.56 1,981 1.97 391 109 499.26 2.52
Neyveli TS-I Expansion 1,526 1.82 277 212 489.41 3.21 1,629 1.81 295 219 513.23 3.15
Neyveli Expansion Unit II -
NTPL JV with NLC -
Ramagundam I&II 4,106 1.59 652 217 869.37 2.12 4,149 1.72 712 250 962.77 2.32
Ramagundam III 1,048 1.87 196 88 284.10 2.71 981 2.02 198 110 308.10 3.14
Simhadri Stage II -Unit III 570 1.80 103 115 217.72 3.82 1,079 2.03 219 191 409.96 3.80
Simhadri Stage II -Unit IV - - - -
NTPC_TNEB JV Vallur Unit 1 - 488 2.08 102 126 227.54 4.66
NTPC_TNEB JV Vallur Unit 2 - -
Talcher 3,622 2.04 741 284 1,024.52 2.83 3,405 1.47 502 283 784.69 2.30
Madras APS 1,604 1.99 319 - 319.21 1.99 1,774 2.03 361 - 360.68 2.03
Kaiga APS 1,171 3.12 366 - 365.68 3.12 1,261 3.37 425 - 424.69 3.37
Kudankulam - - - -
Kudankulam II -
PFBR Kalpakkam -
NTPC ER 465 2.90 135 43 177.90 3.83 319 2.15 68 33 101.06 3.17
NTECL - - - - NTPC Kayamkulam 205 9.90 203 65 268.00 13.07 - Total CGS 20,630 4,126 1,378 5,503 2.67 21,566 25 4,244 1,761 6,005 2.78
Form 7Statement showing Abstract of Power Purchase Cost
Abstract of Power Purchase Cost
S. No. Source of Power Purchase
FY 2011-12 FY 2012-13
TANGEDCO
NAME OF THE COMPANY
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
Abstract of Power Purchase Cost
S. No. Source of Power Purchase
FY 2011-12 FY 2012-13
TANGEDCO
GMR Vasavi 858 9.45 811 159 969.19 11.30 610 10.41 635 167 801.94 13.15
Samalpatti 292 10.20 298 116 413.62 14.17 329 10.17 335 109 443.76 13.48
Madurai Power Corpn 282 10.46 295 125 420.05 14.90 357 10.99 392 110 501.69 14.06
Pillaiperumalnallur 1,491 6.48 967 286 1,252.29 8.40 1,785 8.55 1,527 292 1,818.56 10.19
TAQA (STCMS) 1,688 2.01 339 315 653.40 3.87 1,665 2.32 386 364 749.19 4.50
LANCO Power (Aban co) 760 1.77 134 107 240.87 3.17 850 2.00 170 118 287.38 3.38
PIONEER Power co. (Penna) 360 1.79 64 56 120.60 3.35 375 2.04 77 58 134.48 3.58
Windmill 5,711 3.10 1,770 1,769.92 3.10 7,474 3.41 2,549 2,548.75 3.41
Co-generation 1,285 3.94 506 506.38 3.94 1,428 3.74 534 534.44 3.74
Biomass 73 4.63 34 33.68 4.63 11 4.62 5 5.25 4.62
Captive generation 575 4.12 237 236.82 4.12 595 3.77 224 224.26 3.77
Solar 11 4.91 6 5.53 4.91 45 4.91 22 22.32 4.91
Co-Gen in Co-op Sugar Mills - - -
UI Power 717 4.57 327.35 327.35 82 6.09 50 49.82
Traders-MTOA - - -
Traders-LTOA - - -
Traders -STOA 2,203 4.46 983 983.20 4.46 - -
CPP_Traders - - - -
Power Exchanges -
TANTRANSCo charges 1,500.00 2,381.00
Trading Bilateral 6,900 4.77 3,292 3,292.21 4.77 6,935 5.13 3,557 3,557.37 5.13
ABT PGCIL - 327 327.04 - 136.00
PGCIL Reactive 3.00 2.74
Total 43,835 14,515 2,540 18,559 4.23 44,109 14,707 2,977 20,204 4.58
NAME OF THE COMPANY
(1) (2)
Central Generating Stations
Neyveli TS-I
Neyveli TS-II Stage I
Neyveli TS-II Stage II
Neyveli TS-I Expansion
Neyveli Expansion Unit II
NTPL JV with NLC
Ramagundam I&II
Ramagundam III
Simhadri Stage II -Unit III
Simhadri Stage II -Unit IV
NTPC_TNEB JV Vallur Unit 1
NTPC_TNEB JV Vallur Unit 2
Talcher
Madras APS
Kaiga APS
Kudankulam
Kudankulam II
PFBR Kalpakkam
NTPC ER
NTECLNTPC KayamkulamTotal CGS
Abstract of Power Purchase Cost
S. No. Source of Power Purchase
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
(15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26)
3,271 2.57 842 286 1,127 3.45 2,851 2.65 755 251 1,006 3.53
1,443 2.14 310 110 419 2.91 1,328 2.29 305 111 415 3.13
1,956 2.14 420 94 513 2.63 1,948 2.16 421 95 516 2.65
1,584 2.22 351 189 541 3.41 1,672 2.09 349 225 574 3.43
- - -
- - -
4,005 2.09 838 253 1,091 2.72 3,876 2.45 950 232 1,183 3.05
1,054 2.71 285 99 384 3.65 949 2.53 240 88 328 3.46
1,572 2.35 370 273 643 4.09 1,428 2.60 372 254 626 4.38
-
2,558 2.12 543 625 1,168 3,850 746 695 1,440
-
3,475 1.51 526 288 814 2.34 3,760 1.46 549 294 843 2.24
1,332 2.45 326 326 2.45 1,672 2.06 345 - 345 2.06
1,581 3.01 475 475 3.01 1,568 3.03 475 - 475 3.03
462 10.29 475 475 2,071 541 - 541 -
267 2.67 71 23 95 3.54 239 2.49 59 20 79 3.31
- - - - 24,560 5,832 2,240 8,072 27,212 6,106 2,264 8,371 3.08
Form 7
TANGEDCO
Abstract of Power Purchase Cost
Statement showing Abstract of Power Purchase Cost
FY 2014-15FY 2013-14
NAME OF THE COMPANY
(1) (2)
Abstract of Power Purchase Cost
S. No. Source of Power Purchase
GMR Vasavi
Samalpatti
Madurai Power Corpn
Pillaiperumalnallur
TAQA (STCMS)
LANCO Power (Aban co)
PIONEER Power co. (Penna)
Windmill
Co-generation
Biomass
Captive generation
Solar
Co-Gen in Co-op Sugar Mills
UI Power
Traders-MTOA
Traders-LTOA
Traders -STOA
CPP_Traders
Power Exchanges
TANTRANSCo charges
Trading Bilateral
ABT PGCIL
PGCIL Reactive
Total
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
(15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26)
TANGEDCO
Abstract of Power Purchase CostFY 2014-15FY 2013-14
804 10.73 862 161 1,024 12.74 576 10.32 594 73 667 11.58
299 11.57 346 80 426 14.25 223 10.77 240 82 322 14.46
345 11.38 393 88 481 13.93 243 10.22 248 95 343 14.12
1,427 12.27 1,751 223 1,974 13.83 1,143 12.41 1,418 215 1,634 14.29
1,721 2.39 411 425 835 4.85 1,678 2.57 431 343 774 4.61
699 2.27 159 88 246 3.53 561 2.52 141 66 207 3.69
363 2.26 82 55 137 378 2.56 97 41 138 3.64
5,110 2.56 1,310 1,310 2.56 3,963 4.174 1,303 - 1,303 3.29
803 291 291 1,508 5.165 779 - 779 5.17
20 3.62 7 7 3.62 18 4.020 7 - 7 4.02
2,383 0.65 155 155 0.65 2,972 4.820 1,432 - 1,432 4.82
20 4.30 9 9 4.30 25 3.436 12.25 - 12 4.90
- - - - -
(418) (2.79) 117 117 (529) 0.186 (10) - (10) 0.19
3,465 4.99 1,728 1,728 4.99 6,233 4.708 3,931 - 3,931 6.31
- - - - - - - -
3,526 4.86 1,713 1,713 4.86 6,790 5.774 3,852 - 2,118 5.50
- - - - - -
2,769 1.17 323 323 387 5.308 205 - 205 5.31
2,228 - 4.708 - - 1,374
828 13.25 1,097 1,097 -
- 2,219 978
48,724 16,585 3,360 24,392 5.01 53,381 20,789 3,179 24,587 4.61
NAME OF THE COMPANY
(1) (2)
Central Generating Stations
Neyveli TS-I
Neyveli TS-II Stage I
Neyveli TS-II Stage II
Neyveli TS-I Expansion
Neyveli Expansion Unit II
NTPL JV with NLC
Ramagundam I&II
Ramagundam III
Simhadri Stage II -Unit III
Simhadri Stage II -Unit IV
NTPC_TNEB JV Vallur Unit 1
NTPC_TNEB JV Vallur Unit 2
Talcher
Madras APS
Kaiga APS
Kudankulam
Kudankulam II
PFBR Kalpakkam
NTPC ER
NTECLNTPC KayamkulamTotal CGS
Abstract of Power Purchase Cost
S. No. Source of Power Purchase
Form 7
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
(27) (28) (29) (30) (31) (32) (33) (34) (35) (36) (37) (38)
2,487 2.88 715.99 217.55 934 3.75 2,675 2.94 786 239 1,024 3.83
3,157 2.37 747.58 201.49 949 3.01 3,260 2.42 787 212 1,000 3.07
- -
1,629 2.24 365.06 217.56 583 3.58 1,675 2.29 383 228 611 3.65
307 2.41 73.89 64.72 139 4.52 1,302 320 280 600
1,299 2.33 302.45 212.58 515 3.96 2,375 564 396 960
4,020 2.29 921.66 234.21 1,156 2.88 4,050 2.34 947 241 1,188 2.93
1,069 2.33 249.48 92.22 342 3.20 1,095 2.38 261 96 357 3.26
1,544 2.48 382.73 238.95 622 4.03 1,525 2.53 386 241 626 4.11
- -
5,162 1.98 1,021.40 889.12 1,911 3.70 7,193 1,452 1,264 2,715 3.78
- -
3,713 1.35 499.61 283.38 783 2.11 3,810 1.37 523 297 819 2.15
2,091 2.08 435.39 - 435 2.08 2,371.0 2.1 503.6 - 504 2.12
1,869 3.05 569.33 - 569 3.05 1,825.0 3.1 567.0 - 567 3.11
1,047 3.94 412.86 - 413 - 3,776.5 3.9 1,491.7 - 1,492 3.95
944.1 3.9 372.9 373 3.95
- - - -
285 2.34 66.57 22.48 89 3.13 325 2.38 78 26 104 3.19
- -
29,678 6,764 2,674 9,438 3.18 38,202 9,420 3,520 12,940 3.39
TANGEDCO
Statement showing Abstract of Power Purchase Cost
FY 2016-17 (Projected)FY 2015-16Abstract of Power Purchase Cost
NAME OF THE COMPANY
(1) (2)
Abstract of Power Purchase Cost
S. No. Source of Power Purchase
GMR Vasavi
Samalpatti
Madurai Power Corpn
Pillaiperumalnallur
TAQA (STCMS)
LANCO Power (Aban co)
PIONEER Power co. (Penna)
Windmill
Co-generation
Biomass
Captive generation
Solar
Co-Gen in Co-op Sugar Mills
UI Power
Traders-MTOA
Traders-LTOA
Traders -STOA
CPP_Traders
Power Exchanges
TANTRANSCo charges
Trading Bilateral
ABT PGCIL
PGCIL Reactive
Total
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
(27) (28) (29) (30) (31) (32) (33) (34) (35) (36) (37) (38)
TANGEDCO
FY 2016-17 (Projected)FY 2015-16Abstract of Power Purchase Cost
- - - - - - - - - -
35.81 5.05 18.08 67.00 85 - - - - -
39.95 7.25 28.99 75.57 105 - - - - -
159.18 5.52 87.90 259.09 347 21.80 159.18 6 88 259 347 21.80
1,384.93 2.87 397.56 235.84 633 4.57 1,104.94 3 324 192 515 4.66
620.22 2.58 160.07 64.50 225 3.62 793.31 3 209 84 293 3.69
178.67 2.66 47.58 16.07 64 370.02 3 101 34 134 3.63
2,873 945 3.29 6,944 3.26 2,264 2,264 3.26
509 - - 181 3.56 970 4 400 400 4.12
21 - - 10 4.81 20 - - - -
24 - - 4 1.79 39 2 9 9 2.40
69 - - 36.15 5.23 1,506 7 1,032 1,032 6.85
- - - - - - - -
(231) - - (42.76) 1.85 - - - -
- - -
- - - - 8,822.84 3 2,297 3,923 4.45
4,542 - - 2,294 5.05 250.62 4 96 96 3.85
- - - - - - -
58 - - 30 5.16 - - - -
- - - 1,697 - - - 1,782
14,126 - - 7,261 5.14 -
900.50 946
54,087 7,504 3,392 24,212 4.48 59,181 16,239 4,089 24,681 4.17
NAME OF THE COMPANY
(1) (2)
Central Generating Stations
Neyveli TS-I
Neyveli TS-II Stage I
Neyveli TS-II Stage II
Neyveli TS-I Expansion
Neyveli Expansion Unit II
NTPL JV with NLC
Ramagundam I&II
Ramagundam III
Simhadri Stage II -Unit III
Simhadri Stage II -Unit IV
NTPC_TNEB JV Vallur Unit 1
NTPC_TNEB JV Vallur Unit 2
Talcher
Madras APS
Kaiga APS
Kudankulam
Kudankulam II
PFBR Kalpakkam
NTPC ER
NTECLNTPC KayamkulamTotal CGS
Abstract of Power Purchase Cost
S. No. Source of Power Purchase
Statement showing Abstract of Power Purchase Cost
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
(39) (40) (41) (42) (43) (44) (45) (46) (47) (48) (49) (50)
3,942 3.00 1,181 359 1,540 3.91 3,942 3.06 1,205 366 1,571 3.98
3,596 2.46 886 239 1,125 3.13 3,596 2.51 904 244 1,147 3.19
- -
1,675 2.33 390 233 623 3.72 1,675 2.38 398 237 636 3.79
1,302 2.51 326 286 612 4.70 1,302 2.56 333 291 624
2,375 2.42 575 404 979 4.12 2,375 2.47 587 412 999
4,050 2.39 966 246 1,212 2.99 4,050 2.43 985 250 1,236 3.05
967 2.43 235 87 322 3.33 967 2.48 240 89 328 3.39
1,674 2.58 432 270 701 4.19 1,674 2.63 440 275 715 4.27
- -
7,867 2.06 1,619 1,410 3,029 3.85 7,867 2.10 1,652 1,438 3,090 3.93
- -
3,925 1.40 549 302 852 2.17 3,925 1.43 560 309 869 2.21
2,472 2.17 535 535 2.17 2,480 2.17 538 538 2.17
1,654 3.17 524 524 3.17 1,654 3.17 524 524 3.17
3,777 3.95 1,492 1,492 3.95 3,777 3.95 1,492 1,492 3.95
3,777 3.95 1,492 1,492 3.95 3,777 3.95 1,492 1,492 3.95
458 3.90 179 179 1.00 1,170 3.90 456 456 3.90
325 2.43 79 27 106 3.25 325 2.48 81 27 108 3.32
- -
43,835 11,461 3,861 15,322 3.50 44,555 11,887 3,938 15,825 3.55
Form 7
TANGEDCO
FY 2017-18 (Projected) FY 2018-19 (Projected)Abstract of Power Purchase Cost Abstract of Power Purchase Cost
NAME OF THE COMPANY
(1) (2)
Abstract of Power Purchase Cost
S. No. Source of Power Purchase
GMR Vasavi
Samalpatti
Madurai Power Corpn
Pillaiperumalnallur
TAQA (STCMS)
LANCO Power (Aban co)
PIONEER Power co. (Penna)
Windmill
Co-generation
Biomass
Captive generation
Solar
Co-Gen in Co-op Sugar Mills
UI Power
Traders-MTOA
Traders-LTOA
Traders -STOA
CPP_Traders
Power Exchanges
TANTRANSCo charges
Trading Bilateral
ABT PGCIL
PGCIL Reactive
Total
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
Un
its
in M
U
VC
Rs/
kwh
Tota
l Var
iab
le
Co
st R
s. C
rore
s
Tota
l Fix
ed
Co
st R
s. C
rore
s
Tota
l Co
st R
s
Cro
res
(5+6
)
Co
st R
s./k
wh
(39) (40) (41) (42) (43) (44) (45) (46) (47) (48) (49) (50)
TANGEDCO
FY 2017-18 (Projected) FY 2018-19 (Projected)Abstract of Power Purchase Cost Abstract of Power Purchase Cost
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
159 5.63 90 264 354 22.23 159 5.75 91 270 361 22.68
1,105 2.99 330 196 526 4.76 1,105 3.05 337 200 536 4.85
793 2.69 213 86 299 3.77 793 2.74 217 88 305 3.84
370 2.77 103 35 137 3.71 370 2.83 105 35 140 3.78
6,150 3.33 2,045 2,045 3.33 6,347 3.39 2,153 2,153
970 4.20 408 408 4.20 970 4.29 416 416
20 3.15 6 6 3.15 20 3.21 6 6
39 2.45 9 9 2.45 35 2.50 9 9
2,294 6.13 1,406 1,406 6.13 2,525 5.75 1,452 1,452
- - - - - - - -
- - - - - - - -
1,840 2.10 386 168 554 - - -
8,044 2.66 2,140 1,691 3,831 4.76 15,230 2.71 4,125 2,921 7,046
- - - - - -
- - - - - -
- - - - - - - -
- - - 1,871 - - - - 1,964
- -
993 1,042
65,620 18,597 6,300 27,761 4.23 72,110 20,797 7,452 31,256 4.33
Form 8
NAME OF THE COMPANY TANGEDCO
Gross (in MU) Net (in MU) Gross (in MU) Net (in MU) Gross (in MU) Net (in MU) Gross (in MU) Net (in MU)
I Coal Based Thermal Stations
1 ETPS 340 22.61% 16.73% 894 744 18.67% 17.07% 736 610 30.61% 16.18% 1,207 1,011 20.31% 19.83% 605 485
2 TTPS 1,050 85.60% 7.98% 7,892 7,262 90.04% 7.99% 8,282 7,620 85.80% 8.09% 7,891 7,253 83.42% 8.21% 7,673 7,043
3 MTPS 840 92.77% 8.26% 6,845 6,280 84.26% 8.32% 6,200 5,684 88.04% 8.50% 6,479 5,928 84.71% 8.60% 6,233 5,697
4 NCTPS 630 84.81% 8.36% 4,693 4,301 91.68% 8.42% 5,059 4,634 74.33% 9.32% 4,102 3,720 77.21% 9.29% 4,261 3,865
5 NCTPS Stage II 1,200 53.14% 7.14% 5,586 5,187
7 MTPS III 600 80.00% 1,978.30 1,840 57.50% 7.28% 3,022 2,802
8 Ennore Expansion 561 0.00% 0.00% - -
Ennore SEZ 1,320 0.00% 0.00% - -
Total 5,221 20,324 18,587 20,278 18,549 21,657 19,752 27,380 25,079
II Gas based Thermal Stations
1 TGTPS 108 74.68% 6.05% 706 663 76.90% 6.13% 727 682 52.69% 8.36% 498 456 43.81% 7.84% 414 382
2 KGTPS 101 46.76% 7.02% 414 385 6.31% 8.50% 56 51 72.49% 7.32% 641 594 56.74% 7.65% 497 459
3 BBGTPS 120 2.81% 0.57% 30 29 0.04% 0.96% 0.4 0 0.08% 5.06% 1 1 0.29% 0.00% 3.0 3.0
4 VGTPS-1 95 79.15% 6.00% 659 619 54.00% 5.76% 449 424 87.64% 5.81% 729 687 1,081 996
5 VGTPS-2 92 56.21% 6.12% 454 426 60.42% 5.59% 488 461 65.17% 6.17% 526 494 - -
Total 516 2,262 2,123 1,720 1,618 2,396 2,232 1,995 1,840
III Hydro Stations
1 Erode Hydro Generation Circle 454 32.41% 0.49% 1,202 1,196 11.68% 1.02% 469 464 21.42% 0.57% 907 902 23.90% 0.40% 950 946
2 Kundah Hydro 834 0.00% 0.00% 1,928 1,920 0.00% 0.00% 1,360 1,353 0.00% 0.00% 2,195 2,187 27.89% 0.41% 2,036 2,028
3 Tirunelveli Hydro 355 31.31% 0.48% 585 583 0.00% 0.42% 232 231 0.00% 0.38% 462 461 37.40% 0.43% 1,162 1,157
4 Kadamparai Hydro 595 4.99% 0.52% 1,093 1,087 3.08% 0.61% 674 670 4.89% 0.47% 1,068 1,063 19.90% 0.48% 1,038 1,033
Total 2,237 4,809 4,788 2,735 2,717 4,632 4,612 5,187 5,165
IV Windmills 17 12 12 13 13 13 13 8 8
V Infirm Power from Own Plants
1 NCTPS unit I
2 NCTPS Unit II
3 MTPS III -
Grand Total 7,991 27,407 25,509 24,746 22,897 28,697 26,609 34,570 32,091
Less Kadamparai Pump Mode 533 335 493 395
Total Net Generation 24,976 22,562 26,116 31,696
Actual
FY 2012-13PLF (in %)
Aux. Consu.
(in %)
Actual
FY 2011-12PLF (in %)
Aux.
Consu. (in
%)
PLF (in %)
Aux.
Consu. (in
%)
ENERGY AVAILABILITY FROM OWN GENERATING STATIONS
I Generating Station
Installed
Capacity (in
MW)
PLF (in %)
Aux.
Consu. (in
%)
Actual
FY 2014-15
Actual
FY 2013-14
64.95% 7.86%
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
NAME OF THE COMPANY TANGEDCO
I Coal Based Thermal Stations
1 ETPS 340 22.61% 16.73%
2 TTPS 1,050 85.60% 7.98%
3 MTPS 840 92.77% 8.26%
4 NCTPS 630 84.81% 8.36%
5 NCTPS Stage II 1,200
7 MTPS III 600
8 Ennore Expansion 561
Ennore SEZ 1,320
Total 5,221
II Gas based Thermal Stations
1 TGTPS 108 74.68% 6.05%
2 KGTPS 101 46.76% 7.02%
3 BBGTPS 120 2.81% 0.57%
4 VGTPS-1 95 79.15% 6.00%
5 VGTPS-2 92 56.21% 6.12%
Total 516
III Hydro Stations
1 Erode Hydro Generation Circle 454 32.41% 0.49%
2 Kundah Hydro 834 0.00% 0.00%
3 Tirunelveli Hydro 355 31.31% 0.48%
4 Kadamparai Hydro 595 4.99% 0.52%
Total 2,237
IV Windmills 17
V Infirm Power from Own Plants
1 NCTPS unit I
2 NCTPS Unit II
3 MTPS III
Grand Total 7,991
Less Kadamparai Pump Mode
Total Net Generation
ENERGY AVAILABILITY FROM OWN GENERATING STATIONS
I Generating Station
Installed
Capacity (in
MW)
PLF (in %)
Aux.
Consu. (in
%) Gross (in MU) Net (in MU)Gross (in
MU)Net (in MU)
Gross (in
MU)Net (in MU)
Gross (in
MU)Net (in MU)
31.08% 12.25% 447 392 31.08% 15.00% 926 787 0.00% 0.00% - - 0.00% 0.00% - -
77.00% 8.20% 7,082 6,501 80.00% 8.50% 7,358 6,733 80.00% 8.50% 7,358 6,733 81.60% 8.50% 7,506 6,868
80.25% 8.45% 5,905 5,406 80.00% 8.50% 5,887 5,386 80.00% 8.50% 5,887 5,386 81.60% 8.50% 6,004 5,494
85.00% 8.50% 4,449 4,071 80.00% 8.50% 4,415 4,040 87.44% 8.50% 4,826 4,415 89.17% 8.50% 4,921 4,503
85.00% 7.29% 4,820 4,468 80.00% 8.50% 8,410 7,695 80.00% 8.83% 8,410 7,667 81.60% 8.83% 8,578 7,820
85.00% 6.45% 2,848 2,664 80.00% 8.83% 4,205 3,834 80.00% 8.83% 4,205 3,834 81.60% 8.83% 4,289 3,910
0.00% 0.00% - - 0.00% 0.00% - - 0.00% 0.00% - - 32.80% 8.50% 1,896 1,735
0.00% 0.00% - - 0.00% 0.00% - - 0.00% 0.00% - - 0.00% 0.00% - -
25,551 23,503 31,200 28,474 30,685 28,035 33,194 30,330
42.23% 9.07% 399 363 80.00% 6.00% 756 711 85.20% 6.00% 805 757 87.00% 6.00% 822 773
64.35% 2.00% 564 552 80.00% 6.00% 701 659 85.80% 6.00% 752 707 87.50% 6.00% 767 721
1.00% 0.00% 10.5 10.5 0.60% 0.99% 6.3 6.2 0.60% 0.99% 6.3 6.2 0.60% 0.99% 6.3 6.2
1,694 1,606 2,129 2,001 2,932 2,756 2,992 2,813
19.13% 0.50% 760 756 19.13% 0.50% 760 756.26 33.19% 0.50% 1,319 1311.97 33.51% 0.50% 1,331 1324.43
12.26% 0.50% 895 891 12.26% 0.50% 895 890.77 18.85% 0.50% 1,377 1369.97 19.40% 0.50% 1,417 1409.69
54.81% 0.50% 1,704 1695 54.81% 0.50% 1,704 1695.06 77.96% 0.50% 2,423 2410.94 78.43% 0.50% 2,438 2425.41
21.12% 0.50% 1,101 1096 21.12% 0.50% 1,101 1095.89 19.77% 0.50% 1,031 1025.97 19.85% 0.50% 1,035 1030.08
4,460 4,438 4,460 4,438 6,150 6,119 6,221 6,190
6.79 6.79 12 12 12 12 12 12
31,712 29,553 37,801 34,926 39,779 36,922 42,419 39,345
425.00
29,128 34,926 36,922 39,345
ENERGY AVAILABILITY FROM OWN GENERATING STATIONS
Projected
FY 2018-19PLF (in %)
Aux.
Consu. (in
%)
Projected
FY 2017-18PLF (in %)PLF (in %)
Aux.
Consu. (in
%)
Projected
FY 2016-17Aux.
Consu. (in
%)
Form 8
Actual
PLF (in %)Aux. Consu.
(in %)
FY 2015-16
86.63% 5.65% 721 680 80.00% 6.00% 666 626 6.00% 1,397 1,313 83.56% 6.00% 1,369 1,287 85.30%
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in Crs) Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in Crs) Total (Rs.in
Crs)
Cost per unit
(in RS)1 Ennore TPS 744 377 313 690 9.27 610 414 303 717 11.75
2 Tuticorin TPS 7,262 717 2,463 3,179 4.38 7,620 885 2,484 3,368 4.42
3 Mettur TPS 6,280 397 1,811 2,208 3.52 5,684 507 1,936 2,443 4.30
4 North Chennai TPS 4,301 641 1,014 1,655 3.85 4,634 790 1,271 2,062 4.45
5 NCTPS Stage-II** - - - - - - - - -
7 MTPS Stage-III** - - - - - - - - - -
Ennore Expansion
Ennore SEZ
Coal based Stations 18,587 2,131 5,601 7,732 4.16 18,549 2,595 5,994 8,590 4.63
9 Tirumakottai GTPS 663 115 115 230 3.47 682 143 131 274 4.01
10 Kuttalam GTPS 385 83 73 156 4.06 51 57 22 79 15.51
11 Basin Bridge GTPS 29 139 50 189 0 164 1 165
12 Valuthur Unit-I 619 65 101 166 2.68 424 89 89 178 4.21
13 Valuthur Unit-II 426 65 101 166 3.89 461 89 89 178 3.87
Gas based Stations 2,123 467 440 907 4.27 1,618 543 332 875 5.41
14 Erode HEP 1,196 193 - 193 1.62 464 226 - 226 4.86
15 Kadamparai HEP 1,087 111 - 111 1.02 670 128 - 128 1.91
16 Kundah HEP 1,920 260 - 260 1.35 1,353 314 - 314 2.32
`7 Tirunelveli HEP 583 108 - 108 1.84 231 123 - 123 5.32
Hydro Stations 4,788 671 - 671 1.40 2,717 791 - 791 2.91
Wind Stations 12.15 - 3.34 2.75 12.66 - 3.48 2.75
Total 25,509 3,270 6,040 9,313 3.65 22,897 3,929 6,326 10,259 4.48
Statement showing Generation Cost
Sl. No Power Station FY 2011-12 FY 2012-13
Form 9
Name of the Company TANGEDCO
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
1 Ennore TPS
2 Tuticorin TPS
3 Mettur TPS
4 North Chennai TPS
5 NCTPS Stage-II**
7 MTPS Stage-III**
Ennore Expansion
Ennore SEZ
Coal based Stations
9 Tirumakottai GTPS
10 Kuttalam GTPS
11 Basin Bridge GTPS
12 Valuthur Unit-I
13 Valuthur Unit-II
Gas based Stations
14 Erode HEP
15 Kadamparai HEP
16 Kundah HEP
`7 Tirunelveli HEP
Hydro Stations
Wind Stations
Total
Statement showing Generation Cost
Sl. No Power Station
Name of the Company
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in Crs) Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in Crs) Total (Rs.in
Crs)
Cost per unit
(in RS) 1,011 592 410 1,002 9.91 485 640 246 886 18.26
7,253 1,119 2,399 3,518 4.85 7,043 1,280 2,576 3,856 5.48
5,928 823 2,330 3,153 5.32 5,697 1,044 2,382 3,426 6.01
3,720 1,140 1,165 2,305 6.20 3,865 1,331 1,247 2,578 6.67
- - - - - 5,187 100 1,655 1,755 3.38
1,839.82 180 - 180 0.98 2,802 (113) 1,039 925 3.30
- -
- - 19,752 3,854 6,304 10,158 5.14 25,079 4,282 9,144 13,426 5.35
456 203 110 313 6.86 382 235 111 346 9.08
594 230 132 361 6.08 459 122 130 252 5.49
1 239 2 240 3 283 6 289
687 125 149 274 3.98 996 289 242 531 5.33
494 125 114 239 4.84 - - - - #DIV/0!
2,232 921 506 1,427 6.39 1,840 929 489 1,418 7.71
902 341 - 341 3.78 946 417 - 417 4.40
1,063 185 - 185 1.74 1,034 211 - 211 2.04
2,187 456 - 456 2.08 2,028 521 - 521 2.57
461 199 - 199 4.32 1,158 236 - 236 2.03
4,612 1,181 - 1,181 2.56 5,166 1,384 - 1,384 2.68
13 - 3.46 2.75 7.81 - 2.15 2.75
26,609 5,956 6,811 12,770 4.80 32,092 6,596 9,633 16,231 5.06
Statement showing Generation Cost
FY 2014-15FY 2013-14
Form 9
TANGEDCO
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
1 Ennore TPS
2 Tuticorin TPS
3 Mettur TPS
4 North Chennai TPS
5 NCTPS Stage-II**
7 MTPS Stage-III**
Ennore Expansion
Ennore SEZ
Coal based Stations
9 Tirumakottai GTPS
10 Kuttalam GTPS
11 Basin Bridge GTPS
12 Valuthur Unit-I
13 Valuthur Unit-II
Gas based Stations
14 Erode HEP
15 Kadamparai HEP
16 Kundah HEP
`7 Tirunelveli HEP
Hydro Stations
Wind Stations
Total
Statement showing Generation Cost
Sl. No Power Station
Name of the Company
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in Crs) Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in Crs) Total (Rs.in
Crs)
Cost per unit
(in RS) 392 671 185 856 21.82 787 811 307 1,119 14.22
6,501 1,338 2,161 3,499 5.38 6,733 1,390 2,284 3,674 5.46
5,406 887 1,847 2,733 5.06 5,386 919 2,066 2,985 5.54
4,071 1,471 996 2,468 6.06 4,040 1,357 953 2,310 5.72
4,468 423 1,706 2,128 4.76 7,695 916 1,527 2,443 3.18
2,664 370 1,217 1,586 5.95 3,834 703 1,398 2,101 5.48
- - - - -
- - - - -
23,503 5,160 8,112 13,271 5.65 28,474 6,097 8,535 14,632 5.14
363 246 120 366 10.09 711 258 164 422 5.94
552 215 156 371 6.72 659 223 154 377 5.73
11 273 16 289 6 380 1 381
680 333 237 569 8.37 626 331 138 469 7.50
- - - - - - - -
1,606 1,068 528 1,596 9.94 2,001 1,192 458 1,650 8.24
756 488 488 6.45 756 473 473 6.26
891 200 - 200 2.25 891 247 247 2.78
1,695 560 - 560 3.30 1,695 560 560 3.31
1,096 195 - 195 1.78 1,096 356 356 3.25
4,438 1,443 - 1,443 3.25 4,438 1,637 - 1,637 3.69
6.79 - 1.87 2.75 12 3.30 2.75
29,553 7,670 8,640 16,312 5.52 34,926 8,925 8,993 17,922 5.13
Form 9
Statement showing Generation Cost
TANGEDCO
FY 2016-17FY 2015-16
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
1 Ennore TPS
2 Tuticorin TPS
3 Mettur TPS
4 North Chennai TPS
5 NCTPS Stage-II**
7 MTPS Stage-III**
Ennore Expansion
Ennore SEZ
Coal based Stations
9 Tirumakottai GTPS
10 Kuttalam GTPS
11 Basin Bridge GTPS
12 Valuthur Unit-I
13 Valuthur Unit-II
Gas based Stations
14 Erode HEP
15 Kadamparai HEP
16 Kundah HEP
`7 Tirunelveli HEP
Hydro Stations
Wind Stations
Total
Statement showing Generation Cost
Sl. No Power Station
Name of the Company
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in Crs) Total (Rs.in
Crs)
Cost per unit
(in RS)
Net Gen
(MU)
AFC (Rs.in
Crs)
VC (Rs.in Crs) Total (Rs.in
Crs)
Cost per unit
(in RS) - 22.26 - 22 - 22 - 22
6,733 1,001.24 2,199 3,201 4.75 6,868 1,089 2,311 3,399 4.95
5,386 690.26 1,850 2,540 4.72 5,494 738 1,944 2,681 4.88
4,415 999.23 1,013 2,012 4.56 4,503 1,168 1,066 2,234 4.96
7,667 1,276.68 2,027 3,304 4.31 7,820 1,270 2,136 3,406 4.36
3,834 772.19 1,324 2,096 5.47 3,910 783 1,392 2,175 5.56
- - - - 1,735 446 459 905 5.21
- - - - - - - -
28,035 4,761.87 8,413 13,175 4.70 30,330 5,516 9,306 14,822 4.89
757 163.36 180 343 4.54 773 184 189 374 4.83
707 141.17 170 311 4.41 721 147 179 326 4.52
6 370.64 1 372 6 363 1 364
1,287 260.43 293 553 4.30 1,313 294 308 601 4.58
- - - - - - - -
2,756 935.61 644 1,580 5.73 2,813 988 677 1,665 5.92
1,312 346.43 346 2.64 1,324 346 346 2.62
1,370 142.11 142 1.04 1,410 164 164 1.16
2,411 375.17 375 1.56 2,425 382 382 1.57
1,026 212.70 213 2.07 1,030 212 212 2.06
6,119 1,076.41 - 1,076 1.76 6,190 1,104 - 1,104 1.78
12 3.30 2.75 12 3.30 2.75
36,922 6,774 9,057 15,835 4.29 39,345 7,608 9,983 17,594 4.47
Form 9
Statement showing Generation Cost
TANGEDCO
FY 2017-18 FY 2018-19
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 16
Name of the Company TANGEDCO
Rs Crs
FY 2016-17 FY 2017-18 FY 2018-19
1 2 3 4 5 6 7 8 9 10
1 O & M expenses 302 294 331 380.42 403.74 436.24 461.19 487.57
2 Maintenance Spares 114 128 118 139.62 263.32 323.65 357.56 381.14
3 Recievables 3,679 4,021 4,761 8,239.54 8,094.59 8,577.81 8,712.96 9,764.94
4 Total Working Capital 4095 4443.01 5209.58 8,759.59 8,761.65 9,337.70 9,531.71 10,633.65
5 Less: Consumer Security Deposit 5335 5903.84 6556.70 7,212.38 7,302.53 7,393.81 7,486.23 7,579.81
6 Net Working Capital -1240 (1460.83) (1347.12) 1547.21 1459.12 1943.89 2045.48 3053.84
7 Rate of Interest 13.00% 14.75% 14.45% 12.25% 12.25% 12.25% 11.50% 11.50%
8 Interest on Working Capital 0.00 0.00 0.00 189.53 178.74 238.13 235.23 351.19
FY 2014-15
(Actuals)
Interest on Working Capital
FY 2015-16
(Actuals)
ProjectedSl. No. Particulars
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
FY 2013-14
(Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 10
FY 2016-17 FY 2017-18 FY 2018-19
1 Equity at the beginning 1,109 2,614 4,115 4,463 4,463 4,463 4,463 4,463
2 Addition during the year 1,505 1,500 348 - - - - -
3 Total Equity 2,614 4,115 4,463 4,463 4,463 4,463 4,463 4,463
4 Return on Equity (in %) 14.00% 14.00% 14.00% 14.00% 14.00% 14.00% 14.00% 14.00%
5 Return on Equity 261 471 600 582 582 582 610 610
FY 2014-15
(Actuals)
Computation of Return on Equity
Rs. Crs
FY 2015-16
(Actuals)
Projected
TANGEDCOName of the Company / Licensee
Sl. No ParticularsFY 2013-14
(Actuals)
FY 2012-13
(Actuals)
FY 2011-12
(Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 11 B
1 2 3 4 5 6 7 8 9 10 111 Interest on Security deposit from consumers 310 493 565
2 Interest on MCD 63 9 10
3 Interest on Family Benefit Fund contribution - - -
4 Interest on deposit from employees and others - - 10
5 Interest on Hydro Balancing Fund 0 1 1
6 Interest on Advance C.C.Charges 1 4
7
Interest on Contributory Provident Fund/ TNEB Spl. PF
cum Gratuity Scheme - 0 0
8 Interest on General provident Fund 56 59 62
9 Other Interest 15 25 35
10 Cost of raising finance 17 10 18
11 Other Bank Charges/Penal int for E.tax 31 23 70
12 Guarantee commission to State Government 39 62 190
Total Other Interest and Finance Charges 531 683 965
Statement showing other Interest
FY 2013-14 (Actuals)Outstanding
at the
beginning
InterestNet additionsInterest
Outstanding
at the
beginning
Net additions Interest
Sl.
no.
ParticularsOutstanding
at the
beginning
Net additions
FY 2011-12 (Actuals) FY 2012-13 (Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
FORM-11 C
Name of the Company TANGEDCO
FY 2016-17 FY 2017-18 FY 2018-191 Net Interest on Existing Loan 708 1,454 2,386 2,992 3,501 2,945 2,441 2,995
2 Interest on Project borrowings
3 Other Interest 531 683 965 1,002.90 882 862 905 950
4 Total Interest 1,239 2,137 3,351 3,995 4,384 3,807 3,346 3,945
Abstract of Interest
ProjectedFY 2011-12
(Actuals)
FY 2015-16
(Actuals)
FY 2014-15
(Actuals)Sl.
no.
Particulars FY 2012-13
(Actuals)
FY 2013-14
(Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
1 2
1 Interest on Security deposit from consumers
2 Interest on MCD
3 Interest on Family Benefit Fund contribution
4 Interest on deposit from employees and others
5 Interest on Hydro Balancing Fund
6 Interest on Advance C.C.Charges
7
Interest on Contributory Provident Fund/ TNEB Spl. PF
cum Gratuity Scheme
8 Interest on General provident Fund
9 Other Interest
10 Cost of raising finance
11 Other Bank Charges/Penal int for E.tax
12 Guarantee commission to State Government
Total Other Interest and Finance Charges
Statement showing other Interest
Sl.
no.
Particulars
Form 11 B
3 4 5 6 7 8 9 10 11
625.41 492 516
12.57 9 10
0.10 65 0
0.97 1 2
3.08 7 7
- 3
65.96 63 66
50.49 0 0
54.67 33 35
19.96 - -
169.69 212 222
1,002.90 882 862
Statement showing other Interest
Outstanding
at the
beginning
Net additions Interest
Outstanding
at the
beginning
Net additions Interest
FY 2015-16 (Actuals) FY 2016-17 (Projected)Outstanding
at the
beginning
InterestNet additions
FY 2014-15 (Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Name of the Company
1 Net Interest on Existing Loan
2 Interest on Project borrowings
3 Other Interest
4 Total Interest
Abstract of Interest
Sl.
no.
Particulars
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
1 2
1 Interest on Security deposit from consumers
2 Interest on MCD
3 Interest on Family Benefit Fund contribution
4 Interest on deposit from employees and others
5 Interest on Hydro Balancing Fund
6 Interest on Advance C.C.Charges
7
Interest on Contributory Provident Fund/ TNEB Spl. PF
cum Gratuity Scheme
8 Interest on General provident Fund
9 Other Interest
10 Cost of raising finance
11 Other Bank Charges/Penal int for E.tax
12 Guarantee commission to State Government
Total Other Interest and Finance Charges
Statement showing other Interest
Sl.
no.
Particulars
Form 11 B
3 4 5 6 7 8
542 569
10 11
0 0
2 2
8 8
3 3
69 72
0 0
36 38
- -
234 245
905 950
Statement showing other Interest
FY 2017-18 (Projected) FY 2018-19 (Projected)Outstanding
at the
beginning
Net additions Interest
Outstanding
at the
beginning
Net additions Interest
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Name of the Company
1 Net Interest on Existing Loan
2 Interest on Project borrowings
3 Other Interest
4 Total Interest
Abstract of Interest
Sl.
no.
Particulars
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 12
Name of the Company TANGEDCO
FY 2016-17 FY 2017-18 FY 2018-19
1 2 3 4 5 6 7 8 9 10
1 Buildings and civil Engineering works of a
permenant character, not mentioned above
- - -
(a) Offices and show rooms - - -
(c) Temporary errections such as wooden
structures
- - -
(c) Roads other than kacha roads - - -
(d) Control room - - -
(e) Others 5.54 (3.21) 2.50
2 Transformers, transformer (kiosk) sub station
equipmernt and other fixed aparatus
(including plant foundations)
- - -
(a) Transformers (including foundation) having
a rating of 100 kVA and over.
- - 155.00
(b) Others 218.26 252.82 175.00
3 Switch gear, including cable connections - - -
4 Lightening arresters - - -
(a) Station type - - -
(b) Pole type - - -
(c) Synchronous condensers - - -
5 Batteries - - -
FY 2015-16
(Actuals)
Projected
ESTIMATE OF CAPITAL EXPENDITURE
Sl. No.Name of Works
FY 2011-12
(Actuals)
FY 2013-14
(Actuals)
FY 2012-13
(Actuals)
FY 2014-15
(Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 12
Name of the Company TANGEDCO
FY 2016-17 FY 2017-18 FY 2018-19
1 2 3 4 5 6 7 8 9 10
FY 2015-16
(Actuals)
Projected
ESTIMATE OF CAPITAL EXPENDITURE
Sl. No.Name of Works
FY 2011-12
(Actuals)
FY 2013-14
(Actuals)
FY 2012-13
(Actuals)
FY 2014-15
(Actuals)
6 (a) Underground cables including joint boxes
and disconnected boxes
- - -
(b) Cable duct systems - - -
7 Overhead lines including support - - -
(a) lines on fabricated steel operating at
normal voltages higher than 11KV and less
than 66 KV
907.80 1,014.83 1,370.02
(b) Lines on steel or reinforced concrete
supports
- - -
(c) Lines on treated wood supports - - -
8 Meters - - 55.00
9 Self propelled vehicles 1.07 1.03 -
10 Air-conditioning plants - - -
(a) Static - - -
(b) Portable - - -
11 (a) Office furniture and fittings 1.52 1.58 0.75
(b) Office equipments 3.59 13.17 3.50
(c) Internal wirings including fittings and
apparatus
- - -
(d) Street light fittings - - -
12 Motors - - -
13 Communication equipments - - -
(a) Radio and higher frequency carrier system - - 315.78
(b) Telephone lines and telephones - - -
TOTAL 1,138 1,280 2,078 3,483 4,035 5,577 3,016 2,101
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 15 B
Name of the Company
Rs. Crs
FY 2016-17 FY 2017-18 FY 2018-19
Opening GFA (Rs. Crores) 7,941.09 8,962.34 10,050.42 11,212.02 13,289.12 25,534.68 30,833.15 33,906.18
Addition to GFA (Rs. Crores) 1,021.25 1,088.08 1,161.59 2,077.10 12,245.56 5298.47 3073.03 2,173.32
Closing GFA (Rs. Crores) 8,962.34 10,050.42 11,212.02 13,289.12 25,534.68 30,833.15 33,906.18 36,079.50
Average Rate of Depreciation (%) 3.34% 3.28% 3.26% 4.69% 5.05% 5.28% 5.28% 5.28%
Depreciation (Rs. Crores) 265.10 294.39 327.15 525.28 670.46 203.77 483.53 645.79
* impact of revaluation assets post final transfer scheme considered in FY 2016-17 to FY 2018-19
Depreciation
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
FY 2013-14
(Actuals)
FY 2014-15
(Actuals)
FY 2015-16
(Actuals)
ProjectedParticulars
TANGEDCO
Form 17
Name of the Company TANGEDCO
Rs in Crs
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Other Expenditure
1 Repairs and Maintenance (0.15) (1.02) (0.56) (0.08) (0.66) (0.70) (0.74) (0.78)
2 Employee Cost (171.53) (210.38) (349.40) (459.02) (368.52) (389.60) (411.88) (435.44)
3 Administrative and General Expenditure (7.77) (9.33) (15.19) (21.04) (22.55) (23.84) (25.21) (26.65)
4 Fabrication Charges (0.43) (1.03) (1.06) (1.11) (0.52) 1.22 1.29 1.35
5 Depreciation and other related costs (3.40) (4.04) (6.84) (2.05) (10.19) 10.97 11.52 12.10
6 Other Debits - - - - - - - -
Total (183.28) (225.79) (373.05) (483.30) (402.45) (401.94) (425.02) (449.43)
FY 2014-15
(Actuals)
Details of Revenue Expenses Capitalised
FY 2015-16
(Actuals)
ProjectedSl.No Particulars
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
FY 2013-14
(Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 18 A
Rs in Crs
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) 3 4 5 6 7
1 Plant & Machinery 25.11 44.20 (21.70) 41.89 39.36 41.61 43.99 46.51
2 Building 0.28 0.58 1.02 1.56 2.15 2.27 2.40 2.54
3 Civil Works 1.44 2.27 2.22 2.62 4.32 4.57 4.83 5.11
4 Hydraulic work 0.00 0.00 0.02 0.01 0.01 0.01 0.01 0.01
5 Lines & Cable network 34.92 42.98 51.51 64.16 77.63 82.07 86.76 91.73
6 Vehicles 1.72 1.99 2.32 2.80 3.36 3.55 3.76 3.97
7 Furniture & Fixtures 0.01 0.02 0.02 0.01 0.02 0.02 0.02 0.02
8 Office equipments 2.07 3.39 4.69 5.26 5.44 5.75 6.08 6.42
9 Allocation of Head Quarters Expenses - - - - - - -
10 Total Expenses 65.55 95.42 40.11 118.30 132.29 139.86 147.86 156.32
11 Less: Capitalisation 0.15 1.02 0.56 (0.08) (0.66) (0.70) (0.74) (0.78)
12 Net Repair & Maintenance expenses 65.39 94.40 39.54 118.23 131.63 139.16 147.12 155.54
FY 2014-15
(Actuals)
Operation and Maintenance expenses - Repairs and Maintenance Expenses
FY 2015-16
(Actuals)
Projected
NAME OF THE COMPANY TANGEDCO
FY 2013-14
(Actuals)
S.
No.Details
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 18 B
Rs. Crs
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) 3 4 5 6 7 8 9 10
1 Salary 1,079 1,060 1,174 1,238 1,217 1,400 1,480 1,564
2 Overtime wages 31 16 13 16 30 32 34 36
3 Dearness Allowance 589 748 1,021 1,259 1,450 1,533 1,621 1,713
4 Other Allowances 97 93 101 105 106 112 119 126
5 Bonus & Exgratia 48 52 55 56 60 63 67 71
Total 1 - 5 1,843 1,970 2,365 2,674 2,864 3,141 3,320 3,510
6 Medical expenses reimbursement 2 2 2 3 2 2 2 2
7 Leave Travel concession 0 1 0 0 0 0 0 1
8 Earned Leave encashment 122 124 147 161 193 204 216 228
9 Terminal benefits 1,567 1,318 1,502 1,684 1,791 1,894 2,002 2,117
10 Staff welfare expenses 6 5 6 8 7 8 8 9
11 Board's Contribution to CPS 41 46 61
12 Others 0 0 2 133 98 104 110 116
Grand Total 3,581 3,465 4,085 4,663 4,956 5,353 5,659 5,982
13 Less: Capitalisation 172 210 349 459 369 390 412 435
Net Expenses 3,410 3,255 3,736 4,204 4,588 4,963 5,247 5,547
Operation and Maintenenace Expenses - Employee Cost
ProjectedFY 2015-16 (Actuals)
NAME OF THE COMPANY / Licensee
S.
No.Details
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
TANGEDCO
FY 2013-14
(Actuals)
FY 2014-15
(Actuals)
Form 18 C
Rs. Crs
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Rent/Rates and Taxes 9.37 10.01 10.64 12.01 12.03 12.72 13.45 14.22
2 Insurance 0.21 0.25 0.35 0.34 3.90 4.13 4.36 4.61
3Telephone/Postage/Telegram/Telex
charges 5.64 6.21 8.84 10.86
9.99 10.57 11.17 11.81
4 Legal Charges 3.75 8.27 6.83 8.29
5 Statutory Audit Fees 0.17 6.76 0.23 0.25
6 Consultancy Charges 0.43 0.76 0.94 0.80
7 Technical Fees 0.36 0.39 0.40 0.30
8 Other Professional Charges 0.93 0.26 0.72 0.86
9 Conveyance & Travel 35.43 32.02 39.42 44.91 46.66 49.33 52.15 55.14
10 Fuel for operating machines 0.00 0.00 0.00 0.00
11 Fees & Subscription 4.77 0.45 0.74 0.15
12 Books & Periodicals 0.04 0.05 0.05 0.04
13 Printing & Stationery 5.38 7.05 7.76 8.20
14 Training Expenses 1.39 1.21 1.25 2.21
15 Advertisement Expenses 0.54 0.14 2.13 4.97
16Subscriptions/Contributions to Books &
Periodicals 0.00 0.00 0.02 0.00
17 Electricity Charges 12.94 11.12 13.72 15.14
18 Water Charges 0.22 0.41 0.30 0.41
19 Entertainment/Recreations for employees 0.00 0.00 0.00 0.01
41.96 44.36 46.90 49.58
FY 2014-15
(Actuals)
Operation and Maintenance Expenses - Administration and General Expenses
12.01 12.69 13.42 14.19
ProjectedFY 2015-16
(Actuals)
FY 2013-14
(Actuals)
NAME OF THE COMPANY / Licensee
S.
No.Details
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
TANGEDCO
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 18 C
Rs. Crs
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
FY 2014-15
(Actuals)
Operation and Maintenance Expenses - Administration and General Expenses
ProjectedFY 2015-16
(Actuals)
FY 2013-14
(Actuals)
NAME OF THE COMPANY / Licensee
S.
No.Details
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
TANGEDCO
20 Watch and Ward Expenses. 4.46 8.26 8.77 10.17
21 Petty Office Maintenance Expenses. 3.22 1.94 0.87 0.72
22 Miscellaneous Expenses 5.01 6.58 19.09 7.61 6.89 7.29 7.70 8.14
23 Freight 4.23 7.74 9.13 9.78 11.01 11.64 12.31 13.01
24 Other Purchase related Expenses. 2.84 2.23 3.81 4.27
25Honororium (Food Allwo.) for SO in
Chennai 0.20 0.45 0.66 0.92
26Reward for theft of energy/Spl reward
vigilance 0.80 2.84 4.09 1.93
27 Licence fee and ROC fee 3.94 4.83 2.00 2.29
28Insurance (1% on the Assets of generation
stations) 53.01 64.82 68.85
29 TOTAL A&G Expenses 159.29 185.05 211.60 265.47 148.08 156.55 165.50 174.97
30 Less Expenses Capitalized 7.77 9.33 15.19 21.04 22.55 23.84 25.21 26.65
31 Less Fabrication charges 0.43 1.03 1.06
Net A&G Expenses 151.09 174.70 195.35 244.44 125.52 132.70 140.30 148.32
3.61 3.82 4.04 4.27
41.96 44.36 46.90 49.58
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 20
NAME OF THE COMPANY / Licensee
Rs Crs
I Income relating to previous year
1 Fuel related gains 80.47 - - 64.91 1.01
2 Receipts from consumers 38.99 16.46 160.43 104.96 39.83
3 Interest Income 0.11 4.48 0.19 0.63 0.51
4 Excess provision for I.T. - - - - -
5 Excess provision for Depreciation - - - - 708.79
6 Excess provn. for Int.& Fin.charges 206.42 466.96 427.62 221.35 1,740.35
7 Other excess provision 46.92 67.80 68.75 142.42 68.01
8 Other income 931.44 461.07 709.55 625.22 614.20
Total 1,304.36 1,016.76 1,366.54 1,159.50 3,172.71
IIExpenses / Losses relating to previous
period1 Short provision for power purchase 1,350.85 1,567.54 374.50 896.64 360.60
2 Fuel related losses and expenses - - (49.34) (48.50) 0.00
3 Operating expenses - - 0.03 - 0.00
4 Material related expenses 0.15 - 4.83 - 0.00
5 Employees cost 18.36 8.13 483.73 161.84 29.54
6 Depreciation under provided - - - 0.25 120.85
7 Interest &Finance charges 296.75 518.18 204.19 23.68 900.44
8 Other charges 222.07 618.84 64.36 36.35 234.37
Total 1,888.20 2,712.69 1,082.29 1,070.26 1,645.80
Net Prior Periode Expenses583.84 1,695.93 (284.26) (89.24) (1,526.91)
TANGEDCO
FY 2014-15
(Actuals)
PRIOR PERIOD CREDITS / CHARGES
FY 2015-16
(Actuals)Sl.No. Details of Expenses
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
FY 2013-14
(Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 19
NAME OF THE COMPANY
Rs in Crs
FY 2016-17 FY 2017-18 FY 2018-19
1 Material Cost Variance (0.10) 0.02 - 0.01 0.03 0.03 0.03 0.03
2 R&D Expenses 0.06 3.22 (0.07) 18.63 3.28 3.28 3.28 3.28
3 Bad & Doubtful Debts 17.03 5.84 15.51 7.54 10.01 10.01 10.01 10.01
4 Miscellaneous losses 5.22 - 6.31 (0.22) (0.10) (0.10) (0.10) (0.10)
5 Compensation for injuries/death to
staff and outsiders- - 0.00 - -
- - -
6 Other expenses written off - 1.16 - 0.02 (0.04) (0.04) (0.04) (0.04)
7 Provision for Hydro Balancing Fund 14.32 - (0.04) 0.00 0.00 0.00 0.00 0.00
8 Allocation of Head Quarters Expenses
9 Total 36.52 10.24 21.70 25.98 13.19 13.19 13.19 13.19
10 Less: Capitalization - - - - - - - -
Net expenses 36.52 10.14 21.70 25.98 13.19 13.19 13.19 13.19
FY 2013-14
(Actuals)
FY 2014-15
(Actuals)
FY 2015-16
(Actuals)
Projected
OTHER DEBITS
Sl.No. Details of ExpensesFY 2011-12
(Actuals)
FY 2012-13
(Actuals)
TANGEDCO
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
NAME OF THE COMPANY / Licensee
Rs in Crs
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Net Repair & Maintenance Expenses 65 94 40 118.23 131.63 139.16 147.12 155.54
2 Net Employees Cost 3,410 3,255 3,736 4,203.79 4,587.67 4,963.03 5,246.91 5,547.04
3 Net Admn. & General Expneses 151 175 195 243.05 125.52 132.70 140.30 148.32
4 Total Operation and Maintenance Expenses 3,626 3,524 3,971 4,565 4,845 5,235 5,534 5,851
FY 2015-16
(Actuals)
Projected
Total Operation and Maintenance Expenses
FY 2013-14
(Actuals)
Form 18 D
S.
No.Details
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
TANGEDCO
FY 2014-15
(Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 22
Name of the Company
Rs in Crs
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Interest on Staff Loans & Advances 4.04 4.82 5.43 8.05 9.54
2 Income from Investment 0.00 0.00 0.01 0.01 0.02
3 Interest on Loans & Advances to Licensees - - 0.00 - 0.00
4 Delayed Payment Surcharges Collected from
Consumers
35.70 47.41 57.22 64.24 75.31
5 Interest on Advances to Suppliers / Contractors 8.99 22.29 7.50 2.90 1.54
6 Interest from Banks 0.04 0.05 0.10 0.04 0.08
7 Income from Trading 19.29 32.77 19.31 23.34 17.36
8 Rebate on power purchase bills 14.27 15.06 43.83 53.99 49.46
9 Gain on Sale of Fixed assets - - 0.00 - 0.00
10 Income from Staff Welfare 0.23 0.14 0.09 0.05 0.09
11 Miscellaneous Receipts 61.56 73.86 96.13 149.62 168.64
Total Other Income 144.13 196.41 229.61 302.23 322.02 434.73 586.89 704.27
FY 2013-14
(Actuals)
TANGEDCO
FY 2014-15
(Actuals)
Statement showing other Income
ProjectedFY 2015-16
(Actuals)Sl.No Particulars
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Form 21
Name of the Company
Rs in Crs
FY 2016-17 FY 2017-18 FY 2018-19
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
1 Meter Rent / Service line Rentals 19.31 18.06 19.39 28.63 22.22
2 Recoveries of Theft of Power / Malpractices 91.56 101.99 82.83 54.61 56.94
3 Wheeling Charges Recoveries 71.80 322.55 181.54 192.80 175.51
4 Miscellaneous Charges collected from Consumers 370.33 493.21 538.40 576.93 526.20
5 Surcharge and Additional surcharge received from
Open Access customers
-
6 Other Miscellaneous Charges collected from
consumers
- -
Total Non Tariff Income 553.00 935.80 822.16 852.97 780.86 780.86 952.65 971.70
Non-Tariff Revenue
FY 2015-16
(Actuals)
Projected
TANGEDCO
FY 2013-14
(Actuals)
FY 2014-15
(Actuals)Sl.No Particulars
FY 2011-12
(Actuals)
FY 2012-13
(Actuals)
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Load
Dem
an
d
Ener
gy
Ch
arge
s R
s./
kwh
Fixe
d C
har
ges
Rs.
/HP
/KW
/ser
vice
LOW TENSION
LT - IA
0-50kWh 7,906,498 8,222,695 2,469 3.00 15 741 142 883 3.58
51-100kWh 0-50 kWh 5,560,963 6,405,124 3,360 3.25 15 1,092 100 1,192 3.55
51-100 kWh - - 2,146 3.25 15 698 - 698 3.25
101-250kWh 0-50 kWh 4,976,069 9,308,316 3,006 3.50 20 1,052 119 1,171 3.90
51-100 kWh - - 3,006 3.50 20 1,052 - 1,052 3.50
100-250 kWh - - 4,982 4.60 20 2,292 - 2,292 4.60
Above 250kWh 0-50 kWh 739,807 4,080,280 476 3.50 25 167 22 189 3.97
51-100 kWh - - 473 3.50 25 166 - 166 3.50
100-250 kWh - - 1,420 4.60 25 653 - 653 4.60
above 250 kWh - - 4,030 6.60 25 2,660 - 2,660 6.60
19,183,336 28,016,415 25,368 10,571 384 10,955 4.32
LT - IB
Single Part Tariff 1,159,828 - 449 4.95 145 202 202 4.50
LT - IC
Single Part Tariff 763 6,957 11 4.60 60 5 0 5 4.65
LT - IIA
Single Part Tariff 688,675 1,938,378 2,567 6.35 60 1,630 140 1,770 6.89
LT - IIB
Single Part Tariff 75,645 232,378 149 5.75 60 86 17 103 6.87
LT - IIB (2)
Single Part Tariff 17,555 349,070 270 7.50 60 203 25 228 8.43
LT - IIC
0-60kWh 115,269 121,356 33 5.75 60 19 9 28 8.41
Above 60kWh 30,960 101,610 98 5.75 60 57 7 64 6.49
146,229 222,966 131 75 16 92 6.97
LT - IIIA(1)
0-250kWh 123,511 393,756 61 4.00 20 24 9 34 5.55
Above 250kWh 19,930 115,887 183 4.60 20 84 3 87 4.75
143,441 509,643 244 109 12 121 4.95
S.
No.Consumer category Slabs Telescopic slab
No
. of
con
sum
ers
Form 25
Revenue from Sale of Power at existing tariff
FY 2016-17
Name of the Company / Licensee TANGEDCO
Tota
l Rev
enu
e
Rs
/lak
hs
Rat
e o
f
Rea
lisa
tio
n
Rs.
/kw
h
Connected
Co
nsu
mp
tio
n
Existing Tariff
Tota
l En
ergy
Ch
arge
s R
s.in
Cro
res
Fixe
d C
har
ges
Rs.
In C
rore
s
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Load
Dem
an
d
Ener
gy
Ch
arge
s R
s./
kwh
Fixe
d C
har
ges
Rs.
/HP
/KW
/ser
viceS.
No.Consumer category Slabs Telescopic slab
No
. of
con
sum
ers
Form 25
Revenue from Sale of Power at existing tariff
FY 2016-17
Name of the Company / Licensee TANGEDCO
Tota
l Rev
enu
e
Rs
/lak
hs
Rat
e o
f
Rea
lisa
tio
n
Rs.
/kw
h
Connected
Co
nsu
mp
tio
n
Existing Tariff
Tota
l En
ergy
Ch
arge
s R
s.in
Cro
res
Fixe
d C
har
ges
Rs.
In C
rore
s
LT - IIIA(2)
0-250kWh 73,319 217,254 125 5.20 60 65 16 80 6.46
Above 250kWh - - - 5.20 60 - - -
29,314 113,264 157 5.75 60 90 8 98 6.27
11,161 56,178 104 5.75 60 60 4 64 6.14
27,290 171,075 651 5.75 60 375 12 387 5.94
141,083 557,771 1,036 589 40 629 6.07
LT - IIIB
Single Part Tariff 320,907 9,580,140 7,335 6.35 35 4,658 402 5,060 6.90
LT - IV
Single Part Tariff 2,101,654 11,478,703 11,928 3.22 2,875 3,300 3,300 2.77
LT - V
0-50kWh 1,798,723 2,707,012 325 5.00 70 163 227 390 11.99
Above 50kWh 1,036,784 5,902,499 6,865 8.05 70 5,526 496 6,022 8.77
2,835,507 8,609,511 7,190 5,689 723 6,412 8.92
LT - VI
Single Part Tariff 182,000 383,008 197 12.00 345 237 159 395 20.04
Total Low Tension 26,996,623 61,884,942 56,876 23,851 5,420 29,271 5.15
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Load
Dem
an
d
Ener
gy
Ch
arge
s R
s./
kwh
Fixe
d C
har
ges
Rs.
/HP
/KW
/ser
viceS.
No.Consumer category Slabs Telescopic slab
No
. of
con
sum
ers
Form 25
Revenue from Sale of Power at existing tariff
FY 2016-17
Name of the Company / Licensee TANGEDCO
Tota
l Rev
enu
e
Rs
/lak
hs
Rat
e o
f
Rea
lisa
tio
n
Rs.
/kw
h
Connected
Co
nsu
mp
tio
n
Existing Tariff
Tota
l En
ergy
Ch
arge
s R
s.in
Cro
res
Fixe
d C
har
ges
Rs.
In C
rore
s
HIGH TENSION
HT - IA
Single Part Tariff 5,497 6,562,339 12,730 6.35 350 8,083 2,756 10,840 8.52
HT - IB
Single Part Tariff 28 308,760 880 6.35 300 559 111 670 7.61
HT - IIA
Single Part Tariff 772 422,014 1,502 6.35 350 954 177 1,131 7.53
HT - IIB
Single Part Tariff 266 135,133 351 6.35 350 223 57 280 7.97
HT - III
Single Part Tariff 1,721 1,176,514 2,160 8.00 350 1,728 494 2,222 10.29
HT - IV
Single Part Tariff 9 3,001 7 6.35 - 4 - 4 6.35
HT - V
Single Part Tariff 107 190,929 179 11.00 350 196 80 277 15.49
Sale to
Pondicherry 3 8,179 188 - - - - - -
Total High Tension 8,403 8,806,869 17,996 11,748 3,676 15,424 8.57
Total LT and HT 27,005,026 70,691,811 74,872 35,599 9,096 44,695 5.97
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Load
De
man
d
Ene
rgy
Ch
arge
s R
s./
kwh
Fixe
d C
har
ges
Rs.
/HP
/KW
/se
rvic
e
LOW TENSION
LT - IA
0-50kWh 7,962,000 8,575,873 2,566 3.00 15 770 143 913 3.56
51-100kWh 0-50 kWh 5,600,000 6,680,234 3,492 3.25 15 1,135 101 1,236 3.54
51-100 kWh - - 2,231 3.25 15 725 - 725 3.25
101-250kWh 0-50 kWh 5,011,000 9,708,123 3,124 3.50 20 1,093 120 1,214 3.88
51-100 kWh - - 3,124 3.50 20 1,093 - 1,093 3.50
100-250 kWh - - 5,178 4.60 20 2,382 - 2,382 4.60
Above 250kWh 0-50 kWh 745,000 4,255,534 495 3.50 25 173 22 196 3.95
51-100 kWh - - 492 3.50 25 172 - 172 3.50
100-250 kWh - - 1,476 4.60 25 679 - 679 4.60
above 250 kWh - - 4,189 6.60 25 2,765 - 2,765 6.60
19,318,000 29,219,765 26,367 10,988 387 11,374 4.31
LT - IB
Single Part Tariff 1,183,025 - 458 4.95 145 206 206 4.50
LT - IC
Single Part Tariff 778 7,097 11 4.60 60 5 0 5 4.65
LT - IIA
Single Part Tariff 702,449 2,170,984 2,873 6.35 60 1,824 156 1,980 6.89
LT - IIB
Single Part Tariff 77,158 239,773 155 5.75 60 89 17 107 6.86
LT - IIB (2)
Single Part Tariff 17,906 354,973 289 7.50 60 217 26 242 8.38
LT - IIC
0-60kWh 117,575 128,866 35 5.75 60 20 9 29 8.39
Above 60kWh 31,579 107,898 105 5.75 60 61 8 68 6.49
149,154 236,763 140 81 17 98 6.96
LT - IIIA(1)
0-250kWh 125,981 433,132 65 4.00 20 26 10 37 5.59
Above 250kWh 20,329 127,476 196 4.60 20 90 3 93 4.76
146,310 560,608 261 116 13 130 4.97
S.
No.Consumer category Slabs Telescopic slab
No
. of
con
sum
ers
Form 25
Revenue from Sale of Power at existing tariff
FY 2017-18
Name of the Company / Licensee TANGEDCO
Tota
l Re
ven
ue
Rs
/lak
hs
Rat
e o
f R
eal
isat
ion
Rs.
/kw
h
Connected
Co
nsu
mp
tio
n
Existing Tariff
Tota
l En
erg
y
Ch
arge
s R
s.in
Cro
res
Fixe
d C
har
ges
Rs.
In
Cro
res
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Load
De
man
d
Ene
rgy
Ch
arge
s R
s./
kwh
Fixe
d C
har
ges
Rs.
/HP
/KW
/se
rvic
e
S.
No.Consumer category Slabs Telescopic slab
No
. of
con
sum
ers
Form 25
Revenue from Sale of Power at existing tariff
FY 2017-18
Name of the Company / Licensee TANGEDCO
Tota
l Re
ven
ue
Rs
/lak
hs
Rat
e o
f R
eal
isat
ion
Rs.
/kw
h
Connected
Co
nsu
mp
tio
n
Existing Tariff
Tota
l En
erg
y
Ch
arge
s R
s.in
Cro
res
Fixe
d C
har
ges
Rs.
In
Cro
res
LT - IIIA(2)
0-250kWh 74,785 217,304 137 5.20 60 71 16 87 6.34
Above 250kWh - - - 5.20 60 - - -
29,900 113,290 172 5.75 60 99 8 107 6.22
11,384 56,191 114 5.75 60 65 4 70 6.11
27,836 171,114 716 5.75 60 412 12 424 5.92
143,905 557,899 1,139 647 40 687 6.04
LT - IIIB
Single Part Tariff 327,325 9,714,410 8,581 6.35 35 5,449 408 5,857 6.83
LT - IV
Single Part Tariff 2,143,687 11,576,878 12,544 3.22 2,875 3,328 3,328 2.65
LT - V
0-50kWh 1,834,697 2,818,748 399 5.00 70 199 237 436 10.94
Above 50kWh 1,057,520 6,146,134 8,409 8.05 70 6,770 516 7,286 8.66
2,892,217 8,964,883 8,808 6,969 753 7,722 8.77
LT - VI
Single Part Tariff 185,640 452,194 247 12.00 345 296 187 483 19.59
Total Low Tension 27,287,554 64,056,227 61,873 26,681 5,539 32,220 5.21
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Load
De
man
d
Ene
rgy
Ch
arge
s R
s./
kwh
Fixe
d C
har
ges
Rs.
/HP
/KW
/se
rvic
e
S.
No.Consumer category Slabs Telescopic slab
No
. of
con
sum
ers
Form 25
Revenue from Sale of Power at existing tariff
FY 2017-18
Name of the Company / Licensee TANGEDCO
Tota
l Re
ven
ue
Rs
/lak
hs
Rat
e o
f R
eal
isat
ion
Rs.
/kw
h
Connected
Co
nsu
mp
tio
n
Existing Tariff
Tota
l En
erg
y
Ch
arge
s R
s.in
Cro
res
Fixe
d C
har
ges
Rs.
In
Cro
res
HIGH TENSION
HT - IA
Single Part Tariff 5,607 6,651,882 15,232 6.35 350 9,672 2,794 12,466 8.18
HT - IB
Single Part Tariff 29 324,262 938 6.35 300 596 117 713 7.59
HT - IIA
Single Part Tariff 787 453,169 1,602 6.35 350 1,018 190 1,208 7.54
HT - IIB
Single Part Tariff 271 141,558 365 6.35 350 232 59 291 7.98
HT - III
Single Part Tariff 1,755 1,201,549 2,667 8.00 350 2,133 505 2,638 9.89
HT - IV
Single Part Tariff 9 3,003 8 6.35 - 5 - 5 6.35
HT - V
Single Part Tariff 109 191,863 187 11.00 350 206 81 287 15.30
Sale to Pondicherry 3 8,179 188 - - - - - -
Total High Tension 8,570 8,975,466 21,187 13,862 3,746 17,607 8.31
Total LT and HT 27,296,124 73,031,693 83,060 40,543 9,285 49,827 6.00
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Load
De
man
d
Ene
rgy
Ch
arge
s R
s./
kwh
Fixe
d C
har
ges
Rs.
/HP
/KW
/se
rvic
e
LOW TENSION
LT - IA
0-50kWh 8,121,240 8,944,220 2,669 3.00 15 801 146 947 3.55
51-100kWh 0-50 kWh 5,712,000 6,967,161 3,632 3.25 15 1,180 103 1,283 3.53
51-100 kWh - - 2,320 3.25 15 754 - 754 3.25
101-250kWh 0-50 kWh 5,111,220 10,125,103 3,249 3.50 20 1,137 123 1,260 3.88
51-100 kWh - - 3,249 3.50 20 1,137 - 1,137 3.50
100-250 kWh - - 5,385 4.60 20 2,477 - 2,477 4.60
Above 250kWh 0-50 kWh 759,900 4,438,316 515 3.50 25 180 23 203 3.94
51-100 kWh - - 512 3.50 25 179 - 179 3.50
100-250 kWh - - 1,535 4.60 25 706 - 706 4.60
above 250 kWh - - 4,357 6.60 25 2,875 - 2,875 6.60
19,704,360 30,474,800 27,422 11,427 394 11,822 4.31
LT - IB
Single Part Tariff 1,206,686 - 467 4.95 145 210 210 4.50
LT - IC
Single Part Tariff 794 7,238 12 4.60 60 5 0 5 4.65
LT - IIA
Single Part Tariff 716,498 2,431,502 3,215 6.35 60 2,041 175 2,216 6.89
LT - IIB
Single Part Tariff 78,701 247,403 162 5.75 60 93 18 111 6.85
LT - IIB (2)
Single Part Tariff 18,264 360,977 309 7.50 60 232 26 258 8.34
LT - IIC
0-60kWh 119,926 136,840 38 5.75 60 22 10 31 8.37
Above 60kWh 32,211 114,574 113 5.75 60 65 8 73 6.48
152,137 251,414 150 86 18 105 6.95
LT - IIIA(1)
0-250kWh 128,500 476,445 71 4.00 20 28 11 40 5.61
Above 250kWh 20,736 140,224 213 4.60 20 98 3 101 4.76
149,236 616,668 284 127 15 141 4.97
S.
No.Consumer category Slabs Telescopic slab
No
. of
con
sum
ers
Form 25
Revenue from Sale of Power at existing tariff
FY 2018-19
Name of the Company / Licensee TANGEDCO
Tota
l Re
ven
ue
Rs
/lak
hs
Rat
e o
f R
eal
isat
ion
Rs.
/kw
h
Connected
Co
nsu
mp
tio
n
Existing Tariff
Tota
l En
erg
y
Ch
arge
s R
s.in
Cro
res
Fixe
d C
har
ges
Rs.
In
Cro
res
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Load
De
man
d
Ene
rgy
Ch
arge
s R
s./
kwh
Fixe
d C
har
ges
Rs.
/HP
/KW
/se
rvic
e
S.
No.Consumer category Slabs Telescopic slab
No
. of
con
sum
ers
Form 25
Revenue from Sale of Power at existing tariff
FY 2018-19
Name of the Company / Licensee TANGEDCO
Tota
l Re
ven
ue
Rs
/lak
hs
Rat
e o
f R
eal
isat
ion
Rs.
/kw
h
Connected
Co
nsu
mp
tio
n
Existing Tariff
Tota
l En
erg
y
Ch
arge
s R
s.in
Cro
res
Fixe
d C
har
ges
Rs.
In
Cro
res
LT - IIIA(2)
0-250kWh 76,281 217,354 150 5.20 60 78 16 94 6.24
Above 250kWh - - - 5.20 60 - - -
30,498 113,316 189 5.75 60 109 8 117 6.18
11,612 56,204 125 5.75 60 72 4 76 6.07
28,393 171,154 785 5.75 60 451 12 464 5.91
146,783 558,028 1,248 710 40 750 6.01
LT - IIIB
Single Part Tariff 333,872 9,850,563 9,491 6.35 35 6,027 414 6,441 6.79
LT - IV
Single Part Tariff 2,186,561 11,675,893 13,276 3.22 2,875 3,357 3,357 2.53
LT - V
0-50kWh 1,871,391 2,935,097 461 5.00 70 230 247 477 10.35
Above 50kWh 1,078,670 6,399,826 9,721 8.05 70 7,825 538 8,363 8.60
LT - VI
Single Part Tariff 189,353 533,877 309 12.00 345 371 221 592 19.15
Total Low Tension 27,833,306 66,343,287 66,526 29,175 5,672 34,847 5.24
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx
Load
De
man
d
Ene
rgy
Ch
arge
s R
s./
kwh
Fixe
d C
har
ges
Rs.
/HP
/KW
/se
rvic
e
S.
No.Consumer category Slabs Telescopic slab
No
. of
con
sum
ers
Form 25
Revenue from Sale of Power at existing tariff
FY 2018-19
Name of the Company / Licensee TANGEDCO
Tota
l Re
ven
ue
Rs
/lak
hs
Rat
e o
f R
eal
isat
ion
Rs.
/kw
h
Connected
Co
nsu
mp
tio
n
Existing Tariff
Tota
l En
erg
y
Ch
arge
s R
s.in
Cro
res
Fixe
d C
har
ges
Rs.
In
Cro
res
HIGH TENSION
HT - IA
Single Part Tariff 5,719 6,742,648 17,331 6.35 350 11,005 2,832 13,837 7.98
HT - IB
Single Part Tariff 30 340,542 1,009 6.35 300 641 123 763 7.56
HT - IIA
Single Part Tariff 803 486,625 1,726 6.35 350 1,096 204 1,300 7.53
HT - IIB
Single Part Tariff 276 148,287 387 6.35 350 246 62 308 7.96
HT - III
Single Part Tariff 1,790 1,227,118 3,231 8.00 350 2,585 515 3,100 9.60
HT - IV
Single Part Tariff 9 3,004 8 6.35 - 5 - 5 6.35
HT - V
Single Part Tariff 111 192,802 207 11.00 350 228 81 309 14.91
Sale to Pondicherry 3 8,179 188 - - - - - -
Total High Tension 8,741 9,149,205 24,087 15,805 3,818 19,623 8.15
Total LT and HT 27,842,047 75,492,492 90,613 44,980 9,490 54,469 6.01
Petition Formats_Distribution_2014-15-2015-16_18_01_2017.xlsx