Steam Generation – Concepts and Supplies 1 “Steinmüller-Tagung” 2013 23. – 24. April 2013 Gummersbach, Germany Title: Presenter: Steam Generation – Concepts and Supplies Dr. Ralph Ernst

Upload: others

Post on 15-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 11

“Steinmüller-Tagung” 2013 23. – 24. April 2013

Gummersbach, Germany

Title:

Presenter:

Steam Generation – Concepts and Supplies

Dr. Ralph Ernst

Page 2: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 2

Employment Record Ralph Ernst

Since 2013

STEINMÜLLER ENGINEERING GMBH

Department Manager Steam Generation2010 - 2012 Department Manager Chemical Plant Components

2009 - 2010 Process Engineer Chemical Plant Components

2008 - 2009 Process Engineer Flue gas Cleaning

2005 - 2007FISIA BABCOCK ENVIRONMENT GMBHProcess Engineer Flue gas Cleaning

2002- 2005

TECHNISCHE UNIVERSITÄT DARMSTADTErnst Berl Institut für Technische ChemiePost – Doc (Homo- and heterogeneous catalysis)

1998 - 2002 PhD „Simultaneous ad – and desorption of HCl and SO2 on MgO supported active carbon coke“

1991 - 1997Universitary studiesChemical Engineering in Darmstadt / Bordeaux

Page 3: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 3

A. Services for power plants

Motivation

Engineering services

Examples

B. Components for chemical plants

Objectives

Examples

C. Summary

Content

Page 4: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 4

A) Services for power plants - Motivation

Reasons for pressure part modifications

• Boiler capacity and efficiency increase

• Change in fuel qualities

• Problems with wear, fouling, corrosion

• Enhancing part load performance

• Specific needs for SCR units

• Enhanced flexibility

• Reduction of start –

up time

ZÜ-Austritt

Überhitzer-Schott

Ü3

ZÜ2Ü4

ZÜ 1.2

Ü2

ZÜ 1.1

EK3

EK5

EK4

Überhitzer-Eintritt

EK2

ECO 2

ECO 1

ECO 3

HD - 1.2

HD - 1.1

Speisewasser-

Eintritt

EK1

ZÜ-Eintritt

HD-AustrittZÜ-Austritt

Überhitzer-Schott

Ü3

ZÜ2Ü4

ZÜ 1.2

Ü2

ZÜ 1.1

EK3

EK5

EK4

Überhitzer-Eintritt

EK2

ECO 2

ECO 1

ECO 3

HD - 1.2

HD - 1.1

Speisewasser-

Eintritt

EK1

ZÜ-Eintritt

HD-Austritt

Vattenfall EuropeLignite fired boilerJänschwalde535 °C / 175 bar / 815 t/h

Page 5: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 5

Appropriate process calculation is key technology for all

pressure part engineering works

SE provides a detailed simulation of complex boilers by its

in-house design tool DimBo

DimBo’s governing equations for heat transfer and material

properties are based on actual FDBR standards

Various scenarios and load cases are calculated within one model

A) Services for power plants – Engineering

DimBo

Circulation ratio

Heat transfer

Thermodynamics

Pressure drop

Page 6: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 6

A) Services for power plants - Engineering

Engineering according to various relevant design codes

and standards

• Material design

• pressure part stress calculation

• structural design

calculations

• Basic and detail engineering

• Drawings

• Specifications

Page 7: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 7

A) Services for power plants – Example PCK SchwedtOriginal plant key data

PCK refinery, Schwedt (Germany)•

Two parallel boilers•

Continuous steam output: 620 t/h•

Main steam parameters:

520 °C / 90 bar•

Fuels:-

High Soaker Conversion residue (HSC-R)-

Visbreaker / vacuum residue-

Heavy fuel oil-

Refinery gas

Schwedt

©

PCK Raffinerie GmbH

Page 8: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 8

A) Services for power plants – Example PCK Schwedt

Objectives

• Enable throughput of 45 t/h HSC-R• Increase steam output to 750 t/h• Good burnout, minimum unburned carbon• Reduce fouling• High full-load availability

Steinmüller Engineering

• Conceptual design• Basic Engineering• Detail Engineering

Balcke Dürr

• Manufacture of heating surfaces• Installation works

Scope split

Page 9: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 9

Measures 2006 / 2007

1.

Modification of existing burners

2.

Additional counter air flow system

3.

Two additional burners

4.

Examination of FD fan and additional fresh-air suction system

5.

Change of evaporator screen and Superheater 3

6.

Modification of the drum

7.

Additional soot blowers in front of the evaporator screen

By Client8.

Refurbishment of the feedwater pump

9.

New ID fan

7

2 1

34

6

5

A) Services for power plants – Example PCK Schwedt

Page 10: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 10

A) Services for power plants – Example PCK Schwedt

SH 3TB

=90 mm

EVATB

=360 mmSootblowers

EVATB =180 mm

SH 3TB =180 mm

Before retrofit After retrofit

Pressure part modification• Rearrangement of EVA• Rearrangement of SH3• Additional Sootblowers

Page 11: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 11

A) Services for power plants – Example PCK Schwedt

New heating surfaces

Page 12: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 12

A) Services for power plants – Example PCK Schwedt

Performance test on Boiler 1 in March 2007

Project design data Contract Performance test

Steam generator output 750 t/h 750 t/h

Fuel consumption HSC-R 45 t/h 45 t/h

Main steam temperature 520 °C 520 °C

Main steam pressure 90 bar 90 bar

Pressure loss water/steam -

side <10 bar < 10 bar

NOx before SCR (@ 3 % O2

, dry) ≤1200 mg/Nm³ < 800 mg/Nm³

CO before SCR (@ 3% O2, dry) ≤

10 mg/Nm³ < 10 mg/Nm³

Page 13: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 13

A) Services for power plants – Example PCK Schwedt

Measures 2010 - 2012

Installation of new Economizer & Bypass line

SE Scope

• Conceptual engineering• Basic engineering• Specifications• Consulting during procurement• Supervision during installation works

Client

• Procurement of heating surfaces• Installation works

Motivation

• Enhance the thermal efficiency of the boiler• Lower the air heater inlet temperature by 30 K• Enlarge running time• Gain flexibility for part load

Page 14: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 14

A) Services for power plants – Example PCK Schwedt

• Examination of various concepts• Result: two –

staged heating surface downstream SCR• Bypass line to

• compensate fouling during running time• enhance flexibility for part load operation

Installation of new EconomizerHeating surfaces

Page 15: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 15

A) Services for power plants – Example PCK Schwedt

Distributor

New heating surface –

finned tubes

Page 16: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 16

A) Services for power plants – Example PCK Schwedt

New sootblowers

New duct

Page 17: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 17

A) Services for power plants – Example Mehrum Power Station

Plant key data•

Electrical power: 750 MW

Bituminous coal fired boiler

Steam parameters:

535 °C / 200 bar

Objective

Maintaining the flue gas temperature down-

stream ECO over the entire boiler load to ensure proper performance of the DeNOx plant (Selective Catalytic Reduction)

Mehrum

Page 18: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 18

EVA Separator

A) Services for power plants – Example Mehrum Power Station

Measures

• New bypass line

• Additional valves and fittings

• Additional measurement devices

• Modification of boiler control

Scope Split

SE: • Conceptual design• Basic engineering• Detail engineering

Client:• Procurement• Installation

Page 19: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 19

B) Components for chemical plants - Introduction

Engineering and supply for• Process gas coolers (downstream sec. reformer)

• Syngas coolers for coal gasification plants

• Waste heat boilers for catalytic processes (nitric acid plants and similar)

Motivation• Increase of plant capacity

• Optimization of thermal and mechanical designTechnologies• Natural circulation

horizontal fire tube boilers

vertical fire tube boilers

Texaco boilers

• Forced circulation –

water tube boilers incl. superheater

• Radiant syngas coolers

Page 20: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 20

B) Components for chemical plants – Example ChalampéReplacement of a reactor / waste heat boiler for catalytic HCN - synthesis

Client: Rhodia / ButachimieLocation: Chalampé, FranceProcess: Catalytic Reaction (Andrussow Process)

CH4 + NH3

+ 1.5 O2

HCN + 3 H2

O

• Exothermic reaction•

Product tends to decompose at high temperatures

• Fast cooling required to enhance yield• Plant capacity increased by 15 %

Chalampé

Page 21: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 21

Scope split and technical data

Steinmüller Engineering Client (Rhodia / Butachimie) basic and detail engineering erection

supply of hardware installation

transport to location thermal insulation

installation of refractory catalyst

commissioning (with SE support)

Project design data Gas side Water / SteamTemperature @ inlet 1100 °C 227 °C

Temperature @ outlet < 285 °C 227 °C

Pressure 2.1 bar 26.5 bar

Mass flow 156 000 kg/h 121 000 kg / h

B) Components for chemical plants – Example Chalampé

Page 22: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 22

Technology• Natural circulation• Vertical arrangement• Fire tube boiler• Conical upper tubesheet• embedded tubesheet

SE’s Scope of supply• New waste heat boiler• Ceramic ferrules• Drum internals• Refractory• Piping modification (red)

B) Components for chemical plants – Example Chalampé

Page 23: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 23

Design supported by CFD simulationand FEM stress calculation

B) Components for chemical plants – Example Chalampé

Page 24: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 24

Challenges•

Large tubesheet diameter (2.8 m) •

Short time schedule (12 month)•

Heavy forgings •

Stress calculation•

Steam outlet on actual plant

Design improvements1.

Conical tubesheet to ensure cooling2.

Double walled ring3.

Grids with low resistance to enhance circulation

4.

Number of risers doubled

1 2

3

3

4

B) Components for chemical plants – Example Chalampé

Page 25: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 25

Upper conical tubesheet embedded in double walled ring

Upper double walled ring “Knuckle”

Heavy forgingsB) Components for chemical plants – Example Chalampé

Page 26: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 26

Manual welded upper tubesheet

Assembly of vessel and upper part

B) Components for chemical plants – Example Chalampé

Page 27: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 27

DimensionsHeight over all

11 m

Max diameter

4.4 m

Tubesheet dia.

2.9 m

No. of tubes

1878

Weight

80 tons

Fabrication in German workshop

Engineering and manufacturing

time 12 month

Commissioning: June 2013

B) Components for chemical plants – Example Chalampé

Page 28: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 28

B) Components for chemical plants – Example GrowHow Ince

Revamp of a reactor / waste heat boiler for catalytic NO – synthesis

Ince

Client: Kemira GrowHow Ltd.Location: Ince, UKProcess: Catalytic Oxidation (Ostwald Process)

2 NH3

+ 2.5 O2

2 NO + 3 H2

O

Replacement of existing WHB with design modifications

Page 29: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 29

Scope split and technical data

Steinmüller Engineering Client (Kemira GrowHow UK) basic and detail engineering erection

supply of waste heat boiler installation

supply of new burner cover catalyst (Pt –

gauze)

commissioning (with SE support)

Project design data Gas side Water / SteamTemperature @ inlet 900 °C 249 °C

Temperature @ outlet 690 °C 249 °C

Pressure 9 bar 38 bar

Mass flow 160 000 kg/h 45 000 kg / h

B) Components for chemical plants – Example GrowHow Ince

Page 30: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 30

New design of burner cover and flange connection

• design supported by FEM calculation • reduction of thermal stress• automatic ignition device (swivel motor)

B) Components for chemical plants – Example GrowHow Ince

Page 31: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 31

Technology• Water tube boiler with forced circulation

• Vertical arrangement

• Spiral evaporator bundle

• Bended wall coils

• Headers and distributors outside vessel

• Purchase order received 02 / 2013•

All components manufactured in German workshops

Vessel fabrication and final assembly at Balcke Dürr (Germany)

• Delivery date 02 / 2014

B) Components for chemical plants – Example GrowHow Ince

Page 32: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 32

C) Summary

Steinmüller Engineering is a competent partner for

Process engineering

Mechanical design

Stress calculation

Technical specifications

Project execution

Hardware supply

in a wide range of applications for steam generation

Page 33: “Steinmüller-Tagung” 2013 23. – 24. April 2013 · Tubesheet dia. 2.9 m. No. of tubes 1878. Weight 80 tons • Fabrication in German workshop • Engineering and manufacturing

Steam Generation – Concepts and Supplies 33

Thank you

for your

attention!