arnd meyer (rwth aachen) jan 2, 2004page 1 agenda russmechanical fred / drew / abidcft / ps bill...

4
Arnd Meyer (RWTH Aachen) Jan 2, 2004 Page 1 Agenda Russ Mechanical Fred / Drew / Abid CFT / PS Bill L. STT Michael / Sergey SMT Robert CAL Dmitri Forward Muon Al Ito Central Muon Fritz / Geoff Controls Jeff L1Muon Brendan Luminosity Stefan / Brigitte CTT Mike S. FPD Miroslav L2

Upload: ella-sharp

Post on 26-Mar-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 1 Agenda RussMechanical Fred / Drew / AbidCFT / PS Bill L.STT Michael / SergeySMT RobertCAL DmitriForward Muon

Arnd Meyer (RWTH Aachen) Jan 2, 2004 Page 1

Agenda

Russ Mechanical

Fred / Drew / Abid CFT / PS

Bill L. STT

Michael / Sergey SMT

Robert CAL

Dmitri Forward Muon

Al Ito Central Muon Fritz / GeoffControls

Jeff L1Muon BrendanLuminosity

Stefan / Brigitte CTT Mike S. FPD

Miroslav L2

Page 2: Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 1 Agenda RussMechanical Fred / Drew / AbidCFT / PS Bill L.STT Michael / SergeySMT RobertCAL DmitriForward Muon

Arnd Meyer (RWTH Aachen) Jan 2, 2004 Page 2

Store 3118 (Dec 31)

Initial Lum. 1.5⋅1031cm-2s-1

STT outBLS PS trip

Special runs (CTT, Muon)

Page 3: Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 1 Agenda RussMechanical Fred / Drew / AbidCFT / PS Bill L.STT Michael / SergeySMT RobertCAL DmitriForward Muon

Arnd Meyer (RWTH Aachen) Jan 2, 2004 Page 3

Store 3120 (Dec 31 – Jan 1)

Initial Lum. 2.7⋅1031cm-2s-1

Take STT out, SMT HDI problemMDT problem

Page 4: Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 1 Agenda RussMechanical Fred / Drew / AbidCFT / PS Bill L.STT Michael / SergeySMT RobertCAL DmitriForward Muon

Arnd Meyer (RWTH Aachen) Jan 2, 2004 Page 4

Store 3122 (Jan 1 – 2)

Initial Lum. 4.3⋅1031cm-2s-1

Multiple crate x51 downloads SMT tripSTT (in, one out, all out)

Efficiency: Dec 31st 77% (0.70/0.91 pb-1)Jan 1st 87% (1.34/1.55 pb-1)