arup ppt template 2018 - polis network

19
Polis Webinar: Mobilising Mobility FlexKerbs Susan Claris 6 October 2020

Upload: others

Post on 02-Oct-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Arup PPT TEMPLATE 2018 - POLIS Network

Polis Webinar:

Mobilising Mobility

FlexKerbs

Susan Claris

6 October 2020

Page 2: Arup PPT TEMPLATE 2018 - POLIS Network
Page 3: Arup PPT TEMPLATE 2018 - POLIS Network
Page 4: Arup PPT TEMPLATE 2018 - POLIS Network
Page 5: Arup PPT TEMPLATE 2018 - POLIS Network

Play Streets, School streets (check link or original

pres)

Page 6: Arup PPT TEMPLATE 2018 - POLIS Network

Flexible Streets

Page 7: Arup PPT TEMPLATE 2018 - POLIS Network
Page 8: Arup PPT TEMPLATE 2018 - POLIS Network
Page 9: Arup PPT TEMPLATE 2018 - POLIS Network

City leaders need to

consider how to manage the

impacts of changing travel

patterns in their transport

planning. But the basic

challenge of urban transport

is still the same: there is

simply not enough space in

cities for everyone to travel

by car. National Infrastructure Assessment (2018)

Today’s Streets

Source: Lucy Saunders

Page 10: Arup PPT TEMPLATE 2018 - POLIS Network

FlexKerbs

Page 11: Arup PPT TEMPLATE 2018 - POLIS Network

11

“…generate practical ideas for how UK roads should be

designed, managed and used to maximise the benefits of CAVs.”

Page 12: Arup PPT TEMPLATE 2018 - POLIS Network

FlexKerbs: The Idea

FlexKerbs facilitate dynamic use of the

kerbside to accommodate multiple users at

different times of the day or week

Policy-led, demand-informed

Page 13: Arup PPT TEMPLATE 2018 - POLIS Network

Methodology

1. Site selection 2. FlexKerb inputs 3. Proof of concept

Page 14: Arup PPT TEMPLATE 2018 - POLIS Network
Page 15: Arup PPT TEMPLATE 2018 - POLIS Network

Wide range of benefits for all street users including CAVs

Helps to achieve local policy objectives such as active travel and improved air quality

Reductions in vehicle delay

Safer and more comfortable experience for cyclists

Extra-wide footway to accommodate high footfall

More efficient use of kerb space

FlexKerbs: Outcomes and Benefits

Page 16: Arup PPT TEMPLATE 2018 - POLIS Network

FlexKerb Challenges

Physical infrastructure and

communicationMobility impairments Enforcement Charging regime

Cybersecurity Funding sourcesGovernment regulations

Page 17: Arup PPT TEMPLATE 2018 - POLIS Network

FlexKerbs media coverage

Page 18: Arup PPT TEMPLATE 2018 - POLIS Network

Low Traffic Streets

Page 19: Arup PPT TEMPLATE 2018 - POLIS Network

https://www.arup.com/news-and-events/arup-shortlisted-

in-competition-to-make-streets-fit-for-driverless-cars

[email protected]

@susanclaris