assembly instruction for gh0500 greenhouse instructions/gh0500.pdfcur, we kindly ask you to contact...
TRANSCRIPT
Assembly instruction for
GH0500 Greenhouse
2X4
2
Statement
Dear Customer! May we congratulate you on your new Greenhouse. We feel sure that by following the detailed assembly instructions you will find as much pleasure in actually building the greenhouse as the time you will spend in your green-house in the future. The assembly instructions mainly consist of detailed illustrations and no specific knowl-edge is required for the assembly of the greenhouse. The house is packed in 1 carton and contains all sheets of polycarbonate, frames , base and fittings. All the aluminum profiles are marked with a part number corresponding to the numbers given on the draw-ings and in the part list. Nuts, bolts and fit-tings will be found in the package together with frames of poly-carbonate. The sheets of polycarbonate are not marked with a part num-ber, but the sizes and symbol appear in the overview. When fitting the polycarbonate the side with the opal film/text must turn outward. Winter Protection In areas where snow might be expected we recommend the following in order to protect your greenhouse: 1.Support the ridge at the center of the greenhouse. 2.Removed larger snow mounds. 3.Take precautions against snow falling down, for instance from a roof. Complaints We have ensured that you will receive a quality product. However, should a problem oc-cur, we kindly ask you to contact us. To help us with your enquiry, you should specify the extent of the defect by quoting the part number from the list found on the assembly in-structions page. Please also note the model number which can be found on the front page of these instructions. Guarantee We grant a 10 year comprehensive guarantee which covers replacement or repairs of defective parts due to material or manufacturing defect. The guarantee does not cover polycarbonate, transport or erection. The guarantee will become invalid if the green-house is not assembled according to these instructions. Insurance Not all insurance companies automatically cover greenhouses. We recommend you con-tact your insurance company to ensure that you are covered. Foundation The base should be maintenance free and of course all fittings are included. You will also need to order concrete pipes and concrete from a local supplier as these are not in-cluded in the delivery.
3
Cautions
Remove approximately 2 inches of film from all sheet edges before installing. Remove all film immediately after the con-structions is completed.
The UV-protected side of the sheet is covered with opal white film and must face towards the sun.
Please put on gloves avoid slitting your hands.
Handle with care! Dropping can bend the frame, and it won’t fit properly.
Keep sharp instruments away from the polycarbonate sheets.
Tips • Read the instructions completely before starting to assemble. • Construct the base first so that the greenhouse can be securely mounted when completed. • Find someone to help you: This is not very heavy work so would suit most able-bodied people. • Allow plenty of time: If you have never built a greenhouse before, it can take most of a day to care-fully complete the construction. • Lay out all the parts of the greenhouse and check that all of the parts are present before com-mencing construction. Lay on cloths or plastic sheets if there is any risk of scratching the parts. • Assemble the greenhouse loosely where possible and tighten when all in place so that minor ad-justments can be made. Note that some nuts will need to be tightened to keep them in place. • Check the frame is square and using a spirit level to check that it is upright.
4
Polycarbonate sheet
# Size GH0500
K 610x1880/1405 2
N 610x810 1
P 610x450 1
R 610x311 1
M 610x1390 1
L 606x665 2
p6 592 4
This page shows the positioning of the polycarbonate panels for the front and rear gable as well as the roof and sides. It also indicates where the parts No. P6 is used. When fitting P6 consider using some window cleaner spray this will make the strips slide on with ease and rapidly dry out leaving no residue. No. P6 must be fitted on both ends of the polycarbonate in advance before polycarbonate can be inserted into the aluminum frame.
To convert the size of the panels from mm to inches, divide by 25.4.
p6
p6
K
p6
K
p6
p6
p6
N P
R
M
L
L
5
Model Gable Side profiles Anchor leg Fixing tab Bolts/Nuts Connectors
GH0500 2x685 1x1338 2 5 10 -
# m7
GH0500 5
# m5
GH0500 5
X Y
GH0500 1340 685
X Y
GH0500 4’43/4” 2’3”
Base
a2
m7
Steel Base
a2
m5
Concrete
6
Base
7
# Size GH0500
a1 M6x10 37
a2 M6 40
a4 Φ4.2x9.5 6
a5 Φ3.5x19 6
a6 Φ3.5x25 4
a8 M6x15 3
a10 Φ4x25 2
m2 - 2
m3 - 2
m8 - 2
p2 - 2
p3 - 2
p4 - 4
p7 - 2
p8 - 2
p9 - 2
FLUFF 2.8m 1
# Size Qty
023 647 2
134 1892 1
135 1892 1
165 795 2
166 1396 2
015 1506.5 1
046 795 1
133 1396 1
061 1288 1
152 1288 1
191 1288 1
062 1288 1
182 1367 2
111 594 3
044 594 1
051 200 1
172 615 1
122 615 1
102 465 2
201 300 1
GH0500
The list of the section
8
Gable
1
# 023 134 135 165 166 a1 a2 m2 m8 p2 p6
mm 647 1892 1892 795 1396 M6x10 M6 - - - 592
QTY 2 1 1 2 2 18 18 2 2 2 2
K
K
165
165
166
166
023
023
135
134
p6
023/152
023
135
023
166
135
165 m8 165
166
p2
165
166
p2
m2
9
Side wall & Roof
2
# 015 046 133 061 152 191 a1 a2
mm 1506.5 795 1396 1288 1288 1288 M6x10 M6
GH0500 1 1 1 1 1 1 13 13
1 2 3
4
5
6
7
3
7
1 4
6
2
5
061
191
046
152
015 133
061
165
166
m2
023 152
166
191
165
061
165
m2
166 015
152
015 133
061 133
046
191
046
10
Side wall & Roof
Φ6mm a10
p9
a8/a2
062
061
3
# 062 a8 a2 a10 p9
mm 1288 M6x15 M6 Φ4x25 -
GH0500 1 3 3 2 2
062
M
p6
p6
N
R
11
Door
4
# 182 111 p4 a6 p7 a5 a4
mm 1367 594 - Φ3.5x25 - Φ3.5x19 Φ4.2x9.5
QTY 2 3 4 4 2 2 2
FLUFF
-
2.8m
1
2
3
1
2
3
4
5
4
5
111
111
111
182
182
L
L
111
182
p4 a6
111
182
a5
111
182
p4 a6
p7/a4
182
FLUFF
12
5
# 044 051 172 122 102 201 m3 a1 a2 a4 a5 p8
mm 594 200 615 615 465 300 - M6x10 M6 Φ4.2x9.5 Φ3.5x19 -
Qty 1 1 1 1 2 1 2 6 6 4 4 2
p3
-
2
Vent
4
5
1 2
3
044
051
044
046
m3
a1/a2
a1/a2
102
a5
102
122
a5
122
201
a4
172
P
172 102
102
122
1
2 3
4 5
8
6
7
8