atn subnetwork implementation: vdl mode 2/controller pilot data link communications (cpdlc)
DESCRIPTION
ATN Subnetwork Implementation: VDL Mode 2/Controller Pilot Data Link Communications (CPDLC) Presentation ATN 3-4 by R. Oishi, ARINC ICAO Regional ATN Seminar 6-7 May 2002. Aviation Communications. Aeronautical Operational Control (AOC) Dispatcher - Pilot Communications - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: ATN Subnetwork Implementation: VDL Mode 2/Controller Pilot Data Link Communications (CPDLC)](https://reader035.vdocuments.net/reader035/viewer/2022081504/568141aa550346895dad8d97/html5/thumbnails/1.jpg)
A1
ATN Subnetwork Implementation:ATN Subnetwork Implementation:VDL Mode 2/Controller Pilot Data Link VDL Mode 2/Controller Pilot Data Link
Communications (CPDLC)Communications (CPDLC)
Presentation ATN 3-4 by R. Oishi, ARINCICAO Regional ATN Seminar
6-7 May 2002
![Page 2: ATN Subnetwork Implementation: VDL Mode 2/Controller Pilot Data Link Communications (CPDLC)](https://reader035.vdocuments.net/reader035/viewer/2022081504/568141aa550346895dad8d97/html5/thumbnails/2.jpg)
A2
Aviation Communications
Aeronautical Operational Control (AOC)• Dispatcher - Pilot Communications• Operational Information• Flight Information Services
Air Traffic Services (ATS)• Controller - Pilot Communications• Flight Information Services
![Page 3: ATN Subnetwork Implementation: VDL Mode 2/Controller Pilot Data Link Communications (CPDLC)](https://reader035.vdocuments.net/reader035/viewer/2022081504/568141aa550346895dad8d97/html5/thumbnails/3.jpg)
A3
VDL Mode 2 Subnetwork
FMSor ATSU
VDLRadio
CMU
ATN Aircraft
FMSor ATSU
MU or CMU
VDLRadio
VDL Mode 2Subnetwork
GroundStation
AOC G/G Network
ATN G/G Network
ATNRouter
ATN ATCEnd System
ACARS Aircraft
Air/GroundRouter
AOCEnd System
MessageProcessor
ATN Messages
ACARS Messages
![Page 4: ATN Subnetwork Implementation: VDL Mode 2/Controller Pilot Data Link Communications (CPDLC)](https://reader035.vdocuments.net/reader035/viewer/2022081504/568141aa550346895dad8d97/html5/thumbnails/4.jpg)
A4
VDL Mode 2 Ground Station Status
US• 40+ AOA stations operational
…and approaching 50+ stations quickly over 90 stations deployed by end of CY 2002
• 9 aircraft using AOA operationally and number of aircraft growing (revenue flights)
Europe• 3 AOA stations being installed to support Airbus
Toulouse is operational Lyon and Nice are installed; waiting for frequency
license
![Page 5: ATN Subnetwork Implementation: VDL Mode 2/Controller Pilot Data Link Communications (CPDLC)](https://reader035.vdocuments.net/reader035/viewer/2022081504/568141aa550346895dad8d97/html5/thumbnails/5.jpg)
A5
ARINC VDL Coverage Available/Near-Term
![Page 6: ATN Subnetwork Implementation: VDL Mode 2/Controller Pilot Data Link Communications (CPDLC)](https://reader035.vdocuments.net/reader035/viewer/2022081504/568141aa550346895dad8d97/html5/thumbnails/6.jpg)
A6
EUROCONTROL PETAL II
PETAL II in operational environment at Maastricht Upper Air Control Centre• With line ATC controllers • Revenue and non-revenue flights of American Airlines 767-
300ERs• Also conducted test flights with Qinetiq BAC1-11 in a test
sector configuration • Flight operations completed September 01
PETAL II was a Success• Demonstrated viability/suitability of CPDLC over
VDLM2/ATN• Worked out many technical and ops issues for CPDLC over
VDLM2/ATN in a trials environment• Basis for US-based CPDLC program and Link 2000+
![Page 7: ATN Subnetwork Implementation: VDL Mode 2/Controller Pilot Data Link Communications (CPDLC)](https://reader035.vdocuments.net/reader035/viewer/2022081504/568141aa550346895dad8d97/html5/thumbnails/7.jpg)
A7
CPDLC Partnership
A
![Page 8: ATN Subnetwork Implementation: VDL Mode 2/Controller Pilot Data Link Communications (CPDLC)](https://reader035.vdocuments.net/reader035/viewer/2022081504/568141aa550346895dad8d97/html5/thumbnails/8.jpg)
A8
FAA CPDLC Build 1
CPDLC Build 1 partners, in a consensus decision, replanned CPDLC Build 1• Technical validation and operational evaluation conducted• Operational service begins Sep 02 and lasts until Build 1A
(Dec 05)
ARINC has installed the US ATN/VDLM2 ground network • 4 stations in FL operational (MCO, RSW, GNV, MIA)• Provides partial coverage of the Miami ARTCC airspace to
support testing pre-operational testing • 5 additional stations (9 total) to be operational by Sep 02
FAA flight tests with Rockwell Collins• In the Miami ARTCC• Three successful flights on 22, 24 January 02
![Page 9: ATN Subnetwork Implementation: VDL Mode 2/Controller Pilot Data Link Communications (CPDLC)](https://reader035.vdocuments.net/reader035/viewer/2022081504/568141aa550346895dad8d97/html5/thumbnails/9.jpg)
A9
CPDLC Build I Coverage Map
![Page 10: ATN Subnetwork Implementation: VDL Mode 2/Controller Pilot Data Link Communications (CPDLC)](https://reader035.vdocuments.net/reader035/viewer/2022081504/568141aa550346895dad8d97/html5/thumbnails/10.jpg)
A10
Summary ARINC VDL Mode 2 and CPDLC
AOA and ATN capability using VDL Mode 2 is now available
Customers are using VDL Mode 2 operationally today
Coverage is being expanded as customer aircraft are equipped
CPDLC activities are proceeding• PETAL II was a success• CPDLC Build 1 is in flight tests