ayca-4gkxkp contractor logo e17-p.z660551.d.01n n/a · multi dwelling unit (mdu) fan access node...
TRANSCRIPT
APPLY TO OTHER TYPE OF METERING POINT ( any service)
BANDSTAND / ROTUNDA / SPORTS FIELD STANDS /OTHER PARK BUILDING
Fibre Distribution Hub-FDH Cabinet with Cabinet ID shown
Splice Joint on a Transit Cable (TJL)
Splice Joint on a Local Cable (LJL)
Network Access Point (NAP)
Multiport (MPT)n is the number of ports (eg 4,6,8,12)
Traffic Lights / Traffic Light Controller /Variable Speed Sign / Traffic Signal
Public Transport (bus stop, tram stop, railway station, taxi rank, ferry wharf)
Transformer / Kiosk / Pad Mount Sub-station / Pole Mount Transformer
Links / Link Pole / MV / HV Links / ABC Links / Dynamic Switch / Airbrake Switch / Isolator
Water Infrastructure (storage, pumps, valves water supply, waste water, sewerage stations)
Natural Gas Infrastructure
Camera (security / traffic)
Bridge control, swing bridge, traffic control gates, railway boom gates)
Mobile Phone Tower / radio antenna
Street Lighting Pole / street light controller
Unmanned (council) car park
POINT OF SALE DEVICE (vending machine, ticket machine)
Zone Terminal / Splice Joint (AJL)
Symbol to be used when replacing/removing existing networkSplice Joint on a Distribution Cable (DJL)
ATMATM
Multiport (MPT)
FAN
DEPTHALIGN
FSA Boundary
FSAM Boundary
FDA Boundary
CABLE CONFIGURATIONCABLE TYPE:
CABLES DIVIDE INTO FOLLOWING CATEGORIES AND ARECOLOUR CODED:TRANSIT CABLESDISTRIBUTION CABLESLOCAL CABLESTETHER CABLESLEAD IN (DROP) CABLES
CABLE SIZE:
CABLE SIZE IS THE TOTAL NUMBER OF OPTICFIBRES IN THE CABLE AND IS DETERMINED BY ANUMBER FOLLOWED BY F (FIBRE) OR R (RIBBON) IN THE MIDDLEOF THE LINE TYPE
CABLE LOCATION:CABLE LOCATIONS DETERMINES WHERE THECABLE IS USED AS PER BELOW:
IN-CONDUITAERIALBURIED
EXAMPLE:
144 FIBRE AERIAL LOCAL CABLE1 FIBRE BURIED DROP CABLE432 FIBRE IN-CONDUIT TRANSIT CABLE
LINE TYPES ARE CATEGORIZED INTO 3 TYPES:
1- IN-CONDUIT: (XXXF) 312F , ...
2- AERIAL: (XXXF_A) 144_A , ...
3- BURIED: (XXXF_B) 12_B , ...
COLOUR NO: 1COLOUR NO: 190COLOUR NO: 4COLOUR NO: 3COLOUR NO: 5
312F288F144F12F
1F
288F144F
96F
144F1F 1F
48F
576F
CONDUITS AND DUCTS ARE IN LAYER :< L460 NBN Support - Underground >AND TERMINOLOGY CATEGORIZED INTO TWO GROUPS INTHE DRAWING AS PER BELOW:1- DUCT USED WITH LOCAL NETWORK
2-CONDUIT USED WITH LEAD-IN DROPSATTRIBUTES ATTACHED ARE AS SHOWN
CONDUIT SIZE CONDUIT LENGHT
CONDUIT CONFIGURATION
Multi Dwelling Unit (MDU)
Fan Access Node site (FAN)
Pole (showing pole identity)
Premise Connection Device (PCD)
Example of descriptor box that will show thetype of work and the quantity involved
Existing Telstra manhole
Existing Telstra Pit ( 2,3,4,5,6,7,8,9 )
Example of Telstra Major Conduit Layout withProposed duct marked to be used by NBN
Telstra exchange
NBN MARKER POSTMARKER POST TO BE NUMBERED
RCXX138A
DEPTH OVER ALIGNMENT SYMBOL TO BE USED WITH EVERY MARKER POST
Splice Joint on a Tether Cable (MJL)
ASSISTANCE TELEPHONES (EG ELEVATOR AND ROADSIDE PHONES)
PRIVATELY OPERATED PAYPHONESPOP
FDH-ID
APS
MJL-ID
26.5P100
--
< _>
MPT-IDN
NAP-IDDESQTY
5
AAAA
POLE-ID
PIT-ID9
PIT-ID5
PIT-ID2
AJL-ID
LJL-ID
DJL-ID
TJL-ID
CAR
LIT
MOB
CTL
CAM
GAS
WAT
SWT
PBT
TRF
PSD
PRK
ATM
MET
N
Service Drop Access Pit
Network Boundary/Local Network Pit (Single Lid)
Fibre Distribution Hub (FDH) Pit
Distribution/Local Network Connection PitPIT-ID8
CABLE TRAY:
(650mmX280mmX565mm)
(700mmX450mmX650mm)
(1360mmX555mmX860mm)
(2000mmX555mmX900mm)
PIT-ID9
PIT-ID5PIT-ID
6 Distribution/Local Network Connection Pit (Dual Lid)(1360mmX555mmX650mm)
FSA:
STATE: REGION:
SAM:
DRAFTER
ADA:
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
DRAWING TITLE:
PROJECT No:
SCALE SHEET No. REV.
QUALITY RECORD :
APPROVED
NBNCO APPROVAL RECORD:
DD
AB
WD
REV DATE DESCRIPTION
SIGNATURE DATE
NBNCO DISCLAIMER
CADREF No:
NN KEY PLAN
OF
CONTRACTOR LOGO
STRICTLY CONFIDENTIAL
THIS DOCUMENT HAS BEEN PREPARED SOLELY FOR THE USE OFNBNCO LIMITED (ABN 86 136 533 741) FOR USE IN MAINTAININGNBNCO FACILITIES. IT HAS NOT BEEN CREATED FOR ANY OTHERUSE. IT SHOULD NOT BE SCALED TO LOCATE NBNCO ASSETS. NOWARRANTY IS GIVEN THAT THE INFORMATION IS ACCURATE ORCOMPLETE. N/A
- 31-05-17 T.S./B.H. ORIGINAL ISSUE
A 18-07-17 T.S./I.T.J. ADD PIT AT STN 2
B 12-09-17 A.Mc/I.T.J APPROVED BY NBN Co INCLUDING ROAD NAMES
C 03-11-17 S.H./I.T.J. ISSUED FOR CONSTRUCTION & AMEND ROAD CROSSING AT STN'S 13A-50
D 16-05-18 P.H./I.T.J. AS CONSTRUCTED
-
-
-
LASER BEAM
DANGER
FSA:
STATE: REGION:
SAM:
DRAFTER
ADA:
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
DRAWING TITLE:
PROJECT No:
SCALE SHEET No. REV.
QUALITY RECORD :
APPROVED
NBNCO APPROVAL RECORD:
DD
AB
WD
REV DATE DESCRIPTION
SIGNATURE DATE
NBNCO DISCLAIMER
CADREF No:
NN KEY PLAN
OF
CONTRACTOR LOGO
STRICTLY CONFIDENTIAL
THIS DOCUMENT HAS BEEN PREPARED SOLELY FOR THE USE OFNBNCO LIMITED (ABN 86 136 533 741) FOR USE IN MAINTAININGNBNCO FACILITIES. IT HAS NOT BEEN CREATED FOR ANY OTHERUSE. IT SHOULD NOT BE SCALED TO LOCATE NBNCO ASSETS. NOWARRANTY IS GIVEN THAT THE INFORMATION IS ACCURATE ORCOMPLETE.
NBN Co. PIT & PIPE INFRASTRUCTURETO PROPOSED SUBDIVISIONAMITY ESTATE STAGES 1 & 2NARANGBA
QLD
AYCA-4GKXKP
E17-P.Z660551.D.01N
1 3 D
Steve Harte
STAGE 1
STAGE 2
STAGE 3
STAG
E 4
STAGE 5
STAGE 6
STAGE 7STAGE 8STAGE 9
STAGE 10
FSA:
STATE: REGION:
SAM:
DRAFTER
ADA:
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
DRAWING TITLE:
PROJECT No:
SCALE SHEET No. REV.
QUALITY RECORD :
APPROVED
NBNCO APPROVAL RECORD:
DD
AB
WD
REV DATE DESCRIPTION
SIGNATURE DATE
NBNCO DISCLAIMER
CADREF No:
NN KEY PLAN
OF
CONTRACTOR LOGO
STRICTLY CONFIDENTIAL
THIS DOCUMENT HAS BEEN PREPARED SOLELY FOR THE USE OFNBNCO LIMITED (ABN 86 136 533 741) FOR USE IN MAINTAININGNBNCO FACILITIES. IT HAS NOT BEEN CREATED FOR ANY OTHERUSE. IT SHOULD NOT BE SCALED TO LOCATE NBNCO ASSETS. NOWARRANTY IS GIVEN THAT THE INFORMATION IS ACCURATE ORCOMPLETE.
NBN Co. PIT & PIPE INFRASTRUCTURETO PROPOSED SUBDIVISIONAMITY ESTATE STAGES 1 & 2NARANGBA
QLD
AYCA-4GKXKP
E17-P.Z660551.D.01N
1:500 @ A1 2 3 D
- 31-05-17 T.S./B.H. ORIGINAL ISSUE
A 18-07-17 T.S./I.T.J. ADD PIT AT STN 2
B 12-09-17 A.Mc./I.T.J. APPROVED BY NBN Co INCLUDING ROAD NAMES
C 03-11-17 S.H./I.T.J. ISSUED FOR CONSTRUCTION & AMEND ROAD CROSSING AT STN'S 13A-50
D 16-05-18 P.H./I.T.J. AS CONSTRUCTED
INTERCONNECTION BETWEEN PROPOSED NBN CO. NETWORK AND THE EXISTINGINFRASTRUCTURE AT STATION 1 ON CALLAGHAN ROAD.
NETWORK TO BE ORGANISED AND CARRIED OUT BY NBN. CO.2.
SOURCE DOCUMENTSDRG. No.AUTHOR REV. No. DATE170308 11124 DESIGN STRINGS - PHASE 1.DWG-----
RMA-----
------
24-03-17-----
INTERNALSTEPD
L W
5
2
P100 P100
P50
Steve HarteSOURCE DOCUMENTS
DRG. No.AUTHOR REV. No. DATE-
CANCELLING LOTS 1 ON RP170868, 1000 ON SP295608 & 1 & 2 ON RP171287PROPOSED LOTS 13-23, 372-421, 429-448, 456-467
PROPOSED SUBDIVISION
CIVIL CONSULTANT - RMA - KYLE MARTIN - 3361 9319SURVEYOR - DTS - BRIAN WHITE - 3118 0600
- (CONSTRUCTION) - PETER HARLEY - 3271 2911- (DESIGNER) - TOBY SKEATES - 3271 2911
GAS - APA GROUP - SILVIA HART - 3215 6655
No OF LOTS:- 93
TARGET DATES
ON SITE CHECKS OF EXISTING SERVICES SHOULD BE
MATERIALS REQ'D - DECEMBER 2017INSTALLATION REQ'D - JANUARY 2018
ON SITE SERVICE CHECKS
NBN - WORKS CO-ORDINATOR - WARREN SMITH - 0408 469 685J&P RICHARDSON
COUNCIL - DIAL BEFORE YOU DIG - 1100DIAL BEFORE YOU DIG - 1100
ARRANGED WITH THE RELEVANT AUTHORITIES LISTED BELOW.
* NBN Co. GUIDELINES FOR DEVELOPERS: NBN-TE-CTO-194 V7.0
THIS WORKS PLAN IS TO BE READ IN CONJUNCTION WITHTHE FOLLOWING NBN Co. MANUAL AND SPECIFICATIONS:
SPECIFICATIONS
1.
3.
NEW RESIDENTIAL SUBDIVISIONORIGIN:NOTES:
P100 TO BE INSTALLED TO BOUNDARY OF DEVELOPMENT AND CAPPED FOR FUTURE STAGE EXTENSION.
P100 TO BE INSTALLED UP TO BUT NOT CONNECTED INTO THE EXISTING
2.
LANDSCAPE ARCHITECT - SAUNDERS HAVILL - GLEN CHALLENOR - 0438 147 365
STAGE 1
STAGE 2
STAGE 3
STAG
E 4
STAGE 5
STAGE 6
STAGE 7STAGE 8STAGE 9
STAGE 10
TADO
RNA
ST
TADO
RNA
ST
EVER
TON
ST
HOPEWELL LN
VENUS ST
VENUS ST
VENUS ST
CALLAGHAN RD
GRAZIER ST
TYRA
LN
1314
1516
1718
19
20
21
22
23
374
375
376
377
378
379
380
381
382
383
389
390
391
392
393
394
395
396397
398399
400401
402
403
404
405
406
407
408
409 436437438
439440
441
442443
444445
446447
448
456457
458459
460461
462
463
464
465
466
467
9996
PIT-0
016
PIT-0
025
PIT-0036
PIT-0045
PIT-0052
PIT-0065
PIT-0072
PIT-0085
PIT-0095
PIT-0105
PIT-0118
PIT-0125
PIT-0
135
PIT-0146
PIT-0
155
PIT-0
168
PIT-0
17 2
PIT-0
182
PIT-0
195
PIT-0
202
PIT-0
215
PIT-0
222
PIT-0
235
PIT-0
308
PIT-0
315
PIT-0
322
PIT-0
338
PIT-0348
PIT-0352 PIT-036
2PIT-037
2
PIT-0385
PIT-0392
PIT-0405
PIT-0412
PIT-0425
PIT-0432
PWR
P2010
P2010
P10017
P100
19.7
P50
19.4
P100
22.2
P100
45.9
P100
66.3
P50
21
P10019.2 P100
17
P202
P202
P202
P202
P202
P202
P202
P202 P20
2
P202
P202
P202 P20
2
P202 P20
2P2015
P202
P2020
P2020
P202
P202
P2015 P20
15
P202
P202
P202
P202
P202
P202
P202
P202
P202
P202
P202
P202
P202P20
2
P202
P202
P202
P202
P202
P202
P2022
P2022
P209
P209
P202
P202
P202
P202
P208 P20
2P202 P20
2 P202
P202
P202
P202 P20
2
P202 P20
P202 P20
2P202
P35P100MC
P35P100
P205
P205
STAGE 1STAGE 2
9994
PIT-0445
P100
27.7
P100
26.8
P100
39.4
P100
103.7
P100
34.2
P50
17.5
P50
17.7
P50
18.2
P100
29.2 P10020
P10022.4
P10018.8
P100
53.1
P10019.9
P100
61.8P100 31.4P100 18.6
P100
17.3
P50
22.1
P100
25.7
P100
25.7
P50
23.4
P100
50.6
P10050.6
P10021.3
P10021.3
P50
27.4
P50
20.6
P5018.7
P50
18.7
P50
19.2
43.3
P50
18.9
P50
19.8
SOURCE DOCUMENTSDRG. No.AUTHOR REV. No. DATE170308 11124 DESIGN STRINGS - PHASE 1.DWG-----
RMA-----
------
24-03-17-----
Steve HarteSOURCE DOCUMENTS
DRG. No.AUTHOR REV. No. DATE-
FSA:
STATE: REGION:
SAM:
DRAFTER
ADA:
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
A
B
C
D
E
F
G
H
DRAWING TITLE:
PROJECT No:
SCALE SHEET No. REV.
QUALITY RECORD :
APPROVED
NBNCO APPROVAL RECORD:
DD
AB
WD
REV DATE DESCRIPTION
SIGNATURE DATE
NBNCO DISCLAIMER
CADREF No:
NN KEY PLAN
OF
CONTRACTOR LOGO
STRICTLY CONFIDENTIAL
THIS DOCUMENT HAS BEEN PREPARED SOLELY FOR THE USE OFNBNCO LIMITED (ABN 86 136 533 741) FOR USE IN MAINTAININGNBNCO FACILITIES. IT HAS NOT BEEN CREATED FOR ANY OTHERUSE. IT SHOULD NOT BE SCALED TO LOCATE NBNCO ASSETS. NOWARRANTY IS GIVEN THAT THE INFORMATION IS ACCURATE ORCOMPLETE.
NBN Co. PIT & PIPE INFRASTRUCTURETO PROPOSED SUBDIVISIONAMITY ESTATE STAGES 1 & 2NARANGBA
QLD
AYCA-4GKXKP
E17-P.Z660551.D.01N
1:500 @ A1 3 3 D
- 31-05-17 T.S./B.H. ORIGINAL ISSUE
A 18-07-17 T.S./I.T.J. ADD PIT AT STN 2
B 12-09-17 A.Mc./I.T.J. APPROVED BY NBN Co INCLUDING ROAD ANEMS
C 03-11-17 S.H./I.T.J. ISSUED FOR CONSTRUCTION & AMEND ROAD CROSSING AT STN'S 13A-50
D 16-05-18 P.H./I.T.J. AS CONSTRUCTED
STAGE 1
STAGE 2
STAGE 3
STAG
E 4
STAGE 5
STAGE 6
STAGE 7STAGE 8STAGE 9
STAGE 10
TADO
RNA
ST
EVER
TON
ST
WARREGO LN
GRAZIER ST
KALLATINA ST
KALLATINA ST
EVER
TON
ST
TADO
RNA
ST
LUCIND
A LN
TYRA
LN
TYRA
LN
RUFU
S ST
CLAR
A LN
372
373
374
375
376
377
378
384385
386387
388
389
390
391
392
393
404
405
406
407
408
409
410411
412413
414415
416417
418419
420421
429430
431432
433434
435436
437438439
440441
442443
444445
446447
448
466
467
PIT-0
195
PIT-0
202
PIT-0
215
PIT-0
222
PIT-0
235
PIT-0246
PIT-0255
PIT-0
268
PIT-0275
PIT-0285
PIT-0
298
PIT-0
308
PIT-0
338
PIT-0348
PIT-0352 PIT-036
2PIT-037
2
PIT-0385
PIT-0392
PIT-0405
PIT-0412
PIT-0425
PIT-0432
P100
22.2
P100
P50
21
P10019.2 P100
17
P100
27.5P100
37.9
P100
20.2
P202
P202
P202
P202
P202P20
2
P202
P202
P202
P202
P202
P202
P2010 P20
10P2015
P2015
P2023
P202
P2012 P20
12 P2025 P20
25 P202 P20
2P2020 P20
20 P2025 P20
25 P2010
P202
P202
P2022
P2022
P209 P20
2
P202
P202
P202
P208 P20
2P202 P20
2 P202
P202 P20
2
P202 P20
2
P202 P20
2
P202 P20
2
P202 P20
2
P202
P202 P20
2
P202
KALLATINA ST
STAGE 1 STAGE 2
P100
P100
25.7
P100
50.6
P10050.6
P10021.3
P10021.3
P50
27.4
P50
20.6
P5018.7
P50
18.7
P50
19.2
P100
43.3
P100
54.1
P100
37.8
P100
33.6P100
44.9
P100
46.3
P10021.4
P100
33.2
P50
18.9
P50
19.8
Development InformationDevelopment Name:
Developer Company:
Authorised Rep:
Development Adress:
CRM ID: Stage Number:
Phone:E-Mail:
AMITY ESTATE
POINTCORP
CALLAGHAN RD NARANGBA
AYCA-4GKXKP 1 & 2
TOBY SKEATES3271 [email protected]
BILL OF MATERIAL
PITSSIZE25
89
QTYDUCTS
SIZE QTY MTRSP100P50P23
TOTAL NUMBER OF PITS:
TOTAL NUMBER OF CONDUITS:TOTAL LENGTH OF CONDUITS:
NO OF LOTS:
TOTAL NUMBER OF MANHOLES:
6
1320470
39 1334.314 291.493 562
4401462187.7
95