Name of Work: Kovvur(Town) W.G.Dt Estimated Amount Rs: 4.99 Lakh S.No Description Quantity Apr-15 May-15 Jun- 1-7 8-15 16-22 23-30 1-7 8-15 16-22 23-31 1-7 8-15 1 C.C (1:3:6) Program 71.00 Cum 71.00 Progress 100% 2 Plastering & Other Finishings Program 242.00 Sqm 242.00 Progress 100% Construction Program Sheet (Bar Sheet) Beautification of C.C drain body wall at Achanta vari streetfrom Prakasam ro bypass road in 23' rd ward

Upload: sasidharkatari91572

Post on 11-Nov-2015

215 views

Category:

Documents


1 download

DESCRIPTION

Bar

TRANSCRIPT

AchantaConstruction Program Sheet (Bar Sheet)Name of Work:Beautification of C.C drain body wall at Achanta vari streetfrom Prakasam road to bypass road in 23'rd wardKovvur(Town) W.G.Dt Estimated Amount Rs: 4.99 LakhsS.NoDescriptionQuantityApr-15May-15Jun-151-78-1516-2223-301-78-1516-2223-311-78-1516-2223-301Sand Bed/ Quarry Rubbish/ Stone dustProgram199.00 Cum199.00Progress2P.C.C (1:4:8)Program250.00 Cum250.00Progress1C.C (1:3:6)Program71.00 Cum71.00Progress100%4Laying of Roof slabProgram497.89 Sqm497.89Progress5Brick WorkProgram7.97 Cum7.97Progress2Plastering & Other FinishingsProgram242.00 Sqm242.00Progress100%7Electrification & Water SupplyProgram-ProgressFIRST FLOOR8R C C ColumnsProgress4.77Cum4.77Program9Centering And steel fabricationProgress5.62 MT5.62Program10Laying of Roof slabProgram380.33 Sqm380.33Progress11Brick WorkProgram96.74 Cum96.74Progress12Doors & WindowsProgram46.64 Sqm46.64Progress13Plastering & Other FinishingsProgram1359.1 Sqm1359.10Progress14Electrification & Water SupplyProgramProgress15PaintingProgram1600 Sqm1600Progress

Luthern churchConstruction Program Sheet (Bar Sheet)Name of Work:Construction of C.C drain at opposite Luthern church and (Door no:16-11-32 to 16-11-32/3) near part of chitti babu gari house to Aurangabad in 16'th ward.Kovvur(Town) W.G.Dt Estimated Amount Rs: 2.55 LakhsS.NoDescriptionQuantityApr-15May-15Jun-151-78-1516-2223-301-78-1516-2223-311-78-1516-2223-301Sand Bed/ Quarry Rubbish/ Stone dustProgram199.00 Cum199.00Progress100%2P.C.C (1:4:8)Program250.00 Cum250.00Progress100%3C.C (1:3:6)Program3.00 Cum3.00Progress100%4Laying of Roof slabProgram497.89 Sqm497.89Progress5Brick WorkProgram7.97 Cum7.97Progress6Plastering & Other FinishingsProgram242.00 Sqm242.00Progress7Electrification & Water SupplyProgram-ProgressFIRST FLOOR8R C C ColumnsProgress4.77Cum4.77Program9Centering And steel fabricationProgress5.62 MT5.62Program10Laying of Roof slabProgram380.33 Sqm380.33Progress11Brick WorkProgram96.74 Cum96.74Progress12Doors & WindowsProgram46.64 Sqm46.64Progress13Plastering & Other FinishingsProgram1359.1 Sqm1359.10Progress14Electrification & Water SupplyProgramProgress15PaintingProgram1600 Sqm1600Progress

R.T.C depot west sideConstruction Program Sheet (Bar Sheet)Name of Work:Construction of C.C drain in R.T.C depot west side and south side from prakasam road to vemuluru puntha road in kovvur municipality.Kovvur(Town) W.G.Dt Estimated Amount Rs: 2.735 LakhsS.NoDescriptionQuantityApr-15May-15Jun-151-78-1516-2223-301-78-1516-2223-311-78-1516-2223-301Sand Bed/ Quarry Rubbish/ Stone dustProgram11.00 Cum11.00 CumProgress100%2P.C.C (1:4:8)Program11.00 Cum11.00 CumProgress100%3C.C (1:3:6)Program32.00 Cum32.00 CumProgress100%4Laying of Roof slabProgram497.89 Sqm497.89Progress5Brick WorkProgram7.97 Cum7.97Progress4PlasteringProgram270.00 Sqm270.00 sqmProgress100%7Electrification & Water SupplyProgram-ProgressFIRST FLOOR8R C C ColumnsProgress4.77Cum4.77Program9Centering And steel fabricationProgress5.62 MT5.62Program10Laying of Roof slabProgram380.33 Sqm380.33Progress11Brick WorkProgram96.74 Cum96.74Progress12Doors & WindowsProgram46.64 Sqm46.64Progress13Plastering & Other FinishingsProgram1359.1 Sqm1359.10Progress14Electrification & Water SupplyProgramProgress15PaintingProgram1600 Sqm1600Progress

Nandamuru puntha road north sidConstruction Program Sheet (Bar Sheet)Name of Work:Construction of C.C drain providing 170 mm thick C.C road from nandamuru puntha road north side road door no:4-2-65/3 to 4-5-16/17 in 21'st ward.Kovvur(Town) W.G.Dt Estimated Amount Rs:3.72 LakhsS.NoDescriptionQuantityApr-15May-15Jun-151-78-1516-2223-301-78-1516-2223-311-78-1516-2223-301Sand Bed/ Quarry Rubbish/ Stone dustProgram27.30 Cum27.30 CumProgress100%2P.C.C (1:4:8)Program13.50 Cum13.50 CumProgress100%3C.C (1:3:6)Program18.00 Cum18.00 CumProgress100%4M20 concreteProgram0.70 Cum0.70 CumProgress100%5M30 concreteProgram22.95 Cum22.95 CumProgress100%6PlasteringProgram180.00 Sqm180.00 SqmProgress100%7SteelProgram50.00 Kg50.00 KgProgress100%FIRST FLOOR8R C C ColumnsProgress4.77Cum4.77Program9Centering And steel fabricationProgress5.62 MT5.62Program10Laying of Roof slabProgram380.33 Sqm380.33Progress11Brick WorkProgram96.74 Cum96.74Progress12Doors & WindowsProgram46.64 Sqm46.64Progress13Plastering & Other FinishingsProgram1359.1 Sqm1359.10Progress14Electrification & Water SupplyProgramProgress15PaintingProgram1600 Sqm1600Progress

Gowthami nagarConstruction Program Sheet (Bar Sheet)Name of Work:Construction of C.C drain at Gowthami nagar Jammalamadugu vari street from door no.10-7-11/2 to 10-10-15 in 9'th and 10'th wards.Kovvur(Town) W.G.Dt Estimated Amount Rs:1.48 LakhsS.NoDescriptionQuantityApr-15May-15Jun-151-78-1516-2223-301-78-1516-2223-311-78-1516-2223-301Sand Bed/ Quarry Rubbish/ Stone dustProgram5.95 Cum5.95 CumProgress100%2P.C.C (1:4:8)Program8.40 Cum8.40 CumProgress100%3C.C (1:3:6)Program15.71 Cum15.71 CumProgress100%4Laying of Roof slabProgram497.89 Sqm497.89Progress5Brick WorkProgram7.97 Cum7.974PlasteringProgram148.00 Sqm148.00 SqmProgress100%7Electrification & Water SupplyProgram-ProgressFIRST FLOOR8R C C ColumnsProgress4.77Cum4.77Program9Centering And steel fabricationProgress5.62 MT5.62Program10Laying of Roof slabProgram380.33 Sqm380.33Progress11Brick WorkProgram96.74 Cum96.74Progress12Doors & WindowsProgram46.64 Sqm46.64Progress13Plastering & Other FinishingsProgram1359.1 Sqm1359.10Progress14Electrification & Water SupplyProgramProgress15PaintingProgram1600 Sqm1600Progress

Bommireddy vari streetConstruction Program Sheet (Bar Sheet)Name of Work:Construction of C.C drain and providing 170 mm thick C.C road in Bommireddy vari street from prakasm road to west in 23'rd ward.Kovvur(Town) W.G.Dt Estimated Amount Rs: 4.93 LakhsS.NoDescriptionQuantityApr-15May-15Jun-151-78-1516-2223-301-78-1516-2223-311-78-1516-2223-301Sand Bed/ Quarry Rubbish/ Stone dustProgram25.00 Cum25.00 CumProgress95%2P.C.C (1:4:8)Program15.80 Cum15.80 CumProgress25%3C.C (1:3:6)Program18.60 CumProgress95%4M30 concreteProgram41.00 Cum41.00 CumProgress5plasteringProgram150.00 Sqm150.00 SqmProgress95%6SteelProgram50.00 Kg50.00 KgProgress7Electrification & Water SupplyProgram-ProgressFIRST FLOOR8R C C ColumnsProgress4.77Cum4.77Program9Centering And steel fabricationProgress5.62 MT5.62Program10Laying of Roof slabProgram380.33 Sqm380.33Progress11Brick WorkProgram96.74 Cum96.74Progress12Doors & WindowsProgram46.64 Sqm46.64Progress13Plastering & Other FinishingsProgram1359.1 Sqm1359.10Progress14Electrification & Water SupplyProgramProgress15PaintingProgram1600 Sqm1600Progress

sanivarapu vari streetConstruction Program Sheet (Bar Sheet)Name of Work:Providing 2 C.C ramps at subramanyeswara temple and sanivarapu vari street at along the Godavari bund in Kovvur Municipality.Kovvur(Town) W.G.Dt Estimated Amount Rs: 3.94 LakhsS.NoDescriptionQuantityApr-15May-15Jun-151-78-1516-2223-301-78-1516-2223-311-78-1516-2223-301Sand Bed/ Quarry Rubbish/ Stone dustProgram75.00 Cum75.00 CumProgress65%2P.C.C (1:4:8)Program17.50 Cum17.50 CumProgress80%3M30 concreteProgram39.00 Cum39.00 CumProgress70%4SteelProgram60.00 Kg60.00 KgProgress

AurangabadConstruction Program Sheet (Bar Sheet)Name of Work:Providing 170 mm C.C road internal cross 6 places in Aurangabad in 10'th ward.Kovvur(Town) W.G.Dt Estimated Amount Rs: 12.14 LakhsS.NoDescriptionQuantityApr-15May-15Jun-151-78-1516-2223-301-78-1516-2223-311-78-1516-2223-301Sand Bed/ Quarry Rubbish/ Stone dustProgram223.00 Cum223.00 CumProgress60%2P.C.C (1:4:8)Program52.00 Cum52.00 CumProgress3M 30 concrete.Program116.50 Cum116.50 CumProgress4SteelProgram310.00 Kg310.00 KgProgress5Brick WorkProgram7.97 Cum7.97Progress6Plastering & Other FinishingsProgram242.00 Sqm242.00Progress7Electrification & Water SupplyProgram-ProgressFIRST FLOOR8R C C ColumnsProgress4.77Cum4.77Program9Centering And steel fabricationProgress5.62 MT5.62Program10Laying of Roof slabProgram380.33 Sqm380.33Progress11Brick WorkProgram96.74 Cum96.74Progress12Doors & WindowsProgram46.64 Sqm46.64Progress13Plastering & Other FinishingsProgram1359.1 Sqm1359.10Progress14Electrification & Water SupplyProgramProgress15PaintingProgram1600 Sqm1600Progress

Krishna chaitanya nagarConstruction Program Sheet (Bar Sheet)Name of Work:Construction of C.C drain and providing 170 mm thick C.C road in krishna chaitanya nagar in 9'th ward.Kovvur(Town) W.G.Dt Estimated Amount Rs: 5.68 LakhsS.NoDescriptionQuantityApr-15May-15Jun-151-78-1516-2223-301-78-1516-2223-311-78-1516-2223-301Sand Bed/ Quarry Rubbish/ Stone dustProgram199.00 Cum199.00Progress2P.C.C (1:4:8)Program250.00 Cum250.00Progress3C.C (1:3:6)Program3.00 Cum3.00Progress4Laying of Roof slabProgram497.89 Sqm497.89Progress5Brick WorkProgram7.97 Cum7.97Progress6Plastering & Other FinishingsProgram242.00 Sqm242.00Progress7Electrification & Water SupplyProgram-ProgressFIRST FLOOR8R C C ColumnsProgress4.77Cum4.77Program9Centering And steel fabricationProgress5.62 MT5.62Program10Laying of Roof slabProgram380.33 Sqm380.33Progress11Brick WorkProgram96.74 Cum96.74Progress12Doors & WindowsProgram46.64 Sqm46.64Progress13Plastering & Other FinishingsProgram1359.1 Sqm1359.10Progress14Electrification & Water SupplyProgramProgress15PaintingProgram1600 Sqm1600Progress

Travellors BugalowConstruction Program Sheet (Bar Sheet)Name of Work:Providing C.C road Travellors Bungalow road from junior college road to railway feeder road in 14'th ward in kovvur municipality.Kovvur(Town) W.G.Dt Estimated Amount Rs: 34.95 LakhsS.NoDescriptionQuantityApr-15May-15Jun-151-78-1516-2223-301-78-1516-2223-311-78-1516-2223-301Sand Bed/ Quarry Rubbish/ Stone dustProgram427.00 Cum427.00 CumProgress2P.C.C (1:4:8)Program154.00 Cum154.00 CumProgress3C.C (1:3:6)Program132.00 Cum132.00 CumProgress4M30 concreteProgram199.00 Cum199.00 CumProgress5steelProgram960.00 Cum960.00 CumProgress6PlasteringProgram430.00 Sqm430.00 SqmProgress7Electrification & Water SupplyProgram-ProgressFIRST FLOOR8R C C ColumnsProgress4.77Cum4.77Program9Centering And steel fabricationProgress5.62 MT5.62Program10Laying of Roof slabProgram380.33 Sqm380.33Progress11Brick WorkProgram96.74 Cum96.74Progress12Doors & WindowsProgram46.64 Sqm46.64Progress13Plastering & Other FinishingsProgram1359.1 Sqm1359.10Progress14Electrification & Water SupplyProgramProgress15PaintingProgram1600 Sqm1600Progress

Gandikota variConstruction Program Sheet (Bar Sheet)Name of Work:Providing C.C road and construction of C.C drain in junior college road from prakasam road to Gandikota vari street in kovvur municipality.Kovvur(Town) W.G.Dt Estimated Amount Rs: 34.95 LakhsS.NoDescriptionQuantityApr-15May-15Jun-151-78-1516-2223-301-78-1516-2223-311-78-1516-2223-301Sand Bed/ Quarry Rubbish/ Stone dustProgram255.00 Cum255.00Progress2P.C.C (1:4:8)Program151.00 Cum151.00Progress3C.C (1:3:6)Program82.00 Cum82.00Progress4M30 concreteProgram177.00 Cum177.00Progress5SteelProgram400.00 Kg400.00 KgProgress6PlasteringProgram890.00 Sqm890.00Progress7Electrification & Water SupplyProgram-ProgressFIRST FLOOR8R C C ColumnsProgress4.77Cum4.77Program9Centering And steel fabricationProgress5.62 MT5.62Program10Laying of Roof slabProgram380.33 Sqm380.33Progress11Brick WorkProgram96.74 Cum96.74Progress12Doors & WindowsProgram46.64 Sqm46.64Progress13Plastering & Other FinishingsProgram1359.1 Sqm1359.10Progress14Electrification & Water SupplyProgramProgress15PaintingProgram1600 Sqm1600Progress

Anangapal streetConstruction Program Sheet (Bar Sheet)Name of Work:Providing C.C road to continues C.c drain in Anangapal street bfrom prakasam road to bypass road in 22'th ward.Kovvur(Town) W.G.Dt Estimated Amount Rs: 30.40 LakhsS.NoDescriptionQuantityApr-15May-15Jun-151-78-1516-2223-301-78-1516-2223-311-78-1516-2223-301Sand Bed/ Quarry Rubbish/ Stone dustProgram62.50 Cum62.50 CumProgress2P.C.C (1:4:8)Program62.50 Cum62.50 CumProgress3C.C (1:3:6)Program234.00 Cum234.00 CumProgress4Laying of Roof slabProgram497.89 Sqm497.89Progress5Brick WorkProgram7.97 Cum7.97Progress4PlasteringProgram1000.00 Sqm1000.00 SqmProgress7Electrification & Water SupplyProgram-ProgressFIRST FLOOR8R C C ColumnsProgress4.77Cum4.77Program9Centering And steel fabricationProgress5.62 MT5.62Program10Laying of Roof slabProgram380.33 Sqm380.33Progress11Brick WorkProgram96.74 Cum96.74Progress12Doors & WindowsProgram46.64 Sqm46.64Progress13Plastering & Other FinishingsProgram1359.1 Sqm1359.10Progress14Electrification & Water SupplyProgramProgress15PaintingProgram1600 Sqm1600Progress