bbi profile project

Upload: denijal-ikanovic

Post on 03-Jun-2018

234 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/11/2019 BBI Profile Project

    1/490

  • 8/11/2019 BBI Profile Project

    2/490

    The world economy is becoming more and moreconnected and investors, businessmen and civil ser-vants are increasingly speaking a unique business lan-guage. Countries are competing to become primaryinvestment destinations for global investors, a pro-cess serving the better good of the global economy.

    Bosnia and Herzegovina, situated at the heart ofEurope, is uniquely placed in this virtuous race.The First International Investment Conference / Sa-rajevo Business Forum (SBF) aims to assist inves-tors discover the huge unrealized potential of thecountry as well as the Souhteast European region.

    Unlike other investment fora, SBF has developeda process whereby, with the help of experts fromPGlobal Global Advisory and Training Services Ltd.,local companies developed their project prepara-tion skills and align them with the agreed standards.

    is a compendium of 157 projects developed by

    tourism (48), agriculture (36), energy (40), and

    infrastructure (33), available to investors. Weexpect that the compendium will render func-tioning of the SBF and communication between

    We would like to extend our appreciation anddeep respect to all those who have assisted BBI,Islamic Development Bank Group and Thiqah, asorganizers, in realization of this event. We wouldlike to especially thank our strategic partnersBushnak Group, GAPID and BBI VIP Business Clubfor their crucial assistance which made the SBFpossible.

    BBI VIP Business Club will continue mak- -er companies from Bosnia and Herzegovi-na as well the Southeast European region.

    Bosna Bank International

    Dear investors,

  • 8/11/2019 BBI Profile Project

    3/490

  • 8/11/2019 BBI Profile Project

    4/490

    T 301SARAJEVO CITY CENTER, SARAJEVO,

    BOSNIA AND HERZEGOVINA

  • 8/11/2019 BBI Profile Project

    5/490

    PROJECT PROFILE

    Sarajevo City Center, Sarajevo, Bosnia and Herzegovina

    Prepared by Consultant MDC doo Sarajevo

    Investment opportunity Different options of cooperation could bediscussed with Owner.

    Industry sector Real Estate Development/TourismLocation The project is located in the most affluent part of

    Sarajevo center with close proximity togovernment buildings (B&H Parliament andGovernment of B&H), foreign embassies atMarijin Dvor District, Sarajevo, Bosnia andHerzegovina.

    Indication of returns Projected IRR is 26,0%Expected investment budget The total initial investment in first two

    years is close to 65 mil EUR The investment relates to initial cost

    preparation of project and completeconstruction of the shopping center, office

    tower, 5 star hotel and garages.Expected collaboration

    Different options of cooperation could bediscussed with Owner

    Company info Real estate development/Tourism Location: Marijin Dvor District, Sarajevo

    Bosnia and Herzegovina The complex is under construction.

    Expected completion: end of 2012 The concept of shopping center is still

    untapped market in Sarajevo and withadditional facilities it projects to be thecentral part of activities in Sarajevo.

    Portfoilio of products 5 star hotel (first international hoteloperator will be introduced in the B&Hmarket), office tower, shopping mall,garages and hypermarket.

    Structure of sales (2008, 2009) The company's projected revenue in 2012is EUR 27 million generated through hotelsale and rental fees of the remainingsegments of the complex.

    Employees structure Currently company employs circa 50employees of company MagrosVeletrgovina dd Sarajevo and intends toemploy additional employees uponcompletion of the project;

    Financial data Full version of feasibility study availableupon signing of LOI and Confidentiality

    Agreement.Contact: Edin Sefo

    Edhema Mulabdia no.3 71000 Sarajevo Mobile: +387 61 191 120, phone/fax:+387

    33 537 360 [email protected] , www.mdcon.ba

  • 8/11/2019 BBI Profile Project

    6/490

  • 8/11/2019 BBI Profile Project

    7/490

    PROJECT PROFILE

    Hotel Bristol Sarajevo, Bosnia and Herzegovina

    Prepared by Consultant MDC doo Sarajevo

    Investment opportunity Different options of cooperation could bediscussed with Owner.

    Industry sector Tourism/HospitalityLocation The Grand Hotel Bristol is located in the

    Municipality of Novo Sarajevo (1 kilometer awayfrom city center), on the right bank of Miljackariver and in the middle of the most famouspedestrian area called Wilson's walkway.Surrounded by several foreign embassies,headquarters of public enterprises andgovernment institutions.

    Indication of returns Projected IRR is circa 20,0%Expected investment budget The total initial investment is close to 16

    million EUR The investment relates to initial

    preparation of the project cost andcomplete reconstruction of the hotel

    Expected collaboration Different options of cooperation could be

    discussed with Owner

    Company info Tourism and Hospitality industry Location: Municipality Novo Sarajevo,

    Sarajevo, Bosnia and Herzegovina The hotel is still under construction

    (expected to be completed by the end of2010).

    The Grand hotel Bristol has long timehistory. It was one of the most famousmeeting points in the city and center ofbusiness and international travelers, aswell.

    A management agreement to operatehotel has been signed with internationalcompany specialized in management andoperation of the hotel,

    186 rooms and 12 suites The hotel is the one of the first of its kind

    in the regionPortfoilio of products Room services (first international hotel

    operator will be introduced in the B&Hmarket), F&B/hospitality related productsand services and retail shops

    Structure of sales (2008, 2009) Targeting high and mid end businesstravelers and tourists, as well

    Employees structure Currently company employs 11employees and intends to employadditional employees upon completion ofreconstruction works;

    Financial data Full version of feasibility study availableupon signing of LOI and Confidentiality

    Agreement.Contact: Edin Sefo

    Edhema Mulabdia no.3 71000 Sarajevo Mobile: +387 61 191 120, phone/fax:+387

    33 537 360 [email protected] , www.mdcon.ba

  • 8/11/2019 BBI Profile Project

    8/490

    T 303BETANIJA MARRIOTT RETAIL CENTER

  • 8/11/2019 BBI Profile Project

    9/490

  • 8/11/2019 BBI Profile Project

    10/490

  • 8/11/2019 BBI Profile Project

    11/490

  • 8/11/2019 BBI Profile Project

    12/490

    PROFILE PROJECT BOSMAL D.O.O. Sarajevo

    Investment oportunity To find partner in businessTurism Investment in hotels, apartments, serviced

    apartments.Location Bosmal City Center, Sarajevo, BiHGoal of the project To be best location to stay, do business,

    shopping, eating etc.

    Indicators of return on investment To be discusValue 120 Mil.

    Expected collaboration Partnership up to 70%

    Company InfoCompany was established 1998 inSarajevo.Bosmal d.o.o is company registred ascompany for civil engineering,consulting , trading.Location Sarajevo 71000, BiH,Milana Preloga bb, tel: 033/ 715000,fax: 033/ 725 181; ExecutiveDirector: Edin abanovicThe advantages of BCC is that this isnow also the first and most luxurious project. This condominium in ourregion offers a lot of features the firstmodern building that provides asymbol metropolitan city of Sarajevo,and inexhaustible space creatingvarious events within the facility, aswell as the intersection ofinternational relations with Bosniaand Herzegovina

    Products Products that have a BCC are: luxury flats,offices, wellness (swimming pool, sauna,fitness ...), shopping center, restaurants,heliport, garage

    Contacts Edin abanoviAdresa: Milana Preloga 12A, 71000

    Sarajevo, BiHTel: 033/ 715 000; 061/ 484 618Fax: 033/ 725 181E-mail: [email protected],www.bosmal.com

    Other information Interesting information is that Bosmal seeks partner for a luxury business hotel that is in theTower B. Hotel would have luxury apartmentsfor rent, you can use Heliodrom, swimming pool, sauna, Turkish bath, beauty salon,garage, restaurants ... all with exceptionalsafety and discretion, and private entrance.

  • 8/11/2019 BBI Profile Project

    13/490

    T 305MALCOM D.O.O. SARAJEVO,

    HOTEL POSTA + UNDERGROUND PARKING

  • 8/11/2019 BBI Profile Project

    14/490

  • 8/11/2019 BBI Profile Project

    15/490

  • 8/11/2019 BBI Profile Project

    16/490

    T 349WILSON PLAZA HOTEL OFFICE CENTER

    Wilson Plaza Hotel Office Center MIMS Group Development

    pr

    A 306

  • 8/11/2019 BBI Profile Project

    17/490

  • 8/11/2019 BBI Profile Project

    18/490

  • 8/11/2019 BBI Profile Project

    19/490

    T 307MALCOM D.O.O. SARAJEVO,

    KOMPLEKS ZUNOVNICA

  • 8/11/2019 BBI Profile Project

    20/490

  • 8/11/2019 BBI Profile Project

    21/490

  • 8/11/2019 BBI Profile Project

    22/490

    T 308ECO SELO D.O.O. MERGER &/ORACQUISITION OF THE PROJECT

  • 8/11/2019 BBI Profile Project

    23/490

  • 8/11/2019 BBI Profile Project

    24/490

  • 8/11/2019 BBI Profile Project

    25/490

    T 309EKO ING DOO, INDUSTRY SECTOR OF THE

    PROPOSED INVESTMENT SPORTS TOURISM

  • 8/11/2019 BBI Profile Project

    26/490

  • 8/11/2019 BBI Profile Project

    27/490

  • 8/11/2019 BBI Profile Project

    28/490

  • 8/11/2019 BBI Profile Project

    29/490

  • 8/11/2019 BBI Profile Project

    30/490

  • 8/11/2019 BBI Profile Project

    31/490

  • 8/11/2019 BBI Profile Project

    32/490

  • 8/11/2019 BBI Profile Project

    33/490

  • 8/11/2019 BBI Profile Project

    34/490

  • 8/11/2019 BBI Profile Project

    35/490

  • 8/11/2019 BBI Profile Project

    36/490

  • 8/11/2019 BBI Profile Project

    37/490

  • 8/11/2019 BBI Profile Project

    38/490

    T 313SUPPLEMENT OF SNOW GROOMERS

  • 8/11/2019 BBI Profile Project

    39/490

  • 8/11/2019 BBI Profile Project

    40/490

  • 8/11/2019 BBI Profile Project

    41/490

  • 8/11/2019 BBI Profile Project

    42/490

    T 314ILLUMINATION OF SKI SLOPE ON

    IGMAN /MALO POLJE

  • 8/11/2019 BBI Profile Project

    43/490

  • 8/11/2019 BBI Profile Project

    44/490

  • 8/11/2019 BBI Profile Project

    45/490

  • 8/11/2019 BBI Profile Project

    46/490

  • 8/11/2019 BBI Profile Project

    47/490

  • 8/11/2019 BBI Profile Project

    48/490

  • 8/11/2019 BBI Profile Project

    49/490

  • 8/11/2019 BBI Profile Project

    50/490

    T 316SNOW MAKING SYSTEM ON

    BJELANICA MOUNTAIN

  • 8/11/2019 BBI Profile Project

    51/490

  • 8/11/2019 BBI Profile Project

    52/490

  • 8/11/2019 BBI Profile Project

    53/490

  • 8/11/2019 BBI Profile Project

    54/490

  • 8/11/2019 BBI Profile Project

    55/490

  • 8/11/2019 BBI Profile Project

    56/490

  • 8/11/2019 BBI Profile Project

    57/490

  • 8/11/2019 BBI Profile Project

    58/490

  • 8/11/2019 BBI Profile Project

    59/490

  • 8/11/2019 BBI Profile Project

    60/490

  • 8/11/2019 BBI Profile Project

    61/490

  • 8/11/2019 BBI Profile Project

    62/490

    T 319RECONSTRUCTION AND MODERNIZATION

    OF SKI JUMPS ON OLYMPIC MT.IGMAN

  • 8/11/2019 BBI Profile Project

    63/490

  • 8/11/2019 BBI Profile Project

    64/490

  • 8/11/2019 BBI Profile Project

    65/490

  • 8/11/2019 BBI Profile Project

    66/490

    T 320NEW SKI SLOPES ON

    BJELASNICA AND IGMAN

  • 8/11/2019 BBI Profile Project

    67/490

  • 8/11/2019 BBI Profile Project

    68/490

  • 8/11/2019 BBI Profile Project

    69/490

  • 8/11/2019 BBI Profile Project

    70/490

  • 8/11/2019 BBI Profile Project

    71/490

  • 8/11/2019 BBI Profile Project

    72/490

  • 8/11/2019 BBI Profile Project

    73/490

  • 8/11/2019 BBI Profile Project

    74/490

  • 8/11/2019 BBI Profile Project

    75/490

    T 322WATER ACUMULLATIONS

    STINJA LOKVA/BJELASNICA MT

  • 8/11/2019 BBI Profile Project

    76/490

  • 8/11/2019 BBI Profile Project

    77/490

  • 8/11/2019 BBI Profile Project

    78/490

  • 8/11/2019 BBI Profile Project

    79/490

    T 323NEW SKI SLOPES ON LISIIJA GLAVA

    AND ILJAK / BJELANICA

  • 8/11/2019 BBI Profile Project

    80/490

  • 8/11/2019 BBI Profile Project

    81/490

  • 8/11/2019 BBI Profile Project

    82/490

  • 8/11/2019 BBI Profile Project

    83/490

    T 324BABY LIFTS ON BJELANICA AND IGMAN

  • 8/11/2019 BBI Profile Project

    84/490

  • 8/11/2019 BBI Profile Project

    85/490

  • 8/11/2019 BBI Profile Project

    86/490

  • 8/11/2019 BBI Profile Project

    87/490

    T 325HOTEL BOSNALIJEK ON BJELANICA MT.

  • 8/11/2019 BBI Profile Project

    88/490

  • 8/11/2019 BBI Profile Project

    89/490

  • 8/11/2019 BBI Profile Project

    90/490

  • 8/11/2019 BBI Profile Project

    91/490

  • 8/11/2019 BBI Profile Project

    92/490

  • 8/11/2019 BBI Profile Project

    93/490

  • 8/11/2019 BBI Profile Project

    94/490

    T 326THE HOTEL IN THE FRAMEWORK

    OF THE TRAFFIC BUSINESS CENTER

  • 8/11/2019 BBI Profile Project

    95/490

  • 8/11/2019 BBI Profile Project

    96/490

    Technical function Executive Director dipl.ecc. Ibrahim Kerla

    Joint functions Executive Director

    Marketing function Executive Director dipl.ecc. Nermana

    Factory premises Basic resources of Centrotrans Eurolines are based of theland, construction objects and vehicles, estimated value of

    Manufacturing departments International passenger transportEntity passenger t ransportFederal passenger transportKanton passenger transportMunicipality passenger transportContractual passenger transportExtraordinary transportsTourist activitiesCateringBus stationsService of vehicles (buses)Sales of the spare parts and other bus equipment

    Portfoilio of products Transport at all kind of lines Tourist agency Vehicle service and spare parts sales (Neoplan,

    Man, Isuzu) Bus station services

    Structure of sales (2008, 2009) Passenger transport 2008 - in amount of 15.000.000

    Passenger transport u 2009 - in amount 13.000.000

    Total sales caonsidered as export ( internationaltransport) is 30%.The states we work with are: Austria,Germany, Netherland, France, Slovenia, Belgium, Srbia,Monte Negro,Croatia, and Saudi Arabia transport).

    Production and sale by products Transported passengers : 6.000.000 passengersCrossed kilometres: 12.000.000 kmOther activities: 8 % of the total turnover

    Employees structure Number of the employees is 471+130 employees indaughter firms.

    Average age of the employees is 47 years. Total number of employees in the basic company,

    fall from 539 to 471 at the end of 2009, ie. fall downfor 12%.

    Customers Population 75%State institutions 15%Companies

    Financial data 000

    2008 2009

    Sales 15.143 13.165Costs 15.125 13.672

    Gross profit 18 -506Depreciation 1.625 1.651

    Assets 13.654 11.817

    Fixed 9.748 9.183Cash 174 128Inventories 605 478Receivables 3.034 2.050

    Liabilities 13.654 11.817

    Capital 5.400 4.893Long term liabilities 8.163 7.118 Short term liabilities 2.890 2.549

    Contact: Director of the Society is

  • 8/11/2019 BBI Profile Project

    97/490

  • 8/11/2019 BBI Profile Project

    98/490

    T 327HEALTH AND REHABILITATION CENTER

    HOTEL BOSNA AS BIHA BIH

  • 8/11/2019 BBI Profile Project

    99/490

  • 8/11/2019 BBI Profile Project

    100/490

  • 8/11/2019 BBI Profile Project

    101/490

  • 8/11/2019 BBI Profile Project

    102/490

    T 328DISCOVER BEAUTY CREATE YOUR OWN TOURIN BOSNIA HERZEGOVINA AND MONTENEGRO

  • 8/11/2019 BBI Profile Project

    103/490

  • 8/11/2019 BBI Profile Project

    104/490

  • 8/11/2019 BBI Profile Project

    105/490

  • 8/11/2019 BBI Profile Project

    106/490

    T 329PROJECT PROFILE BOSANSKO SELO KORA

    D.O.O. SARAJEVO

  • 8/11/2019 BBI Profile Project

    107/490

  • 8/11/2019 BBI Profile Project

    108/490

    T 330BUSINESS ACTIVATES WITH THE GOAL TO BUILDNEW ATTRACTIVE TOURIST AND SPORT RESORT

    AT LAKE BORAKO

  • 8/11/2019 BBI Profile Project

    109/490

  • 8/11/2019 BBI Profile Project

    110/490

  • 8/11/2019 BBI Profile Project

    111/490

    T 331KOSTEL COMMERCE LTD. BIHAC,

    BOSNIA AND HERZEGOVINA

  • 8/11/2019 BBI Profile Project

    112/490

  • 8/11/2019 BBI Profile Project

    113/490

  • 8/11/2019 BBI Profile Project

    114/490

    T 332CONSTRUCTION OF HOTELS HIGH CLASS, 5

    STAR HOTEL SKENDERIJA OR YOUR BREND

  • 8/11/2019 BBI Profile Project

    115/490

  • 8/11/2019 BBI Profile Project

    116/490

  • 8/11/2019 BBI Profile Project

    117/490

  • 8/11/2019 BBI Profile Project

    118/490

  • 8/11/2019 BBI Profile Project

    119/490

    T 334EMAN ENERGOPROM DOO,

    JELAH POLJE BB

  • 8/11/2019 BBI Profile Project

    120/490

  • 8/11/2019 BBI Profile Project

    121/490

  • 8/11/2019 BBI Profile Project

    122/490

    T 335TUNNEL OF SALVATION

    CONSTRUCTION OF COLLECTIVEGARAGES RP DOBRINJA

    CONVERSION OF MILITARY CAPACITIES INTO CIVIL NECESSITIES BARRACK HALILOVICI

    unicipality Novi Grad Sarajevo

    Municipality Novi Grad Sarajevo Promotion of capacities for investment 2010

  • 8/11/2019 BBI Profile Project

    123/490

    Municipality Novi Grad Sarajevo

    Concession/PPP

    Project proposal 1.

    Tunnel of salvation

    Location: Dobrinja-Butmir Purpose: Cultural historical tourism destination

    Project objectives and required investments

    Unique cultural-historical monument complex from period 92-95 Highly positioned on the interest list of local and international

    organizations and institutions which support tourism In objects and area arrangement around object approximately 7,2

    million KM In accompanying infrastructure approximately 3 million KM In terrain arrangement approximately 9 million KM For required documentation 700.000 - 800.000 KM

    Project proposal 2.

    Construction of collective garages RP Dobrinja

    Location: Dobrinja Purpose: Construction of collective garages Importance: Development of infrastructure and solution of the

    garage capacities problem for the urban part of the municipality Characteristics: planned capacities for construction, strategic

    project of development, urban zone, transit zone for both entities,developed business infrastructure, developed communalinfrastructure, specificity of Dobrinja as settlement

    Project objective

    Insufficient garage capacities versus necessities

    Municipality Novi Grad Sarajevo has the most numerous plannedlocation for garages

    Development of business infrastructure and business contents Evident possibility of quick return on investment Short time frame required for investment realization

    Project proposal 3.

    Conversion of military capacities into civil necessities - Barrack

    near RTV

  • 8/11/2019 BBI Profile Project

    124/490

    Municipality Novi Grad Sarajevo

    Surface: 10,9 ha

    Purpose: sport and education contents and capacities Significance: Development of infrastructure of regional importance Characteristics: Existing capacities, constructed urban communal

    infrastructure, favorable geo-traffic position, vicinity of airport andcorridor C5, significant location from the aspect of capital city,project preparation in progress

    Project objective

    Activation of unused military capacities for civil necessities anddevelopment of Sarajevo

    Economical investment through redesign and adaptation of existingcapacities

    Possibility of different investment ideas within the main purpose Large necessities from the aspect of demand (large market) Great interest of institutions and investors Excellent strategic position of the location for international

    cooperation

    Information about Municipality Novi Grad Sarajevo

    Municipality Novi Grad Sarajevo: 1978-2008

    Municipality with the largest number of inhabitants in CantonSarajevo

    Favorable geo-traffic position Green areas and watercourses Developed communal infrastructure Economy zones for SME accommodation Large housing capacity with possibility of enlargement Significant capacities for sport, culture, education, recreation and

    tourism (Park- Tunel Spasa...) Developed system of health care and social protection Part of largest market consumer in B&H

    The largest capacity areas for economic development of Sarajevo Favorable ambience for investment

    Contact

    MUNICIPALITY NOVI GRAD SARAJEVO

    71 000 SarajevoTel.: + 387 33 291 103Fax.: +387 33 291 278E-mail: [email protected]@novigradsarajevo.ba

  • 8/11/2019 BBI Profile Project

    125/490

  • 8/11/2019 BBI Profile Project

    126/490

    PROJECT PROFILE Skivillage Bjelasnica (C) by Dr. Medzid Muhasilovic, Dipl.-Ing.

    Investment opportunity SKIVILLAGE BJELASNICA (C)Industry sector TOURISM (and infrastructure)Location Bosnia & Herzegovina, Trnovo D.C. The Mountain of

    Bjelasnica (next to the Bosnian Capital of Sarajevo)www.bjelasnica.ba

    Investment opportunity objective Within the construction and building phase:EMPLOYMENT OF LOCAL LABOUR FORCE,ENGAGEMENT OF LOCAL INDUSTRY (of BH)

    Within the operation phase: POSITIVE TOURISTICIMPACT ONTO THE REGION, ONTO THE ECOLOGY,LONG-TERM EMPLOYMENT OPPORTUNITIES

    Indication of returns FORECATS OF BREAK-EVEN IS within first 4 yearsExpected investment budget In this conceptual phase of the project

    Skivillage Bjelasnica (C) the exact financialstudy was not completed yet. However to becompared with world-wide price-level the

    investment costs in Bosnia & Hercegovina (inthe construction and building sector) forresidental, touristic or bussiness objects isabout EUR 500,- per square-meter of usablespace (in a constructed building).

    Expected collaborationThe Companies or the Subjects that would beenvolved in this project are the D. C. of Trnovo,the community where the Mountain ofBjelasnica is situated in. Further, there is theCity-transportation company of Sarajevo and theZOI-84, the company that runs the Cable-cars

    Company info The Companies or the Subjects that would beenvolved in this project are D. C. Of Trnovo, thecommunity where the Mountain of Bjelasnica issituated in. Further, there is the City- transportation company of Sarajevo. The ZOI-84,

    the company that runs the Cable-carsFactory premises -----------------------------Manufacturing departments -------------------Portfoilio of products --------------Structure of sales (2008, 2009) -----------------------

    ------------------------Production and sale by productsEmployees structure ------------------------------,

    ----------------------------,---------------------------

    Customers Tourist Market of the Surrounding CountriesFinancial data ----------------------------------------------

    ----------------------------------------------------Contact: Dr. Medzid Muhasilovic, Dipl.-Ing.

    Dz. Bijedica 35 BH-71000 Sarajevo

    00387 62 841 45000387 33 677 [email protected] [email protected]://www.zeda.ba http://lin.epfl.ch

    Others The Skivillage Bjelasnica is a concept for touristicdevelopment of the region. The Bjelasnica Mountain asthe Olympic Sport-resort, is situated not far fromSarajevo (the Olympic city from 1984) in the territoryof the D.C. Trnovo. The Trnovo community sees one ofthe collaboration-modes with future strategic investorin giving long-term concessions onto the land(surface) where the Skivillage Bjelasnica is about tobe build up.

    All further details, meetings discussion can bearranged

  • 8/11/2019 BBI Profile Project

    127/490

    T 337DEVELOPMENT OF

    SPA RECREATIONAL TOURISM

  • 8/11/2019 BBI Profile Project

    128/490

  • 8/11/2019 BBI Profile Project

    129/490

  • 8/11/2019 BBI Profile Project

    130/490

    T 338COMMUNITY OF NOVI TRAVNIK

  • 8/11/2019 BBI Profile Project

    131/490

  • 8/11/2019 BBI Profile Project

    132/490

  • 8/11/2019 BBI Profile Project

    133/490

    T 339COMPANY INTENDS TO SELL CAPITAL /TO EXPAND BUSINESS / HOTEL C.U.INN

    AEROTEL AT SARAJEVO AIRPORT

  • 8/11/2019 BBI Profile Project

    134/490

  • 8/11/2019 BBI Profile Project

    135/490

  • 8/11/2019 BBI Profile Project

    136/490

    T 340PRELIMINARY DESIGN FOR

    TOURISTIC SPA RECREATIVE OBJECTSSTOLAC

  • 8/11/2019 BBI Profile Project

    137/490

  • 8/11/2019 BBI Profile Project

    138/490

    T 341PRELIMINARY DESIGN FOR

    TOURISTIC SPA RECREATIVE OBJECTSILIJA

  • 8/11/2019 BBI Profile Project

    139/490

  • 8/11/2019 BBI Profile Project

    140/490

    T 342PROJECT PROPOSAL FOR WINTER SPORTS

    AND TOURIST CENTER ON THEMOUNTAIN MAJEVICA

  • 8/11/2019 BBI Profile Project

    141/490

  • 8/11/2019 BBI Profile Project

    142/490

    T 343PROJECT PROPOSAL FOR RECONSTRUCTION

    OF OLD TOWN FORTRESS SREBRENIK DATEDFROM THE YEAR OFF 1333

  • 8/11/2019 BBI Profile Project

    143/490

  • 8/11/2019 BBI Profile Project

    144/490

    T 344TOURISM RECREATION HEALTH CENTER

  • 8/11/2019 BBI Profile Project

    145/490

  • 8/11/2019 BBI Profile Project

    146/490

  • 8/11/2019 BBI Profile Project

    147/490

    T 345HOTEL BOUTIQUE 36

  • 8/11/2019 BBI Profile Project

    148/490

  • 8/11/2019 BBI Profile Project

    149/490

  • 8/11/2019 BBI Profile Project

    150/490

  • 8/11/2019 BBI Profile Project

    151/490

  • 8/11/2019 BBI Profile Project

    152/490

  • 8/11/2019 BBI Profile Project

    153/490

  • 8/11/2019 BBI Profile Project

    154/490

  • 8/11/2019 BBI Profile Project

    155/490

  • 8/11/2019 BBI Profile Project

    156/490

    T 348TOURIST CONDOMINIUM

    TIHA LUKA, NEUM

  • 8/11/2019 BBI Profile Project

    157/490

  • 8/11/2019 BBI Profile Project

    158/490

  • 8/11/2019 BBI Profile Project

    159/490

  • 8/11/2019 BBI Profile Project

    160/490

  • 8/11/2019 BBI Profile Project

    161/490

  • 8/11/2019 BBI Profile Project

    162/490

  • 8/11/2019 BBI Profile Project

    163/490

  • 8/11/2019 BBI Profile Project

    164/490

  • 8/11/2019 BBI Profile Project

    165/490

  • 8/11/2019 BBI Profile Project

    166/490

    A-403FOOD INDUSTRY AGRICULTURE

    An investment opportunityin Bosnia & Herzegovinas

    food industry

    EXPANSIONOF THE PRESENT

    BUSINESS

  • 8/11/2019 BBI Profile Project

    167/490

  • 8/11/2019 BBI Profile Project

    168/490

  • 8/11/2019 BBI Profile Project

    169/490

  • 8/11/2019 BBI Profile Project

    170/490

  • 8/11/2019 BBI Profile Project

    171/490

  • 8/11/2019 BBI Profile Project

    172/490

  • 8/11/2019 BBI Profile Project

    173/490

  • 8/11/2019 BBI Profile Project

    174/490

  • 8/11/2019 BBI Profile Project

    175/490

    A 406AGRICULTURE FROZEN

    FRUITS AND VEGETABLES

  • 8/11/2019 BBI Profile Project

    176/490

  • 8/11/2019 BBI Profile Project

    177/490

  • 8/11/2019 BBI Profile Project

    178/490

  • 8/11/2019 BBI Profile Project

    179/490

  • 8/11/2019 BBI Profile Project

    180/490

  • 8/11/2019 BBI Profile Project

    181/490

    A 408CAPITAL INVESTMENT FOR THE PROJECT OF

    THE REGIONAL FOOD CENTER

    KGI KONSTRUKT d.o.o. Sarajevo

    REGIONAL FOOD CENTRE

    -It is unique center in region without competiti-Reception of imported and export dedicatedagricultural and food products-to provide space and other conditions for storicommodity reserves in cooperation with federaand government commodity reserves-providing inputs for food production-construction of other accompanying facilities ,which will complement the contents of RegionFood Centre

    INVESTMENT OPORTUNITY IN REGIONAL FOOD CENTRE

  • 8/11/2019 BBI Profile Project

    182/490

  • 8/11/2019 BBI Profile Project

    183/490

  • 8/11/2019 BBI Profile Project

    184/490

    A 409THE COMPANY INTENDS THE PROPOSED

    PROJECT TO EXPAND PRODUCTION THROUGH JOINT VENTURES.

    Investment opportunities in organicproduction (products of pumpkins)

    Company: CET BAH D.O.O. SARAJEVO

  • 8/11/2019 BBI Profile Project

    185/490

  • 8/11/2019 BBI Profile Project

    186/490

  • 8/11/2019 BBI Profile Project

    187/490

  • 8/11/2019 BBI Profile Project

    188/490

  • 8/11/2019 BBI Profile Project

    189/490

  • 8/11/2019 BBI Profile Project

    190/490

  • 8/11/2019 BBI Profile Project

    191/490

  • 8/11/2019 BBI Profile Project

    192/490

  • 8/11/2019 BBI Profile Project

    193/490

  • 8/11/2019 BBI Profile Project

    194/490

  • 8/11/2019 BBI Profile Project

    195/490

    A 413ORGANIC PUMPKIN SEED OIL FACTORY

    Sarajevo, March 2010

  • 8/11/2019 BBI Profile Project

    196/490

  • 8/11/2019 BBI Profile Project

    197/490

  • 8/11/2019 BBI Profile Project

    198/490

  • 8/11/2019 BBI Profile Project

    199/490

  • 8/11/2019 BBI Profile Project

    200/490

  • 8/11/2019 BBI Profile Project

    201/490

  • 8/11/2019 BBI Profile Project

    202/490

  • 8/11/2019 BBI Profile Project

    203/490

  • 8/11/2019 BBI Profile Project

    204/490

  • 8/11/2019 BBI Profile Project

    205/490

    A 416EXPLOATATION OF DRINKING WATER

    MALCom d.o.o.

    Project: Water Spring - Drink Gold

  • 8/11/2019 BBI Profile Project

    206/490

  • 8/11/2019 BBI Profile Project

    207/490

  • 8/11/2019 BBI Profile Project

    208/490

    A 417AGRICULTURE COOPERATIVES GRAANKA

    GRAANICA

  • 8/11/2019 BBI Profile Project

    209/490

  • 8/11/2019 BBI Profile Project

    210/490

  • 8/11/2019 BBI Profile Project

    211/490

    B - Balans sheet

    R.b. Item of balance

    1 Permanent funds 521.417 493.235

    2 Money in cash 795 280

    3 Inventories 101.383 109.973

    4 Trade receivables 250.337 239.930

    5 Other current assets 51.548 76.149

    6 Total assets 925.480 919.567

    7 Total capital 466.435 454.084

    8 Long-term liabilites 9.493 2.108

    9 Short term liabilites 449.552 463.375

    10 Total liabilites and capital 925.480 919.567

    )Contact:

    Gracanica BiH.

    Tel/fax. 035/703-277, mob. 062/393/868, e-mail. [email protected]

    Others

  • 8/11/2019 BBI Profile Project

    212/490

    A 418THE INVESTMENT PROJECT OF THE INTENSIVE

    PRODUCTION VEGETABLE AND FLOWERS INGREENHOUSE IN BOSNIA AND HERZEGOVINA

    Invest in production of vegetable andflowers in

    greenhouse

    Project for

    Sale

  • 8/11/2019 BBI Profile Project

    213/490

  • 8/11/2019 BBI Profile Project

    214/490

  • 8/11/2019 BBI Profile Project

    215/490

    A 419STORAGE BUILDING FOR

    FRUIT AND VEGETABLES WITH FINISHING ANDCONSERVATION

  • 8/11/2019 BBI Profile Project

    216/490

  • 8/11/2019 BBI Profile Project

    217/490

  • 8/11/2019 BBI Profile Project

    218/490

  • 8/11/2019 BBI Profile Project

    219/490

  • 8/11/2019 BBI Profile Project

    220/490

  • 8/11/2019 BBI Profile Project

    221/490

  • 8/11/2019 BBI Profile Project

    222/490

  • 8/11/2019 BBI Profile Project

    223/490

  • 8/11/2019 BBI Profile Project

    224/490

  • 8/11/2019 BBI Profile Project

    225/490

  • 8/11/2019 BBI Profile Project

    226/490

  • 8/11/2019 BBI Profile Project

    227/490

  • 8/11/2019 BBI Profile Project

    228/490

  • 8/11/2019 BBI Profile Project

    229/490

  • 8/11/2019 BBI Profile Project

    230/490

  • 8/11/2019 BBI Profile Project

    231/490

    A 424GROWING HEALTHY FOOD COMPANY INTENDS

    TO START, RENEW AND EXPAND BUSINESS

    Tuzla, Miladije bbphone: +387 35 282 048

    fax: +387 35 282 [email protected]

    GROWING HEALTHY FOOD

  • 8/11/2019 BBI Profile Project

    232/490

  • 8/11/2019 BBI Profile Project

    233/490

  • 8/11/2019 BBI Profile Project

    234/490

    A 425GREENFIELD INVESTMENT IN POULTRY

    FARMING IN SREBRENICA REGION

    INNOVA Management Consulting

    Investment opportunity inpoultry farming in Srebrenica

    Bosnia and Hercegovina

    Can be easily linked to already established productio

    available access to the market place

  • 8/11/2019 BBI Profile Project

    235/490

  • 8/11/2019 BBI Profile Project

    236/490

  • 8/11/2019 BBI Profile Project

    237/490

  • 8/11/2019 BBI Profile Project

    238/490

  • 8/11/2019 BBI Profile Project

    239/490

  • 8/11/2019 BBI Profile Project

    240/490

    A 427 JOIN INVESTMENT IN MINERAL WATER

    FACTORY ZEPCE, BOSNIA AND HERZEGOVINA

  • 8/11/2019 BBI Profile Project

    241/490

  • 8/11/2019 BBI Profile Project

    242/490

  • 8/11/2019 BBI Profile Project

    243/490

  • 8/11/2019 BBI Profile Project

    244/490

  • 8/11/2019 BBI Profile Project

    245/490

  • 8/11/2019 BBI Profile Project

    246/490

    A 429CENTRE FOR FRUIT PROCESSING, COMPANY

    INTENDS TO EXPAND BUSINESS

    Tuzla, Miladije bbphone: +387 35 282 048

    fax: +387 35 282 [email protected]

    CENTRE FOR FRUIT PROCESSING

  • 8/11/2019 BBI Profile Project

    247/490

    PROJECT PROFILE HK Tuzla

    Investmentopportunity

    Centre for fruit processingCompany intends to expand business

    Industry sector AgricultureLocation Brcko District, Bosnia and HerzegovinaInvestment opportunity objective Explain expected impact of the investment: Build Center for fruit processing,

    (growing, finishing and packaging), taking into account that buildings are builtconditional to apply international standards of quality, range and quality ofproducts for the world market. Development has a goal to encourage agriculturalfruit production in this region of Bosnia and Herzegovina.

    Profit on sales of products.

    It would employee a number of new workers.

    Accesses to new market for export.Indication of returns Financial ratios that shows economic justification for the Project (ROI etc)

    PrunesItems Qty

    (1.000kg)Unit price

    (BAM)Total price

    (BAM)

    Dried pittedprunes - 250 g.

    1.000 1,50 1.500.000

    Dried pittedprunes - 500 g.

    1.000 3.30 3.300.000

    Dried pittedprunes 10kg

    300 5.00 1.500.000

    TOTAL 6.300.000BAM

    Refrigerator

    Items Qty

    (1.000kg)

    Unit price

    (BAM)

    Total price

    (BAM)

    Frozen strawberries 400 2.500 1.000.000

    Frozen strawberry 100 1.500 150.000

    Frozen raspberries role 180 3.600 648.000

    Frozen raspberriessemolina

    90 2.200 198.000

    Frozen raspberries blockton

    30 1.600 48.000

    Frozen cherry 1.000 1.800 1.800.000

    Frozen blueberries 100 7.500 750.000

    Frozen Blackberry-role 300 3.000 900.000

    Frozen Plum m/s 500 1.300 650.000

    Frozen Plum r/s 500 1.400 700.000

    Consumable tons of Plum 1.000 900 900.000

    TOTAL 7.744.000BAM

    Items Qty(1.000kg)

    Unit price(BAM)

    Total price(BAM)

  • 8/11/2019 BBI Profile Project

    248/490

  • 8/11/2019 BBI Profile Project

    249/490

  • 8/11/2019 BBI Profile Project

    250/490

  • 8/11/2019 BBI Profile Project

    251/490

  • 8/11/2019 BBI Profile Project

    252/490

  • 8/11/2019 BBI Profile Project

    253/490

  • 8/11/2019 BBI Profile Project

    254/490

  • 8/11/2019 BBI Profile Project

    255/490

  • 8/11/2019 BBI Profile Project

    256/490

  • 8/11/2019 BBI Profile Project

    257/490

    A 432PRODUCTION OF ESSENTIAL OIL LEMON

    BALM: EXPANSION OF PRODUCTION,GATHERING OF SUB CONTRACTORS

  • 8/11/2019 BBI Profile Project

    258/490

  • 8/11/2019 BBI Profile Project

    259/490

    A 433FRUIT TERMINAL RAJLOVAC WITH BANANA

    RIPENING CHAMBERS ANDFRUIT & VEGETABLE STORAGE CHAMBERS

    LAGERHAUS

  • 8/11/2019 BBI Profile Project

    260/490

  • 8/11/2019 BBI Profile Project

    261/490

    A 434CONSTRUCTION & EQUIPPING OF THE

    FACTORY FOR PRODUCTION AND SALES OFFRIED POTATO

    FRIED POTATO

    PRODUCTION AND SALES FACTORYPROJECT PROFIL

    EKO TALUS d.o.o.Sarajevo Ltd

  • 8/11/2019 BBI Profile Project

    262/490

  • 8/11/2019 BBI Profile Project

    263/490

  • 8/11/2019 BBI Profile Project

    264/490

    A 435EXPANDING THE EXISTING PRODUCT RANGE,

    PRODUCT PLACEMENT ON THE MARKETCOUNTRIES IN THE MIDDLE EAST AND TURKEY

  • 8/11/2019 BBI Profile Project

    265/490

  • 8/11/2019 BBI Profile Project

    266/490

  • 8/11/2019 BBI Profile Project

    267/490

    A 436NATURAL MINERAL WATER FACTORY

    ILIDANSKI DIJAMANT

  • 8/11/2019 BBI Profile Project

    268/490

  • 8/11/2019 BBI Profile Project

    269/490

  • 8/11/2019 BBI Profile Project

    270/490

  • 8/11/2019 BBI Profile Project

    271/490

    E-201CONSTRUCTION OF THE NEW PLANT

    REPLACEMENT UNIT 7,450 MW IN TUZLA

  • 8/11/2019 BBI Profile Project

    272/490

  • 8/11/2019 BBI Profile Project

    273/490

  • 8/11/2019 BBI Profile Project

    274/490

  • 8/11/2019 BBI Profile Project

    275/490

  • 8/11/2019 BBI Profile Project

    276/490

    E-202CONSTRUCTION OF THE NEW PLANT

    REPLACEMENT UNIT 8, 300 MW IN KAKANJ

  • 8/11/2019 BBI Profile Project

    277/490

  • 8/11/2019 BBI Profile Project

    278/490

  • 8/11/2019 BBI Profile Project

    279/490

  • 8/11/2019 BBI Profile Project

    280/490

  • 8/11/2019 BBI Profile Project

    281/490

    E 203CONSTRUCTION OF THE NEW COGENERATION

    THERMAL POWER PLANT TPP UNIT1,300 MW BUGOJNO

  • 8/11/2019 BBI Profile Project

    282/490

  • 8/11/2019 BBI Profile Project

    283/490

  • 8/11/2019 BBI Profile Project

    284/490

  • 8/11/2019 BBI Profile Project

    285/490

  • 8/11/2019 BBI Profile Project

    286/490

    E 204HPP USTIKOLINA

    USTIKOLINA GORADE

  • 8/11/2019 BBI Profile Project

    287/490

  • 8/11/2019 BBI Profile Project

    288/490

  • 8/11/2019 BBI Profile Project

    289/490

  • 8/11/2019 BBI Profile Project

    290/490

    E 205HPP VRANDUK

    ZENICA

  • 8/11/2019 BBI Profile Project

    291/490

  • 8/11/2019 BBI Profile Project

    292/490

  • 8/11/2019 BBI Profile Project

    293/490

  • 8/11/2019 BBI Profile Project

    294/490

    E 206HPP UNAC

    UNSKO SANSKI CANTON

  • 8/11/2019 BBI Profile Project

    295/490

  • 8/11/2019 BBI Profile Project

    296/490

  • 8/11/2019 BBI Profile Project

    297/490

  • 8/11/2019 BBI Profile Project

    298/490

    E 207HPP KRUSEVO WITH HPP

    ZELENI VIR/OLOVO

  • 8/11/2019 BBI Profile Project

    299/490

  • 8/11/2019 BBI Profile Project

    300/490

  • 8/11/2019 BBI Profile Project

    301/490

  • 8/11/2019 BBI Profile Project

    302/490

    E 208HPP VRHPOLJESANSKI MOST

  • 8/11/2019 BBI Profile Project

    303/490

  • 8/11/2019 BBI Profile Project

    304/490

    total: 517 MW, 1 693 GWh

    Structure of sales(2008, 2009)

    Total sales:2008. 445.031.515

    Structure of sales

    Direct consumers 5,5 %

    Distribution ( tariff)consumers 56,0 %Export + other 38,5 %

    Production andsale by products

    Production of electric energy in 2009.: 6 927 GWhSales of electric energy in 2009.: 6 661 GWh

    Employeesstructure

    Total 4975 employees : Direction 326 Production 1774; Distribucion and sales 2.875Structure of employees:

    Dr. M.Sc. VSS VS VKV SSS KV PK NK

    0,14% 0,82% 12,99% 3,85% 30,66% 25,27% 17,79% 2,27% 3,21%

    Employment Trend 2008. : 49662009. : 4975

    Buyers The company supplies energy for 688,514 domestic consumersTariff costumers : 4 095 GWhCountries of Southeast Europe: 2 566 GWh

    Financial data Income statement

    2009. 2008.

    Income 458.362.933 445.031.515

    Cost of sales 435.723.921 427.391.403

    Profit 22.639.012 17.640.112

    Operating expenses 673.850 241.768

    Profit from operatingactivities

    21.965.162 17.398.344

    Depreciation 72.876.166 71.413.191

    Taxes

    Nett profit 31.650.666 23.641.527

  • 8/11/2019 BBI Profile Project

    305/490

  • 8/11/2019 BBI Profile Project

    306/490

    E 209HPP APLJE

    SANSKI MOST

  • 8/11/2019 BBI Profile Project

    307/490

  • 8/11/2019 BBI Profile Project

    308/490

  • 8/11/2019 BBI Profile Project

    309/490

  • 8/11/2019 BBI Profile Project

    310/490

    E 210HPP VINAC

    JAJCE

  • 8/11/2019 BBI Profile Project

    311/490

  • 8/11/2019 BBI Profile Project

    312/490

    Structure of sales(2008, 2009)

    Total sales:2008. 445.031.515

    Structure of sales

    Direct consumers 5,5 %Distribution ( tariff)consumers 56,0 %Export + other 38,5 %

    Production andsale by products

    Production of electric energy in 2009.: 6 927 GWhSales of electric energy in 2009.: 6 661 GWh

    Employeesstructure

    Total 4975 employees : Direction 326 Production 1774; Distribucion and sales 2.875Structure of employees:

    Dr. M.Sc. VSS VS VKV SSS KV PK NK

    0,14% 0,82% 12,99% 3,85% 30,66% 25,27% 17,79% 2,27% 3,21%

    Employment Trend 2008. : 49662009. : 4975

    Buyers The company supplies energy for 688,514 domestic consumersTariff costumers : 4 095 GWhCountries of Southeast Europe: 2 566 GWh

    Financial data Income statement

    2009. 2008.

    Income 458.362.933 445.031.515

    Cost of sales 435.723.921 427.391.403

    Profit 22.639.012 17.640.112

    Operating expenses 673.850 241.768

    Profit from operatingactivities

    21.965.162 17.398.344

    Depreciation 72.876.166 71.413.191

    Taxes

    Nett profit 31.650.666 23.641.527

  • 8/11/2019 BBI Profile Project

    313/490

    Balance sheet

    2009. 2008.

    Non-current assets 1.440.318.184 1465.320.853

    Bank deposit 60.504.671 46.419.390

    Reserves 59.093.628 48.679.559

    Trade receivables 54.779.297 54.820.308

    Other current assets 334.783.741 269.732.370

    Total Equity 1.949.479.522 1.884.972.479

    Capital 1.505.987.427 1.443.591.425

    Long-term liabilities 168.081.785 157.127.892

    Short term liabilities 275.410.310 284.253.162

    Total Liabilities 1.949.479.522 1.884.972.479

    Contact: Contact person : Address : Vilsonovo etalite 15, Sarajevo, Bosnia I HerzegovinaTelephone: 387 33 75 17 50Telefax: 387 33 75 17 48

    E-mail: [email protected]

  • 8/11/2019 BBI Profile Project

    314/490

    E 211HPP BABINO SELO

    DONJI VAKUF

  • 8/11/2019 BBI Profile Project

    315/490

  • 8/11/2019 BBI Profile Project

    316/490

  • 8/11/2019 BBI Profile Project

    317/490

  • 8/11/2019 BBI Profile Project

    318/490

    E 212HPP KOZLUK

    ZVORNIK

  • 8/11/2019 BBI Profile Project

    319/490

  • 8/11/2019 BBI Profile Project

    320/490

    total: 517 MW, 1 693 GWh

    Structure of sales(2008, 2009)

    Total sales:2008. 445.031.515

    Structure of sales

    Direct consumers 5,5 %

    Distribution ( tariff)consumers 56,0 %Export + other 38,5 %

    Production andsale by products

    Production of electric energy in 2009.: 6 927 GWhSales of electric energy in 2009.: 6 661 GWh

    Employeesstructure

    Total 4975 employees : Direction 326 Production 1774; Distribucion and sales 2.875Structure of employees:

    Dr. M.Sc. VSS VS VKV SSS KV PK NK

    0,14% 0,82% 12,99% 3,85% 30,66% 25,27% 17,79% 2,27% 3,21%

    Employment Trend 2008. : 49662009. : 4975

    Buyers The company supplies energy for 688,514 domestic consumersTariff costumers : 4 095 GWhCountries of Southeast Europe: 2 566 GWh

    Financial data Income statement

    2009. 2008.

    Income 458.362.933 445.031.515

    Cost of sales 435.723.921 427.391.403

    Profit 22.639.012 17.640.112

    Operating expenses 673.850 241.768

    Profit from operatingactivities

    21.965.162 17.398.344

    Depreciation 72.876.166 71.413.191

    Taxes

    Nett profit 31.650.666 23.641.527

  • 8/11/2019 BBI Profile Project

    321/490

  • 8/11/2019 BBI Profile Project

    322/490

    E 213HPP TEGAREBRATUNAC

  • 8/11/2019 BBI Profile Project

    323/490

  • 8/11/2019 BBI Profile Project

    324/490

    total: 517 MW, 1 693 GWh

    Structure of sales(2008, 2009)

    Total sales:2008. 445.031.515

    Structure of sales

    Direct consumers 5,5 %

    Distribution ( tariff)consumers 56,0 %Export + other 38,5 %

    Production andsale by products

    Production of electric energy in 2009.: 6 927 GWhSales of electric energy in 2009.: 6 661 GWh

    Employeesstructure

    Total 4975 employees : Direction 326 Production 1774; Distribucion and sales 2.875Structure of employees:

    Dr. M.Sc. VSS VS VKV SSS KV PK NK

    0,14% 0,82% 12,99% 3,85% 30,66% 25,27% 17,79% 2,27% 3,21%

    Employment Trend 2008. : 49662009. : 4975

    Buyers The company supplies energy for 688,514 domestic consumersTariff costumers : 4 095 GWhCountries of Southeast Europe: 2 566 GWh

    Financial data Income statement

    2009. 2008.

    Income 458.362.933 445.031.515

    Cost of sales 435.723.921 427.391.403

    Profit 22.639.012 17.640.112

    Operating expenses 673.850 241.768

    Profit from operatingactivities

    21.965.162 17.398.344

    Depreciation 72.876.166 71.413.191

    Taxes

    Nett profit 31.650.666 23.641.527

  • 8/11/2019 BBI Profile Project

    325/490

  • 8/11/2019 BBI Profile Project

    326/490

    W VELEJEMALI GRAD AND SVETA G

  • 8/11/2019 BBI Profile Project

    327/490

  • 8/11/2019 BBI Profile Project

    328/490

  • 8/11/2019 BBI Profile Project

    329/490

  • 8/11/2019 BBI Profile Project

    330/490

    E 215WINDFARM 2 PODVLEJE

    MERDAN GLAVA AND POLJICE

  • 8/11/2019 BBI Profile Project

    331/490

  • 8/11/2019 BBI Profile Project

    332/490

  • 8/11/2019 BBI Profile Project

    333/490

  • 8/11/2019 BBI Profile Project

    334/490

    E 216CONSTRUCTION OF 15 SHPP

    ON NERETVICA RIVER

  • 8/11/2019 BBI Profile Project

    335/490

  • 8/11/2019 BBI Profile Project

    336/490

    total: 517 MW, 1 693 GWh

    Structure of sales(2008, 2009)

    Total sales:2008. 445.031.515

    Structure of sales

    Direct consumers 5,5 %

    Distribution ( tariff)consumers 56,0 %Export + other 38,5 %

    Production andsale by products

    Production of electric energy in 2009.: 6 927 GWhSales of electric energy in 2009.: 6 661 GWh

    Employeesstructure

    Total 4975 employees : Direction 326 Production 1774; Distribucion and sales 2.875Structure of employees:

    Dr. M.Sc. VSS VS VKV SSS KV PK NK

    0,14% 0,82% 12,99% 3,85% 30,66% 25,27% 17,79% 2,27% 3,21%

    Employment Trend 2008. : 49662009. : 4975

    Buyers The company supplies energy for 688,514 domestic consumersTariff costumers : 4 095 GWhCountries of Southeast Europe: 2 566 GWh

    Financial data Income statement

    2009. 2008.

    Income 458.362.933 445.031.515

    Cost of sales 435.723.921 427.391.403

    Profit 22.639.012 17.640.112

    Operating expenses 673.850 241.768

    Profit from operatingactivities

    21.965.162 17.398.344

    Depreciation 72.876.166 71.413.191

    Taxes

    Nett profit 31.650.666 23.641.527

  • 8/11/2019 BBI Profile Project

    337/490

  • 8/11/2019 BBI Profile Project

    338/490

    E 217SMALL HYDRO POWER PLANTS

    ENERGONOVA SarajevoSmall Hydro Power Plants

  • 8/11/2019 BBI Profile Project

    339/490

  • 8/11/2019 BBI Profile Project

    340/490

  • 8/11/2019 BBI Profile Project

    341/490

  • 8/11/2019 BBI Profile Project

    342/490

    Customers Energy: Public distribution networkcompany Engineering service: domestic andforeign investors

    Contact: Zmaja od Bosne 44, 71000 Sarajevo,B&H 00387 33 657 205

    00387 33 657 206 [email protected]/intrade-energija

  • 8/11/2019 BBI Profile Project

    343/490

    E 219HIDRO POWER PLANTS ON RIVERS

    KRIVAJA, SANA AND DRENICA

  • 8/11/2019 BBI Profile Project

    344/490

  • 8/11/2019 BBI Profile Project

    345/490

  • 8/11/2019 BBI Profile Project

    346/490

  • 8/11/2019 BBI Profile Project

    347/490

    E 221CONSTRUCTION OF BANOVICI THERMAL

    POWER PLANT 300 MW/350MVA

  • 8/11/2019 BBI Profile Project

    348/490

  • 8/11/2019 BBI Profile Project

    349/490

  • 8/11/2019 BBI Profile Project

    350/490

    E 222PROJECT PROPOSAL

    FOR COAL MINE

  • 8/11/2019 BBI Profile Project

    351/490

  • 8/11/2019 BBI Profile Project

    352/490

  • 8/11/2019 BBI Profile Project

    353/490

    PROJECT PROFILE HK Tuzla

    Investment opportunity Increase profit in existing Power plantsIndustry sector Electrical Power plants / producing electrical energyLocation Sarajevo TuzlaInvestment opportunity objective To build new line for better cooling of water in cooling towers. Our

    company has developed algorithm and Beta system for cooling waterin power plants.

    Profit: We expect profit from the lower price of produced electricalenergy.

    Employment: Installation and adjustment of this line would employ 5workers in one shift. Time for installation depends on how big Power

    plant is.

    Installations in the area of southern Europe, North Africa and MiddleEast. (Higher temperature - better area for this application).

    Indication of returns

    The price for ( source: 22.03.2010.StockExchange for CentralEurope ) than for one year it could increase profit of power plant for

    Expected investment budget

    Expected collaborationWe expect cooperation with the new partner in the area ofaccess to world market and distributors channel.We are joint-venture share capital

    Company info Nature of business,Established: 2006,Location

    o Address: Tvornicka 3o City: Sarajevoo Country: Bosnia and Herzegovinao Phone: +387 33 768 000o Fax: : +387 33 768 001o e-mail: [email protected]

    o ManagementDirector Technical DirectorDirector of Developer DepartmentHelp-deskSupport Finance

    Facilities possessedo None

    Structure of capitalo 100% Bosnia share private capital,

    Basic financial information:o o

    Number of employeeso 24

    Strengths and Opportunitieso

    Factory premises Tvornicka 3, Sarajevo, 350m2, 6 rooms.Manufacturing departments Department for software developer

    Department for hardware developerDepartment for Energy Efficiency

    Portfolio of products TI-SR o The encoder is based on the Fujitsu MB86391 MPEG-

    2 system module. This is a dedicated DSP for real-timevideo compression. Encoder board contains thenecessary peripherals, namely, SDRAMs, audio and

    video codec as well as the power supply (3.3 and 1.8V).A

  • 8/11/2019 BBI Profile Project

    354/490

    TEAM WORKo Based on decades of experience and engagements

    with a wide range of companies, Teleinformatica TEAMworks with customers on a local or global basis to planand control energy use through an ongoing, strategicenergy efficiency program.

    TI-100 PABX and Contact Center Solutiono VoIP PABX

    HOTEL nPlay SYSTEMo Cost-Effective Hotel Telephony, Internet, TV Solution,

    Smart Room and ERP SolutionTI-CADS

    o Content Acquisition and Distribution SystemTI-LOGS

    o The Logistic Operations Support SystemTI-LUX

    o Energy efficiency of public lightingStructure of sales (2008, 2009)

    Structure / Domestic and foreign marketProduction and sale by products TI-SR 6 systems

    TEAM WORK 2 systemsTI-100 PABX 12 PcsHOTEL nPlay SYSTEM 2 systems

    TI-CADSTI-LOGSTI-LUX 1 systems

    Employees structure Number of employees: 26 Age structure: 30Workforce trend

    o 2008: 23o 2009: 26

    Customers2008 2009

    Sales 584.860,00 580.443,00 Cost of goods sold 0,00 561,498,00 Gross profit 584.860,00 18.945,00 Operating costs 559.676,00 5.191,00 Depretiation 11.074,00 5.242,00

    Taxes 1.411,00 1.143,00 Net profit 12.699,00 17.369,00 Fixed assets 49.422,00 46.291,00 Cash 2.843,00 4.481,00 Invertory 63.432,00 66.391,00

    Accounts receivables 83.299,00 96.028,00 Other current assets 17.826,00 244.625,00 Total assets 216.822,00 457.816,00 Total capital 51.953,00 52.281,00 Long term liabilities 5.497,00 2.010,00 Short term liabilities 159.372,00 403.525,00

    Financial data

    Total liabilities and capital 216.822,00 457.816,00 Contact: Aida Buljubasic +387 61 925 532

    Jasenko Sehanovic +387 61 103 444Sarajevo, Bosnia and HerzegovinaFax: +387 35 921 [email protected]

    Others List all information that potential investor could be interested in

  • 8/11/2019 BBI Profile Project

    355/490

    E 224TRANSMISSION GAS PIPELINE

    BOSANSKI BROD ZENICA

    ZENICAKLAD

    A

    JAVOR

    DERVENTA

    BOS. BROD

    DOBOJ

    MAGLAJ

    ZAVIDOVICI

    GRADACAC

    A BOS. SA

    MOD

    ZIVINICE

    NIK

    GRAC

    LUKAVAC

    ZEPCE

    TESANJ

    PTG1

    PGG1

    ZENICAKLAD

    A

    JAVOR

    DERVENTA

    BOS. BROD

    DOBOJ

    MAGLAJ

    ZAVIDOVICI

    GRADACAC

    A BOS. SA

    MOD

    ZIVINICE

    NIK

    GRAC

    LUKAVAC

    ZEPCE

    TESANJ

    PTG1

    PGG1

    HIGH-PRESSURE GAS PIPELINES PROJECTS

  • 8/11/2019 BBI Profile Project

    356/490

  • 8/11/2019 BBI Profile Project

    357/490

    E 225GASIFICATION OF

    UNA SANA CANTON

    BOS. NOVI

    VEL. KLADUSA

    CAZIN

    BIHAC

    BOS. PETROVAC

    BOS. DUBICA

    JASEN

    PRIJEDOR

    SANSKI MOS

    KLJUC

    TR.RASTELA BOS. KRUPA

    PTG4

    PGG4

    BOS. NOVI

    VEL. KLADUSA

    CAZIN

    BIHAC

    BOS. PETROVAC

    BOS. DUBICA

    JASEN

    PRIJEDOR

    SANSKI MOS

    KLJUC

    TR.RASTELA BOS. KRUPA

    PTG4

    PGG4

    HIGH-PRESSURE GAS PIPELINES PROJECTS

  • 8/11/2019 BBI Profile Project

    358/490

  • 8/11/2019 BBI Profile Project

    359/490

    E 226TRANSMISSION GAS PIPELINE

    SARAJEVO MOSTAR PLOCE

    MOSTAR

    JABLANICAKONJIC

    ILIJAS

    PLOCECAPLJINA

    PTG2 PGG2

    MOSTAR

    JABLANICAKONJIC

    ILIJAS

    PLOCECAPLJINA

    PTG2 PGG2

    HIGH-PRESSURE GAS PIPELINES PROJECTS

  • 8/11/2019 BBI Profile Project

    360/490

  • 8/11/2019 BBI Profile Project

    361/490

  • 8/11/2019 BBI Profile Project

    362/490

  • 8/11/2019 BBI Profile Project

    363/490

    E 228NATURAL GAS INTRODUCTION IN

    TPP KAKANJ

    HIGH-PRESSURE GAS PIPELINES PROJECTS

  • 8/11/2019 BBI Profile Project

    364/490

  • 8/11/2019 BBI Profile Project

    365/490

    E 229UNDERGROUNG GAS STORAGE

    IN SALT MINE TETIMA

    ZVORNIK

    DANJ

    SEKOVICI

    OLOVO

    TUZLA

    E

    VLASENICA

    SEPAK

    PTGS6

    ZVORNIK

    DANJ

    SEKOVICI

    OLOVO

    TUZLA

    E

    VLASENICA

    SEPAK

    PTGS6

    HIGH-PRESSURE GAS PIPELINES PROJECTS

  • 8/11/2019 BBI Profile Project

    366/490

  • 8/11/2019 BBI Profile Project

    367/490

    E 230ZENICA CITY GASIFICATION

    PROPOSED BY ZENICA MUNICIPALITY

  • 8/11/2019 BBI Profile Project

    368/490

  • 8/11/2019 BBI Profile Project

    369/490

  • 8/11/2019 BBI Profile Project

    370/490

  • 8/11/2019 BBI Profile Project

    371/490

  • 8/11/2019 BBI Profile Project

    372/490

  • 8/11/2019 BBI Profile Project

    373/490

  • 8/11/2019 BBI Profile Project

    374/490

  • 8/11/2019 BBI Profile Project

    375/490

  • 8/11/2019 BBI Profile Project

    376/490

  • 8/11/2019 BBI Profile Project

    377/490

    E 233PROJECT TECHNOLOGY

    FOR MAKING WATER USING SUN ENERGY

  • 8/11/2019 BBI Profile Project

    378/490

  • 8/11/2019 BBI Profile Project

    379/490

    E 234PRODUCTION OF THE PROTOTYPE FOR

    THERMO GRAVITY POWER PLANT OF THETHIRD GENERATION

  • 8/11/2019 BBI Profile Project

    380/490

  • 8/11/2019 BBI Profile Project

    381/490

  • 8/11/2019 BBI Profile Project

    382/490

    E 235NEW LINE FOR PRODUCTION OF SYSTEM

    INTELLIGENT STREET LIGHTING

  • 8/11/2019 BBI Profile Project

    383/490

    PROJECT PROFILE HK Tuzla

    Investment opportunity Project: Intelligent street lightingCompany to expand businessIndustry sector Street LightingLocation Investment opportunity objective To build new line for production of system for Intelligent Street

    Lighting. Our company has developer Beta-Production version

    Profit: We expect profit from the sale this devices.

    Employment: The new production line would employ 3 workers.Production capacity depends on the size of the production line.

    Exports: in the area of Europe, Asia and Africa.Indication of returns

    Expected investment budget

    Expected collaborationWe expect cooperation with the new pertner in the area offaccess to world market and distribution channels,We are joint-venture share capitalThe market for intelligent streetlighting is huge. Based on theexisting installations within Europe, the project have

    retrofit old installations with electricity represents as much as 63.7 % of present annualconsumption for streetlighting purposes within thecommunity. Based on the estimates we discussed the totalenergy consumption for street and highway lighting in Europecan be calculated as follows:

    hours per year:59.760.000.000.000 Watt hours = 59,760 TWh per Year

    Company info Nature of busniess, Location

    o Address: Tvornicka 3o City: Sarajevoo Country: Bosnia and Herzegovinao o o e-mail: [email protected]

    o ManagementDirector Technical DirectorDirector of Developer Department

    Help-deskSupport Finance

    Facilities possessedo None

    Structure of capitalo

    Basic financial information:o o

    Number of employeeso

    Factory premises Manufacturing departments Department for software developer

    Department for hardware developerDepartment for Energy Efficiency

    Portfoilio of products TI-SR o

  • 8/11/2019 BBI Profile Project

    384/490

  • 8/11/2019 BBI Profile Project

    385/490

  • 8/11/2019 BBI Profile Project

    386/490

  • 8/11/2019 BBI Profile Project

    387/490

    E 237 ECO PURITYVUKOSAVLJE

  • 8/11/2019 BBI Profile Project

    388/490

  • 8/11/2019 BBI Profile Project

    389/490

  • 8/11/2019 BBI Profile Project

    390/490

    E 238RENEWABLE GREEN ENERGY SYSTEM

    WASTE TIRES RECYCLING

    SGI d.o.o.

  • 8/11/2019 BBI Profile Project

    391/490

  • 8/11/2019 BBI Profile Project

    392/490

  • 8/11/2019 BBI Profile Project

    393/490

  • 8/11/2019 BBI Profile Project

    394/490

  • 8/11/2019 BBI Profile Project

    395/490

  • 8/11/2019 BBI Profile Project

    396/490

    E 240PRODUCTION OF FERROSILICON AND

    SI METAL IN JAJCE

  • 8/11/2019 BBI Profile Project

    397/490

  • 8/11/2019 BBI Profile Project

    398/490

  • 8/11/2019 BBI Profile Project

    399/490

  • 8/11/2019 BBI Profile Project

    400/490

  • 8/11/2019 BBI Profile Project

    401/490

  • 8/11/2019 BBI Profile Project

    402/490

  • 8/11/2019 BBI Profile Project

    403/490

  • 8/11/2019 BBI Profile Project

    404/490

  • 8/11/2019 BBI Profile Project

    405/490

  • 8/11/2019 BBI Profile Project

    406/490

    I 103NEW BISINESS CENTER

  • 8/11/2019 BBI Profile Project

    407/490

  • 8/11/2019 BBI Profile Project

    408/490

  • 8/11/2019 BBI Profile Project

    409/490

    I 104BUSINESS AND

    ENTERTAINMENT CENTER

  • 8/11/2019 BBI Profile Project

    410/490

  • 8/11/2019 BBI Profile Project

    411/490

  • 8/11/2019 BBI Profile Project

    412/490

    I 105THE TRAFFIC BUSINESS CENTER

  • 8/11/2019 BBI Profile Project

    413/490

  • 8/11/2019 BBI Profile Project

    414/490

  • 8/11/2019 BBI Profile Project

    415/490

  • 8/11/2019 BBI Profile Project

    416/490

    I 106WASTEWATER COLLECTION AND TREATMENT

    PROJECT OF BIHA MUNICIPALITY

  • 8/11/2019 BBI Profile Project

    417/490

  • 8/11/2019 BBI Profile Project

    418/490

  • 8/11/2019 BBI Profile Project

    419/490

    I 107PRODUCTION OF THE HIGH QUALITY STONE

    MATERIAL FOR RAILWAYS ANDROAD CONSTRUCTION

  • 8/11/2019 BBI Profile Project

    420/490

  • 8/11/2019 BBI Profile Project

    421/490

  • 8/11/2019 BBI Profile Project

    422/490

    I 108PROJECT ON WATER SUPPLY OF SOUTH

    AREA OF GRADACAC MUNICIPALITY OFF THEDOMAZIC SPRING

  • 8/11/2019 BBI Profile Project

    423/490

  • 8/11/2019 BBI Profile Project

    424/490

  • 8/11/2019 BBI Profile Project

    425/490

    I 109MULTIPLEKS CITY OTOKA MEANDER,

    SARAJEVO

  • 8/11/2019 BBI Profile Project

    426/490

  • 8/11/2019 BBI Profile Project

    427/490

    I 110MEDIA BUSINESS CENTRE MBS

  • 8/11/2019 BBI Profile Project

    428/490

  • 8/11/2019 BBI Profile Project

    429/490

  • 8/11/2019 BBI Profile Project

    430/490

    I 111MULTIFUNCTIONAL STATION COMPLEX

  • 8/11/2019 BBI Profile Project

    431/490

  • 8/11/2019 BBI Profile Project

    432/490

    I 112ELECTRIFICATION AND

    MODERNIZATION OF RAILWAY

  • 8/11/2019 BBI Profile Project

    433/490

  • 8/11/2019 BBI Profile Project

    434/490

    I 113TRANSFERABLE FIBER OPTICAL AND

    TRANSMISSION SYSTEMS ANDTELECOMUNNICATION KNOTS

  • 8/11/2019 BBI Profile Project

    435/490

  • 8/11/2019 BBI Profile Project

    436/490

    I 114SAFETY OF TRAVEL INTERSECTION IN LEVEL

  • 8/11/2019 BBI Profile Project

    437/490

  • 8/11/2019 BBI Profile Project

    438/490

    I 115AERO COMPOSITE DESIGN CENTER

  • 8/11/2019 BBI Profile Project

    439/490

  • 8/11/2019 BBI Profile Project

    440/490

  • 8/11/2019 BBI Profile Project

    441/490

  • 8/11/2019 BBI Profile Project

    442/490

  • 8/11/2019 BBI Profile Project

    443/490

  • 8/11/2019 BBI Profile Project

    444/490

    I 117NOISE PROTECTION IN URBAN AREAS AND

    ALONG ROADS

    Slide

    5

  • 8/11/2019 BBI Profile Project

    445/490

  • 8/11/2019 BBI Profile Project

    446/490

  • 8/11/2019 BBI Profile Project

    447/490

  • 8/11/2019 BBI Profile Project

    448/490

    I 118LOGISTIC CENTER BALKAN

    INDUSTRIAL BUSINESS CENTER VOGOA,SARAJEVO

  • 8/11/2019 BBI Profile Project

    449/490

  • 8/11/2019 BBI Profile Project

    450/490

    I 119CONSTRUCTION AND RENT OF THE

    BUSINESS CITY

  • 8/11/2019 BBI Profile Project

    451/490

  • 8/11/2019 BBI Profile Project

    452/490

  • 8/11/2019 BBI Profile Project

    453/490

    I 120RESIDENTIAL AND BUSINESS FACILITIES IN

    THE CENTER OF CITY

    Joint Venture investment opportuni es in

    the constru industry

  • 8/11/2019 BBI Profile Project

    454/490

  • 8/11/2019 BBI Profile Project

    455/490

  • 8/11/2019 BBI Profile Project

    456/490

  • 8/11/2019 BBI Profile Project

    457/490

  • 8/11/2019 BBI Profile Project

    458/490

  • 8/11/2019 BBI Profile Project

    459/490

    I 122TRADING CENTER VMC

  • 8/11/2019 BBI Profile Project

    460/490

  • 8/11/2019 BBI Profile Project

    461/490

  • 8/11/2019 BBI Profile Project

    462/490

  • 8/11/2019 BBI Profile Project

    463/490

  • 8/11/2019 BBI Profile Project

    464/490

  • 8/11/2019 BBI Profile Project

    465/490

  • 8/11/2019 BBI Profile Project

    466/490

  • 8/11/2019 BBI Profile Project

    467/490

  • 8/11/2019 BBI Profile Project

    468/490

  • 8/11/2019 BBI Profile Project

    469/490

  • 8/11/2019 BBI Profile Project

    470/490

  • 8/11/2019 BBI Profile Project

    471/490

  • 8/11/2019 BBI Profile Project

    472/490

  • 8/11/2019 BBI Profile Project

    473/490

  • 8/11/2019 BBI Profile Project

    474/490

  • 8/11/2019 BBI Profile Project

    475/490

    PROJECT PROFILE HK Tuzla

    Investment opportunity Project: WEB TVCompany to expand businessIndustry sector CommunicationLocation SarajevoInvestment opportunity objective To build WEB TV a network in the world.

    Profit: We expect profit from the rental software for WEB TV.

    Employment: 1 technical per location + 4 engineers in Head-endcentre.

    Exports: in the country where over 30,000 Bosnia diasporas.Indication of returns 1.500.000 Bosnian diasporas in the world.

    Set BH TV channels 8,00 USD per month.

    Expected investment budget Rental rack space per each location per month: 500,00 USD

    Expected collaborationWe expect cooperation with the new partner in the area offaccess to world market and distribution channels,We are joint-venture share capital

    Company info Nature of business,Established: 2006,Location

    o Address: Tvornicka 3o City: Sarajevoo Country: Bosnia and Herzegovinao Phone: +387 33 768 000o Fax: : +387 33 768 001o e-mail: [email protected]

    o ManagementDirector Technical DirectorDirector of Developer DepartmentHelp-deskSupport Finance

    Facilities possessedo None

    Structure of capitalo 100% Bosnia share private capital,

    Basic financial information:o o

    Number of employeeso 24

    Strengths and Opportunitieso

    Factory premises Tvornicka 3, Sarajevo, 350m2, 5 offices, 1 server room.Manufacturing departments Department for software developer

    Department for hardware developerDepartment for Energy Efficiency

    Portfolio of products TI-SR o The encoder is based on the Fujitsu MB86391

    MPEG-2 system module. This is a dedicated DSPfor real-time video compression. Encoder boardcontains the necessary peripherals, namely,SDRAMs, audio and video codec as well as the

    power supply (3.3 and 1.8 V).ATEAM WORK

    o Based on decades of experience andengagements with a wide range ofcompanies,Teleinformatica TEAM works withcustomers on a local or global basis to plan and

  • 8/11/2019 BBI Profile Project

    476/490

    control energy use through an ongoing, s trategicenergy efficiency program.

    TI-100 PABX and Contact Center Solutiono VoIP PABX

    HOTEL nPlay SYSTEMo Cost-Effective Hotel Telephony, Internet, TV

    Solution, Smart Room and ERP SolutionTI-CADS

    o Content Acquisition and Distribution SystemWEB-TV

    o TV over Public InternetTI-LOGS

    o The Logistic Operations Support SystemTI-LUX

    o Energy efficiency of public lightingStructure of sales (2008, 2009)

    Structure / Domestic and foreign marketProduction and sale by products TI-SR 6 systems

    TEAM WORK 2 systemsTI-100 PABX 12 PcsHOTEL nPlay SYSTEM 2 systemsTI-CADSWEB-TV

    TI-LOGSTI-LUX 1 systems

    Employees structure Number of employees: 26 Age structure: 30Workforce trend

    o 2008: 23o 2009: 26

    Customers2008 2009

    Sales 584.860,00 580.443,00 Cost of goods sold 0,00 561,498,00 Gross profit 584.860,00 18.945,00 Operating costs 559.676,00 5.191,00 Depretiation 11.074,00 5.242,00 Taxes 1.411,00 1.143,00

    Net profit 12.699,00 17.369,00 Fixed assets 49.422,00 46.291,00 Cash 2.843,00 4.481,00 Invertory 63.432,00 66.391,00

    Accounts receivables 83.299,00 96.028,00 Other current assets 17.826,00 244.625,00 Total assets 216.822,00 457.816,00 Total capital 51.953,00 52.281,00 Long term liabilities 5.497,00 2.010,00 Short term liabilities 159.372,00 403.525,00

    Financial data

    Total liabilities and capital 216.822,00 457.816,00 Contact: Aida Buljubasic +387 61 925 532

    Jasenko Sehanovic - +387 61 103 444Sarajevo,Bosnia and HerzegovinaFax: +387 35 921 888

    [email protected] List all information that potential investor could be interested in

  • 8/11/2019 BBI Profile Project

    477/490

  • 8/11/2019 BBI Profile Project

    478/490

  • 8/11/2019 BBI Profile Project

    479/490

  • 8/11/2019 BBI Profile Project

    480/490

    I 129ADDITIONAL SCOUP OF TESTING LABORATORYIN ENERGY EFFICIENCY AND TESTING ELECTRO

    EQUIPMENTS AND HOUSING EQUIPMENTS

  • 8/11/2019 BBI Profile Project

    481/490

  • 8/11/2019 BBI Profile Project

    482/490

  • 8/11/2019 BBI Profile Project

    483/490

    I 130BUILDING OF RESIDENTIAL AND BUSINESS

    SETTLEMENT NOVA VOGOA

  • 8/11/2019 BBI Profile Project

    484/490

  • 8/11/2019 BBI Profile Project

    485/490

  • 8/11/2019 BBI Profile Project

    486/490

    I 131WIGWAM LIKE WOODEN HOUSES AND

    PASSIVE PREFABRICATED WOODENBUILDINGS

  • 8/11/2019 BBI Profile Project

    487/490

  • 8/11/2019 BBI Profile Project

    488/490

    I 132AIRABA TELECOMMUNICATIONS AND

    ABA TEL TELECOMMUNICATIONSEXPANDING TO THE BALKAN REGION

  • 8/11/2019 BBI Profile Project

    489/490

  • 8/11/2019 BBI Profile Project

    490/490