38 DONGYANG STRUCTURAL ENGINEERS GROUP
04 BIM Project in Korea
KOREA _ Asiana Hangar • Size : 5F, B1
• Gross Area : 27,443m²
• Architect : Keunjeong Architects
2 0 1 4 Dong Yang Structural Engineers Group
• Constructing Simulation
2 0 1 4 Dong Yang Structural Engineers Group
Top Rail
Hangar Door Hangar Door : Heavy Equipment Simulation
Pre - Construction
2 0 1 4 Dong Yang Structural Engineers Group
42 DONGYANG STRUCTURAL ENGINEERS GROUP
43 DONGYANG STRUCTURAL ENGINEERS GROUP
04 BIM Project in Korea
Pusan Haeundae Resort - Land Mark Tower
Size : 84F, B5
Gross Area : 660,077㎡
Architect : Samoo
44 DONGYANG STRUCTURAL ENGINEERS GROUP
Pusan Haeundae Resort Land Mark Tower
– Belt Wall Proposal
• SRC System
• Steel System
• RC System
45 DONGYANG STRUCTURAL ENGINEERS GROUP
04 BIM Project in Korea
D- Tower – Reinforced Concrete Rebar Model
Size : 24F & 2 Tower, B8
Gross Area : 1,053,939㎡
Architect : Samoo
46 DONGYANG STRUCTURAL ENGINEERS GROUP
Revit Basic Model
Alplan Re-bar Model
D- Tower – Reinforced Concrete Rebar Model
47 DONGYANG STRUCTURAL ENGINEERS GROUP
04 BIM Project in Korea
F K I – the Federation of Korean Industries Tower
Size : 50F, B6
Gross Area : 170,104㎡
Architect : ASGGE, Changjo
2 0 1 4 Dong Yang Structural Engineers Group
First Phase Model
2 0 1 4 Dong Yang Structural Engineers Group
FKI – the Federation of Korean Industries : Podium
Create vertical planes from
architectural division Vertical planes and new free surface i
ntersection
2 0 1 4 Dong Yang Structural Engineers Group
is the first non-rotated rib 15
0
4
8 11 14
Study Construction from Various Rib - Plan
2 0 1 4 Dong Yang Structural Engineers Group
Analysis - Robot
Revit Structure
BIM Model & Analysis Model
2 0 1 4 Dong Yang Structural Engineers Group
53 DONGYANG STRUCTURAL ENGINEERS GROUP
04 BIM Project in Korea
• Size : 3F, B1
• Gross Area : 3,688m²
• Architect : Asymptote
Ega Architects
The Arc
2 0 1 4 Dong Yang Structural Engineers Group
First Phase (Concept + SD)
– Rhino + Grasshopper & 2D CAD
2 0 1 4 Dong Yang Structural Engineers Group
Second Phase (DD+CD)
– Revit Structural
2 0 1 4 Dong Yang Structural Engineers Group
Analysis
MIDAS
Robot
SCIA
Transformation - Analysis
2 0 1 4 Dong Yang Structural Engineers Group
Construction Phase
– Tekla Structure & CATIA
Detailing
Advance Steel
Tekla
CATIA
2 0 1 4 Dong Yang Structural Engineers Group
59 DONGYANG STRUCTURAL ENGINEERS GROUP
60 DONGYANG STRUCTURAL ENGINEERS GROUP
04 BIM Project in Korea
2015 Gwangju Summer Universiade Swimming Pool
Size : 3F, B1
Gross Area : 88,506㎡
Architect : UI Architecture, Pos A&C
2 0 1 4 Dong Yang Structural Engineers Group
Alt 1
Alt 2 Revit Model
First Phase (Concept + SD)
– Rhino + Grasshopper
2 0 1 4 Dong Yang Structural Engineers Group
Second Phase (DD+CD)
– Revit Structural
Before After
2 0 1 4 Dong Yang Structural Engineers Group
Construction Phase
– Tekla Structure
64 DONGYANG STRUCTURAL ENGINEERS GROUP
해외 BIM 프로젝트
05
65 DONGYANG STRUCTURAL ENGINEERS GROUP
05 BIM Project in Overseas
Size : 4F
Gross Area : 9,960㎡
Architect : Arup
Saudi Arabia - King Abdulla Sports City – Multi-Purpose Sports Hall
2 0 1 4 Dong Yang Structural Engineers Group
Second Phase (DD+CD)
– Revit Structural
2 0 1 4 Dong Yang Structural Engineers Group
Revit Quantity
2 0 1 4 Dong Yang Structural Engineers Group
Construction Phase
– Tekla Structure